HomeMy WebLinkAboutPublic Comment from Jim Holland - 5.28.26 with NESHAP inspection - Correspondence - 0 Prescott Street 5/28/2026 5/28/26, 1:15 PM Town of North Andover Mail-Online Form Submittal:Contact the Zoning Board of Appeals
k 10
INVR
Massachusts Terri MacNeil <tmacneil@northandoverma.gov>
Online Form Submittal: Contact the Zoning Board of Appeals
1 message
noreply@civicplus.com <noreply@civicplus.com> Thu, May 28, 2026 at 1:13 PM
Reply-To: noreply@civicplus.com
To: zoningemails@northandoverma.gov
Contact the Zoning Board of Appeals
Your Name Jim Holland
Your Email jimcholland@gmail.com
Subject Meeting participation request and follow-up question
Message Dear Zoning Board of Appeals members:
I would like to request additional public participation
opportunities at the next meeting considering the Zero Prescott
Street 40B application.
would like to request two items:
-An added public comment period earlier in the meeting in
addition to the one at the end of the meeting (5 minutes per
person, per comment period, 10 minutes total)
-The opportunity for members of the public to make a
presentation to the board with slide visuals, limited to 10
minutes not including questions and answers.
In its current format, residents must wait until the end of the
meeting to make a comment limited to 5 minutes. By this point
in the meeting, the applicant and their consultants have had
ample time to make a case for the proposal.
I believe these additions will improve public engagement and
will provide the board with more balanced information.
I also want to ask about the attached summary I found
describing a NESHAP inspection. Is this the same requirement
that was referenced at the last meeting or is there a different
one?
Thank you for considering my requests.
Sincerely,
Jim Holland
Attachments
https:Hmai1.google.com/mai 1/u/O/?ik=fObefc9b3b&view=pt&search=all&permthid=thread-f:1866453152006560494%7Cmsg-f:1866453152006560494&s... 1/2
5/20/26. 115PM Town of North Andover Mail-Online Form Submittal:Contact the Zoning Board ofAppeals
Files must be less than 2MU3.
Allowed file types: tst doe pdfdncm 'pAoifpug.
Attachment Number 1 FAQa Renovation NESHAPmmAl iERA-202,1.pdf
Attachment Number 2 Field not completed.
Attachment Number 3 Field not completed.
Email not displaying correctly?View iiinymaxbrowser.
THE(OMMONVVEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
FREQUENTLY ASKED QUESTIONS
ASBESTOS AND RENOVATION IN SCHOOLS
AHERA AND NESHAP
Asbestos Hazard Emergency Response Act, 40 CFR 763 Subpart E, ("AHERA") regulations and the
National Emission Standard for Hazardous Air Pollutants, 40 CFR 61 Subpart M, ("NESHAP") apply to
schools conducting renovations. State regulations, including 454 CMR 28.00 and 310 CMR 7.15 would
also apply.
1) What is the difference between an AHERA inspection and a NESHAP inspection?
• The AHERA inspection is limited to the identification of suspect materials that are visible and
accessible. The Local Education Agency ("LEA") is permitted to assume that all suspect materials
contain asbestos, and sampling these materials to identify asbestos is optional. The AHERA
inspection cannot be used in lieu of the NESHAP inspection.
• The NESHAP inspection, also known as a pre-renovation inspection, is a thorough identification
of all suspect materials, and entails destructive or invasive sampling of all suspect materials. This
type of inspection differs from the AHERA inspection because sampling is mandatory, and is
intended to penetrate layers of walls, floors, ceilings, etc. that may not be visible or accessible.
The purpose of the NESHAP inspection is to identify all suspect materials that may be impacted
during the renovation. Failure to identify all the ACM may result in a fiber release episode that can
create extensive contamination inside and outside the school building, including fiber migration
into occupied spaces.
2) Is a NESHAP inspection required if an architect statement has been provided?
• YES. There is no exemption from a NESHAP inspection. Even new construction that has taken
place over the last twenty years is subject to a NESHAP inspection before any renovation occurs.
Imported building products have been known to contain asbestos, including but not limited to,
wallboard,joint compound, floor tiles, roofing materials, and mastics.
• Due to multiple construction periods and earlier renovations, there may still be existing ACM in
crawl spaces or pipe chases, in window caulk or glazing, in waterproofing materials or roofing
materials remaining in areas of the school that were not previously renovated. School renovations
are not always intended to remove all ACM remaining in the building.
3) Do I have to sample the entire building during a NESHAP inspection?
• NO. Only the materials that could be disturbed during the renovation must be sampled. A project
design or work plan will demarcate the work areas. If the entire building will be "gutted" and
reconstructed on the framework, all suspect materials must be sampled.
• Keep in mind that a renovation may not necessarily specify the removal of all remaining ACM,
but rather only the materials that could be disturbed during the renovation, including vibration
from equipment or the removal of adjacent building materials.
Page I of 2
Doc#2021-013
4) How many samples must be collected during the NESHAP survey?
• Bulk samples must be collected in the manner set forth in 454 CMR 28.13(3) and (4), and 40 CFR
763.86.
• Samples must be collected in a randomly distributed pattern that is representative of the entire
homogeneous area being sampled.
• A material is considered homogeneous if it is of similar color, size, texture and time of
application. Several different homogeneous areas of floor tiles and ceiling tiles are typically
present in most school buildings.
• The number of samples collected will depend on the type of ACM, and the quantity of ACM.
5) Do materials that have already been sampled for AHERA compliance have to be resampled for
NESHAP?
• Materials that have been sampled and contain asbestos do not have to be resampled.
• Materials that were not sampled, or were insufficiently sampled, must be resampled.
• Materials that are non friable organically bound, such as floor tiles, mastics, transite board, etc.
that were determined to be non-asbestos containing using a method other than the EPA 600/R-
93/116 Method or Transmission Electron Microscopy will need to be resampled. Older analytical
methods were not capable of detecting the fine thin fibers embedded in the matrix, and a false
negative could result in improper removal and disposal of ACM.
For further information on AHERA and NESHAP, visit ww z�iaa.gc v/<;Cc is or
Wlvw mass l ov/dcp/a,lLj,,tp.
Page 2 of 2
Doc#2021-013