Loading...
HomeMy WebLinkAbout2026-09-22 Planning Board Minutes Sean Kevlahan, Chair John Simons, Vice Chair TOWN OF NORTH ANDOVER Peter Boynton PLANNING BOARD Kate Kelly Den evan O'Connell Bral Spight,Associate Tuesday September 22, 2026 k 7 p.m., 120 Main Street—Town Hall, North Andover, MA 01845 Present/Planning Board: S.Kevlahan,J. Simons,P.Boynton,K.Kelly,B. Spight,D. O'Connell(Arrived at 7:04 p.m.) Absent:None Staff Present: J.Enright S.Kevlahan: The Planning Board meeting for September 22,2026,was called to order at 7:00 p.m. STAFF REPORT 10 11 CONTINUED PUBLIC HEARING 12 291 Massachusetts Avenue,Donna Backman:Application for construction of a Detached Accessory Dwelling 13 Unit(ADU)permit under Article 8 Supplementary Regulations Part 3 Site Plan Review and Part 14 Accessory 14 Dwelling Unit of the Zoning Bylaw to authorize construction of a detached ADU. The property is located in the 15 Residential 4 zoning district. 16 J.Enright:A request for continuance has been submitted placing the deadline to render a decision on October 23, 17 2026. The Planning Board meeting prior to this date is scheduled on October 20,2026,which will allow for three 18 days to file the decision in the Clerk's office. 19 MOTION: J. Simons made a motion to accept the continuance request for 291 Massachusetts Avenue to the 20 October 20,2026 Planning Board Meeting. The motion was seconded by P. Boynton. The vote was 5-0,unanimous 21 in favor. 22 23 0 Berry Street(Map 108.0 Lot 10),Town of North Andover: Application for Site Plan Review and Modification 24 of Landscaping requirements special permits under Article 8 Part 1 Off-Street Parking and Loading §195-8.8 25 Special Permits,Article 8 Part 3 Site Plan Review,and Article 10 Administration Section 195-10.7 of the North 26 Andover Zoning Bylaw.Applicant proposes construction of a new Fire Station with associated driveways,parking 27 area,utilities and site grading. The site is located within the Residential 2 and I3 zoning district with proposed 28 development located in the R2 portion of the parcel. 29 J.Enright: The applicant requested a continuance to the October 6,2026 meeting today. The stormwater peer 30 review is still underway and the applicant is preparing a Photometric Plan. Waivers were requested for a traffic 31 study and fiscal impact study. A community impact statement was submitted. 32 MOTION: J. Simons made a motion to accept the continuance for 0 Berry Street to the October 6,2026 Planning 33 Board Meeting. The motion was seconded by K.Kelly. The vote was 5-0,unanimous in favor. 34 35 DISCUSSION ITEM 36 Draft 2027 Planning Board Meeting Calendar 37 MOTION: P. Boynton made a motion to approve the 2027 Planning Board Meeting Calendar.The motion was 38 seconded by D. O'Connell.The vote was 5-0,unanimous in favor. 39 Data Centers:Potential moratorium warrant article 40 S.Kevlahan: Provided an explanation for requesting that Jean include this item on the agenda.Key concerns 41 highlighted regarding data center impacts included water resources,power infrastructure, and noise control. The 42 town contains a sensitive water resource area,but local standards currently lack design guidelines for closed-loop 43 recycling systems in data centers,creating a potential strain on municipal water supplies. Commonwealth guidance 44 is likely needed regarding on-site power generation.Direct connection to the municipal grid could shift significant 45 infrastructure expenses onto local ratepayers through increased utility fees.Data center cooling systems can produce 1 Sean Kevlahan, Chair John Simons, Vice Chair TOWN OF NORTH ANDOVER Peter Boynton PLANNING BOARD Kate Kelly Den evan O'Connell Bral Spight,Associate Tuesday September 22, 2026 k 7 p.m., 120 Main Street—Town Hall, North Andover, MA 01845 46 sound levels exceeding 60 decibels comparable to or slightly louder than a chainsaw. Current local bylaws contain 47 no provisions to regulate or attenuate noise generated by these facilities. 48 D' O'Connell:Asked whether an executive order regarding 25-megawatt data centers had recently been issued. 49 J.Enright: Confirmed that executive order 658 requires data centers to have a municipal community benefit 50 agreement and local support to receive state permits.Projects exceeding 25 megawatts must comply with state 51 standards for clean energy,infrastructure self-funding,and protection of water,air quality, and public health. Stated 52 that they must also provide their own clean energy or contribute to a ratepayer protection fund.With 44 data centers 53 currently in Massachusetts,concerns remain regarding high water and energy usage,air and noise pollution,and 54 diesel generator operations. Consequently,many municipalities are considering bans or moratoriums to allow for 55 time to establish design standards.Provided an example that Everett enacted a bylaw capping the size of the facility 56 at 20,000 square feet gross floor area and 5 megawatts of power,while requiring self-supplied closed-loop water 57 recycling. 58 K.Kelly Inquired if the executive order would apply that the town would have to enter into one of these community 59 agreements. 60 J.Enri hit:Verified,but stated that the Building Commissioner would have to determine whether the use was even 61 allowed in town. It's not a defined term in the town's bylaw right now and the Board would need to define it as part 62 of a moratorium article or bylaw. 63 K.Kelly: Expressed appreciation to Sean for bringing the topic to the agenda, she noted that this represents a very 64 significant potential issue and emphasized the necessity of understanding the impacts of such facilities.Furthermore, 65 she stated she is in full support for establishing a governing bylaw to allow the Board to proceed deliberately and 66 align its actions with evolving national scientific and development trends. 67 J.Enright:Asked the Board if staff should begin drafting up a moratorium. 68 Board:Expressed caution due to the limited details available regarding data center developments.Members raised 69 questions concerning the timeline required to establish a moratorium or enact a targeted bylaw. 70 J.Enright: Explained that normally they aim to bring substantive warrant articles before the Board in December to 71 initiate discussions prior to the start of the public hearing process in February. Following the opening of public 72 hearings,the Board typically takes three meetings to formulate a recommendation for inclusion in the printed 73 warrant. 74 Board:Members expressed concern regarding the novelty of data centers and the numerous uncertainties 75 surrounding their long-term environmental and community impacts. They raised questions about how a moratorium 76 could be crafted and what its duration should be,given the many unresolved questions and continuous evolution. 77 J. Simons:Asked about the Town's existing noise ordinance limits and whether a future bylaw could incorporate 78 specific noise regulations for data centers.Mentioned that data centers ought to be handled in the same manner as 79 previous proposals brought before the Board. 80 J.Enright: Explained that North Andover currently lacks a local noise bylaw and instead adheres to state standards. 81 She noted the absence of an explicit definition for data centers in local zoning bylaws. She clarified that the initial 82 use determination rests with the Building Commissioner.If classified under an existing permitted category such as 83 office use,the project would not require a use Special Permit.However,any proposed construction exceeding 2,000 84 square feet of gross floor area automatically triggers Site Plan Review and requires approval of a Special Permit, 85 enabling the Board to attach conditions. She emphasized that given the threshold,virtually any physical construction 86 would ultimately fall under Board jurisdiction.Overall,she acknowledged that significant uncertainty remains 87 regarding how a data center use will be classified and evaluated. 88 K.Kelly: Stated that because many data center developers are highly sophisticated organizations,they will likely 89 challenge any enacted moratorium or bylaw. Consequently, she recommended that the Board exercise due diligence 2 Sean Kevlahan, Chair John Simons, Vice Chair TOWN OF NORTH ANDOVER Peter Boynton PLANNING BOARD Kate Kelly Den evan O'Connell Bral Spight,Associate Tuesday September 22, 2026 k 7 p.m., 120 Main Street—Town Hall, North Andover, MA 01845 90 and craft a comprehensive,broadly scoped bylaw or moratorium rather than focusing narrowly on a single concern 91 such as noise control. 92 Board:Members concurred with K.Kelly's points.In addition,water consumption emerged as a primary concern, 93 with the Board discussing how the high water demands of data centers would compare against current high-volume 94 local water users like large apartment complexes,Merrimack College,and the country club. 95 P.Boynton: Mentioned the historical absence of water quality testing results provided to the Board.He emphasized 96 the significance of sampling the lake,highlighting its connection to various tributaries across the community.He 97 asked Jean whether previous water studies existed or if new ones could be conducted to evaluate the water quality 98 and consumption patterns in town. 99 Board: Suggested inviting representatives from the Department of Public Works(DPW)to present data on municipal 100 water use and lake level fluctuations, specifically examining potential impacts from the addition of local apartment 101 complexes and other large properties over time. 102 J.Enright: Reminded the Board that a water demand study was conducted by an outside consultant during the Royal 103 Crest Redevelopment review process. Expressed her intention to confer with the Town Manager to inform her of the 104 request for DPW representatives to attend an upcoming Planning Board meeting. 105 K.Kelly Raised concerns that the Board was considering the effects of data centers in isolation,noting that 106 potential secondary and broader impacts had received little discussion, such as energy consumption which has the 107 potential to increase utility costs for local ratepayers. 108 S.Kevlahan: Concurred,noting that additional details are necessary to facilitate further deliberation and determine 109 whether pursuing a moratorium or a bylaw is the appropriate path forward.Noted two primary action items for the 110 Board,establishing a formal definition for data centers and drafting applicable design standards.He explained that 111 although energy usage is a key concern,it remains largely outside the Board's control given that the local utility 112 provider,National Grid,is governed at the state level. 113 P.Boynton:Asked whether a study could be conducted regarding data center energy usage and potential utility rate 114 increases. 115 Board:Noted that energy rates fall outside the Board's jurisdiction,making a study impractical unless North 116 Andover had its own municipal power entity. 117 D.O'Connell: Requested more information and data about precedents set by other Massachusetts municipalities 118 regarding moratoriums and bylaws,including any initial measures and subsequent revisions. 119 S.Kevlahan: Emphasized the necessity of gathering additional details and expressed hope for a DPW presentation 120 over the course of the upcoming two meetings.Following these steps,the Board will be positioned to determine 121 whether to pursue a data center moratorium or bylaw. 122 123 MEETING MINUTES: September 8,2026 meeting minutes. 124 MOTION: J. Simons made a motion to approve the meeting minutes for September 8,2026. The motion was 125 seconded by D. O'Connell.The vote was 5-0,unanimous in favor. 126 127 MEETING ADJOURNMENT: 128 MOTION: J. Simons made a motion to adjourn the September 22,2026 Planning Board meeting.The motion was 129 seconded by P.Boynton.The meeting adjourned at 8:45 p.m. The vote was 5-0,unanimous in favor. 130 131 MEETING MATERIALS: September 22,2026 Planning Board Agenda.pdf, September 22,2026 Planning Board 132 Agenda.docx; 0 Berry Street: Locus.pdf,Application:2455-Fire Station 3-Submission Letter(07-22-2026).pdf, 133 2455-Fire Station 3-Site Plans(07-20-2026).pdf,2455-Fire Station 3-Stormwater Report(07-20-2026).pdf, 134 2455-North Andover FIre Station 3 -Architect Renderings.pdf,2544-Fire 260911 Waiver Requests Station 3.pdf, 3 Sean Kevlahan, Chair John Simons, Vice Chair TOWN OF NORTH ANDOVER Peter Boynton PLANNING BOARD Kate Kelly Den evan O'Connell Bral Spight,Associate Tuesday September 22, 2026 k 7 p.m., 120 Main Street—Town Hall, North Andover, MA 01845 135 2544-Fire Station 3-Site Plan Review and Special Permit Application(07-20-2026).pdf,260818 Letter of 136 authorization.pdf,260911 Fire Station 3 Community Impact Analysis.pdf,Department Review: 260728 NAFD 137 Comment.pdf,Mass Wildlife: 8.27.2026 Mass Wildlife Decision Letter.pdf,Rev Plans: 260909 Rev Site Plan Fire 138 Station 3.pdf, Stormwater Review: 260818_1 stHW_SWPeerReview FireStation_3.pdf,Resp to 1st Peer Rev: 139 260909 Fire Station 3 Response Letter.pdf,260909 Rev Site Plan Fire Station 3.pdf,260909 Rev Stormwater Report 140 Fire Station 3.pdf,291 Mass Ave: LSPR: 260922 Draft Decision 291 Mass Ave-LSPR-ADU.pdf,Application 141 Detached ADU: Application.pdf,Bldg Comm Use Determination.pdf,Photo existing detached structure.pdf, Site 142 Plan-Floor Plans-Elevations.pdf,Continuance Request:Request for Continuance to 10.23.2026.pdf,Department 143 Review: 260708 Conservation Comment.pdf,260708 NAPD Comment.pdf,260803 DPW Water& Sewer 144 Comment.pdf,ZBA Denial Letter: 260730 291 Mass Ave Denial.pdf,Draft 2027 Planning Board Meeting 145 Schedule: DRAFT-2027 PB Meeting Schedule.xlsx;Meeting Minutes: DRAFT- September 8,2026 Planning 146 Board Meeting Minutes.docx,DRAFT- September 8,2026 Planning Board Meeting Minutes.pdf; Staff Report: 147 260922 Staff Report.pdf 4