Agenda
■ Peer Review: Water
■ Peer Review: Sewer
■ Supplemental Traffic Studies
■ Site Visit
■ Questions
z
Peer Review: Water
■ Peer Review by Weston and Sampson issued on
4/23/26.
■ Conducted Hydrant Flow Tests and found water pressure
adequate to support the new buildings.
■ Calculated estimated water demand for the proposed
number and type of units and determined the existing
water service infrastructure to be adequate.
■ Applicant will correct drawings on size of existing
pipe and submit final engineered drawings prior to
building permit.
4
Peer Review: Sewer
■ Peer Review by Woodard and Curran issued on 4/22/26
■ Studied "downstream sewer capacities under both
existing peak dry and wet weather flows and the addition
of future flows from the planned development".
■ Found that the existing infrastructure has sufficient
capacity to carry the additional flow from the proposed
Project.
4
Supplemental Traffic Studies
Transportation Peer Review Process
Previously Submitted Documents
F October 2025 — VAI Transportation Impact Assessment
, December 2025 — VHB Traffic Peer Review #1
i ZBA Hearing — Traffic Presentation
Submissions Since Last ZBA Traffic Hearing
March 2026 — VAI Response to Traffic Peer Review Letter
March 2026 — VHS Traffic Peer Review #2
April 2026 — VAI Response to Traffic Peer Review Letter
April 2026 — VAI Parking Demand Study
49
Supplemental Traffic Studies
Major Peer Review Items
Expanded the study area to include the High Street/Elm Street/Water Street and
Sutton Street/High Street/High Street intersections
Included a review of traffic operations and motor vehicle crash data for the
expanded intersection
ompleted a traffic operations Sensiti�rity analysis for the study which assures
a 0% additional increase in Project-related volumes beyond industry standard
ITE, trip-generation estimates
Affirmed the conclusions of the October 2025 that the Project does not result in
significant impacts
Completed Parking Demand Observations and Dill Complex Parking Study
Sufficient parking will be afforded to accommodate the Project based on a review
of parking demand observations obtained for the Dill Complex and estimates
published by the ITE
6
Site Visit
■ Comments and Impressions from the ZBA site visit on
4/26/26.
r/ d
r
f
1 // J
u r ter, r r d
1 ,. Illlll/i ,,//,,, . , ✓/ r r,
I
/
r f
I /
r �
I r /
l
1� XKIr1(1(,,,, llluli/i
1 n ��,
OP
�fr!/,iic, � /`G�/ .. �//.r, �// ;/,,/� i�fir✓ ,� l ,
of ;. ,✓ /„./ I r ,� r ., l lwyrK w,
/ H I r r
f � r
/G
/
If
ir
,
' r f v,ai
ri S/HE,
r�
r 1, /: /i / Y ',JIrI�I ✓ I I
/ r l f
,f
1
...............
W
WE
AN
ISM o \
2-1
g-,
Mal 0%
Met
1
a
r
0 IN
\\ \\ \\
\ \ ON.
\ \ \ \\\
MEMO \ a\\
\ \ \ \ \\\
\ \
\\UJA
"al
'ho lgi
v - y4 loll �gg
` \\