Loading...
HomeMy WebLinkAboutExploration Location Plan - - Turnpike Street/Route 114 -------------------------------- ------------------------------------------- ---------- _-Zi---- ------------ ---- ------ ------- ---- ------------------ ------ --------- --------- no X0 Rik= W�m ------i------- ------------------- -------- - �227 �22 GEO-11:1 GEO-101 22 231— GEO-02-A GEO-110 GIEO�04( E GEO�01(W) GEO-02-C Proposed Building 11 TP-5 LOT C G�0-02 -112 GEO -02-D P GEO Q -1�, � I roposed Building 1 FFE 22,4' I 1 7 - FFE 228' TP-413 LOT C EN GEO-02-F" 000 TP-1 LOT C ------ EN GEO-O B I (P GEO-102 TP-4A LOT C 7------ GEO-1 % EN[ 09 P-A TP-3 LOT C 27, GEO-02-E Q GEO-TP-F-C Q GEO-TP-F-A Nqe0e JEG GEO-06-A GEO-1i3 ME[ e�f\e GEO-06-B-Offset PA Subsurface Infiltration System C 4V G EO-06-B MI �T, &-EN E�, _T "r �0�05 Bottom of System=El.212.5' GEO-iO3 GEO P-F-B TP-2 LOT C A �0436 G� �03 A G Me GEO-06'-C ------ abri HY Proposed Bu 1 2 1/e GEO- 108 .,,Sao FFE 220' SNWCUT "we N GEO-104 (TYP) GEO-06-D % I Q �&- - % **7� F 00-7\0 GEO-1-05 -010 227------I .......... N.a, Limit of Work G O� 7 HY G-1 E 0 0 9 Infiltration System A -106 GEO *7 Bottom of System El.223.6' Proposed Building 2 FFE 224' U_ -7;7 225 -A 224 J, fit --f ————-———-————— 010010 A G�O�08(W) 0100 40P 0100 < -107 f GEO 0 000 2V_ 0 000 _4 10 N_ 40 10 f to to to 10, too f 40 40 A- Am so f f Subsurface Infiltration System B LUI --------- Bottom of System El.217.0' TP-1 NORTH CAMPUS N� 011 Z LLI 0 Legend ———————— Limit of Work Exploration Location Plan Boring by GeoEngineers,January 2024 1Z GEO-101 = Source(s): 0 Proposed Building a) 0 Survey from Vanasse,Hangen,Brustlin,Inc.(VHB),received 8/30/2023 IL Delineation Boring by GeoEngineers, Soil Pre-Characterization Memorandum 0 Proposed site features from VHB,received 2/22/2024 Proposed Subsurface Infiltration System GEO-06-A January 2024 Corner Development at Merrimack College Q I < Projection:MA State Plane,Mainland Zone,NAD83,US Foot Boring by GeoEngineers,June 2023 Gl-&� North Andover,Massachusetts 'W'denotes Monitoring Well Installed 0 Disclaimer:This figure was created for a specific purpose and project.Any use ofthis figure for any other project or purpose shall be at the user's sole risk and without liability to GeoEngineers.The locations of __1% 0 r suitability of the figure,or data contained therein.The file containing this figure is a copy of o..n .1--lee Stormwater Test Pit by GeoEngineers,June 2023 0 60 features shown may be approximate.GeoEngineers makes no warranty or representation as to the accuracy, Ir Figure 2 S�L 1!5iW!!6iW!n Ge g r_S completeness,o a master document,the original of which is retained by GeoEngineers and is the official document of record. TP-1 LOT C* Test Pit by Others Feet Start End Total Logged By BD Drilling Drilled 1/31/2024 1/31/2024 Depth(ft) 10 Checked By ACB Driller G&M Subsurface Method Direct push Surface Elevation(ft) 216 Hammer NA Drilling Geoprobe 6712 Vertical Datum NAVD88 Data Equipment Easting(X) 756717.8 System MA State Plane North See"Remarks"section for groundwater observed Northing(Y) 3070085 Datum NAD83(feet) Soil samples were screened in the field for volatile organic compounds using a photoionization detector with 10.6eV lamp,calibrated to 100 ppmv isobutylene standard Notes: with a response factor of 1.0.Results reported in ppmv."ND"on readings below 1.0ppmv. FIELD DATA 4-1 4- � •C E o MATERIAL > 0 � DESCRIPTION (1)Q REMARKS O - O N U QQ i-- > > N U Q to > � aO-+ 0 p O �� M O s N CL w 00 U W F-- C� C�U cn => 0 43 S-1 ^^^^^^ ^^ TS Dark brown silty fine to medium sand with roots and ^^^^ ^A^^A^^A^^ ^ organic matter(moist)(topsoil) ^^^ SP-SM Brown fine to medium sand with silt and gravel(moist) (subsoil) SM Stratified orange,dark brown and gray silty fine to medium sand(moist) SP-SM Tan-gray fine to medium sand with silt; (moist to wet)(glacial till) Groundwater observed at approximately 4 feet bgs during drilling SP-SM Tan-gray fine sand with silt 5 (wet)(glacial till) ND 60 S-2 �y0 0 i z o ' z a i z w z 10 z Boring terminated at approximately 10feet,no refusal LUI encountered LO m J C.3 ZD H �I U- Q ZD O W J J m ❑ O O O O O O N H Z Not See Figure A-1 for explanation of symbols. Coordinates Data Source:Horizontal approximated based on the ground survey by VHB,Inc.dated June 8,2023(the Survey).Vertical approximated based on the Survey. 0 N Log of Boring GEa107 N Project: Merrimack College-Residential Project NGeo,Engninee r's USA It Project Location: North Andover, Massachusetts Figure A 17 ❑ Pro j ect Number: 20449-009-00 Sheet 1 of 1