To: Jean Enright Date: May 19, 2026
Planning Director
Town of North Andover
Project #: 201270.000
120 Main Street
North Andover, MA 01845
From: Michael A. Santos, PE, PTOE Re: Proposed Residential Development
Vinod Kalikiri, PE, PTOE 0 Prescott Street
North Andover, Massachusetts
Traffic Peer Review #3
Overview
On behalf of the Town of North Andover, VHB has reviewed responses prepared by Vanasse & Associates, Inc. (VAI) in
letters dated April 13 and April 24, 2026 that address comments in initial December 26, 2025 peer review letter
and the follow-up peer review letter dated March 13, 2026.
The April 13, 2026 response letter addressed remaining comments in our follow-up peer review letter with the
exception of a parking study for the Mill Complex. The April 24, 2026 response letter includes a parking study.
Based on the review of the additional information, VHB has determined that all pending comments have been
satisfactorily addressed, and therefore the technical peer review is complete. The following bulleted items summarize
The comment numbers corresponds to the original VHB comments from the December 26, 2025 comment letter.
Comment 10: VHB requests that the Applicant provide a comparison of the driveway counts for the Avalon
residential development and the trip distribution patterns used in the TIA. This comparison
should be used to validate the north-south traffic split for the trip distribution pattern used in
the TIA.
Response Summary: The Applicant provide a comparison of the directional distribution of the turning movement
counts at the Avalon North Andover driveway and the trip distribution that was used to develop
travel patterns for the Project. The turning movement counts indicate that in the morning, 36
percent of the existing exiting traffic at the driveway travels north and 64 percent travels south.
In the evening, 38 percent of the entering traffic enters from the north and 62 percent enters
from the south. The trip distribution used in the October 2025 TIA assumed that 40 percent of
the Project traffic will be oriented to/from the north and 60 percent to/from the south.
The material provided by the Applicant confirms that the trip distribution patterns used in the
October 2025 TIA are consistent with observed traffic volumes at the Avalon North Andover
driveway.
No additional follow-up by VHB is necessary.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 2
Comment 16: VHB recommends that if signs and landscaping are installed within the sight triangles that they
are designed and maintained to not restrict lines of sight. Snow accumulations should be
removed where they may impede sight lines. The sight distance diagram should also show
desired and available lines of sight for ISD at the driveway and SSD at the crosswalk.
Response Summary: The Applicant provided the requested sight distance diagrams for ISD at the driveway and SSD
at the crosswalk. The diagrams indicate that the available ISD at the intersection exceeds the
desirable distance when looking to the north on High Street. The diagrams show that the
available ISD to the south meets the required minimum distance. The diagrams also show that
the required SSD is provided for vehicles approaching the crosswalk.
No additional follow-up by VHB is necessary. VHB notes that the required sight distances
are provided at the intersection. The recommended ISD for vehicles exiting the driveway
looking south on High Street is limited by an existing building. The exhibit prepared by the
that the recommended ISD can be satisfied when vehicles
pull up closer to the edge of the roadway rather than 14.5 feet behind the curb line.
Comment 24: VHB recommends that the Applicant conduct a post-occupancy monitoring study to review
operations at the westernmost on-site driveway that intersects the north side of the East Mill
driveway to determine if there are issues related to vehicles entering the driveway. Monitoring
should be conducted upon 75 percent occupancy of the Project. Specifically, queues should be
monitored to determine if there are impacts to the intersection of High Street at the East Mill
driveway and at the westernmost on-site driveway. If the monitoring study finds that vehicles
entering the westerly driveway have impacts to High Street, additional measures should be
undertaken at the driveway. Specifically, restrictions to entering vehicles at the westerly driveway
should be considered. The post-occupancy monitoring study should be conducted in
consultation with the Town of North Andover Engineering and Planning Departments.
Response Summary: The Applicant noted that they are willing to accept the condition of a post-occupancy
monitoring study with the stipulation that any follow-up actions are limited to signage,
pavement markings, and turn restrictions.
No additional follow-up is necessary. VHB recommends that the scope of the post-
Engineering departments.
Comment 30: VHB requests clarification on whether the Applicant plans to equip any parking spaces with EV
equipment. The Applicant should discuss with the town as to whether EV charging stations
should be provided at this time to meet the demands of the future residents.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 3
Response Summary: The Applicant noted that they will discuss the EV accommodations with Town staff. They noted
that the installation of EV spaces will be consistent with past practices in other areas of East and
West Mill and will activate the EV-ready spaces based on marked demand.
No additional follow-up by VHB is necessary.
Comment 31: VHB requests that the Applicant confirm the vehicle movements on the turning templates are for
the largest emergency vehicle for the Town of North Andover. The Applicant should also confirm
if the diagrams have been reviewed and approved by the Town of North Andover Fire
Department.
Response Summary: The Applicant noted that the Fire Department reviewed the swept path analysis for emergency
vehicles. The Fire Department noted that the grades on roads connecting the lower parking area
to the upper parking area cannot exceed 10 percent. The Applicant noted that the final civil
plans will comply with this request.
No additional follow-up is necessary. The final plans should comply with the Fire
the parking areas.
The following comment was not included in the initial peer review letter, but should be addressed by the
Applicant:
Comment 32: VHB recommends that the Applicant conduct a post-construction traffic monitoring study upon
75 percent occupancy of the Project. The traffic monitoring study should collect new traffic
counts at the three site driveways that intersect the East Mill driveway and at the intersection of
High Street/East Mill driveway. The study should evaluate the following items:
Conduct parking utilization counts within the Mill Complex and compare to the results
of the parking study that the Applicant noted that they will prepare as a follow-up to
their response letter
Evaluate queues and traffic volumes along the East Mill driveway to determine if there
are any impacts within the East Mill complex and along High Street, as noted in the
response summary for Comment 24.
Compare observed traffic volumes with the future traffic volumes projected in the TIAS.
Determine if there are any operational or safety issues at the site driveway, specifically
for vehicles entering and exiting the Project and any blockages for through traffic along
High Street and the East Mill driveway.
The study should be submitted to and reviewed by appropriate Town staff and should propose
specific improvements if any operational or safety issues are identified.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 4
Response Summary: The Applicant noted that they are willing to accept the condition of a traffic and monitoring
study.
No additional follow-up by VHB is necessary. As noted in Comment 24, VHB recommends
that the scope of the post-occupancy monitoring study be developed in consultation with
The following two additional comments were made by Board members at the January 20, 2026 Zoning Board
of Appeals (ZBA) hearing.
ZBA Comment 1: The intersection \[of Sutton Street at High Street\] was discussed by both the ZBA and during
the public comment as being a critical intersection close to the project site. The Applicant
had noted at the hearing that recent existing traffic data for the intersection may be
available from another studyit is recommended
that the Applicant use available record traffic data for the intersection to perform capacity
analysis as well as a crash data review. Any potential improvement needs could be
identified for the Townfuture consideration.
Response Summary: The Applicant conducted new traffic counts at this intersection in March 2026. Evaluations of
traffic operations and motor vehicle crashes at the intersection were provided in the April 13,
2026 response letter.
The motor vehicle crash history does not indicate any identifiable patterns in the crash
occurrences at the intersection. The operations analysis was conducted for both the morning and
evening peak hour periods for the Existing, No-Build, and Build conditions. The operations
analysis showed that the High Street northbound approach at the intersection currently operates
over capacity during the weekday evening peak hour and operates at LOS F during bothpeak
hours.
The Applicant provided traffic volume networks that indicate the Project could add
approximately 22 to 23 new trips to the intersection during the peak hours. The analysis shows
that this level of traffic increase could result in queue increases of 1 to 2 vehicles along the High
Street northbound approach during the peak hours.
VHB reviewed the traffic and safety evaluations, analysis tables, and technical
documentation related to the analysis at the intersection of Sutton Road at High Street.
VHB acknowledges that the High Street approach to Sutton Street is currently operating at
or over capacity and that some of the Project-related trips will travel through this
intersection.
Should the Town seek to implement potential future improvements at this intersection, it is
recommended that an initial planning study be conducted to identify any existing
operational, geometric, and safety deficiencies and develop potential improvement
strategies.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 5
The following comments are related to the requested parking study.
Comments 12, 13, 14, 23, and 29 in the December 26, 2025 peer review letter were related to existing parking
occupancy and supply in proximity to the Project site and estimated parking demand for the Project. Those comments
requested that a parking study be conducted to identify the existing parking usage within the Mill Complex and on
the surrounding roadways and to develop future parking demand estimates for the Project. The intent of the
comments in our December 26, 2025 peer review letter was to gain an understanding the existing parking demand
and to determine if the Project would have any impacts to the future parking supply. The following summarizes the
parking study and provides VHBs comments for each component of that study.
Summary: The Applicant conducted a parking study with the requested exhibits, land uses, and parking use
limitations in the April 24, 2026 parking study.
on the parking study.
Existing Parking and Land Use Inventory
The parking study provided a detailed inventory of the existing parking spaces within the Mill
Complex and on-street parking spaces along High Street, Water Street, and Elm Street within an
approximately 5-minute walk of the site. The inventory identified the regulations of the parking
spaces including those that had no restrictions, short-term visitor parking, tenant-reserved
spaces, and handicap spaces. The existing usable spaces within the 0 Prescott Street garage on
the Project site were also included. The Applicant noted that some of the spaces within the
garage were not accessible and therefore were not included in the parking inventory.
Based on the information in the parking study, a total of 1,139 spaces exist within the Mill
Complex and along the surrounding roadways within a 5-minute walk to the site. The parking
study indicates that a total of 655 parking spaces are unrestricted before 7:00 PM. The study
notes that there are some spaces that are only restricted to tenant/visitor parking between 8:00
AM and 7:00 PM and they become available to all users after 7:00 PM. A total of 757 unrestricted
spaces are available after 7:00 PM.
VHB Comment: The parking and land use inventory provided in the parking study addresses
Comments in the December 26, 2025 peer review memo.
VHB notes that the parking study indicates that the existing site contains a total of 372
parking spaces, distributed between the garage and the surface parking lot. A total of 324
of these parking spaces are currently unrestricted. A total of 48 spaces within the surface
lot are restricted to short-term visitor parking or are reserved for tenants only. These
spaces will be replaced by the Projec506 spaces (397
spaces in a new garage and 109 surface spaces to remain as part of the Project). VHB notes
that the parking supply of 506 is an increase of 9 spaces compared to what was previously
reviewed. This change in parking supply will not have any material impact on any previous
commentary offered by VHB.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 6
Existing Parking Demand Observations
Parking demand observations were conducted on Friday March 20, 2026 from 6:00 9:00 PM
and on Wednesday March 25, 2026 from 7:00 AM 7:00 PM, as discussed at the ZBA hearing for
the Project.
The parking demand observations focused on the unrestricted parking spaces (655 before 7:00
PM and 757 after 7:00 PM). The parking demand observations indicate that the peak parking
demand occurs at 12:00 PM, with a total of 328 parked vehicles and 327 available unregulated
spaces. The Friday evening peak parking demand occurs at 7:00 PM, with 212 parked vehicles
and 545 available unregulated parking spaces.
VHB Comment: The existing parking demand observations show that the maximum occupancy of the
unrestricted spaces is approximately 50 percent of the total supply. The existing parking
demand study was conducted during the appropriate time periods for analysis.
Project Parking Demand
Parking demand estimates were developed by the Applicant based on available data in the
Institute of Transportation Engineers Parking Generation Manual. Based on this assessment, the
th
Project would be expected to have an average peak parking demand of 373 vehicles and an 85
percentile peak parking demand of 431 vehicles.
The study also provided a time-of-day parking demand distribution for the Project. Based on this
th
time-of-85 percentile parking demand during the peak periods
identified in the parking occupancy observations is 225 vehicles at 12:00 PM and 294 vehicles at
7:00 PM on a Friday.
The parking demand estimates also include the expected number of available parking spaces
throughout the day and accounts for the increase in number of parking spaces on the site.
The Applicant stated that the majority of the uses within the Mill complex are office or research
and development uses and that those uses have peak parking demands between 11:00 AM
2:00 PM.
VHB Comment: VHB reviewed the parking demand estimates and compared them with the existing
parking demand for the unrestricted spaces within the Mill Complex. Based on the
information provided in the parking study, the overall parking supply with the
construction of the Project will exceed the overall parking demand (existing demand plus
the Project) by at least 273 spaces.
analysis for
the Mill Complex was calculated appropriately, and VHB concurs with the methodology
used to develop the future parking demand for the Project.
The Applicant also provided a map of pedestrian travel paths from the parking areas
evaluated and the Project site and indicated that all unrestricted parking spaces are within
a 4-minute walk of the Project site.
Jean Enright
Ref: 201270.000
May 19, 2026
Page 7
VHB concurs with the conclusions of the parking study that state the number of parking
spaces available to residents of the Project and users of the Mill complex will exceed the
number of parking spaces for the existing and proposed uses. VHB notes that this
conclusion is based on the assumption that a four-minute or less walk between
parking space and destination would serve the majority of visitors that use the parking
areas.
The above -related materials submitted for the Project. Formal
responses by the Applicant are not needed. VHB will continue this review through participation in upcoming ZBA
hearings, as requested to provide additional commentary and discussion. Please contact VHB if there are any
questions or if any aspect of the review requires further discussion.