Loading...
HomeMy WebLinkAboutBREEN, PETER f(-!S ex f e //Sio •� c>_� �rffe.. 1,��e�.o n _ �� : THe _ _hoc-C�� �roal� __ ' �s des Sv/6 a111,11,90/V %Ian /7-)elgc? 'aFll9g-9 r f\� let wv s►, 6 Qj BOARD Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board on Definitive Subdivision Pian entitled: Rocky Brook I� Peter R. Breen Trustee of Rock Book Estates By: Thomas Neve Associates, Inc. Gated , 19 „ ewe * * e The North Andover Planning Board has voted to APPROVE said plant subject to the following conditionsr 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land", or otherwise provide security for the con- struction of ways and the installation of municipal services within said sub- division, all as provided by G.L. c. 41, S. 81-U* 2. That all such construction and installations shall in all respects conform to the governing rules and regulations of this Board. 3. That, as required by the North Andover Board of Health in its report to this Board, no building or other structure shall be built or placed upon Lots No. as shown on said Plan without the prior consent of said Board of Health. 4. Other conditions- See attached conditions ro z r J M_{s � amara ca `r,° r Ln C so -.J In the event that no appeal shall have been taken from said approval within twenty days from this date, the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. �I * * tee * �r * � �re * :reg * * aeee * +r � sr * eeeee * e � �ee� ex +r The North Andover Planning Board has DISAPPROVE said plan, for the following reasons: NORTH ANDOVER PING BOARD Dates September 8, 1987 By- Erich W. Nitzsche, Chairman FORM C MODIFICATION APPLICATION FOR OF WE= PLAR Sente�8 19 87 To the Planning Board of the Town of North Andover: The underaigiads being the applicant as defined under Chapter 419 Section 81-., for approval of a proposed subdivision shown on a plan entitled Rockev Brook Estates _ by Thomas Neve Associates Inc. dated being land bounded as follows: Northerly by of Farr & Wilkinson Easterly by land of B & Farr. Southerly by land of Girago�sian, Westerly by land of Winter reen Realty Trust hereby submits said plan as a VErINITIVS plan in accordance witg the Rules and Regulations of the North Andover Planning Board aped makes application to the Board for approval of said plan. Title References North Essex Deeds, Book 2011 j, Page 277, ;or, 229 Certificate of Title No. s Registration Book..# page.; or Other: Said plan has(x) has not( ) evolved from a preliminary plan submitted to the Board of Aril 25 19 86 and approved (with modifications) disapproved ( on _ August"ll , 19 87 . The undersigned hereby applies for the approval of said DEFINtTM plan by the Board, and in furtherance thereof hereby agrees to abide by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said MWINITIVS plan by the Board: 1. To install utilities in accordance with the rules and regulations of the Planning Board, the Public Works Departments the Highway Surveyor, the Board of Health and all r w of as are applicable to the installation of utiliitties withinsthe limits of ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Iv and V of the Rules and Regulations of the Planning Board and the approved DEFINITIVE plsn, profiles and cross sections of the same. Said plan, profiles, cross sections and construction specifications are specifically, by reference, incorporated herein and made a part of this application. This application and the covenants and agree- ments herein shall.be binding upon all heirs# executorss administratorsp successorss grantees of the whole or part of said land, and assigns of the undersigned; and 3• To complete the aforesaid installations and construction within two (2) years from the date hereof. Received by Town Clerk: Date: Signature of Applicant Time: Signature: Address ROCKY BROOK DEFINITIVE SUBDIVISION MODICIATION y3 «, DECISION AUGUST 31 , 1987 a. All Planning Board Order of Conditins are to be placed on the recorded definitive plan, (cover sheet) prior to the signature at a Planning Board Meeting. b. Prior to signing the definitive plans all executed deeds of 9 g easements and parcels shall be submitted to the Planning Board and held in escrow until completion. At the time of completion and prior to final security release, the developer shall execute such documents for the Town. c. A certified document shall be submitted to the Planning Board after the completion of each phase verifying that all utilities (including electric, telephone, sewer, and cable) have been installed prior to application of the binder coat. Installation shall be in accordance with the plans and profile prior to the release of any lots. 1. A Notice of Intent shall be filed with the NACC as required under Chaper 131 - Wetlands Protection Act, and local Conservation Commission regulations and any changes required may be cause for reconsideration of the subdivision under M.G.L. Chapter 41. All wetlands shall be properly located in accordance with Chapter 131 and shown on the Definitive Subdivision Plans at the time of submittal. 2. The roadway layout and alignment shall be revised so as to minimize wetland crossings. 3. The roadway cross section and drainage shall be designed to conform with the Planning Boards Rules and Regulations. 4 . Two (2) watergates should be shown at Tanglewood Lane and Rocky Brook intersection with the approval of the Board of Public Works. 5. The developer will add watergates at stations 7.00 and 20.00 in accordance with the Subdivision Rules and Regulations (Section V. 0 F, (3) . 6. Houses, septic systems and proper grading are to be shown on the plans in accordance with the Subdivision Rules and Regulations (Section B,3 (k) ) . 7 . The developer will provide catch basins at the intersection of Tanglewood and Rocky , k Brook Road to be coordinated with the Division of Public Works. 8. A notation shall be made on the plans regarding the removal of the temporary turn around on lots 7 and 8 in the event that the road is continued. A condition shall be placed on the record j plan, with special notation on lots 7 and 8 , which specifies that the temporary turn-around easement on said lots will be removed and the easement restored to lawn upon the future submittal upon approval and construction of any extension to Rocky Brook Road. The developer shall also include a written clause in a purchase and sale agreements and deeds of the lots that the road may become a through street at a future date (to be noted on the plan) . 9. Drainage and retention easements shall be on record plans. 10 . Parcel A, at the intersection of Rocky Brook and Tanglewood Lane is unacceptable as an easement and must be shown as part of the road layout. The slope easement for Parcel A at the intersection; of Rocky Brook and Tanglewood Lane shall be shown on the plans as part of the road layout. If there is to be an easement then all documentation shall be submitted to the Planning Board. 11 . Executed deeds of easements shall be submitted to the Planning Board. 12. Lot 11 should not be included as a separate lot since it is not a buildable lot and should be absorbed into adjacent lots. Lot 11 and lot 10 are to be combined to produce one buildable lot to be identified as lot 10-11 . 13. The 100-year flood plain elevation should be shown in the detention ponds and floodway of Mosquito Brook. 14 . Mosquito Brook is to be shown on recorded and topographic plans as it flows through the property. 15. A Drainage easement shall be placed on lots on Mosquito Brook to be measured from the tributary at the rear of each lot shall be placed along the 100 foot setback from the Mosquito Brook along the edge of the wetland for the purpose of minimizing adverse environmental impacts on the watershed of Mosquito Brook. The easement is to be noted on record plans and lot deeds. 16. The developer shall work closely with the Tree Warden and the Planning Board to minimize the amount of tree cutting in the subdivision. A tree cutting plan (and planting plan where required) shall be submitted to and approved by the Planning Board and Tree Warden prior to final Planning Board endorseesnt of the Definitive Plan. x d rM� CA , 4 .. 17. There shall be no driveways constructed at catch basin or stone bound locations in accordance with rules and regulations (note on record plan. ) 18. The water mains shall be shown on the profile sheets in accordance with the Subdivision Rules and Regulations (Section B, 3, (p) ) . 19. No lot (s) or group of lots will be released from the Statutory covenant until all street utilities have been installed to the satisfaction of the Division of Public Works and further that certification and an interim As-Built plan and profile shall be submitted for approval to the Planning Board indicating that all drainage has been installed in accordance with the -a proved plans. In the event any drainage has not been installer in accordance with the approved plans, the Design Engineer shall substantiate with the revised drainage computations that the incorrected installation shall not adversely effect any downstream, abutter and/or the overall drainage design of the subdivision to the satisfaction of the Planning Poard. The as-built plan and certification shall include all utilites installed within the street, including, but not limited to drainage, sewer, gas, water, telephone,fire, cable and electric and further that all detention basins and off street drainage has been completed satisfactorily. 20. No lot (s) or groups of lots shall bezeleased from the Statutory Covenant until the binder coat of bituminous pavement has been placed to the satisfaction of the Division of Public Works and certification from the Design Engineer certifies the horizontal and vertical location of the binder coat is in conformance with the approved plans. 21. No lot (s) or group of lots shall be released from .the Statutory Covenant unless the Conservation Commission has approved such lot construction and has issued either a Negative Determination or an Order of Conditions on such lot or if neither is applicable has informed the Planning Board that such lot is not governed by Chapter 131. 22. The final As-built and Acceptance plans shall be accompanied by a Certificate of Compliance from a Registered Professional Engineer certifying that the grades on all lots and streets have been established in compliance with the Definitive Plans and that such grades do not create adverse drainage patterns onto adjoining lots, streets and/or abutters. 23. Developer shall reserve the fee in the roadway from any lot conveyance. cn r, 'n a 1 R Nop ; 0VER 24. All Boiler Plate including but not limited to: SEP 23 ;5A$ °al a) Conservation Commission Order of Conditions. b) Executed Deeds of Easements prior to endorsement. 25. Gutter profiles should be submitted for intersection of roadway with Tanglewood. 26. The crowns of the pipes should be matched in accordance with proper engineering procedures with the proper amount of fill over crowns of pipes to be shown on plan. The plans shall show the cover at the Catch Basins at the shoulder of the roadway, station 15 of the profiles shall be corrected to reflect what is shown on plans. 27. Erosion and sedimentation control programs shall be submitted for approval and shown on plans. 28. A bond in the acount of $20, 000 must be submitted to cover the amount of the final as-built plan. 29. Subdivision plans show roadway filling on abutting property of Wintergreen Realty Trust. Written easements shall be provided for the filling. 30. Plans will be provided which show in proper detail and clarity the existing drainage or retaining wall on Tanglewood. Proper interface of drainage and retaining walls at intersection of Tanglewood and Rocky Brook should be shown on plans. - 31 . The Plans shall show to the satisfaction *of the Planning Board that the drainage calculations do properly mitigate runoff. 32. No benchmarks are shown on plans in accordance with rules and regulations, the developer is required to coordinate through field checks and adapt the plans to reflect accurate benchmarks, calculations. 33. All conditionalnotes shall be shown on the subdivision plans. 34. The length of the deadend road exceeds the maximum allowed under the Rules and Regulations of the Planning Board (about 2,000) . However, the Planning Board will grant a waiver due to the following considerations and/or conditions: (1) The Highway Surveyor has no major problems with the length of the culdesac (per his letters of April, 1987 and May, 1986) . (2) The developer will install residential sprinkler systems in conformity with the specifications mentioned in the Fire i Chief' s letter of April 17, 1987. (3) A temporary culdesac has been provided to ensure possible connection to the abutting property in Boxford. (4) The developer shall also provide adequate documentation that the Boxford Planning Board has been notified of the existence of the Rocky Brook Plan. The developer shall also provide information (e.g. copy of preliminary plan of abutting land) to assess the physical possibility of connection to the abutting land prior to endorsement. 35. Prior to the.release of Pots 14 , 18 and 19 , the developer must demonstrate to the satisfaction of the Planning Board that a dwelling can be constructed on the site and still conform to the pertinent Board of Health and zoning requirements. 36. The Planning Board shall waive the requirement for water main looping provided that the developer install residential sprinkler systems in conformity with the Fire Chief' s letter of April 17, 1987 . 37 . Prior to endorsement, the developer, shall demonstrate rights in fee to parcel A and the easement rights to construct roadway sideslopes on land of Wintergreen Realty Trust. ;' 38. Per discussion with the developer, the developer shall provide (prior to endorsement) a permanent public conservation easement for the Mosquito Brook area and adjacent wetlands; this Conservation easement shall be included on the final subdivision plan prior to final signature by the Planning Board. The Town of North Andover shall not be responsible for maintenance on the property covered by the Conservation easement. Also, the developer shall provide (prior to endorsement) 30' access easements on lots 14 and 16 in order for the public to reach the area covered under the Conservation, easement. 39. Prior to endorsement, the applicant shall submit to the Planning Board for its approval an appropriate plan for phasing the construction of the subdivision. 40 . The developer will provide written documentation to the Planning Board and staff that he hasp ermission, without liability to the Town of North Andover, to cross the subdivision known as Winter- green Estates in order to gain access/egress from the proposed Rocky Brook Subdivision. 41. In the event Cluster Zoning is passed at the Annual Town M*Fting this parcel wouldbecome eligible and the Planning Board would z=, encourage such application. w , cc: Highway Surveyor Police Chief n Board of Public Works Fire Chief Ln Tree Department Assessor ; NACC Applicant m Building Inspector Engineer Health Department File Received by Town Clerk : FORMA REGrtV ! OAN§wL L�;11G APPLICATION FOR ENDORSEMENT OF PLANpR �Ov R BELIEVED NOT TO REQUIRE APPROVAL 3Z 72 •$� 19 9a To the Planning Board of the Town of North Andover: The undersigned wishes to record the accompanying plan and requests a determination by said Board that approval by it under the Subdivision Control Law is not required . The undersigned believes that such approval ; is not required for the following reasons : 1. The division of land shown on the accompanying plan is not a sub- division because every lot shown thereon has the amount of frontage required by the North Andover Zoning B,K Law and is on a public way , namely , , or a private way , namely , 7" ,U(rGEW0CJ0 G/J�C , being land bounded as follows : Svvr�iE7%�y E3y: I./fuD of t3,eE�.J A�vU ��,e�-c cie�cesi��v 2 . The division of land shown on the accompanying plan is not a sub- division for the following reasons : �S9 3. Title reference North Essex Deeds , Book %3j Page /s/ or VY9 of 7 Certificate of Title No . Registration Book ; Page Applicant ' s Signature : Owner ' s signature and address if not the applicant : Applicant ' s Address : S7-1-g-e7- /l/e�T y /9�rz rr�✓c�;�� Received by"TownrClerk r - Notice to APPLICANT/TOWN CLERK' of action of Planning Board on accompanying plan : I. The North Andover Planning Board has determined that said plan does not require approval under the Subdivision Control Law , and the appropriate endorsement has been made upon the same . 2. The North Andover Planning Board hasIdetermined that said plan shows a subdivision , as defined by G . L . c. 41 , s . 81-L , and must therefore be re-submitted to it for approval under the Subdivision Control Law. Very truly yours , NORTH ANDOVER PLANNING BG4Rt By Date • 1 t DEFINITIVE SUBDIVISION PLAN AN HYDROLOGICD ANALYSIS ' SUBMITTED TO THE TOWN OF NORTH ANDOVER ROCKY BROOOK ESTATES tNOVEMBER 25, 1986 REPARED B ' E�IE ASSOCIATES 7 BOSTON STREET TOPSF IEL.D, MA 01983 ' TABLE OF CONTENTS I. Form C Application for Approval of Definitive Plan II. Form D Designer's Certificate III. Statement of Environmental Impact ' IV. Perc Tests V. Abutters List ' VI. Hydrologic Analysis 1 1 F�CC REr DA1f1L LriNG ' APPLICATION FM APPROVAL OF DBFINITIM PLAN TO '4a ( _ ;K NOVFMRFRN&5 2 nii f*9Q�`Q�ip ' To the Planning Board of the Town of North Andover: Yi The undersigned, being the applicant as defined under Chapter 410 section ' 81—Ls for approval of a proposed subdivision shown on a plan entitled ROCKY WOOL FUMES ' by THOMAS F. NFVF ASSOCIATFA. rur dated NAVFMRFR 7.ru 19 being land bounded as follows: NORTFIFRI Y RY 1 Amn OF FARR A Wil ICTNSON EASTERLY BY LAND OF BR FNA FARRi So RL__RX LAND OF GIRA60 IAN ' WESTERLY BY LAND OF _WINE,G RE91 REALT hereby submits said plan as a DELPINITIM plan in accordance with the Rules and ' Regulations of the North Andover Plana ag Board and makes application to the Board for approval of said plan. 227.228,229 Title Reference: North Essex Deeds, Book ZQlL, Page- ; or ' Certificate of Title No. , Registration Book page ; or Other: Said plan has(x) has not( ) evolved from a preliminary plan submitted to ' the Board A it 19 $�. end a ed (with modifications) O disapproved ]OR � 19 ' The undersigned hereby applies for the approval of said DEFINITIYS plan by the Board, and in furtherance thereof hereby agrees to abide by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said DEFINITIVE plan by the Board: 1. To install utilities in accordance with the rules and regulations of the ' Planning Board, the Public Works Departments the Hi the Board of Health, and all general as well as zoning �a of said Toua, as are applicable to the installation of utilities within the limits of ' ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with sections Iv and V of the Rules and Regulations ' of the Planning Board and the approved DEFINITIYS plan, profiles and cross sections of the same. said plan, profiles, cross sections and construction specifications are specifically, by reference, incorporated herein and made ' a part of this application. Thio application and the covenants and agree— mets herein shall be binding upon all heirs, executors administrators, successors, grantees of the whole or part of said land, and assigns of the undersigned; and ' 3• To complete the aforesaid installations and construction within two (2) years from the date hereof, tP-U5VjEV5 or Z6CVy SrCO04 gZQA_u( TrVT'r Received by TomClerk% 7" /� * f Date: Si&ature of Applicant Time: -770 &3?�� JL_Q &7 � ' signature: taT, /h ldovt4.y r Address ' Notice to APPLICANT/TOWN CL&[tK and Certification of Action of Pl Board on Definitive Subdivision Plan entitled: 8 By= dated lq _ The North Andover Planning Board has voted to APPRM said plan, subject to the ' following conditions: 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land"p or otherwise provide security for the con- struction of ways and the installation of municipal services within said sub- division, all as provided by G.L. c. 41, 3. 81-U. ' 2. That all such construction and installations shall in all respects conform to the governing rules and regulations of this Board. ' 3• That, as required by the North Andover Board of Health in its report to this Board, no building or other structure shall be built or placed upon Lots NO, as shown on said Plan without the prior ' consent of said Board of Health. 4. Other conditions: In the event that no appeal shall have been taken from said approval within twenty days from this date, the North Andover Planning Board will forthwith ' thereafter endorse its formal approval upon said plan. e * * * * * a * * * e * ex• :► * e * * * ee * * * �r :r # w * * * e * sews The North Andover Planning Board has MSAPPWM said plan, for the following reasons: ' NORTH ANWM PLAJ8M BOARD Dates By: ' FORM D , DESIGNER ' S CERTIFICATE t NnvFMRER 25-P s 19 86.— ' TO THE PLAOING BOARD OF THE TOWN , OF ANDOVER: ' In preparing the plan entitled RGUY BROOK ESTATES I hereby certify that the above named plan and accompanying data is true ' and correct to the accuracy required by the current Rules and Regulations ' Governing the Subdivision of Land in North Andover , Massachusetts , and my source of information about the location of boundaries shown on said ' plan were one or more of the following : 1. Deed from ?0t2077t y C-7A/&jLY to ' dated ��� ZS' 11Y6 and recorded in the mnrth RRSPx Registry in Booklin PageM.,2 �9 2. Other plans , as follows _ WINTFRCRFENESTATES SUBpIVISION ' PLAN BY CHRTSTTANSnN LJIENGINEERING„ HAVFRT1 I , NA ANn LAND COURT PLANS ON BOXEORn ROAn_ 3. Oral information furnished by _ No oNE ' 4. Actual measurement on the around from a starting point established ' by THnNAs F, NFVF ASSACIATES- INC 447 BOSTON ST, TOPSFIELD, MA 5. Other Sources tSigne (Sea E o (Registered Professional Engineer or ' Su ve r) "` SOF Registerree�dd Land Surveyor) THOMAS Eil(iEEVEME �_ iw ,_- - B16HIE Na 31724 ti /G � 'W /�'L��,w•. NEVE y °f �°� d r s bN�iL ' ' ROCKY BROOK ESTATES STATEMENT OF ENVIRONMENTAL IMPACT ' Please refer to the Definitive Subdivision Plans and the Hydrological Analysis Plans attached to aid in the review of ' this statement: A. Plan Information ' 1 . Present and proposed topography are shown at a two foot contour interval. A graphic drainage configuration is shown on Hydrologic Drawings H-1 through H-4 attached with an associated Hydrologic Report. 2 . The site is completely moderately wooded with little ' underbrush. The surface of the ground is sloping from north to south down to the watershed of Mosquito Brook. There are no outstanding tree groupings on the site which should be preserved. The wetland associated with Mosquito ' Brook is significant and does contain botanical features and wildlife habitat potential which should be protected during construction. All wetlands have been delineated ' by I .E.P. Environmental Scientists and located and plotted on Plans by Neve Associates. ' 3 . Most of the soil in the area being subdivided has been observed by digging several deep holes to identify the soil structure and permability. See Perc Test results attached. All tests were witnessed by the North Andover ' Board of Health agent. 4 . Soil types and Hydrologic Soil Groups are shown on ' the Hydrologic Drawings and included in the report. B. Physical Environment ' The general characteristic of the site is ' rural. The abutting land to the south and east is undeveloped. The land to the north along Tanglewood Lane, part of Wintergreen ' Estates Subdivision, will contain single family homes. The site is physically comprised of gentle sloping land ' to a moderate bank leading down to the wetlands associated with Mosquito Brook. The upland is a very suitable candidate for single family development. C. Surface, Water and Soils 1 . There are wetlands to the south and southeast of the ' proposed development. The rear of Lots 12, 14 , 18 and 19 contain wetlands which will not be disturbed for the construction of the dwellings. The wetland between Lots ' 15 and 16 shall be used as a Detention Basin to control the peak rate of runoff leaving the site. The surface runoff characteristics are shown on Sheet H-1 through H- 4 . The wetlands shown will be the receiving bodies for ' pre and post development runoff. With the use of the Detention Basin there will be no increase in the peakrate of runoff leaving the site. ' 2 . During the construction the developer will install a row of staked hay bales in the location as shown on Sheet H-1 and H-2 to control sedimentation and erosion from entering the wetlands . A triple row of staked hay bales backed up by a filter fabric fence shall be installed perpendicular to the inlet outfill of the Detention Basin t as shown and at all cross culverts. This system shall be maintained throughout the duration of construction. As a secondary provision to control sediments from entering ' the significant wetlands associated with Mosquito Brook an inverted elbow shall be installed at the inlet of the outlet pipe leaving the Basin. This elbow shall be made of 12" diameter corrugated metal pipe with 4 one inch ' diameter holes drilled at elevation 112 and 114 respectively with a baffled top at elevation equal to 116 .00 . ' 3 . The detention basin has been designed to detain the increase in the rate of runoff during a 10 year and 100 year, type II, storm event. The basin shall be a permanent mitigation device. The basic should not require regular ' annual maintenance since we do not anticipate the post development sedimentation to be of significant volume. After several years, however, the basin will require a surface cleaning. The proposed grading is shown on Sheets 4 and 5 in order ' to construct the roadway and appurtenances . Approximately 50% of the lot areas will be disturbed to construct the homes, drives and install proper landscaping features. No large cuts or fills are required to develop the site. ' No waivers for the construction of the roadway is required, i.e. , slope, grade. ' 4 . Sewage Disposal shall be provided by conventional subsurface means. Each dwelling shall have its own septic system. Each system shall be designed in strict accordance ' with the State Environmental Code (Title V) and the local Board of Health Regulations. No system shall have an impact on any surface water, soils, or vegetation existing on the site. ' D. Subsurface Conditions ' The soils on the site are considered moderately well drained. ( See Soil portion of Hydrology Report) . The ground where tested was comprised of sandy-glacial soils. Groundwater will not pose a limitation during construction. Since all sewage disposal systems will be desgined in strict accordance with the health regulations, the impact on the ' quality of subsurface water is minimized. ' E. Town Services ' Rocky Brook shall be about 1975 feet in length and will access and engress onto Tanglewood Lane to the north of the site. We propose 19 additional lots which will generate 228 vehicle trips per day. This quantity will pose no ' impact on Tanglewood Lane. ultimately, the land to the east, currently owned by Farr, shall be developed extending Rocky Brook Road to Main Street in the Town of Boxford. ' The road will have town water and town drainage. Water will temporarily dead end. Drainage all flows into the ' brook watershed. The drainage system is typical of Town roads, and will be maintained by the Highway Department. t The subdivision will impact the DPW and Highway Department work load and maintenance requirements. There is no unusual service or maintenance problems associated with the proposed new roadway. ' The subdivision has the potential of generating 38 children which primarily will attend public schools. No indication ' was made by the School officials whether this ,number will pose a significant problem to the school system. General Impact We feel that this subdivision has been intelligently designed. Provisions for future extension to Main Street ' in Boxford have been made. The wetlands on the property have been protected by this design. The development has been designed to .have no increase in the peak rate of runoff leaving the site, post development.• The soils are suitable for disposal of sanitary wastes and all dwellings will be served by Town water. 1 ' ROCKY BROOK ESTATES Perc Test September 3, 41 & 9, 1986 ' 1 . Less than 2 min/inch. 2 . Less than 2 min/inch. 3. Less than 2 min/inch. ' 4 . Less than 2 min/inch. S. Less than 5 min/inch. ' 6 . Less than 2 min/inch. 7 . Less than 20 min/inch. i8 . Less than 2 min/inch. ' 9 . Less than 2 min/inch. 9A. Less than 2 min/inch. ' 10 . Less than 8 min/inch. 11 . Less than 9 min/inch. ' 12 . Less than 17 min/inch. 13 . Less than 2 min/inch. 14 . Less than 2 min/inch. ' 15 . Less than 9 min/inch. 16 . Less than 2 min/inch. 17 . Less than 3 min/inch. 18 . Less than 6 min/inch. ' 19 . Less than 2 min/inch. ' 20 . Less than 2 min/inch. 21 . Less than 15 min/inch. ' 22 . Less than 7 min/inch. 23 . Less than 9 min/inch. 24 . Abandoned. 25 . Less than 7 min/inch. 26 . Less than 15 min/inch. 27. Abandoned. 28 . Abandoned. 29 . Less than 12 min/inch. 30 . Abandoned. ' 31 . Less than 10 min/inch. 32 . Less than 2 min/inch. 33 . Less than 7 min/inch. ' 34 . Less than 6 min/inch. 35. Abandoned. ' 36 . Less than 15 min/inch. ' 37 . Less than 19 min/inch. 38 . Less than 6 min/inch. ' 39 . Less than 5 min/inch. 40. Less than 10 min/inch. 41 . Less than 2 min/inch. 42. Less than 9 min/inch. 43 . Less than 2 min/inch. i ' 44 . Less than 2 min/inch. 45. Less than 2 min/inch. ' 46. Less than 2 min/inch. 47 . Less than 7 min/inch. t48 . Less than 6 min/inch. ' 49. Less than 7 min/inch. 50. Less than 18 min/inch. ' 51 . Less than 22 min/inch. REC ED�AN B " TOM S� MT '"LIMRoc�ro�a1mwuspm 550 DATE 4/23/86 • Thomas E. Neve Associates, Inc. JOB NO.�-. .�� NAME OF ABUTTER . (OWNER) ADDRESS AND/OR MAILING DEED ASSESSOR'S PLAT COMMENTS ADDRESS BOOK/PAGE PLAT BLOCK IAT IN NORTH ANDOVER Rocky Brook Realty Trust: Boxford Road Peter Breen & Tyler Munroe, North Andover, MA 01849 011 229 90A 1 TrijqfPPq OWNER 'Thomas N,. and Mabel 745 Foster ST. Wilkinson North Andover, MA 01845 1377 350 90A 7 Wintergreen Realty Trust 865 Turnpike St. North Andover, MA 01845 1850 312 90A 9. George Giraqosian . . 568 Mass. Ave. Forth Andover, MA 01845 39•-• 95 90A 3 Peter & Kerry Breen 78 Boxford St. AND CURT North Andover, MA 01845 ERTIF 9564 90A 2 IN BOXFORD Thomas N. and Mabel B. 745 Foster St. Wilkinson North Andover, MA 01845 6617 145 Map 22, Lot 3 George and Wanda Farr 216 Raleigh Tavern Lane North Andover, MA 01845 6123 273 Map 22, Lot 17. 1 ROCKY BROOK ESTATES Rocky Brook Estates is a proposed subdivision of land consisting of 19 buildable lots on a thirty-one acre parcel south of Tanglewood Lane (Wintergreen Estates) . The site drains in a southerly and westerly direction to the ' wetlands adjoining Mosquito Brook. The site is comprised of forest areas and shrub areas with poorly drained soils. Classification of soils were determined by the Soil Conservation Soil Survey Maps of 1981. The purpose of this analysis has been to design structural ' onsite drainage which complies with Planning Board criteria while limiting off-site runoff discharge to below existing rates . The DRAINCALC Computer Model, an intensive flood routing program which incorporates SCS methods and standard hydraulic ' relationships, has been used to model existing and post-development hydrology and to size and design the storm drain system. The model develops hydrographs for each ' subcatchment area within the watersheds, routes them through channel reaches, pipes and detention areas with controlled outlets and integrates them to generate composite hydrographs . The model also prints out summaries of -subcatchment input data ' and tabulations of detention (storage) pond inflow, stage and storage volume at small time increments during the modelled storms . The storm drainage pipe network was designed for a 10 year storm event. The culverts carrying existing water courses under proposed roadways were designed for a 100 year storm event. This criteria is required according to the Town ' of North Andover Subdivision Rules and Regulations. This hydrologic analysis is based on the combined run-off leaving the site and draining towards the wetlands to the south and west of the property. The following table shows a comparison of the existing and post-development discharge rates. The increase in run-off has been mitigated with a detention pond. HYDROLOGIC SUMMARY ' PRE DEVELOPMENT POST DEVELOPMENT POST DEVELOPMENT (Existing) (No Detention Pond) (Detention Pond) Combined Runoff Combined Runoff Combined Runoff ' 10 Yr Event 46.8 62 .6 44 .1 ' 25 Yr Event 65 79 .5 60 .5 ' 100 Yr Event 100.7 110 86.7 -2- a 5�.- > / -tea.�,... � � [+•M� � •` ,.;,. 11 u` '1��� � �� mg PON .� (. 1 Fro " R. t•:� MA Nd•:'I" , nye,, � y,, ��� � '/� l� � ��` � _ }'I v ) �.�� !' � �, � _��. ,t . � � �� '� •�; "-ice � \ � ,� /r y... 'o�` .- h45 {� ZLj. y�*�'�',' --tati'� � I � +• it � 4 ' PRE-DEVELOPMENT FLOW CHART ROCKY BROOK ESTATE 1 1 SuPjcq'rt,H}1gNT *30 1 7.4" PIPE 0.00 t - PLOW1k4 t-u« 4 130 3 4 J 1 1 i 1 - S UBCATCHM ENT _ OFF-SITE SUBCATCHMENT ouT LEr rkovk u itiructREEN1 1 l�TENTMN POMD it -4- 1 Now. ' PRE-DEVELOPMENT (EXISTING) 10 YEAR EVENT ------------------------- ' EXISTING SUBCATCHMENTDATA --------------------------- SUBCAT 4 1 SUBCAT # 2 AREA= 8.69 ACRES AREA= 2.34 ACRES CN- 61 CN= 61 ' To- 19 To= 11 RAINFALL= 4.5 INCHES RAINFALL- 4.5 INCHES PEAK FLOW= 9.4 CFS PEAK FLOW= 3 GFS ' VOLUME= .72 ACRE-FT VOLUME= .2 ACRE-FT SUBCAT # 3 SUBCAT # 4 ' AREA= 1 .33 ACRES AREA= 8. 11 ACRES CN- 59 CN= 69 To- 6 To= 16 RAINFALL- 4.5 INCHES RAINFALL- 4.5 INCHES PEAK FLOW= 2 CFS PEAK FLOW= 13.2 CFS VOLUME- .09 ACRE-FT VOLUME= .99 ACRE-FT ' SUBCAT-#-5 SUBCAT-#-6 AREA= 9.3 ACRES AREA= 3. 13 ACRES ' CN- 65 CN= 67 To- 13 To= 15 RAINFALL= 4.S INCHES RAINFALL= 4.S INCHES ' PEAK FLOW- 14.3 CFS PEAK FLOW= 4.9 CFS VOLUME= .94 ACRE-FT VOLUME- .35 ACRE-FT SUBCAT # 30 AREA= 0 ACRES CN- 0 ' Tc RAINFALL= 0 INCHES PEAK FLOW= 6.2 CFS ' VOLUME= .05 ACRE-FT I ' PRE-DEVELOPMENT (EXISTING) 25 YEARV E ENT EXISTING SUBCATCHMENT DATA -------------------------- SUBCAT --------------- SUBCAT # 1 SUBCAT # 2 AREA= 6.69 ACRES AREA= 2.34 ACRES CN= 61 CN- 61 Tc= 19 Tc= 11 ' RAINFALL= 5.4 INCHES RAINFALL= S.4 INCHES PEAK FLOW= 14. 1 CFS PEAK FLOW= 4.5 CFS VOLUME= 1 .07 ACRE-FT VOLUME= .28 ACRE-FT ' SUBCAT-#-3 SUBCAT- - # 4 AREA= 1 .33 ACRES AREA= 8. 11 ACRES ' CN= 59 CN= 69 Tc= 6 Tc= 16 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 3 CFS PEAK FLOW= 18.6 CFS ' VOLUME= . 15 ACRE-FT VOLUME= 1 .39 ACRE-FT SUBCAT # 5 SUBCAT # 6 ' AREA= 9.3 ACRES AREA= 3. 13 ACRES CN= 65 CN= 67 Tc= 13 Tc= 15 RAINFALL= S.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW- 20.7 CFS PEAK FLOW= 6.9 GFS VOLUME= 1 .36 ACRE-FT VOLUME= .S ACRE-FT ' SUBCAT # 30 ---------- AREA= 0 ACRES CN= 0 Tc= 0 RAINFALL= 0 INCHES ' PEAK FLOW= 6.2 CFS VOLUME= .05 ACRE-FT 1 -7- PRE-DEVELOPMENT (EXISTING) 100 YEAR EVENT ' EXISTING SUBCATCHMENTDATA -------------------------- SUBCAT # i SUBCAT # 2 ---------- ---------- AREA- 8.69 ACRES AREA= 2.34 ACRES CN= 61 CN- 61 ' Tc= 19 Tc- 11 RAINFALL= 7 INCHES RAINFALL- 7 INCHES PEAK FLOW= 23.5 CFS PEAK FLOW- 7.6 CFS ' VOLUME= 1 .8 ACRE-FT VOLUME- .48 ACRE-FT SUBCAT # 3 SUBCAT # 4 ' AREA= 1 .33 ACRES AREA= 6. 11 ACRES CN= 59 CN- 69 Tc= 6 Tc- 16 ' RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 5.2 CFS PEAK FLOW= 29 CFS VOLUME= .26 ACRE-FT VOLUME= 2. 17 ACRE-FT SUBCAT # 5 SUBCAT # 6 ---------- ---------- AREA= 9.3 ACRES AREA- 3. 13 ACRES CN= 65 CN- 67 Tc= 13 Tc- 15 RAINFALL= 7 INCHES RAINFALL= 7 INCHES ' PEAK FLOW- 33.3 CFS PEAK FLOW= 11 CFS VOLUME= 2 . 19 ACRE-FT VOLUME- .79 ACRE-FT SUBCAT-#-30 AREA= 0 ACRES CN= 0 i ' Tc= 0 RAINFALL= 0 INCHES PEAK FLOW= 6.2 CFS ' VOLUME= .05 ACRE-FT 'i I ' 1 —8— STORE IN MEMORY # i ' CALCULATED HYDROGRRPHPRE-DEVELOPMENT (EXISTING) ' 45 40. PERK = 46.8 10 YEAR EVENT >i c� 25 4 20 � 15 ' 10 5 j ' 10 11 12 13 14 15 16 17 18 19 20 TIME (HOURS) ' CALCULATED HYDROGRRPH 6c 6o 50 PEAK = 65 25 YEAR EVENT 45 un 40 , u 35 - 30 ' 0 25 � 20 15 10 5 10 11 12 13 14 15 16 17 18 19 20 TIME (HOURS) CR --L HYDRG6RRPH 100 - 31 0 00 310 - PERK a 100.7 100 YEAR EVENT 80 i� 60� cVt 50 0 40 ' � �o y 20 10 L,� 90 11 12 13 14 15 16 17 18 19 20 TIME (HOURS) -9— POST DEVELOPMENT FLOW CHART ROCKY BROOK ESTATE fo 0 � 13 5vl6CATf_t4KENT x`30I R-S 3 0".TLET fRZM WlnrT£R�RpEN UEt" 4►T1GN ftVID n FLOVVIN& FULL �2 I 5 0 i N Z3 �- R-r4 II ZI ( 30 7 2.2 10 ND C_� 8 1 9 -SUBCATCHMENT -REACH RWALOP40 mlo - 10,M6 MA MP T . ' i�!i �c'i : 0 Fop" MAI REM Fals oa o • � Dov 4 � -ran FURA WN 9-AN WE�� + �� I 11; , : WPM- PROJECT: • • �� � iii�■�■iiii iii�■�■iii�''� �. Elm sum STORMmm CHECKED BY: 7DESIGN A DETENTION/STORAGE POND DATA 1POND NO. / PROJECT: I MAP SCALE: SF: - STAGE vs. STORAGE 1 ELEV. (ft.) A(acres) .!(acres) D(ft.) Wocm•ft.) Z V(ocre•ft.) O p p p p J! 70, INLET 1: oLa, SLP i Ny = 113.60 INLET 4: INLET 2: INLET 5: i JINLET 3: INLET 6: WLETS No. TYPE INV. DIA. WIDTH LENGTH N SLOPE ENT : Q (0, 1I1.50 15 10 .&5 .oio NCALC. BY: CHECKED BY: ' -14- NFI1F ASSRRT4TF4 TNR nATF PRDJFCT: ROCXY BRDf1K F.STATF - pns.T DEUE! nPMFNT SNE.FT BEGIN WITH SUBCATCHMENT # 16 AnD SUBCATCHMENT # I PIPE SIZING (10 YEAR EVENT) STORE IN MEMORY # 1 FOR Q=6 CFS n=.015 S=.OI58, REQUIRED PIPE DIAMETER IS 14 IN ' VOLUME UNDER THE HYDROGRAPH = .37 ACRE-FT. PEAK = 6 CFS ROUTE THROUGH REACH # 11 ' CIRCULAR PIPE: 0=15in n=.015 L=26' S=.0158 ADD SUBCATCHMENT # 14 STORE IN MEMORY # 2 FOR Q-7.4 CFS n=.015 S=.032, REQUIRED PIPE DIAMETER IS 13 IN VOLUME UNDER THE HYDROGRAPH = .45 ACRE-FT, PEAK = 7.4 CFS ROUTE THROUGH REACH # 10 CIRCULAR PIPE: D=18in n=.015 L=133' S=.032 ' ROUTE THROUGH REACH # 9 CIRCULAR PIPE: 0=18in n=.015 L=117' S=.0356 ' STORE IN MEMORY # 3 VOLUME UNDER THE HYDROGRAPH - .45 ACRE-FT, PEAK - 7.7 CFS BEGIN WITH SUBCATCHMENT # 15 ' kOUIE THROUGH REACH # 8 CIRCULAR PIPE: 0=17in n=-01S L=21:' S=.OI ' ADD SUBCATCHMENT # 3 . ADD MEMORY # 3 ' STORE IN MEMORY # 4 FOR Q=13. 1 CFS n=.015 S=.03, REQUIRED PIPE DIAMETER IS 17 IN VOLUME UNDER THE HYDROGRAPH = .78 ACRE-FT , PEAK = 13. 1 CFS ' RQUTE THROUGH REACH # 7 CIRCULAR PIPE: 0=18in n=.015 L=88' S=.03 ROUTE THROUGH REACH # 6 CIRCULAR PIPE: D=24in n=.015 L-102' S=.005 $TORE IN MEMORY # 5 FOR Q=13. 1 CFS n=.015 S=.005, REQUIRED PIPE DIAMETER IS 23 IN Ir —15— ' BEGIN WITH SUBCATCHMENT # 23 ADD SUBCATCHMENT # 4 ' VOLUME UNDER THE HYDROGRAPH = .23 ACRE-FT, PEAK - 3.8 CFS ' ROUTE THROUGH REACH # 14 CIRCULAR PIPE: 0-12in n=.015 L=26' S=.02 ADD SUBCATCHMENT # 11 ' VOLUME UNDER THE HYDROGRAPH - .25 ACRE-FT, PEAK = 4.2 CFS ' ADD MEMORY # 5 VOLUME UNDER THE HYDROGRAPH - 1 .03 ACRE-FT, PEAK = 17.6 CFS ' FOR 0=17.6 CFS n=.015 S=.@08 , REQUIRED PIPE DIAMETER IS 24 IN FOR Q=17.6 CFS n=.015 S=.007, REQUIRED PIPE DIAMETER IS 25 IN VOLUME UNDER THE HYDROGRAPH = 1 .03 ACRE-FT, PEAK = 17.6 CFS ' STORE IN MEMORY # 6 ROUTE THROUGH REACH # 5 i CIRCULAR PIPE: D=24in n=.015 L=82' S=.008 VOLUME UNDER THE HYDROGRAPH = 1 .03 ACRE-FT, PEAK = 17.5 CFS ' STORE IN MEMORY # 7 BEGIN WITH SUBCATCHMENT # 19 ' ROUTE THROUGH REACH # 15 CIRCULAR PIPE: D=12in n=.015 L=26' S=.01 ' VOLUME UNDER THE HYDROGRAPH = .02 ACRE-FT, PEAK .5 CFS ADD SUBCATCHMENT # 18 ' ADD MEMORY # 7 STORE IN MEMORY # 8 VOLUME UNDER THE HYDROGRAPH = 1 .07 ACRE-FT, PEAK = 18.3 CFS FOR 0=18.3 CFS n=.015 S=.009, REQUIRED PIPE DIAMETER IS 24 IN ROUTE THROUGH REACH # 4 ' CIRCULAR PIPE: D=24in n=.015 L=22' S=.009 ADD SUBCATCHMENT # 10 STORE IN MEMORY # 9 ' -16- ' SUBCAT-#-1 SUBCAT-#-2 POST-DEVELOPMENT AREA= 2.97 ACRES AREA= 2. 13 ACRES T�= sTc- 7 7 = 60 10 YEAR EVENT Tc RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 5. 1 CFS PEAK FLOW= 3. 1 CFS ' VOLUME= .32 ACRE-FT VOLUME= . 17 ACRE-FT SUBCAT # 3 SUBCAT # 4 ' - AREA= 1 .69 ACRES AREA= 1 . 14 ACRES CN= 70 CN= 68 Tc= 12 Tc= 7 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 3.8 GFS PEAK FLOW= 2.5 CFS VOLUME= .24 ACRE-FT VOLUME= . 13 ACRE-FT ' SUBCAT # 5 SUBCAT # 6 AREA- 1 .23 ACRES AREA= .47 ACRES CN= 64 CN= 72 Tc= 6 Tc- 15 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES ' PEAK FLOW= 2.4 CFS PEAK FLOW= .9 CFS, VOLUME= . 12 ACRE-FT VOLUME= .05 ACRE-FT ' SUBCAT # 7 SUBCAT-#_8 - - AREA= .27 ACRES AREA= 3.7 ACRES CN= 83 CN= 70 ' Tc= 11 Tc- 12 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= .9 CFS PEAK FLOW= 7.4 CFS ' VOLUME= .04 ACRE-FT VOLUME= .47 ACRE-FT SUBCAT # 9 SUBCAT # 10 ' AREA= 2.84 ACRES AREA= 3.2 ACRES CN= 74 CN= 73 Tc= 6 Tc= 9 ' RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 8.7 CFS PEAK FLOW= 7.2 CFS VOLUME= .42 ACRE-FT VOLUME= .46 ACRE-FT ' SUBCAT # 11 SUBCAT # 12 AREA- . 16 ACRES AREA= 5.85 ACRES ' CN= 81 CN- 69 Tc= 11 Tc= 16 RAINFALL= 4.5 INCHES RAINFALL= 4.S INCHES ' PEAK FLOW= .5 CFS PEAK FLOW= 9.6 CFS VOLUME= .02 ACRE-FT VOLUME= .71 ACRE-FT ' SUBCAT # 13 SUBCAT-#-14 - - AREA= 2.95 ACRES AREA= .35 ACRES CN= 63 CN= 89 ' Tc= 13 Tc- 11 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 4. 1 CFS PEAK FLOW= 1 .4 CFS ' VOLUME= .27 ACRE-FT VOLUME .08 ACRE-FT -17- ' SUBCAT-#-15 SUBCAT # 16 AREA= .73 ACRES AREA= .72 ACRES ' CN= 73 CN= 60 Tc= 7 Tc= 11 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 2 CFS PEAK FLOW- .9 CFS VOLUME= . 1 ACRE-FT VOLUME= .04 ACRE-FT SUBCAT # 17 SUBCAT # 18 ' AREA= . 1 ACRES AREA= . 13 ACRES ON= 80 CN= 85 ' Tc= 6 Tc= 8 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= .4 CFS PEAK FLOW= .5 CFS VOLUME= .01 ACRE-FT VOLUME= .02 ACRE-FT SUBCAT # 19 SUBCAT # 20 ' - AREA= . 13 ACRES AREA= . 17 ACRES CN= 85 CN= 81 Tc= 8 Tc- 6 ' RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= .5 CFS PEAK FLOW= .7 CFS VOLUME= .02 ACRE-FT VOLUME= .02 ACRE-FT SUBCAT # 21 SUBCAT # 22 ---------- ---------- AREA= .32 ACRES AREA= 2.67 ACRES CN= 71 CN= 69 j Tc= 7 Tc- 14 RAINFALL= 4.5 INCHES RAINFALL= 4.5 INCHES ' PEAK FLOW= .8 CFS PEAK FLOW= 4.7 CFS VOLUME- .03 ACRE-FT VOLUME- .32 ACRE-FT SUBCAT # 23 SUBCAT # 30 AREA= 1 .05 ACRES AREA- 16 ACRES CN= 65 CN= 67 ' Tc= 11 Tc= 15 RAINFALL- 4.5 INCHES RAINFALL= 4.5 INCHES PEAK FLOW= 1 .7 CFS PEAK FLOW- 24.8 CFS ' VOLUME= . 1 ACRE-FT VOLUME= 1 .78 ACRE-FT t -18- --------------------- EXISTING ROUTING DATA --------------------- REACH # 1 REACH # 2 ' PEAK FLOW= 6.2 CFS PEAK FLOW= .9 CFS MAX. FLOW POSSIBLE- 54.9 GFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED= 9 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT ' REACH # 3 REACH # 4 PEAK FLOW= 2.3 CFS PEAK FLOW= 18.3 CFS MAX. FLOW POSSIBLE= 9. 1 CFS MAX, FLOW POSSIBLE= 18.6 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH- - - # 5REACH-#-6_ PEAK FLOW= 17.5 CFS PEAK FLOW= 13.4 CFS ' MAX. FLOW POSSIBLE- 17.5 CFS MAX, FLOW POSSIBLE= 13.9 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT ' REACH # 7REACH #_8 ----- - - - PEAK FLOW= 13.2 CFS PEAK FLOW= 2 CFS MAX. FLOW POSSIBLE= 15.8 CFS MAX. FLOW POSSIBLE= 3. 1 CFS ' MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 9 REACH # 10 PEAK FLOW= 7.7 CFS PEAK FLOW= 7.6 CFS MAX. FLOW POSSIBLE= 17.2 CFS MAX. FLOW POSSIBLE= 16.3 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 11 REACH # 12 ' PEAK FLOW= 6 CFS PEAK FLOW= .7 CFS MAX. FLOW POSSIBLE= 7 CFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH_#-13 REACH-#-14 PEAK FLOW- 1 .5 CFS PEAK FLOW= 3.8 CFS ' MAX. FLOW POSSIBLE= 6.9 CFS MAX. FLOW POSSIBLE= 4.4 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT ' REACH # 15 - - PEAK FLOW= .5 CFS MAX. FLOW POSSIBLE= 3. 1 CFS ' MAX WATER DETAINED= 0 ACRE-FT ' -19- ROUTE THROUGH STORAGE POND# i ' # ELEVATION (FT) STORAGE (ACRE—FT ) 1 111 .5 0.00 2 112.0 .03 ' 3 114.0 .4S 4 116.5 1 .30 OUTLET # i INVERT ELEVATION = 111 .5 FT CIRCULAR CULVERT: D- 15 IN n= .015 L= 10 FT S= .01 ' CONCRETE PIPE, GROOVE OR BELL, FLUSH INLET: Ka= . 1 THE MAX. WATER STORED = .5 ACRE—FT tINFLOW &. OUTFLOW FOR POND 1 24 22 PERK INFLOW = 25.5 20 ; OUTFLOW 9. 9 18 m 16 , v 14 s v 12 ' p 1@ t� B 6 , 4 - 2 ' 160 11 12 13 14} 15 16 17 18 19 20 ' TIME (HOURS) ' —20— STORAGE POND 8 1 DATA -------------------------- ---------------------------------------------------------------------------- TIME INFLOW OUTFLOW ELEVATION STORAGE ' NR. CFS CFS ----------ACREF---- 10.0 0.0 0.0 111 .5----- 0.00 ' 10.2 0.0 0.0 111 .5 0.00 10.4 .2 0.0 111 .5 0.00 10.6 .3 .2 111 .6 0.00 10.8 .4 .3 111 .6 .01 ' 11 .0 .8 .4 111 .7 .01 11 .2 1 .0 .7 111 .8 .02 11 .4 1 .3 .9 111 .9 .03 11 .6 3. 1 1 .3 112.0 .05 11 .8 22.0 3.9 112.7 .24 12.0 19.5 9.4 113.9 .48 12.2 7.2 9.9 114. 1 .47 12.4 4.6 9.0 113.8 .40 12.6 3.5 7.5 113.5 .33 12.8 2.5 6. 1 113.2 .26 ' 13.0 2. 1 5.0 112.9 .21 13.2 1 .7 4. 1 112.7 . 17 13.4 1 .4 3.4 112.5 . 13 ' 13.6 1 .4 2.9 112.4 . 11 13.8 1 .3 2.4 112.3 .09 14.0 1 .3 2. 1 112.2 .08 14.2 1 .3 1 .9 112.2 .07 ' 14.4 1 . 1 1 .7 112. 1 .06 14.6 1 . 1 1 .5 112. 1 .05 14.8 1 .0 1 .4 112. 1 .04 ' 15.0 1 .0 1 .3 112.0 .04 15.2 1 .0 1 .2 112.0 .03 15.4 1 .0 1 . 1 112.0 .03 ' 15.6 1 .0 1 . 1 112.0 .03 15.8 .8 1 .0 112.0 .03 16.0 .8 .9 111.9 .02 16.2 .7 .8 111 .9 .02 ' 16.4 .7 .8 111 .9 .02 16.6 .5 .7 111 .8 .02 16.8 .5 .6 111 .8 .02 ' 17.0 .5 .6 111 .8 .02 17.2 .5 .5 111 .7 .01 17.4 .5 .5 111 .7 .01 ' 17.6 5 5 111 .7 .01 17.8 .5 .5 111 .7 .01 18.0 .4 .5 111 .7 .01 18.2 .4 .4 111 .7 .01 ' 18.4 .4 .4 111 .7 .01 18.6 .4 .4 111 .7 .01 18.8 .4 .4 111 .7 .01 ' 19.0 .4 .4 111 .7 .01 19.2 .3 .4 111 .7 .01 19.4 .3 .3 111 .7 .01 19.6 .3 .3 111 .6 .01 19.8 .3 .3 111 .6 .01 20.0 .3 .3 111 .6 .01 -21- ' POST-DEVELOPMENT 25 YEAR EVENT -------------------------- ' EXISTING SUBCATCHMENT DATA ' SUBCAT-#-1 SUBCAT-#-2 AREA= 2.97 ACRES AREA= 2. 13 ACRES CN= 67 CN= 60 Tc= 9 Tc= 7 RAINFALL= S.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 7.3 CFS PEAK FLOW= 4.7 CFS VOLUME= .47 ACRE-FT VOLUME- .25 ACRE-FT ' SUBCAT # 3 SUBCAT # 4 - - - _ AREA= 1 .89 ACRES AREA= 1 . 14 ACRES CN= 70 CN= 68 ' Tc= 12 Tc= 7 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 5.3 CFS PEAK FLOW= 3.5 CFS VOLUME= .33 ACRE-FT VOLUME= . 19 ACRE-FT SUBCAT # 5 SUBCAT # 6 - - - - AREA= 1 .23 ACRES AREA= .47 ACRES CN= 64 CN= 72 Tc= 6 Tc= 15 ' RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 3.5 CFS PEAK FLOW= 1 .2 CFS VOLUME= . 18 ACRE-FT VOLUME= .08 ACRE-FT SUBCAT-#-7 SUBCAT-#-8 AREA= .27 ACRES AREA= 3.7 ACRES CN= 83 CN- 70 Tc- 11 Tc= 12 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES ' PEAK FLOW= 1 . 1 CFS PEAK FLOW- 10.4 CFS VOLUME- .06 ACRE-FT VOLUME= .65 ACRE-FT ' SUBCAT # 9 SUBCAT # 10 - - --- AREA 2.84 ACRES AREA= 3.2 ACRES CN= 74 CN= 73 Tc= 6 Tc= 9 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 11 .8 CFS PEAK FLOW= 9.6 CFS ' VOLUME= .58 ACRE-FT VOLUME= .63 ACRE-FT SUBCAT # 11 SUBCAT # 12 ' AREA= . 16 ACRES AREA- 5.85 ACRES CN= 81 CN- 69 Tc= 11 Tc- 16 ' RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= .6 CFS PEAK FLOW= 13.4 CFS 0OLUME= .03 ACRE-FT -22- VOLUME= I ACRE-FT SUBCAT # 13 SUBCAT # 14 ---------- ---- . - --- AREA= 2.95 ACRES AREA- 35 ACRES CN= 63 CN= 89 ' Tc= 13 Tc= 11 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 6 CFS PEAK FLOW= 1 .7 CFS ' VOLUME= .39 ACRE-FT VOLUME- . 11 ACRE-FT SUBCAT # 15 SUBCAT # 16 ' AREA= .73 ACRES AREA= .72 ACRES CN= 73 CN= 60 Tc= 7 Tc= 11 ' RAINFALL= 5.4 INCHES RAINFALL- 5.4 INCHES PEAK FLOW= 2.7 CFS PEAK FLOW= 1 .3 CFS VOLUME= . 15 ACRE-FT VOLUME= .07 ACRE-FT ' SUBCAT-#-17 SUBCAT 18 AREA= . 1 ACRES AREA= . 13 ACRES ' CN= 80 CN= 85 Tc- 6 Tc= 8 RAINFALL- 5.4 INCHES RAINFALL= 5.4 INCHES ' PEAK FLOW- .5 CFS PEAK FLOW= .6 CFS VOLUME= .02 ACRE-FT VOLUME= .02 ACRE-FT SUBCAT # 19 SUBCAT # 20 ' AREA= . 13 ACRES AREA= . 17 ACRES CN= 85 CN= 81 ' Tc= 8 Tc= 6 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= .6 CFS PEAK FLOW- .9 CFS VOLUME= .02 ACRE-FT VOLUME= .03 ACRE-FT SUBCAT # 21 SUBCAT # 22 ' AREA= .32 ACRES AREA- 2.67 ACRES CN= 71 CN= 69 Tc= 7 Tc= 14 RAINFALL= 5.4 INCHES RAINFALL= 5.4 INCHES PEAK FLOW= 1 . 1 CFS PEAK FLOW= 6.7 CFS ' VOLUME- .05 ACRE-FT VOLUME= .46 ACRE-FT ' SUBCAT-#-23 SUBCAT_#-30 AREA= 1 .05 ACRES AREA= 0 ACRES CN= 65 CN= 0 Tc= 11 Tc- 0 RAINFALL= 5.4 INCHES RAINFALL= 0 INCHES PEAK FLOW= 2.4 GFS PEAK FLOW= 6.2 CFS VOLUME= . 16 ACRE-FT VOLUME= .05 ACRE-FT ' -23- 1 --------------------- � EXISTING-ROUTING-DATA 1 REACH # 1 REACH # 2 PEAK FLOW=1 6.2 CFS PEAK FLOW= 1 .2 CFS MAX. FLOW POSSIBLE- 54.9 CFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT 1 REACH # 3 REACH # 4 1 PEAK FLOW= 2.3 CFS PEAK FLOW= 17.7 CFS MAX. FLOW POSSIBLE= 9. 1 CFS MAX. FLOW POSSIBLE= 18.6 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT ' REACH_#-5_ REACH_----- ----# 6- PEAK FLOW= 16.4 CFS PEAK FLOW= 13.9 CFS 1 MAX. FLOW POSSIBLE= 16.4 CFS MAX. FLOW POSSIBLE= 13.9 CFS MAX WATER DETAINED= .07 AGRE-FT MAX WATER DETAINED= .03 ACRE-FT 1 REACH # 7- REACH # B - _ - - - PEAK FLOW- 15.8 CFS PEAK FLOW= 2.7 CFS � MAX. FLOW POSSIBLE= 15.8 CPS MAX. FLOW POSSIBLE= 3. 1 CFS 1 ' MAX WATER DETAINED= .01 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 9 REACH # 10 ' PEAK FLOW= 9 CFS PEAK FLOW= 8.9 CFS MAX. FLOW POSSIBLE= 17.2 CFS MAX. FLOW POSSIBLE= 16.3 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 11 REACH # 12 PEAK FLOW= 7 CFS PEAK FLOW- .9 CFS MAX. FLOW POSSIBLE= 7 CFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED- .02 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT ' REACH-#_13 REACH # 14 PEAK FLOW= 2 CFS PEAK FLOW= 4.4 CFS ' MAX. FLOW POSSIBLE= 6.9 CFS MAX. FLOW POSSIBLE= 4.4 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= .02 ACRE-FT REACH # 15 - - PEAK FLOW= .6 CFS MAX. FLOW POSSIBLE= 3. 1 CFS ' MAX WATER DETAINED= 0 ACRE-FT ' -24- ' BEGIN WITH MEMORY # 18 ROUTE THROUGH STORAGE POND # 1 # ELEVATION (FT) STORAGE (ACRE-FT) ' 1 111 .5 0.00 2 112.0 .03 3 114.0 .45 ' 4 116.5 1 .30 OUTLET # 1 INVERT ELEVATION = 111 .5 FT CIRCULAR CULVERT: D= 15 IN n- .015 L= 10 FT S- .01 CONCRETE PIPE , GROOVE OR BELL , FLUSH INLET: Xe- . 1 THE MAX. WATER STORED = .74 ACRE-FT ' INFLOW & OUTFLOW FOR POND # 1 26 - 24 - PERK INFLOW .= 27. 5 22 OUTFLO14 1 1 .9 20 - le - 16 018 16 ; v 14 , 12 3 ' 0 10 6 4 r A' 90 11 12 13 14 15 16 17 18 19 20 ' TIME (HOURS) ' -25- THOMAS E. NEVE ASSOCIATES . INC. DATE PROJECT: ROCKY BROOK ESTATE - POST DEVELOPMENT SHEET OF STORAGE POND # 1 DATA -------------------------- ---------------------------------------------------------------------------- TIME INFLOW OUTFLOW ELEVATION STORAGE HR. CFS CFS ACRE-FT 10.0 -----10.0-------------------------------------------1115------------------- 0.0 0.0 111 ..5 0.00 10.2 . 1 0.0 111 .5 0.00 ' 10.4 .3 . 1 111 .6 0.00 10.6 .4 .2 111 .6 .01 10.8 .8 .4 111 .7 .01 11 .0 1 . 1 .7 111 .8 .02 11 .2 1 .4 1 .0 111 .9 .03 11 .4 1 .9 1 .2 112.0 .04 11 .6 4.3 1 .6 1122. 1 .07 ' 11 .8 27.2 S. 1 112.9 .32 12.0 24.4 10.3 114.2 .59 12.2 19. 1 11 .6 114.7 .74 12.4 4.5 11 .6 114.7 .67 ' 12.6 2.9 10.9 114.5 .57 12.8 2.2 10.0 114. 1 .47 13.0 2.4 8.6 113.8 .37 ' 13.2 1 .8 6.9 113.4 .29 13.4 1 .8 5.6 113. 1 .24 13.6 2.0 4.6 112.8 . 19 ' 13.6 2.0 3.8 112.6 . 16 14.0 2. 1 3.2 112.5 . 13 14.2 2.0 2.8 112.4 . 11 14.4 1 .6 2.4 112.3 .09 ' 14.6 1 .7 2. 1 112.2 .08 14.8 1 .6 1 .9 112.2 .07 15.0 1 .5 1 .8 112.2 .06 ' 15.2 1 .4 1 .6 112. 1 .06 15.4 1 .4 1 .5 112. 1 .05 15.6 1 .4 1 .5 112. 1 .05 ' 15.8 1 .3 1 .4 112. 1 .04 16.0 1 .3 1 .3 112.0 .04 16.2 1 . 1 1 .2 112.0 .04 16.4 1 .2 1 .2 112.0 .03 ' 16.6 1 . 1 1 .2 112.0 .03 16.8 1 .0 1 . 1 112.0 .03 17.0 1 .0 1 . 1 112.0 .03 ' 17.2 1 .0 1 . 1 112.0 .03 17.4 .9 1 .0 112.0 .03 17.6 .9 1 .0 111 .9 .03 17.8 .8 .9 111 .9 .02 ' 18.0 .8 .9 111 .9 .02 18.2 .8 .8 111 .9 .02 18.4 .8 .8 111 .9 .02 ' 16.6 .8 .8 111 .9 .02 18.8 .7 .8 111 .9 .02 19.0 .7 .8 111 .8 .02 19.2 .6 .7 111 .8 .02 19.4 .5 .6 111 .8 .02 19.6 .5 .6 111 .8 .02 19.8 .5 .$ 111 .7 .01 ' 20.0 .5 5 111 .7 .01 -26- 1 ' THOMAS E. NEVE ASSOCIATES . INC. DATE PROJECT: ROCKY BROOK ESTATE - POST DEVELOPMENT SHEET OF - EXISTING SUBCATCHMENT DATA POST-DEVELOPMENT ' SUBCAT-#-1 SUBCAT # 2 100 YEAR EVENT AREA= 2.97 ACRES AREA= 2. 13 ACRES ' CN= 67 CN- 60 Tc= 9 Tc- 7 RAINFALL= 7 INCHES RAINFALL= 7 INCHES ' PEAK FLOW= 11 .6 CFS PEAK FLOW= 7.9 CFS VOLUME= .74 ACRE-FT VOLUME= .42 ACRE-FT ' SUBCAT- - # 3 SUBCAT- - # 4 AREA= 1 .89 ACRES AREA= 1 . 14 ACRES CN= 70 CN- 68 ' Tc= 12 Tc- 7 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 8.2 CFS PEAK FLOW= 5.5 CFS ' VOLUME= .51 ACRE-FT VOLUME= .29 ACRE-FT SUBCAT # 5 SUBCAT # 6 ' AREA= 1 .23 ACRES AREA= .47 ACRES CN= 64 CN- 72 Tc= 6 Tc= 15 ' RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 5.7 CFS PEAK FLOW= 1 .9 CFS VOLUME= .28 ACRE-FT VOLUME= . 14 ACRE-FT ' SUBCAT-#-7 SUBCAT-#-8 AREA= .27 ACRES AREA= 3.7 ACRES ' CN= 83 CN- 70 Tc= 11 Tc- 12 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 1 .6 CFS PEAK FLOW= 16. 1 CFS VOLUME= . 1 ACRE-FT VOLUME- 1 .01 ACRE-FT ' SUBCAT # 9 SUBCAT # 10 - - --- AREA= 2.84 ACRES AREA= 3.2 ACRES CN= 74 CN- 73 Tc= 6 Tc- 9 ' RAINFALL= 7 INCHES RAINFALL- 7 INCHES PEAK FLOW= 17.8 CFS PEAK FLOW= 14.9 CFS ' VOLUME= .87 ACRE-FT VOLUME= .96 ACRE-FT SUBCAT # 11 SUBCAT # 12 ---------- ---------- AREA= . 16 ACRES AREA= 5.85 ACRES CN= 81 CN- 69 Tc= 11 Tc- 16 ' RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= .9 CFS PEAK FLOW= 21 CFS VOLUME= .04 ACRE-FT -27- VOLUME= 1 .57 ACRE-FT ' SUBCAT-#-13 SUBCAT-#-14 AREA- 2.95 ACRES AREA= .35 ACRES ' CN= 63 CN= 89 Tc= 13 Tc= 11 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 9.9 CFS PEAK FLOW= 2.4 CFS ' VOLUME= .65 ACRE-FT VOLUME= . 1S ACRE-FT SUBCAT # 15 SUBCAT # 16 ' AREA= .73 ACRES AREA= .72 ACRES CN= 73 CN= 60 ' Tc= 7 Tc= 11 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 4. 1 CFS PEAK FLOW= 2.2 CFS VOLUME= .22 ACRE-FT VOLUME= . 14 ACRE-FT ' SUBCAT # 17 SUBCAT # 18 AREA= . 1 ACRES AREA- . 13 ACRES CN= 80 CN= 85 Tc= 6 Tc= 8 RAINFALL= 7 INCHES RAINFALL= 7 INCHES ' PEAK FLOW= .7 CFS PEAK FLOW= .9 CFS VOLUME= .02 ACRE-FT VOLUME= .04 ACRE-FT ' SUBCAT # 19 SUBCAT # 20 - - ---------- AREA= . 13 ACRES AREA= . 17 ACRES ' CN= 85 CN= 81 Tc= 8 Tc= 6 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= .9 CFS PEAK FLOW= 1 .3 CFS ' VOLUME- .04 ACRE-FT " VOLUME= .05 ACRE-FT SUBCAT # 21 SUBCAT # 22 ' AREA= .32 ACRES AREA= 2.67 ACRES CN= 71 CN= 69 Tc= 7 Tc= 14 RAINFALL= 7 INCHES RAINFALL= 7 INCHES PEAK FLOW= 1 .7 CFS PEAK FLOW- 10.4 GFS VOLUMES .08 ACRE-FT VOLUME= .71 ACRE-FT SUBCAT # 23 SUBCAT # 30 ' AREA= 1 .05 ACRES AREA= 0 ACRES CN= 65 CN= 0 Tc= 11 Tc- 0 RAINFALL= 7 INCHES RAINFALL= 0 INCHES PEAK FLOW- 3.9 CFS PEAK FLOW= 6.2 CFS VOLUME= .25 ACRE-FT VOLUME= .05 ACRE-FT ' -28- ' EXISTING ROUTING DATA REACH # 1REACH # 2 - - - - - PEAK FLOW= 6.5 CFS PEAK FLOW= 1 .9 CFS ' MAX. FLOW POSSIBLE= 54.9 CFS MAX. FLOW POSSIBLE= 3. 1 GFS MAX WATER DETAINED- 0 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 3REACH # 4 - - - - - - PEAK FLOW= 3.5 CFS PEAK FLOW= 18.6 EFS ' MAX. FLOW POSSIBLE= 9. 1 CFS MAX. FLOW POSSIBLE= 18.6 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= .01 ACRE-FT REACH # 5 REACH # 6 ' PEAK-FLOW= 17.5 CFS PEAK FLOW= 13.9 CFS MAX. FLOW POSSIBLE- 17.5 CFS MAX. FLOW POSSIBLE= 13.9 GFS MAX WATER DETAINED- .08 ACRE-FT MAX WATER DETAINED= . 1 ACRE-FT REACH # 7 REACH # 8 ' PEAK-FLOW= 15.8 CFS PEAK FLOW= 3. 1 CFS MAX. FLOW POSSIBLE= 15.8 CFS MAX. FLOW POSSIBLE= 3. 1 GFS MAX WATER DETAINED- .08 ACRE-FT MAX WATER DETAINED= .01 ACRE-FT REACH # 9 REACH # 10 ---------- ---------- PEAK FLOW= 9.4 CFS PEAK FLOW= 9.4 CFS MAX. FLOW POSSIBLE- 17.2 CFS MAX. FLOW POSSIBLE= 16.3 CFS MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED- 0 ACRE-FT ' REACH # 11 REACH # 12 - - - - PEAK FLOW= 7 CFS PEAK FLOW= 1 .3 CFS MAX. FLOW POSSIBLE= 7 CFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED- . 13 ACRE-FT MAX WATER DETAINED= 0 ACRE-FT REACH # 13 REACH # 14 PEAK FLOW= 3 CFS PEAK FLOW- 4.4 CFS MAX. FLOW POSSIBLE= 6.9 CFS MAX, FLOW POSSIBLE= 4.4 CFS ' MAX WATER DETAINED= 0 ACRE-FT MAX WATER DETAINED= .08 ACRE-FT REACH # 15 PEAK FLOW= .9 CFS MAX. FLOW POSSIBLE= 3. 1 CFS MAX WATER DETAINED= 0 ACRE-FT S -29- 1 THOMAS E. NEVE ASSOCIATES , INC. DATE ! J PROJECT: ROCKY BROOK ESTATE - POST DEVELOPMENT SHEET OF CALCULATED HYDROGRRPH ' 85 - 00 - 75 - 560?5 PERK = 86.7 ' 65 65 60 55 ' LL 50 u 45 40 3 35 ' oL 30 LL 25 20 15 15 5 90 11 12 13 14 15 16 17 18 19 20 ' TIME (HOURS) i t -30- tTHOMAS E. NEVE ASSOCIATES, INC. DATE -/-/ ' PROJECT: ROCKY BROOK ESTATE - POST DEVELOPMENT SHEET OF BEGIN WITH MEMORY # 15 ROUTE THROUGH STORAGE POND # I # ELEVATION (FT ) STORAGE (ACRE-FT) 1 111 .5 0.00 ' 2 112.0 .03 3 114.0 .45 4 116.5 1 .30 OUTLET # 1 INVERT ELEVATION = 111 .5 FT CIRCULAR CULVERT: D= 15 IN n- .015 L= 10 FT S= .01 CONCRETE PIPE, GROOVE OR BELL , FLUSH INLET: Ke= . 1 THE MAX. WATER STORED = 1 . 15 ACRE-FT ' INFLOW & OUTFLOW FOR POND # 1 ' 32 - 30 - f 230 PERK INFLOW = 33. 5 28 - 26 - OUTFLOW = 14. 9 ' 24 ,• 22 � + n 20 . - u 18 ' 1 a 144 ' J 12 L. 10 - 8 - 6 0 B 6 4 '1 2 - ^ 90 ~ i i 12 13 14 15 1G 17 18 19 20 TIME (HOURS) ' 31- 1 STORAGE POND # 1 DATA ------------------------------------------------------------- ------------ TIME INFLOW OUTFLOW ELEVATION STORAGE ' HR. CFS CFS -ACRE-FT ---------------------------- ------ 10.0 0.0 0.0 111 .5 0.00 10.2 .3 0.0 111 .5 0.00 ' 10.4 .4 .2 111 .6 .01 10.6 1 .0 .4 111 .7 .01 10.8 1 .4 .8 111 .9 .02 ' 11 .0 1 .6 1 . 1 112.0 .03 11 .2 2. 1 1 .3 112. 1 .04 11 .4 3. 1 1 .7 112. 1 .06 ' 11 .6 6.3 2.4 112.3 . 11 11 .8 33.4 7.0 113.4 .43 12.0 29.6 11 .6 114.7 .77 12.2 22.5 13.3 115.4 .95 ' 12.4 20. 1 14.2 115.7 1 .06 12.6 19.5 14.9 116.0 1 . 15 12.8 5.2 14.2 115.7 1 .00 ' 13.0 4.6 13. 1 115.3 .86 13.2 3.8 12. 1 114.9 .73 13.4 3.2 11 . 1 114.5 .60 ' 13.6 2.8 10.2 114.2 .49 13.8 2.3 8.8 113.8 .38 14.0 2.3 7. 1 113.4 .30 14.2 2.2 5.8 113. 1 .25 ' 14.4 2.2 4.8 112.9 .20 14.6 2.0 4. 1 - 112.7 . 17 14.8 2.0 3.5 112.6 . 14 15.0 1 .7 3. 1 112.5 . 12 15.2 1 .9 2.8 112.4 . 11 15.4 2.0 2.5 112.3 . 10 15.6 1 .8 2.3 112.3 .09 ' 15.8 1 .7 2.2 112.3 .08 16.0 1 .7 2.0 112.2 .08 16.2 1 .7 1 .9 112.2 .07 16.4 1 .6 1 .8 112.2 .07 16.6 1 .3 1 .7 112.2 .06 16.8 1 .6 1 .6 112. 1 .06 ' 17.0 1 .4 1 .6 112. 1 .05 17.2 1 .4 1 .5 112. 1 .05 17.4 1 .4 1 .5 112. 1 .05 17.6 1 .5 1 .5 112. 1 .05 ' 17.8 1 .3 1 .4 112. 1 .05 18.0 1 .4 1 .4 112. 1 .05 18.2 1 .4 1 .4 112. 1 .05 18.4 1 .2 1 .4 112. 1 .04 18.6 1 .2 1 .3 112. 1 .04 18.8 1 .2 1 .3 112.0 .04 19.0 1 .0 1 .2 112.0 .04 ' 19.2 1 .0 1.2 112.0 .03 19.4 1 .0 1 . 1 112.0 .03 19.6 .9 1 . 1 112.0 .03 ' 19.8 .9 1 .0 112.0 .03 20.0 .9 .9 111 .9 .03 ' -32 1 POST DEVELOPMENT RUNOFF (COMBINED) CRLCULRTED HYDROGRRPH 60 '(WITHOUT DETENTION) 1 55 50 PERK = 62.6 45 40 10 YEAR EVENT u 35 1 0 2 , � 20 15 1 10 5 - 90 11 12 13 14 15 16 17 1B 19 20 1 TIME (HOURS) 1 CRLCULRTED HYDROGRRPH 1 75 70 PERK 79.5 560 65 - 60 , 55 25 YEAR EVENT 1 450 - 5 u 40 1 35 0 0 30 LL 25 20 1 15 10 5 I 1 90 i l 12 13 14 15 16 17 18 19 20 TIME (HOURS) CRLCULRTED HYDROGRRPH ' 110 - too - 90 - 10 t00 90 PERK = 110 1 s0 100 YEAR EVENT in 70 u 60 5�l , 0 40 1 LL 30 20 ' 10 10 11 12 13 14 15 16 _L3_18 19 20 1 TIME (HOURS) ' POST DEVELOPMENT RUNOFF (COMBINE[ CRLCULRTED HYDROGRRPH ' 40 PEAK 44 . 1 (WITH DETENTION) = 35 30 10 YEAR EVENT v 25 3 20 ' 15 10 S 9E 11 12 13 14 15 16 17 18 19 20 ' TIME (HOURS) 60 55 ' 50 PERK = 60. 5 40 25 YEAR EVENT U 35 30 0 25 ' 15 15 10 55 ' 1C1 it 12 13 14 15 16 17 16 19 20 TIME (HOURS) ' CRLCULRTED HYDROGRAPH ' 85 L _ 8@ 75 PERK 86. 7 7@ 65 Eo 100 YEAR EVENT 55 LL 50 45 40 0 35 J 30 LL 25 25 15 10 - 5 - 10 0 50 ' 10 11 12 13 14 15 16 17 18 19 20 TIME (HOURS) -34- THO E. VE ASS? IAT INC ,c � �= R 7 August 20p 1987 �'`• ��� �Ufore� North Andover Planning Board Town Hall North Andover, MA 01845 RE: Rocky Brook Dear Members: On behalf of my clients, Peter Breen and Tyler Monroe, Trustees, Rocky Brook Realty Trust, I request an extension with respect to the Planning Board making a decision on the Definitive Subdivision Plan for Rocky Brook, until September 6, 1987 . Thank you for your cooperation in this matter. Very truly yours, TH S E VE ASSOCIATES, INC. Thomas E. Neve, P.E. , R.L.S. President /b II ENGINEERS 447 OLD BOSTON ROAD LAND SURVEYORS TOPSFIELD, MA 01983 LAND USE PLANNERS (617) 887-8586 a` R E':£:,/V 0 Notice to APPLICANT/TOWN CLERK and Certificatity!i,, k of Planning Board on Definitive Subdivision Plan entitled: 0 ROCKY BROOK By: Thomas E. Neve Assoc. vein er 26,_ , 19 86 The North Andover Planning Board has voted to APPROVE said plan, subject to the following conditions: 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land", or otherwise provide security for the con- struction of ways and the installation of municipal services within said sub- division, all as provided by G.L. c. 41, S. 81-U. 2. That all such construction and installations shall in all respects conform to the governing rules and regulations of this Board. 3. That, as required by the North Andover Board of Health in its report to this Board, no building or other structure shall be built or placed upon Lots No. as shown on said Plan without the prior consent of said Board of Health. 4. Other conditions: See attached: In the event that no appeal shall have been taken from said approval within twenty dais from this date, the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. iii 'A�4�Fs�p3����HIH ��K�B� Kor�aaet�cgc �xx xxxxxxxx NORTH ANOOM PLANNIM BOARD Dates April 10, 1987 BY Erich W. Nitzsche, Chairman FOR!! C RECEIVED .c DANIEL L014 TOWN C?EAK APPLICATION FOR APPROVAL OF DIN+`TNITIM PIURTH ANDOVER lot 19 AQVIFAIR To the Planning Board of the Town of North Andover: The undereignadq being the applicant as defined under Chapter til, Section 81-Lq for approval of a proposed subdivision shown an a plan entitled , [?nrKYY RFK FIATFS by TmnmAny, F- NFVF ASS(lf i ATPC- T mr- dated NAVFMRFR 9S_ 1986 being land bounded aS follows: NOR HFRI Y RY I ANn nF FARR & Wil KLN52N EAS_TERL_Y BYISD OF BREEN & FARR: SOUTHERLY BY LAND OF CI fiosTAN „WESTERLY BY LAD QF WINjERGR -EN REALTY TRUSIS hereby submits said plan as a DEFINITIVE plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of said plan. 227.,228,229 Title References North Essex Deeds, BooQQ]L9 Page ; or 14 Certificate of Title No. , Registration Book .# page ; or Others Said pa"s not( ) evolved from a preliminary plan submitted to the Board o19 ffi. and a ed (with modifications) ( ) disapproved , 19 , . The undersigned hereby applies for the approval of said DEFINITIVE plan by the Board* and in furtherance thereof hereby agrees to abide by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said DEFINITIVE plan by the Board: 1. To install utilities in accordance with the rules and regulations of the Planning Board, the Public Works Department, the Highway Surveyor, the Board of Health, and all general as well as zoning by-laws of said Town, as are applicable to the installation of utilities within the limits of ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Iv and V of the Rules and Regulations of the Planning Board and the approved DEFINITIVE plan, profiles and cross sections of the same. Said plan, profiles, cross sections and construction specifications are specificallvy, by reference, incorporated herein and made a part of this application. This application and the covenants and agree- ments herein shall,be binding upon all heirs, executors, administrators, successors, grantees of the whole or part of said land, and assigns of the undersigned; and 3. To complete the aforesaid installations and construction within two (2) years from the date hereof. gVV5t{:gX OF Vecwq FBrror. eowt. " 7-0- c-r Received by Town Clerk: A Date: Signature of Applicant Times ® S Signature: tisAodawe, M4 • 01 ¢� Address I ROCKY BROOK DEFINITIVE SUBDIVISION MARCH 2, 1987 Document #204 a. All Planning Board order of conditions are to be placed on the recorded definitive plan, (cover sheet) prior to the signature at a Planning Board Meeting. b. Prior to signing the definitive Plans all executed deeds of easements and parcels shall be submitted to the Planning Board and held in escrow until completion. At the time of completion and prior to final security release, the developer shall execute such documents for the Town. c. A certified document shall be submitted to the Planning Board after the completion of each phase verifying that all utilities (including electric, telephone, sewer , and cable) have been installed prior to application of the binder coat. Installation shall be in accordance with the plans and profile prior to the release of any lots. 1. A Notice of Intent shall be filed with the NACC as required under Chapter 131 - Wetlands Protection Act, and local Conservation Commission regulators and any changes required may be cause for reconsideration of the subdivision under M.G.L. Chapter 41. All wetlands shall be properly located in accordance with Chapter 131 and shown on the Definitive Subdivision Plans at the time of submittal. 2. The roadway layout and alignment shall be revised so as to minimize wetland crossings. 3. The roadway cross section and drainage shall be designed to conform with the Planning Boards Rules and Regulations. 4. Two (2) watergates should be shown at Tanglewood Lane and Rocky Brook intersection with the approval of the Board of Public Works. 5. The developer will add watergates at stations 7 .00 and 20 .00 in accordance with the Subdivision Rules and Regulations (Section V. , F, (3) . 6. Houses, septic systems and proper grading are to be shown on the plans in accordance with the Subdivision Rules and Regulations (Section B,3 (k) ) . 7 . The developer will provide catch basins at the intersection of Tanglewood and Rocky Brook Road, to be coordinated with the i Division of Public Works. 8. A notation shall be made on the plans regarding the removal of the temporary turn around on lots 7 and 8 in the event that the road is continued. A condition shall be placed on the record plan, with special notation on lots 7 and 8, which specifies that the temporary turn-around easement on said lots will be removed and the easement restored to lawn upon the future submittal upon approval and construction of any extension to Rocky Brook Road. The developer shall also include a written clause in a purchase and sale agreements and deeds of the lots that the road may become a through street at a future date (to be noted on the plan) . 9. Drainage and retention easements shall be on record plans. 10 . Parcel A, at the intersection of Rocky Brook and Tanglewood Lane is unacceptable as an easement and must be shown as part of the road layout. The slope easement for Parcel A at the intersection of Rocky Brook and Tanglewood Lane shall be shown on the plans as part of the road layout. If there is to be an easement then all documentation shall be submitted to the Planning Board. 11. Executed deeds of easements shall be submitted to the Planning Board. 12. Lot 11 should not be included as a separate lot since it is not a buildable lot and should be absorbed into adjacent lots. Lot 11 and lot 10 are to be combined to produce one buildable lot to be identified as lot 10-11. 13. The 100-year flood plain elevation should be shown in the detention ponds and floodway of.:.Mosquito Brook. 14. Mosquito Brook is to be shown on recorded and topographic plans as it flows through the property. 15 . A Drainage easement shall be placed on lots on Mosquito Brook to be measured from the tributary at the rear of each lot shall be placed along the 100 foot setback from the Mosquito Brook along the edge of the wetland for the purpose of minimizing adverse environmental impacts on the watershed of Mosquito Brook. The easement is to be noted on record plans and lot deeds. 16 . The developer shall not remove more than 50 percent (508) of existing trees within each subdivision lot. This restriction shall be binding on the developer and builder of each lot. Any tree cutting needed beyond this restriction will require Planning Board approval. As required by the Tree Warden, lots with minimal natural tree coverage will be provided with new tree plantings, number and size of trees to be planted shall be at the discretion of the Tree Department. Also, a tree cutting plan shall be submitted to and approved by the Planning Board and Tree Warden prior to final Planning Board endorsement of the Definitive Plan. 17. There shall be no driveways constructed at catch basin or stone bound locations in accordance with rules and regulations (note on record plan. ) i 18 . The water mains shall be shown on the profile sheets in accordance with the Subdivision Rules and Regulations (Section B, 31 (p) ) • 19 . No lot (s) or group of lots will be released from the Statutory covenant until all street utilities have veen installed to the satisfaction of the Division of Public Works and further that certification and an interim As-Built plan and profile shall be submitted for approval to the Planning Board indicating that all drainage has been installed in accordance with the approved plans. In the event any drainage has not been installed in accordance with the approved plans, the Design Engineer shall substantiate with revised drainage computations that the incorrected installation shall not adversely effect any downstream, abutter and/or the overall' drainage design of the subdivision to the satisfaction of the Planning Board. The as-built plan and certification shall include all utilities installed within the street, including , but not limited to drainage, sewer , gas, water , telephone, fire, cable and electric and further that all detention basins and off street drainage has been completed satisfactorily. 20 . No lot (s) or groups of lots shall be released from the Statutory Covenant until the binder coat of bituminous pavement has been placed to the satisfaction of the Division of Public Works and certification from the Design Engineer certifies the horizontal and vertical location of the binder coat is in conformance with the approved plans. 21. No lot (s) or group of lots shall be released from the Statutory Covenant unless the Conservation Commission has approved such lot construction and has issued either a Negative Determination or an Order of Conditions on such lot or if neither is applicable has informed the Planning Board that such lot is not governed by Chapter 131. 22 . The final As-built and Acceptance plans shall be accompanied by a Certificate of Compliance from a Registered Professional Engineer certifying that the grades on all lots and streets have been established in compliance with the Definitive Plans and that such grades do not create adverse drainage patterns onto adjoining lots, streets and/or abutters. 23. Developer shall reserve the fee in the roadway from any lot conveyance. I 24. All Boiler Plate including but not limited to: a) Conservation Commission Order of Conditions. b) Executed Deeds of Easements prior to endorsement. 25. Gutter profiles should be submitted for intersection of roadway with Tanglewood. 26 . The crowns of the pipes should be matched in accordance with proper engineering procedures with the proper amount of fill over crowns of pipes to be shown on plan The plans shall show the cover at the Catch Basins at the shoulder of the roadway, station 15 of the profiles shall be corrected to reflect what is shown on plans. 27. Erosion and sedimentation control programs shall be submitted for approval and shown on plans. 28 . A bond in the amount of $20 ,000 must be submitted to cover the amount of the final as-built plan. 29 . Subdivision plans show roadway filling on abutting property of Wintergreen Realty Trust. Written easements shall be provided for the filling. 30. Plans will be provided which show in proper detail and clarity the existing drainage or retaining wall on Tanglewood. Proper interface of drainage and retaining walls at intersection of Tanglewood and Rocky Brook should be shown on plans. 31. The Plans shall show to the satisfaction of the Planning Board that the drainage calculations do properly mitigate runoff. 32 . Revisions to plan doesn' t preclude the possibility that Planning Board will not have additional comments on impacts of revisions or changes. 33. No benchmarks are shown on plans in accordance with rules and regulations, the developer is required to coordinate through field checks and adapt the plans to reflect accurate benchmarks, where field checks differ from aerial benchmark calculations. 34. All conditional notes are not shown on plans. 35 . The length of the dead end roadway exceeds the maximum allowed under the rules and regulations of the Planning Board and no provision is allowed for roadway continuity to other land that will permit the extension of the roadway to connect to other streets and roadway. Because the proposed dead end road is so long (about 2000 ft. ) and is situated at the very edge of Town, the Planning Board has concerns regarding traffic flow, serviceability and emergency access. Accordingly, no construction shall commence on this project until the applicant provides sufficient documentation concerning alternatives to the current road layout and the likelihood of the extension of the roadway to the abutting property within a reasonable time. When this information is received, the Planning Board will make a final determination whether to grant a waiver regarding the dead end roadway and/or establish additional conditions regarding the length of the dead end and the possible extension of the roadway to abutting property. 36 . The Planning Board is of the opinion that many of the lots specifically 18 , 19 and 14 are not buildable lots either because of extensive wetland and floodplain areas, Board of Health restrictions or zoning violations. It is the developers responsibility to demonstrate otherwise on the plans, or through a site plan where necessary. 37 . Plans for water main looping shall be provided to the Planning Board for approval prior to endorsement. 38 . The insertion of a new roadway across lot 22 of Wintergreen Estates will require a Modification (under Chapter 41, Sec. 81W) of the Wintergreen Estates subdivision. This modification will entail a new (i.e. revised) application and Public Hearing for the Wintergreen Estates subdivision. Consequently, no construction will be allowed on the Rocky Brook subdivision until the modification of the Wintergreen Estates subdivision has been approved by the Planning Board. 39 . In order to provide for the common welfare, convenience and safety of future inhabitants of the subdivision, and to preserve important site features, the applicant shall submit to the Planning Board for its approval an appropriate plan which provides for open space for parks and/or recreation. 40 . The applicant shall submit an appropriate plan to the Planning Board to preserve (through a conservation easement or other development restriction) the existing walking path that extends through the subdivision. 41. Prior to endorsement, the applicant shall submit to the Planning Board for its approval an appropriate plan for phasing the construction of the subdivision. 42. The developer will provide written documentation to the Planning Board and staff that he has permission, without liability to the Town of North Andover , to cross the subdivision known as Wintergreen Estates in order to gain access/egress from the proposed Rocky Brook Subdivision. 43. In the event Cluster zoning is passed at the Annual Town Meeting this parcel would become eligible and the Planning Board would encourage such application. cc: Highway Surveyor Board of Public Works Tree Department NACC Building Inspector Health Department Assessor Police Chief Fire Chief Applicant Engineer File RECEIVED DANIEL LONG TOWN CLERK WORTH Awp0VER FORM B APR Z5 APPLICAT�ION�FOR APPROVAL OF A PRELIMINARY PLAN i2JG �S , 19A To the Planning Board of the Town-of North Andover: i The undersigned, being the applicant as defined under Chapter lulu Section 81—L9 for approval of a proposed subdivision shown on a plan entitled IMAsAy C;f;ZWv/C,(4 a4,v Ree4e Ssr 7Zs By .tom d &jadated 4PX&- Z3 , 19 _ being land bounded as follows: mac% F hereby subunits said plan as a PRELIMINARY subdivision plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of said plan. ew-2411 Rf 2�7 X&- 2aa e Title reference: North Essex Deeds, Book&//, PageM; or Certificate of Title No, Registration Book j Per.; or Others Applicant's signature. Received by Town Clerk: P� �.` � � 112 Date: Applicants address 976 Qe fa i7- /V- Z/'Li -4,4 A9 i' r"A Time: Signature: Omer's signature and address if not the applicants Notice to APPLICANT/TOWN CLERK of Action of Planning Zosrd on Preliminary Subdivision Plan entitled: ` By: dated 1. The North Andover Planning Board has tentatively approved said plan, with- out any modifications thereof. 2. The North Andover Planning Board has disapproved said plans for the following reasons: 3. The North Andover Planning Board has tentatively approved said plan, subject to the following modificatimw thereof: very truly yourat NMM ANDOM PLANNING BOARD BY Date: RECEIVEt: , DAHIEL LGH6 "fDWN NORTH Au VER ' APR Z5 r .23 P ��� FORM E CERTIFIED LIST OF ABUTTERS S. =4. _ TO THE PLANNING BOARD OF THE TOWN OF NORTH ANDOVER: The undersigned , being an applicant for approval of a _Definitive Plan of a proposed subdivision entitled �( nLc �T14TE submits the following sketch of the land in the subdivision listing the names of the adjoining owners in their relative positions and indicating the address of each abutter on the sketch or in a separate list, in- eluding owners of land separated from the subdivision only by a street . Signatureofo A_ppiicant Address. TO THE PLANNING BOARD OF THE TOWN OF NORTH ANDOVER: This is to certify that at the time of the last assessment- for- taxation made by the Town of North Andover, the names and addresses of the parties assessed as adjoining owners to the .parcel of land shown above were as above written , except as follows = , Assessor f RECORDED BY AN A BUTT ERS L I S T CLIENT Rocky Brook Realty Trust • Thomas E. Neve Associates, Inc. JO8 NO. 550 DATS 4_/23/86 NAME OF ABUTTER , (OWNER) ADDRESS AND/OR MAILING DEED ASSESSOR'S PLAT COMMENTS ADDRESS BOOK/PAGE PLAT BLOCK LOT IN NORTH ANDOVER Rocky Brook Realty Trust: Boxford Road Peter Breen & Uler Munroe, North Andover, MA 01849 2011 229 90A 1 OWNER 'Thomas N, . and Mabel 745 Foster ST. Wilkinson North Andover, MA 01845 1377 350 90A 7 Wintergreen Realty Trust 865 Turnpike St. North Andover, MA 01845 1850 312 90A 9. George- 5fi8-Mass:-Aae. + k,4-Ve,& 845 339 95 90A 3 A/l'fP/Od`l a `.r Q.✓1 Crass ST M N. 4 Peter & Kerry Breen 78 Boxford St. AND C URT North Andover, MA 01845 CERTIF, 9564 90A 2 IN BOXFORD Thomas N. and Mabel B. 745 Foster St. Wilkinson North Andover, MA 01845 6617 145 Map 22, Lot 3 George and Wanda Farr 216 Raleigh Tavern Lane North Andover, MA 01845 . 6123 273 Map 22, Lot 17. 1 .�-.•_.N• :. 1 , epi ! I - !Y IN �'i` -' .%•.=t,` .�� Z - _ +"_S1 i i ' -_`� �"---____— _ � ``.. •jam JO Imo, ,. ���� •Y'-;- `.`G'�_--y.._ •-.�.�-_, ._ - '� % _' -_ - 4 - � \ 'll � r e.+Yhn.�fi_-ter r•, -`-- r \�_/ ', .`�� •� ' s\ 1` _� .mow,.•.� �l ,ten. w0 M� ' a REPJA N 14 Pp�� hlUVFR r Notice to APPLICANT/TOWN CLERK of Action of Planning. Board on Preliminary Subdivision Plan entitled: ROCKY BROOK ESTATES ' By: Thomas E. Neve dated April 23, 1986 xi m6dm*:gt� xbwdi%wKxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 2. The North Andover Planning Board has disapproved said plans for the following reasons: SEE ATTACHED: yAhOc46Ngwinmww��mw*,K&Wyxxxxxxxxxxxxxxxx very truly your$$ 908 MRTH ANDOVER PLANNIIG BDARD N3ALq�4:iv :-ijUQp BY Erich W.Nitzsche Chairman 9 �3713INi�t1 Dates July 21, 1986 RECEIVED 67 ?- DANIEL LONG TOWN CLERK NORTH ANDOVER APR 25 1 23 PM '86 FORM B APPLICATION FOR APPROVAL OF A PRELIMINARY PLAN ele- TO the Planning Board of the Town of North Andover: The undersigned, being the applicant as defined under Chapter lel, Section 81-L, for approval of a proposed subdivision shown on a plan entitled SURD/Ut cie�c/ PLAN OF aiPGY.E'�/�FSrV AES' at160iVT' geoGk- _&Zale PfW T-r T use Byam�s E. N rase dated tic. 23 , 19 86 being land bounded as follows: &kM a 16~00C �Ai2.� l�it� Gt�lt, i cJfoN _ AAS/Lc2G c/ F'r L A�V1�OF ,�i7t1 �iclOJ7,, 4 4WV of 7ZU4-7- fl �� hereby submits said plan as a PRELIMINARY subdivision plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of said plan. B�-?a/ Z27 Title reference: North Essex Deeds, BooBoo��* P 4zf; or Certificate of Title No. , Registration Book , Page.; or Other: Applicant's signature: AA 'n Received by Town Clerk: A$r _ T.1 ,(1 Date: Applicant's address r)9 e &)),, a" S7- Time: Signature: Owner's signature and address if not the applicant: Ji ROCKY BROOK ESTATES Vote to Dissapprove - Preliminary Subdivision for Rocky Brook Estates 1. The length of the dead end roadway exceeds the maximum allowed under the rules and regualtions of the Planning Board and no provision is allowed for roadway continuity to other land that will permit the extension of the roadway to connect to other streets and roadway. 2. The Planning Board is of the opinion that many of the lots, specifically 18, 19 , 20, 5, 14, 11 and 22 are not Buildable lots either because of extensive wetlands, Board of Health restrictions of zoning violations. 3. No provision for water main looping has been provided. 4. A sufficient key map has not been provided that allows the Planning Board to determine where adjoining parcels of land are located so as to be able to determine if a roadway continuity to adjoining land is possible and/ or necessary. 5 . No provision for the mitigation of Strom runoff for the 10 yr. and 100 yr. strom has been provided. 6 . No test pit date has been provided to allow the Planning Board to determine the suitability of the land to accept on site sanitary leaching fields. 7. Drainage has not been designed in accordance with the rules and regulations of the Planning Board. 8. The applicant should be aware that the insertion of a new roadway across lot 22 will require a Modification under Chapter 41,section 81w of the Wintergreen Estates Subdivision requiring a new application and Public Hearing of the existing S.iabdivision. 9. The proposed drainage from Tanglewood Lane across lot 23 is unacceptable to the Planning Board and said drain shall be realigned to fit within the street layout. The drain shown as existing is not evidenced on the ground. 10. In accordance with the Nacc letter dated July 21 , 1986,Rocky Brook Road. from sta. 0+00 to 3+50, there is an existing wetland West of the proposed roadway. Since this wetland is not shown on the plan, it is unclear if wetlandsar.terat�on will occur. 11 . In accordance with the Highway Surveyors letter dated May 28, 1986, Tree Wardens letter dated April 30, 1986, Fire Chiefs letter dated April 30, 1986, and Board of Healths letter of May 28, 1986. kn cc: Highway Surveyor Board of Public Works Tree Department NACC Building Health Police Fire Assessor Applicant Engineer File