Loading...
HomeMy WebLinkAbout2001/05/17 - 1st Civil Review - Delucia Way TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF DEFINITIVE SUBDIVISION PLAN FOR CONFORMANCE WITH PLANNING BOARD RULES AND REGULATIONS GOVERNING THE SUBDIVISION OF LAND AND STANDARD ENGINEERING PRACTICE Subdivision Title: Delucia Way VHB No.: 06716.3,4 Subdivision Location: Waverley Road Owner& Applicant: Right Now Realty Trust,P.O. Box 985, Kingston,NH 03848 MPB Realty Trust,415 Waverly Road,No. Andover,MA 01845 Applicant's Engineer: Christiansen &Sergi,Inc., 160 Summer Street,Haverhill,MA 01830 Plan Date: 03-09-01 Review Date: 05-17-01 The Applicant's engineer submitted plans and documents to VHB for review on April 13, 2001. The submission was reviewed for conformance to the October 20oO Rules and Regulations Governing the Subdivision of Land, appropriate sections of the 1972 Town of North Andover Zoning Bylaw amended in May 2000 and standard engineering practice. The following comments note non-conformance with specific sections and questions/comments on the proposed design. The Applicant has submitted the following information for VHB's review: 0 Definitive Subdivision Plan (5 sheets) dated 03-09-01 0 Stormwater Management Report dated 03-28-01 0 Form C—Application for of Subdivision Approval 0 Form D—Designer's Certificate SECTION 5. DEFINITIVE SUBDIVISION PLAN Section 5.2.5 Contents 1) 5.2.5.2(l)Bearings and distances of the proposed sewer easement lines appear to be omitted from the lot layout plan. The Applicant should add this information to the plan. 2) 5.2.5.3(10)No groundwater observation and percolation test pit data has been shown on the subdivision plans. (See comment below under Section 5.2.6) 3) 5,,2.5.4,b(7)Proposed driveway locations appear to be omitted on the street plan. Also, dimensions of all driveways should be labeled on the street plan. \\MAWATR\te\01671634\docs\reports\Delucia way review.doc 4) 5.2,5,5 The typical section should be revised to show site specific conditions.For example,the plan shows proposed sidewalk on the south side only, yet the typical section shows sidewalk on both sides. Section 5.2.6 Test Data As no soil test data has been submitted, VHB assumes that test pits,have not been performed. Accurate groundwater elevation and soil permeability data is used when designing the distance between the bottom of the detention/infiltration area and high water table elevation. Without this data, it is snot clear whether the detention/infiltration area will function as designed. The Applicant has provided a soil analysis in the Stormwater Management Report Section V. The permeability rate and high water table of the on-site soils were determined according to the Soil Survey by Soil Conservation Service (SCS).VHB suggests that test pits be performed to confirm the high water,table elevation and soil permeability rates deterrm*ned by SCS. Section 5.3 Stormwater Management Report A Stormwater Management Report has been submitted. See comments below under Section 6.14 Storm Drainage. Section 5.4 Environmental and Community Impact Statement An Environmental and Community Impact Statement is required when 6 or more new lots are created. The Applicant has stated that this requirement does not apply to this project because only five(5)new lots are being created.VHB believes that six (6) new lots are being created from one lot as shown on the subdivision plain (sheet 2 of 5).VHB, recommends that the Applicant submit the Environmental and Community Impact Statement or request a waiver from this requirement. SECTION 6. REQUIREMENTS FOR IMPROVEMENTS AND DESIGN 01 Section 6.8 Street—Design Standards According to Table IA, the minimum intersection comer curve radius must be 40 feet. It appears that the radii of the comers at the intersection of Waverley Road is 30 feet. VHB recommends that the radii be revised according to Figure No.I in the Rule &Regulations. 6.8.9 The Applicant should submit site distance measurements/calculations along Waverley Road to determine whether adequate stopping sight distance exists for vehicles exiting the proposed subdivision. 2 "AMA WATR\te\01671634\d cs\reports\Del ud a way reviemdoc Section 6.10 Driveway Aprons VHB recommends that the plans include a detail of driveway construction. VHB suggests that the detail include a plan and section view. The driveway should slope toward the roadway and runoff from the roadway should not be able to flow down a driveway onto private property. Section 6.11 Sidewalk 6.11.4 The plans do not show any provisions for a wheelchair ramp at the intersection of Waverley Road. VHB recommends that a construction detail for a wheelchair ramp be included in the plans, the detail should meet the current Massachusetts Architectural Access Board(AAB)Standards. Section 6.14 Storm Drainage 1) 6.14.7 It appears that a portion of the existing drainage area that used to flow into the isolated freshwater wetland was redirected to the proposed detention/infiltration area. The Applicant should verify altering the existing drainage patterns does not adversely affect the isolated freshwater wetland. 2) 6.14.9 Gutterspread calculations should be submitted to verify the proposed spacing of catch basins is adequate to capture the roadway runoff. 3) 6.14.10 If there will be standing water in the proposed detention/infiltration area for an extended period of time.VHB recommends that a fence be provided around the perimeter of the detention/infiltration area with an access gate for maintenance. 4) + .14.10 Thee minimum(MIN) 3:1 side slope shown on the typical detention area detail (sheet 5) should be revised to maximum(MAX) 3:1. 5) The Applicant should verify whether the isolated freshwater wetland is under the jurisdiction of the Wetlands Protection Act. Limit of 100-foot buffer zone shown on the site grading plan should be removed if the isolated freshwater wetland is a non- Jurisdictional wetland. Section 6.21 Street Lighting 01 No provision for street lighting is apparent on the plans STANDARD ENGINEERING PRACTICE AND,CONSTRUCTION ISSUES 1) VHB recommends that radii of the proposed sloped granite edging be provided at the intersection of Waverley Road, as the proposed sloped granite edging is not concentric with the proposed lot line. 3 `FNMA WATR\te\0671634\docs\reports\Delucia way review.doc k. 2) VHB recommends that centerline stations for the 50-foot taper sections from station 0+00 to station 2+20 be identified on the roadway layout plan. it is recommended that the applicant provide WRITTEN RESPONSES to the issues and comments contained herein. Reviewed by: Date: Danny H. Wong, E.I.T. Civil Engineer—Highway and Municipal Engineering Checked by: Timothy B.McIntosh,P49. Project Manager—Highway and Municipal Engineering 4 \MAWATR\te\0,6716,34\docs\reports\Delucia way review.doc