Loading...
HomeMy WebLinkAboutBOARD OF PUBLIC WORKS t 310 CMR 10.99 Form S DEP File No. 242-522 fro be wovided by DEP) r Commonwealth Ciry"Town North Andover of Massachusetts ADDIiCant North Andover Division — - of Public Works Bradford & Stevens Sts. , (Water Main) Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131 , §40 and under the Town of North Andover's Bylaw, Chapgeer3.5 From NORT4 ANDOVER CONSERVATION COMMISSION North Andover Division of To PubligWorks Town of North Andover (Name of Appiicant) (Name of property owner) Address 3$4 Osgood St. , No. Andover, MA Address 120 Main St. , North Andover rn cc This Order is issued and delivered as follows: M/by hand delivery to applicant or representative on -7 � ��/�D (date) da r '� by certified mail. return receipt requested on ( "r This project is,located at Water Main Bradfirir?d Ora ct eet s, No Andnva "— The property is recorded at the Registry of Northern Essex += Book N/Ar Page N/A Certificate(if registered) The Notice of Intent for this project was filed on January 4, 1990 (date) The public hearing was closed on January 17 1990 (date) Findings The on Commi sa on has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the _ NA-Cr at this time,the NACC _has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act(check as appropriate): Pubiic water supply /Mood control C1 Land containing shellfish Private water supply 3 Storm damage prevention I /Fisheries (!s Ground water supply &I"Prevention of pollution Cg Protection of wildlife habitat Total Filing Fee Submitted N/A State Share N/A Cityrrown Share (V: fee in excess of$25) Total Refund Due S CityfTown Portion 5 State Portion S (1/2 total) ('/a total) Effective 11/10/89 5.1 y . 242-522Bradford St. and Stevens St. water Main 2 Therefore, the North Andover Conservation Commission hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations and the requirements of the Town ByLaw, to protect those interests checked above. The North Andover Conservation Commission (hereafter the "NACC") orders that all work shall be performed in accordance with said conditions and with the Notice of Intent , referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2 . This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4 . The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act and/or the Town ByLaw; (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this order. 5. This order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. f' 242-522 Bradford St. and Stevens St. Water Main 3 8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number 242-522". 10. Where the Department of Environmental Protection is requested to make' a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 11. Upon completion of the work described herein, the applicant shall request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans/documents: (a) Notice of Intent dated December 1989 by Weston & Sampson for the Town of North Andover. (b) Plan entitled " Bradford Street and Stevens Street Water Main Improvements" dated January 1990, prepared by Weston and Sampson. 13. The following wetland resource areas are within the 100' buffer zone of the proposed work: bank, land under water, bordering land subject to flooding and bordering vegetated wetland. These resource areas are significant to the interests of the Act and Town Bylaw as noted above. These resource areas are also significant to the recreational interests of the Bylaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 14. The NACC generally agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans. Y 242-522Bradford St. and Stevens St. Water Main 4 PERFORMANCE & DESIGN STANDARDS 15. Prior to any activity on site, the applicant shall submit a construction schedule/sequence and an erosion control plan to the NACC for review and approval. The construction sequence shall integrate the erosion control measures in the construction program, the erosion control plan shall specifically address the measures to be taken to insure that no silted runoff will enter wetlands during any pumping/dewatering operations. Temporary stilling basins to trap sediments shall be constructed a minimum of 100 feet from any wetland in locations approved by the NACC or its agent. CHANGES 16. Any changes in the submitted plans, Notice of Intent, or resulting from the aforementioned conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant) . Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. 17. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur, a final set of plans and a letter from the professional engineer, land surveyor or landscape architect who prepared these plans shall be submitted to the NACC for review and approval prior to the start of construction. Said letter shall describe any and all changes between the final plans and those reviewed and cited above by the NACC. No work shall begin on a project until written approval has been granted by the NACC. CONSTRUCTI 18. The applicant shall contact the Conservation Office prior to site preparation or construction and shall arrange an on-site conference with an NACC representative, the contractor and the applicant to ensure that all of the Conditions of this Order are understood. This Order also shall be made a part of the contractor's written contract. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. 19. The applicant shall submit, to the NACC, a written progress report every 3 months detailing what work has been done in or 242-522 Bradford St. and Stevens St. Water Main 5 near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence listed above. 20. Wetland flagging shall be checked prior to start of construction and shall be re-established where missing so that required erosion control measures between construction activity and wetland resource areas can be properly placed. 21. Prior to any activity on the site, a filter fabric fence backed by a single row of staked hay bales shall be placed between all construction areas and wetland areas per Soil Conservation Service or D.E.P. standards. This siltation barrier shall be inspected and approved by the NACC prior to the start of construction and shall remain intact until all disturbed areas have been mulched, seeded, and stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction by the NACC shall be implemented at the direction of the NACC. 22. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 50 hay bales and sufficient stakes for staking these bales. Said bales shall be used only for the control of emergency erosion problems, and shall not be used for the normal control of erosion. 23 . Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by sodding, or by loaming, seeding, and mulching according to Soil Conservation Service standards. If the latter course is chosen, stabilization will be considered once complete vegetative cover has been achieved. 24. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 25. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 26. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant as soon as practical. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. 27. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying 242-522 Bradford St. and Stevens St. Water Main 6 of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters at the site for the storage and removal of such spent construction materials off-site. 28. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. OTHER CONDITIONS 29. Members of the NACC or its agent shall have the right to enter upon and inspect the premises to evaluate and/or effect compliance with this Order of Conditions. The NACC reserves the right to require, following field inspection, additional information or resource protection measures. 30. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding or storm damage. 31. The conditions of this decision shall apply to, and be binding upon, the applicant, its employees and all successors and assigns in interest or control. 32. A proper bond or a deposit of money or negotiable securities running to the Town of North Andover shall be provided in the amount of $5000 which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer before commencement of work. Said bond or deposit of money shall be conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provision, satisfactory to the NACC, has been made for performance of any conditions which are of continuing nature. The applicant may propose a bond release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the Town of North Andover's Wetlands Protection Bylaw, 33 . In addition to the requirements of Conditions No. 11, the applicant shall submit a letter to the NACC from a Registered Professional Civil Engineer, Land Surveyor or Landscape Architect, certifying compliance with this Order of Conditions and the approved plans referenced herein (or approved revisions) . D.E.P. #242- 522 Bradford & Stevens Streets (Water Main) North Andover, MA Issued By NORTH ANDOVER _ Conservation Commission Signature(s).d1M� �-- ► Ol�ia� 00 This Order must be signed by a majority of the Conservation Commission. On this 31st day of January 1990 before me personally appeared Paul L. Tariot to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed eMme as his1her free act a deed. r ' e _ September 9, 1994 Not ry Public Marie L. Boudrot My commission expires The applicant,the owner,any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be done or any ten residents of the city or town in which such land is located are hereby notified of their right to request the Deparlment of Environmental Quality Engineering to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department,with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),within ten days from the dale of Issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and the applicant If you wish to appeal this decision under the Town Bylaw, a complaint must be filed in Superior Court. 7 Detach on dotted line and submit to the North Andover Conservation Comm. prior to commencement of work. .................................................................................................................................................................................................................. To Issuing Authorily Please be advised that the Order of Conditions for the project at Stevens & Bradford Sts. , No. Andover File Number 242— 522 has been recorded at the Registry of Deeds and has been noted in the chain of title of the affected property in accordance with General Condition B on— If n If recorded land, the instrument number which identifies this transaction is If registered land,the document number which identifies[his transaction is, __---- - Signature Applicant 5-4A - Any appeal shall be filed REQ ,, rD MUM BEANO within (20) days after the TOWN' ".c8 TOWN OF NORTH ANDOVER date offiling ofthis Notice MASSACHUSETTS in the Office of the Town JUN ��i � Os �$ Clerk. FO a A xs x June 16 , 1983 Mr . Daniel Long , Town Clerk Town Office Building North Andover , Mass . 01845 Re : North Andover Board of Public Works - Special Permit in Watershed District - Installation of 61050 feet of eight inch ductile iron pipe on Great Pond Road , Osgood Street , and Sutton Street . Dear Mr. Long : The North Andover Planning Board held a public hearing on Monday evening , June 6 , 1983 in the Town Office Meeting Room upon the application of the North Andover Board of Public Works . The hearing was advertised in the North Andover Citizen on May 5 and 12 , 1983 and all abutters were notified by certified mail . The following members were present and voting: Michael P. Roberts , Vice Chairman ; Walter R . McDonough , Clerk ; Erich W . Nitzsche ; and John J . Burke . The petitioner seeks a Special Permit under Section 4 . 133 of the Zoning By Law so as to permit the installation. of 6 ,050 feet of 8 inch ductile iron force main located within 250 feet from the annual mean high water mark of Lake Cochichewick , . the affected site being Great Pond Road , Osgood Street , and Sutton Street , lo- cated in a mixture of zoning districts . The proposed project will provide sewer to the area North of Lake Cochichewick . Mr . Joseph Borgesi , representing the Board of Public Works , tes - tified that estified' that his department is responsible for protecting the . decrease water supply and that the installation of said sewer will decre the potential for water contamination from septic system failure in future years . RECcp/cD Board of Public Works DAM"; ` ^HG TGV,p "_.ERK Special Permit - Watershed District NORT4NOOVER Great Pond Road, Osgood Street , and Sutton Street Page 2 JUN 16 !! Oa AN '83 Upon a motion made by Mr. Burke and seconded by Mr . McDonough , the Board voted unanimously to grant the Special Permit subject to the following conditions : 1 . That the construction of the 8 inch ductile iron pipe shall comply with the Conservation Commission ' s Order of Conditions , issued June 8 , 1983, D. E. Q. E . File # 242-196 . 2 . A no cut buffer zone shall exist 150 feet from the annual mean high water mark of Lake Cochichewick ,. according to Section 4. 133 Paragraph 3 (c ) of the Zoning By Law , unless conditioned upon the granting of a variance from the North Andover Board of Appeals . In granting the Special Permit , the Planning Board finds , pursuant to Section 10 . 31 of the Zoning By Law that: a ) The specific site is an appropriate location for such a use ; b) The use as developed will not adversely affect the neighborhood ; c ) There will be no nuisance or serious hazard to vehicles or pedestrians ; d ) Adequate and appropriate facilities will be provided for the proper operation of the proposed use; and e ) The use is in harmony with the general purpose and intent of the Zoning By Law. Sincerely , PLANNING "ARQ��� Michael P. Roberts , Vice Chairman jw cc Highway Surveyor Board of Health Conservation Commission Fire Chief Building Inspector Parties in Interest Applicant