Loading...
HomeMy WebLinkAbout2016/06/08 - Eggleston Environmental Stormwater Review - 384 Osgood Street IIIIIIIIIIIIIIIIIIIII IVu 111 Ali I,.les�ta��n IIIIIIIIIIIIIIIIIIIII II a uu 7 IVm luumul �Illluum �I" °°uu+��m»aiauaial�al0l1!!l0/l1/llllll����������lU' June 8, 2016 North Andover Planning Board 1600 Osgood Street North Andover, MA 01845 Attn: Rebecca Oldham, Staff Planner RE: Stormwater Review North Andover DPW Building Improvements, 384 Osgood Street Dear Ms. Oldham and Board Members: Per your request, I have reviewed the following materials submitted in support of a Site Plan— Special Permit Application for the above-referenced project: ■ Site Plans (Sheets SP-1, LP-1.1, A 1.1-A 1.3, & El), Improvements to the Public Works Building,prepared by CSS Architects Inc. and Linden Engineering, dated 6 May 2016. ■ Civil Site Plans (Sheets C-1 through C-61)), Improvements to the Public Works Building, prepared by CSS Architects Inc. and Linden Engineering, dated 27 May 2016 (electronic pdf version). ■ Plan of Land in North Andover, prepared by Christiansen& Sergi, Inc. and dated 5/22/16 (electronic pdf version). ■ Site Plan (Sheet C.01), prepared by Woodard& Curran, dated February 2016 and revised 4/25/16 (electronic pdf version). ■ Stormwater Report, Town of North Andover Department of Public Works, Improvements to the Public Works Building, 384 Osgood St, dated May 27, 2016 (electronic pdf version, preparer unknown). I also conducted a brief site visit on June 2, 2016 to observe existing drainage patterns. My primary focus in this technical review is on the overall stormwater management approach and design concepts used in the project, as well as its compliance with the Town of North Andover's Site Plan Review regulations, the Massachusetts Department of Environmental Protection (DEP) Stormwater Management Standards and Regulations, and the North Andover Wetlands Bylaw. It is my understanding that a Notice of Intent (NOI) application for the project has been filed concurrently with the Conservation Commission. My review is aimed at assisting both boards in their respective reviews of the project. �uuo� puo� pm w u uuuu��uu uuuup�Illpu�� �w° ,uum��� w w uuuu�u�mug ����, �I i�,���� I i U'' IIII WI I I pl 11 II , ��.�IIIII�P II����I IIII iii���IIII IIII��,� � iiii� � IIII� III.III iiii���� IIIIIIII I III IIL � � III III � w ����I IIII�IIIII ��IIIIIIIII � ��I IIII is i:t 19' :°1 �101" .e IIII.:;° The project site is an approximately 3.58-acre parcel at the intersection of Osgood Street and Wayne Street. It is currently occupied by the North Andover Department of Public Works and includes a large storage/office building with associated parking, salt storage building, vehicle fueling depot and exterior materials and equipment storage. There are presently only a few drainage structures along the western (Wayne Street) edge of the site, which discharge via a 36-inch drain across the site toward Cochichewick Brook to the north. The site is relatively flat and much of the drainage is overland directly to the adjacent wetlands to the north and west. The proposed Base Bid plan calls for a two-story addition to the existing building and reconfiguration of the existing parking area. As proposed, runoff from the new parking area would be collected in a closed drainage system with deep sump catchbasins and drain through a Stormceptor treatment unit prior to discharge via a new outall to the wetlands associated with Cochichewick Brook. Roof runoff from the building addition would also be drained through the Stormceptor unit and discharged through the new outfall. The work proposed under the Alternate Bid includes removal of the existing storage building and construction of a new salt shed as well as regrading and repaving of the areas surrounding the new shed. As proposed, the runoff from a portion of the pavement area would be collected in a closed drainage system with deep sump catchbasins and drain through a Stormceptor treatment unit prior to discharge via a new outall to the wetlands associated with Cochichewick Brook. My comments on the propsed design are outlined below. Please note that these comments should be considered preliminary at this time, as I have not yet had the opportunity to review the full Conservation Commission submittal packet: 1. The proposed project qualifies as a redevelopment project under MA Stormwater Standard 7, hence it is required to comply with Standards 2 and 3 and the pretreatment and structural best management practice requirements of Standards 4, 5 and 6 only to the maximum extent practicable. However, as set forth in the DEP Stormwater Handbook, "to the maximum extent practicable" means that the proponent has made all reasonable efforts to fully meet all of the Standards, and that the highest practicable level of stormwater management for the project is being implemented. In addition, all redevelopment projects are required to improve existing conditions. Based on the plan submitted, the proposed project would likely not increase the rate of runoff from the site and would provide some improvement in the water quality of the runoff discharged through the two new outfalls. I also concur that the recharge of stormwater is neither feasible nor appropriate for this site. As is described further in my comments below however, the proposed plan would not provide full compliance with the Stormwater Standards and I do not believe that the Applicant has satisfactorily demonstrated that full or at least better compliance is not practicable. 2. The proposed drainage design includes inline Stormceptor proprietary separators as the sole BMP to treat the runoff discharged through the two new outfalls, and the TSS calculations assume a removal rate in the of 80% TSS in the units. Based on data presented by Tom Maguire of MassDEP and Jerry Schoen of MaSTEP in their 2013 workshop on evaluating proprietary separators (http://www.mastep.net/documents/MassDEP—Evaluating Nonrated—Stormwaterrmwater _Treatment.pdf), a more realistic TSS removl rate for proprietary separators in general is somewhere in the vicinity of 25-50 percent, but even this does not take into account the presence of upgradient catchbasins, which would already have removed some of the same coarse sediments that are most effectively treated in the Stormceptor units. The Stormwater Handbook (Volume 2, Chapter 2, pg 10) states that proprietary separators must be used for pretreatment and be placed first in the treatment train to receive TSS removal credit. Proprietary separators may be used as treatment BMPs in redevelopment projects where it has been demonstrated that suitable alternatives do not exist, however no documentation of alternatives considered was included in the materials I reviewed. With the proposed addition of the two new outfalls I also don't believe that the proposed stormwater management for the site would comply with Stormwater Standard 1, since it specifically states that "no new stormwater conveyances (e.g. outfalls) may discharge untreated stormwater directly to or cause erosion in wetlands or waters of the Commonwealth." 3. Per DEP criteria, the separators would need to be placed in an offline configuration to maximize treatment effectiveness and prevent carryover of accumulated sediments. 4. As proposed, roof drainage from the building addition would be discharged through the Stormceptor unit located in the front parking area. Since roof drainage is considered clean it does not need to be treated, hence the addition of this flow would merely reduce the Stormceptor's effectiveness in treating the pavement runoff. 5. The Alternate Bid portion of the project site constitutes a Land Use with Higher Potential Pollutant Loading (LUHPPL) therefore the Stormceptor treating runoff from that area needs to be sized for a one-inch water quality volume on an equivalent flow basis. 6. It is not clear from the plan where the roof runoff from the new salt shed would be discharged. 7. As proposed, only a portion of the runoff from the Alternate Bid portion of the site would undergo any stormwater treatment; the majority of the runoff would continue to drain untreated to adjacent wetland areas. Again, no documentation of alternatives considered or demonstration that the proposed plan constitutes compliance to the "maximum extent practicable" has been provided in the materials I reviewed. As these areas contain some of the dirtiest operations of the J t,t e a site in terms of stormwater quality I believe that significantly more can be done to improve existing conditions both through the addition of stormwater BMPs and operational improvements aimed at minimizing pollutant sources. 8. In addition to structural BMPs, Stormwater Standard 4 requires a Long Term Pollution Prevention Plan identifying suitable practices for source control and pollution prevention, and Stormwater Standard 5 requires the implementation of source controls and pollution prevention measures on the LUHPPL to eliminate or minimize pollutant exposure to stormwater. Redevelopment projects are not exempted from complying with these requirements fully. If the Town already has a Pollution Prevention Plan for Municipal Operations as is required by EPA's NPDES Phase 2 Permit for Small MS4s that should fulfill the requirements of Standards 4 and 5, however there was no reference to such a plan in the materials I reviewed and it does not appear that one is currently being implemented on the site. The "Good Housekeeping BMPs" included with the O&M Plan are generic and not specific to the operations on the site. 9. It is unclear why the plan calls for a portion of the pavement to the north of the new salt shed to be removed and replaced with a gravel surface. If these areas of the site are to continue to be used for materials and equipment storage an impervious surface is more easily swept to remove excess sediments etc. and provides more opportunity for spill control and containment. 10. The catchbasin outlet hood should be specified on the plan; I recommend the LeBaron Snout or Eliminator brands. 11. If the Alternate Bid is included, the proposed project would entail the disturbance of more than one acre of land and be subject to EPA's NPDES Construction General Permit (CGP). Prior to the initiation of work the selected contractor will need to file a Notice of Intent for coverage under the CGP, and prepare a Stormwater Pollution Prevention Plan (SWPPP) to be implemented during construction. This requirement should be clearly noted on the plans. The Conservation Commission may also want to require proof of filing of the NOI and the opportunity to review the SWPPP prior to the start of work. 12. I have the following comments on the Operation and Maintenance (O&M) Plan included in the Stormwater Report: ■ Short-term, construction related measures should be removed from the O&M Plan and included in a separate construction SWPPP. The long-term plan should be structured as a standalone document to be maintained on site. ■ Catchbasins on the site should be inspected at least 4 times per year and cleaned a minimum of once per year, not just when sediment thresholds are reached. ■ Stormceptor units should also be cleaned a minimum of once per year, with a vacuum truck. 'ii�IIu 1. B .i..i� i. 'P „ i '. a ■ The plan should include a maintenance checklist and a simple figure showing the locations of all stormwater BMPs to be maintained. ■ Designated snow storage locations should also be shown on the plan/figure. To the extent possible, snow storage should be located upgradient of the stormwater BMPs. 13. Stormwater Standard 10 prohibits all illicit discharges to the stormwater management system and requires proponents to submit an Illicit Discharge Statement demonstrating that no illicit connections exist on the project site. Redevelopment projects must fully comply with this requirement, and must also document all actions taken to identify and remove illicit discharges, including, without limitation, visual screening, dye or smoke testing, and the removal of any sources of illicit discharges to the stormwater management system. This requirement has not yet been met for this project. Since the proposed plan calls for portions of the existing drainage infrastructure and some of the buildings to remain on the site they will need to be thoroughly investigated before such a statement can be made. I appreciate the opportunity to assist the North Andover Planning Board and Conservation Commission with the review of this project, and hope that this information is suitable for your needs. Please feel free to contact me if you or the applicants have any questions regarding the issues addressed herein. Sincerely, EGGLESTON ENVIRONMENTAL Lisa D. Eggleston, P.E. C: Jennifer Hughes, Conservation Coordinator