2 Agenda QuestionsNotes on 2023 FloodingStormwater Design and Peer ReviewCivil Design and Peer Review
Civil Design and Peer Review underlying zones are additionally requested for clarity. utilizing the Subdistrict A Overlay zoning, waivers relative to discussion with the Building Commissioner.
While the Applicant is Proposed dimensional waivers have been revised after further path to Prescott Street.the plans based on Peer Review comments and elimination of the Site grading
and retaining walls have been added or removed from and code compliance. level of the garage and provide clarification of the parking counts Parking garage plans have been updated
to include layouts for each 3
Civil Design and Peer Review 4
Stormwater Design and Peer Review stormwater downstream.then flows into private culverts that channel the accumulated The existing swale ties into public infrastructure in High Street
which existing swale.oil/water separation systems and dump into a single outlet in the The Garage currently captures rain with roof drains that connect to surface (so not “clean”
runoff).This results in a Lot Coverage Ratio of 33%, all of which is a parking story concrete structure. -approximately 2.0 acres of land with a 2The current Garage was built in the
late 1980s and covers 5
6
Stormwater Design and Peer Review Applicant has updated submittals to reflect peer review comments.into existing public infrastructureProposed design redirects stormwater within the
site to reduce flows acres results in 1.4 acres of surface area converted to clean runoff.Reduction in the rooftop area of the garage from 2.0 acres to 0.6 the existing condition.Proposed
condition results in 34% lot coverage ratio, versus 33% in stormwater bylaw that are not deemed practical.current state standards. Waivers are requested from the local Proposed design
adds mitigation of stormwater to meet or exceed 7
8 Revised Grading and Drainage Plan
Notes on 2023 Flooding 9 condition, reducing the likelihood of flooding on High Street.Proposed design for Zero Prescott improves upon the existing Landlord has addressed. Historic
building layout trapped water and exacerbated damage which which have been improved. optimal outlet conditions, -Osgood Pond at highest level and with subhad previously unknown blockages
that have since been cleared. Town infrastructure was not designed for such intensity and additionally capacity in adjacent neighborhoods and wetlands.An unusually wet summer had saturated
the earth and reduced storm would be about 7.9 inches over 24 hours.year -Intensity of storm caused flooding throughout Town. Historic 100Street, which was overwhelmed from all directions:downhil
l through the subject site toward the existing infrastructure at High On August 8, 2023, 6.2 inches of rain fell in 6 hours. Water streamed
Overview of Watershed Source: APEX Cochichewick Brook Riverine Floodplain Management Study, June 202510
Questions?11