Loading...
HomeMy WebLinkAboutRCG ZBA Meeting Presentation 4-29-26 (00314216xBC4F6) - Miscellaneous - 0 Prescott Street 4/29/2026 WE AN \ ISM o \\ \ \ �_ \\ N gBoardo Zonin f App eals ............... Vl etin ril 29 20 6 \g\017 a \-. Is \ \ \. \ \ _ N Agenda ■ Peer Review: Water ■ Peer Review: Sewer ■ Supplemental Traffic Studies ■ Site Visit ■ Questions z Peer Review: Water ■ Peer Review by Weston and Sampson issued on 4/23/26. ■ Conducted Hydrant Flow Tests and found water pressure adequate to support the new buildings. ■ Calculated estimated water demand for the proposed number and type of units and determined the existing water service infrastructure to be adequate. ■ Applicant will correct drawings on size of existing pipe and submit final engineered drawings prior to building permit. 4 Peer Review: Sewer ■ Peer Review by Woodard and Curran issued on 4/22/26 ■ Studied "downstream sewer capacities under both existing peak dry and wet weather flows and the addition of future flows from the planned development". ■ Found that the existing infrastructure has sufficient capacity to carry the additional flow from the proposed Project. 4 Supplemental Traffic Studies Transportation Peer Review Process Previously Submitted Documents F October 2025 — VAI Transportation Impact Assessment , December 2025 — VHB Traffic Peer Review #1 i ZBA Hearing — Traffic Presentation Submissions Since Last ZBA Traffic Hearing March 2026 — VAI Response to Traffic Peer Review Letter March 2026 — VHS Traffic Peer Review #2 April 2026 — VAI Response to Traffic Peer Review Letter April 2026 — VAI Parking Demand Study 49 Supplemental Traffic Studies Major Peer Review Items Expanded the study area to include the High Street/Elm Street/Water Street and Sutton Street/High Street/High Street intersections Included a review of traffic operations and motor vehicle crash data for the expanded intersection ompleted a traffic operations Sensiti�rity analysis for the study which assures a 0% additional increase in Project-related volumes beyond industry standard ITE, trip-generation estimates Affirmed the conclusions of the October 2025 that the Project does not result in significant impacts Completed Parking Demand Observations and Dill Complex Parking Study Sufficient parking will be afforded to accommodate the Project based on a review of parking demand observations obtained for the Dill Complex and estimates published by the ITE 6 Site Visit ■ Comments and Impressions from the ZBA site visit on 4/26/26. r/ d r f 1 // J u r ter, r r d 1 ,. Illlll/i ,,//,,, . , ✓/ r r, I / r f I / r � I r / l 1� XKIr1(1(,,,, llluli/i 1 n ��, OP �fr!/,iic, � /`G�/ .. �//.r, �// ;/,,/� i�fir✓ ,� l , of ;. ,✓ /„./ I r ,� r ., l lwyrK w, / H I r r f � r /G / If ir , ' r f v,ai ri S/HE, r� r 1, /: /i / Y ',JIrI�I ✓ I I / r l f ,f 1 ............... W WE AN ISM o \ 2-1 g-, Mal 0% Met 1 a r 0 IN \\ \\ \\ \ \ ON. \ \ \ \\\ MEMO \ a\\ \ \ \ \ \\\ \ \ \\UJA "al 'ho lgi v - y4 loll �gg ` \\