HomeMy WebLinkAboutGRAY WOODS ESTATES Notice to APPLICARr/TOWN CLERK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled:
GRAY WOOD-ESTATES
By: CHIRISTIANSEN ENGINEEk dated December 27, 19 85
* * Revised: March 22, .1986 '
mor$lttxe���3��o�imt� d�s�sxx4ti �x��xe�c�� �i�4�x�xx
�4}�xatis�l$tsx ,
That the record owners of the subject land forthwith exec =cord ,
00
a "coven with the land", or otherwise provi��eeswithin
for the con-
struction of ways Lti s installation of municipal said sub-
division, all as provide L. c. q1 , S. $
2. That all such construction stallations shall in all respects
conform to the governing rules re s of this Board.
3. That, as re by the North. Andover Boar Health in its report to
this Board, no ding or other structure shall be aced upon Lots
No. as shown on said Plan wi he prior
cons= said Board of Health.
4, . Other .conditions:
In the event that no appeal shall have been taken from said approval within
twenty days from this date, the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
� * � � * �r +� � � * � � * a * � * � we � * ars► * � � * �e � � * � �tat * � *
The North Andover Planning Board has DISAPPROVED said plant for the following
reasons. . _
See attached 12 reasons.
9B, W� sr 6 � add
u.
ulvr. �INi
NORTH A,NAOVM PLANNIW BOARD
Date: _', a2ril 3 , 1986 „�, � By: M,i eba�i p-1 P.: $nhP_-r9g - r hairman
' FORM C hC£tYED
DAME LLdtj R
APPLICATION FOR APPROVAL OF DEFINITIVE PLANDRunT� Ah3_0
Deceey ll 30 - , 19 , y...
To the Planning Board of the Town of North Andover:
The undersigned, being the applicant as defined under Chapter 41., Section
61—Ll for approval of a proposed subdivision shown on a plan entitled
Gr��od Estates
' rr. r�r.. r~ i rrrrrrr. rr�
b Christiansen Engineering r dated 12/27 „ =
Y ,..
being land bounded as follows: Southerly by Gray Std�aterly by N.A.
rimprovement Society & Daiulis Bros. Const-;"l' Northerly by. Chas. Ward
Reservation Land and Easterly
hereby submits s plan as a DEFINITIVE plan in accordance with the Rules and
Regulations of the North Andover Planning Board and makes application to the
Board for approval of plan.
Title References North Essex Deeds, Book Page ; or
Certificate of Title No. , Registration Book..# pages; or
Other: Inst. ## .14565
Said plan has( has not(X) evolved from a preliminary plan submitted to
the Board of 19 and approved (with modifications) ( )
' disapproved ( oa , 19 i
,-,_.,__-_._The undersigned..hereby:_applies for the approval of..said.DXFINITIP& plan
by the Board, and in furtherance thereof hereby agrees to abide by the Boardte
Rules and Regulations. The undersigned hereby further covenants and agrees
with the Town of North Andover, upon approval of said DEFINITIVE plan by the
Board: ,
1. To install utilities in accordance with the rules and regulations of the
Planning Board, the Public Works Department, the Highway Surveyor, the
Board of Health, and all general as well as zoning bar-laws of said Town,
as are applicable to the installation of utilities within the limits of
ways and streets;
2. To complete and construct the streets or ways and other improvements shown
thereon in accordance with Sections Iv and V of the Rules and Regulations ,
of the Planning Board and the approved DEFINITIVE plant profiles and cross
sections of the same, Said plan, profiles, cross sections and construction
specifications are specifically, by reference, incorporated herein and made
a part of this application. This application and the covenants and agree—
ments herein shall be binding upon all heirs, executors, administrators,
successors' grantees of the whole or d assigns of the
, gr a part of said land, and ass gn
undersigned; and
3• To complete the aforesaid installations and construction withint (2) j
years from the date hereof.
` Received by..Town Clerks
Dates Signature of Applican 4
Times Forbol Ilea 1114
401 Andover St.
Signature: Address
r
DEFINITIONS SECTION
Developer: Forbes Realty, Thomas Laudani and James Philbin, 401
Andover Street, North Andover, MA and its successors.
The Board: shall mean the Planning .Board of the Town of North
Andover, MA (120 Main Street, North Andover, MA) .
The 'Rules: shall mean the Rules and Regulations Governing the
Subdivision of. Land - North Andover, MA issued by said Board
and as amended through this date.
The Plan: shall mean sheets one through eleven, of the Definitive
Plan of "Gray Wood Estates" prepared by Christiansen
Fnqineering, Inc. , 114 Kenoza Ave. , Haverhill , MA dated
December 27, 1985 revised March 22, 1986.
I
i
adl
a3naM HiHON
U313 NA
91�(Il �131liV�
t9�A13�3l1
April 7, 1986
Decision — Disapproval
Definitive Plan of Land
Gray Wood Estates dated
12/27/85, rev. 3/22/86
1 . Applicant has not provided a fifty (50) foot roadway width from
Gray Street through to station 22 + 75. In accordance with the
Planning Board' s Rules and Regulations, Section IV, 4.2.a,
street width shall be a minimum of 50 feet and the applicant
can provide for proper width since he owns land along one side
of the roadway or the other. Roadway widening easement is not
sufficient in the opinion of the Board to provide proper
access-egress, maintenance of the roadway and proper side
shoulders for the health, safety and welfare of the proposed
dwellings. For lessening congestion in such ways that will be
safe and convenient for travel, for reducing danger in the
operation of motor vehicles, for securing safety in the case of
fire or other emergencies, for insuring compliance with the
applicable zoning ordinances, for securing adequate provision
for water, sewerage, drainage, electric utilities and other
requirements in a subdivision.
2. The proposed roadway alignment at the intersection of Gray
Street does not provide the proper setbacks in the designated
Residence 2 district in Table 2 of the Zoning Bylaw for the
existing dwelling.
3. Applicant has not demonstrated how to construct the roadway for
its full width in areas of cut and fill without encroachment
onto land of abutters to the East from station 2 + 0 through to
station 15 + 50. The topographic plans show side slopes which
contradict the typical roadway cross section on the plans and
in accordance with the Planning Board's Rules and Regulations.
4. The applicant has not complied with the Board of Health
Regulations (see correspondence dated 1/15/86, 2/24/86 and
3/24/8'6) .
- Applicant has not fully demonstrated how dwelling and related
on-site sanitary leaching fields shall be designed and
constructed to protect and secure adequate provisions for
sewerage and drainage and ensuring sanitary conditions.
- Applicant has not provided information as required under Sec.
II, B,10; applicant has not provided locations of test pits l
through 16, no test pit or percolation data has been provided
for lots 5 through 9 inclusive.
Due to the close proximity of the wetlands to proposed
leacrhing fields and the high spring water table and not
withstanding the fact that some proposed leaching fields do
not meet the specifications of Title 5, the State Sanitary
Code, Regulation 3. 7, in its jurisdiction of ensuring certain
i
I
i
slope requirements for the design and construction of on-site
leaching fields and certain minimum distances from subsurface
drains and not withstanding that the Town of North Andover ' s
Planning Board' s Rules and Regulations, Section II,B, 3
states, "No land shall be subdivided unless it is of such
character that it can be used for building purposes without
danger to health and safety. No land shall be subdivided
unless the subdivision plan shall provide means of drainage
and sanitary sewerage disposal adequate in the opinion of the
Board to fully protect the public health."
- The Planning Board is of the opinion that lots 2, 3,4, 7,8, 12
and 13 shall be considered non buildable lots and shall
remain as open space to protect the integrity of the
wetlands, to ensure against additional flooding of existing
residents on Penni Lane and on land of the North Andover
Improvement Society and to protect the health of residents of
the Town of North Andover.
5. The Planning Board will not grant the applicant a waiver of
Strict compliance under M.G.L. Chapter 40A, Section 81-R and
Section IV.A.4.a and II .B.S.a concerning the length of Dead
End Streets in the Rules, specifically that which is designated
Stiles Street.
6. The applicant has not demonstrated compliance with the Rules of
the Planning Board, specifically Section III,B, l,d,e and
Section III, B, 3,k,m,n and p.
7. The subdivision plans do not indicate locations of stone bound
monuments in accordance with Sec. V. L, throughout the
subdivision.
8. The subdivision plans do not indicate pipe sizes into or out of
the proposed detention pond. Insufficient detail has been
shown to fully depict and demonstrate how the proposed ponding
area will be constructed, dikes or berm, excavated and type of
finish , surface. Applicant should have prcwided detailed
cross-sections with spring water tables and detailed the
proposed activity with proper side slopes from the roadway and
edge of wetlands and shown how the public safety would have
been protected to prevent vehicles from entering said pond.
- The Planning Board is of the opinion that the drainage
analysis as submitted by the applicant which does not
sufficiently detail the existing and proposed watersheds and
has not properly safeguarded against further flooding of the
wetland adjacent to the Penni Lane residences.
- No flood plain elevations have been submitted or delineated
on the plans.
8. The subdivision plans as submitted proposed driveways across
the vegetated wetlands to serve lots 7 and 8, the Planning
Board is of the opinion that detailed cross sections should
have been submitted to ensure proper side slope protection to
preven# the integrity of the slopes, wetland and driveways. No
data was submitted as to drainagle calculations or size of
proposed drain pipe under the driveways to ensure against
flooding and overlapping of the proposed driveways. No data
was submitted regarding the depth of peat in the driveway
crossing nor detailed provisions to show a contractor how to
preperly construct said crossing to protect the integrity of
the driveway.
9. A Notice of Intent has not been filed with the North Andover
Conservation Commission as required under Chapter 131, Wetlands
Protection Act and the local Conservation Commission' s
regulations.
- In accordance with the Conservation Commission' s letter dated
January 23, 1986:
o There is a possibility that the wetland boundaries are
inaccurate. If this is so then several lots would be
unbuildable.
o There is a discrepancy on a wetland boundary between IEP
and Christiansen Engineering on lots 12 and 13.
o Wetland replacement plan is required for lots 7 and 8.
o Off site wetlands need to be shown north of lot 7 and 6.
10. Applicant has not provided the Planning Board with any detail
of the proposed steel bridge to allow for proper analysis by
the Town of North Andover to ensure the safety, health and
welfare for the inhabitants of the Town of North Andover. The
Planning Board is of the opinion that such structural detail be
submitted prior to the approval of a subdivision that proposes
to serve residential dwellings with fire and police protection
and other related services incident to residences . If a
proposed bridge were to be built, what is the effect of
removing the existing drain pipe and roadway that presently
serves as flood control devices. No data regarding that matter
has been submitted to the Planning Board.
11. No Datum for the existing bench marks have been submitted. In
accordance with the rules and regulations, this subdivision
must be on the same datum as the Penni Lane subdivision to
allow the Planning Board to have reference to the watershed and
flood elevations of the mutual wetland areas. Bench marks
should have been established throughout the subdivision in
permanent locations. The Planning Board is of the opinion that
wooden stakes set in the roadway, leaching areas or proposed
house locations would be destroyed as soon as any construction
starts and are not considered permanent.
12. No documentation has been submitted to the Planning Board which
indicates the status or ownership of Stiles Street and the
applicants right to access said street.
cc: Highway Surveyor
Board of Public Works
Tree Warden
Fire Chief
Police Chief
Conservation Commission
Building Inspector
Board of Health
Assessor
Applicant
Engineer
File
i
CNQM 7FR/NG REPORT
FOR
6RA Y WOOD ESTA Ti 5
IN
t NORT1/ ANDOV4CR, MA.
1
i
1
1
1
1
t CRR/ST/ANSEN ENG/NEER/NG, /Nc.
//4 KENOZA .4V9NL/E - 14AVYRII/LL, MA.
GRAY WOOD ESTATES
' INDEX
j � I INTRODUCTION
II CROSS REFERENCE FOR COMPLIANCE OF THE
APPLICATION OF GRAY WOOD ESTATES WITH
NORTH ANDOVER SUBDIVISION REGULATIONS
III FORMS
IV VARIANCE FROM REGULATIONS
V ENVIRONMENTAL REPORT
VI HYDROLOGY
' VII SOILS
A) Soil Survey of Essex County,
Massachusetts, Northern part
B) Site Testing
' VIII SILTATION AND EROSION CONTROL
IX WETLANDS PROTECTION ACT (CHAPTER 131,
SECTION 40)
X SITE ACCESS
XI CONSTRUCTION SCHEDULE
XII EASEMENTS
i
L
I
' INDEX OF FIGURES
' FIGURE IA SITE LOCATION
FIGURE 1 WATERSHED
' FIGURE 2 WATERSHED SOIL CONDITIONS
FIGURE 3 SITE SOIL CONDITIONS
FIGURE 4 SEDIMENTATION CONTROL DETAIL
FIGURE 5SILTATION POND DETAIL
s
i
- i
i
' SECTION I
t,
INTRODUCTION
f;
Gray Wood Estates is a proposed 22.5 acre subdivision
located in the southwest section of North Andover',
Massachusetts. The site is located to the north of Gray
Street, just west of Penni Lane (See figure 1A) . The
subdivision will contain 13 building lots. Access to the
' project site will be provided by Stiles Streets an existing
street that will be improved and reconstructed from its
i
,present condition.
t
i
4
N`
�- s48 ///'���•••���•'''t•� d �o i __� , ' , � "w' �� •1 ��� )p\.fah .
�"\ •� to .w•• � 1�°b ��\ i��id t.��' � O + �•;_ •, 0� 0�^. ,rv'�-"I5� /. ' ..J I
°�'� •"" • �m ���;\¢ ',,I IXC• U � i � �� p �
tj
f� r � 5 may= ,`' � � �� O �° "' '(f\•V
}•S Y,• }• • \ vY- ry IIx �;,�' O "1 •', O�� 0 _ lr...J AO`s' P
1 \ �. ice.� ti �.� _°•' o
.. com o L'a' S,• ,•�
47
\ �Ye• r
�••I �'°" _"^ •"^�M•�-� U .t�0 p f-•d _ �. �`f6+�. \ 4 ���qqq,,, � ,,I .-•
'IF�(� ..d•�•_ ? .� f'` .�V�'.� •If s� QO ' 0 � � e] 9Ci\ 0
� �� \
v •• �� mow. ,,. � ,\. '/tti ~•4�• ••' !f (� ly�J/��//''��°���^�•� :� Ot
•,l 1� •• ��ty — -.a..� 01• � ' o• .e� O .° 1'� °1 •�� \ °..\ J7S ac� \\� `� ,.•�` � J . �. � � : `� �
Ate: a .• oa I
o :�• � �.\ � ._;, ppm w- �
f �• ../ � _ w. 'to V d
,1 �47 ✓/ � M°� � \..�� \til/��� `} � O,��� •"Y• \ ./r� �.. '
US [` 1 ��• ,(lp �•/./�,• /'.,i�.lp `• •y J �`-',�c'.�.`�_iu�'1-C '\�w�
}•' � _ � �q.lJl ° fix: �- °� ,`�"/`•`� � �.• 0`0'e o '� •c
M• • • r, MI •,ate
r• ,!A •r- Ip '1(i.�•� 'AL1., i._\.. C' I!lcJ O 1_ -,t.`\ .. a4"� +• L�
FIGURE IA
SITE Loc4TION
SCdLE�
CRROTIAMMN ENGINEERING, INC
114 KEN42d dVE. -4,dJIMA&L-MA-
<1
Section II
Crows Reference for Compliance of the
application of Gray Wood Estates
For Approval of a Definitive Subdivision Flan
to they North Andover Planning Board
Rules, and Regulations
' Governing the Subdivision of Land
Section II
' Cross Reference for Compliance of the
Application of Gray Wood Estates
for
Approval of a Definitive Subdivision Plan
to the
North Andover Planning Board
Rules and Regulations
Governing the Subdivision of Land
The cross reference list that follows is provided to assist the
' reviewer of this application in locating where in this definitive plan
application requirements specified in the "Rules and Regulations
Governing the Subdivision of Land, North Andover, MA." are met. The
number in the cross reference list corresponds directly with Section
' III Bl and III B3 of the regulations.
Regulation Application Reference
1 . Submission:
' a) Copies of application Submitted as req.
b) Form C
' Form D Section III
c) Key Map Sheet 1
' d) Seepage Test Data Section VII
' e) Drainage Analysis Section VI
f) Easements Section XII
' g) Environmental Report Section V
h) Construction Schedule Section XI
i) Soil Types Section VII
percolation test results
' j) submittal fee $1750
k) erosion and sediment control Plan
during construction See sheets 5,6,7
after construction & Section VII
' 2. Notice to Town Clerk: Cover letter
3. Form and Contents:
' a) Applicant & address
Owner & address
Engineer & address See title block
b) zone(s) See cover sheet
c) title See title block
d) , Form E See Section III
' e) North Point
Date
scale
' legend See each sheet
' f) Boundary Survey See sheets 2-4
g) Existing streets:
stations
curves
paving
right-of-way See sheets 2-7
' Proposed streets:
stations See sheets 2-7
curves
paving
right-of-way
h) proposed lot:
dimensions, area, number See sheets 2-4
' i) existing easements
proposed easements See sheets 2-4
' j) existing drainage lines
proposed drainage lines See sheets 5-10
k) topographic contours:
' existing
proposed
watershed adjacent to site See sheets"5,6,7
' cut and fills
edge of wetlands
spot elevations See sheets 5,6,7
' 1) foliage line See sheets 5,6,7
' m) location of observation and See sheets 5,6,7
percolation test holes
' results
n) existing major site features See sheets 5,6,7
' o) location, bearing and length of:
streets, lot lines, way lines and
boundaries Sheets 2,3,4
permanent monuments location:
p) profiles of streets, sewers,
' drains, waterline, BM Sheets 8,9,10 r
q) Typical cross section Sheet 11
' r') action of Board Sheets 1-4
s
' s) Existing septic systems Sheets 5,6,7
j
t) land of Owner not subdivded Section VII
i
i'
9
t
t
FORM C REEti pu �`
APPLICATION FOR APPROVAL OF DEFINITIVE PLARC%� �';`�;L';ER
Dece*gk 30122� 19 8t;
To the Planning Board of the Town of North Andover:
The undersigned, being the applicant as defined under Chapter 41, Section
81-Lf for approval of a proposed subdivision shown on a plan entitled
Gray Wood Estates
by Christiansen Engineering dated 12/27
being land bounded as follows: Southerly by Gray St. i Westerly by N.A._
Improvement Society & Daiulis Bros. Const._ i Northerly by Chas. Ward
- -
Reservation Land and Easterly !Y various ovFnpr
hereby submits said plan as a DEFINITIVE plan in accordance with the Rules and
Regulations of the North Andover Planning Board and makes application to the
Board for approval of said plan.
Title Reference: North Essex Deedst Book , Page ; or
Certificate of Title No. , Registration Book page.; or
Other: Inst. # 14565
Said plan has( ) has not(X) evolved from a preliminary plan submitted to
the Board of l9 and approved (with modifications) ( ) 1
disapproved ( on 19
_ _._._The •undersigned..hereby-applies for the approval of..said DEFINITIVE plan i
by the Board, and in furtherance thereof hereby agrees to abide by the Board's
Rules and Regulations. The undersigned hereby further covenants and agrees
with the Town of North Andovert upon approval of said DEFINITIVE plan by the
Board:
1. To install utilities. in accordance with the rules and regulations of the
Planning Board, the Public Works Departmentt the Highway Surveyor, the
Board of Health, and &.11 general as well as zoning bye-laws of said Townt
as are applicable to the installation of utilities within the limits of
ways and streets;
I` 2. To complete and construct the streets or ways and other improvements shown
thereon in accordance with Sections Tv and V of the Rules and Regulations
of the Planning Board and the approved DEFINITIVE plan, profiles and cross
1` sections of the same. Said plant profiles, cross sections and construction
specifications are specifically, by reference, incorporated herein and made
a part of this application. This application and the covenants and agree-
ments herein shall,be binding upon all heirs, executors, administrators,
II successors, grantees of the whole or part of said land, and assigns of the
undersigned; and
3. To complete the aforesaid installations and construction within t (2)
years from the date hereof.
1 .
Received by Town Clerk:
Dates Signature of Appliean
Times 401 Andover S t e
Signature:
Address
v
Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled:
By: dated 19 ._.-
The North Andover Planning Board has voted to APPROVE said plane sn63ect to the
following conditions
1. That the record owners of the subject land forthwith execute and
record
a "covenant running-with the landnl or otherwise provide securityfor the r
struction
of ways and the installation of municipal services within said sub-
division, all as provided "by G.L. c. 41, S. 81-U.
2. That all such construction and installations shall in all rospects
conform to the governing rules and regulations of this Board,
3. That, as required by the North Andover Board of Health in its report to
this Board, no building or other structure shall be built or placed upon Lots
No, as shown on said Plan without the prior
consent of said Board of Health. -
4o Other .conditions:
In the event that no appeal shall have been taken from said approval within
twenty days from this date, the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
e *
_1
The North Andover Planning Board has DISAPPROVED said plan, for the following
reasons: II
1
NORTH ANDOVER PLANK M BOARD
Dates By;
1 _
4
FORM D
DESIGNER' S CERTIFICATE
December 30 ► 19 85
' .TO' THE `-�LANNI NG BOARD ,QF THE , TOWN OF NORTH ANDOVER
In preparing the plan e n t i t I ed Gray Wood Estates
I hereby certify that the above named plan and iccompanyinq data is true
and correct .to the accuracy required by the cur-ent Rules and Regulations
Governing the Subdivision of Land in North Andover, Massachusetts , and
my source. of information about the location of boundaries shown on said
plan. were . one or more, of the following ;
1 . Deed from 169 Trust t.o Forbes Realtr 'Trust
dated 7/9/85 ;and recorded in the
Inst. #14565_
Regi s•try in Book Page
2 . Other plans , as, follows Plan by Christiansen Engineering dated 12/11/85,
1 NERD #7215. #9742► #4184, .#7124
3 . Oral information furnished by
1
' 4 Actual measurement on the. around from a sta :•tin'g pointestablished
by Penni Ln.
' S Other Sources .
w
' Signed
( Sea I, '.of Erigin-.eer or ( RegisterrAL
fession.alEng'ineer or
Surveyor ) Registernd Surveyor}
Christiansen En ineerin
14 Kenoza Ayeal gaverhill
,
Address
FORM E
' CERTIFIED LIST OF ABUTTERS
becember 90.. , 19 85
TO THE PLANNING BOARD OF THE TOWN OF NORTH ANDOVER :
The undersigned $ being an applicant for approval of, a Definitive
Plan of -a proposed subdivisidn entitled Gray Wood Estates
submits the following sketch of the land in the subdivision listing the
' names of the adjoining owners in their relative . positions and indicating
the address of' ea(.�i abutter on the sketch or in a separate list , ' in--
cluding owners of land separated from the su divi n storeet .
' S n u r e of AW ican
Fomes Realty Trust
Address
401 Andover St. , N. Andover
' 19
TO THE PLANNING BOARD OF THE TONIN OF NORTH ANDOVER :
r
_ t
' This in to certi. fy ' that at the time'" of the last assessme.nt . for taxation
made by the Town of North Andover , the names and addresses of the partie!
I � assessed as adjoining owners to the parcel' of land shown above were as
' above written , except as fol lows i
h
'Assessor
List of Abutters
- Cray arv-1 Stiles Subdivision
Jahn F. and Marie B. Tierney, 6 Penni Lane
' James and 3evesta Co5ta�s, IB Penna Lane
' Marilyn J . Titus, 30 Penni Lane
Pawl J. and kPaula M. King , 42 Penni Lane
Thema_, J . and , Jean A. Onei 1 , 54 Penni Lane
L<awrenre :.and Janet Ros:aenbaum, 66 Penni Lane=
a F BUi l tiers Inc. , 90 Penni Lane
' 1-iughi and I:.aren French , 102 Penni Lane
Joseph :and Louise Baessiere 114 Penni Lane
' r;hiarles and Jane Nelson , 31 Cray Street
Marilyn A. Stella, 162 Cray Street
' Micthael J . and Barbara A. Stella, lBo Cray Street
' 1-'rancis C-iuodhUe, 91 Boston Street
Christine Stewart , 68 Boston Hill. Road
' Mary A. Stella, 103 F''utni::tm Road
Charle-s Ward Reservation Clonservation Land
' North Andover Improvement: Society --- Town of North Andover
' neIults Brothers Construction Company , 513 Collins Street , Lynne, MR.
X1`''02
1
1
t
SECTION IV
VARIANCE FROM REGULATIONS
i
i
Section IV
Variance from Regulations `
We ask for a waiver from each of the following regulations for
' the reasons listed below.
P .
Regulation ref. Request for Variance
i.
B.lc The town zoning map is at a scale of
' 1:1000, therefore our key map is at 1:1000
rather than the 1:600 called for by Reg
B.1.c.
3.k Cross hatching of cuts and fills was nor
done on the grading sheet because we felt it
' would make the site grading sheets
unreadable.
3.p Proposed grades are shown in black rather
' that red. The drawings are set up in such a
way that existing and proposed can be
distinguished without colors. Furthermore,
' color is of no value when making prints from
the originals.
' 1V, A.2.a The width of the existing roadway varies
from the required fifty foot width of the
subdivision regulations.
i
SECTION V
ENVIRONMENTAL REPORT
1
Section V
' Environmental Report
' This Statement of Environmental Impact is presented by first giving
the specific wording of the subsection as given in Part III-B-5 of
the Rules and Regulations followed by the applicant's response to that
' specific request for information.
Part III b 5.
The statement of Environmental Impact should include the following:
a) A set of plans at uniform scale shall be submitted in
conjunction with the Environmental Impact Statement, encompassing
the entire subdivision on a single sheet not larger that 42" by
60" showing the following:
(1) Present and proposed topography at two (2) foot
intervals, with graphic drainage analysis, location of
' existing structures, including fences and walls;
See design sheets 5, 6 and 7
(2) Vegetative cover analysis, including identification of
general cover type, (wooded, cropland brush, wetland, etc.),
location of all major tree groupings, plus other outstanding
trees or other botanical features, important wildlife
habitats, and identification of areas not to be disturbed by
' construction;
See design sheets 5, 6 and 7; Lot 1 shown on sheet 5
' consists of meadow and orchard. Lots 2, 3 and 4 are
wooded but have recently beencutfor lumber. A large
portion of lots 2, 3 and 4 are wetlands as shown by the
' wetlands line. Lots 13, 12, 11 and 10 shown on sheet 6
are fields with a large portion of the lots being
wetland. Lots 5 and 6 are forested. Lots 7, 8 and 9
consists of both forest and wetland.
(3) Approximate surface and subsurface water level and
' seasonal high ground water mark;
Subsurface water levels are generally l'6" - 6'0" from
the surface. The surface water ranges from elevation
69 92 in the west of the site to 90 - 94 on the east
of the site.
t
(4) Soil types based un U.S.D.A Soils study and location of
soil percolation. tests.
' The soil types are discussed in section VII of the
definitive plan application.
b) Physical Environment
' (1) Describe the general physical conditions of the site,
•. including amounts and varieties of vegetation, general
' topography, unusual geologic, scenic, and historical
features, trails and open space links and indigenous
wildlife;
Stiles Street is an existing undeveloped road bounded
by two stone walls. An existing are house is at the
westerly side of Stiles Street at its intersection with
Gray Road. Stiles proceeds generally in a northerly
direction. The land to the west of Stiles Street, for
a distance of 500 feet, is part of an orchard. From
' the point where the orchard ends to a point where
Stiles Street crosses a stream, (approximately station
14) the land was until recently wooded. A lumbering
operation has cleared most of the land up to the large
' wetlands that is on the site. All of the land to the
east of Stiles Street, in this same area has been
subdivided and is the backyards of the homes on Penni
Lane.
Proceeding from the stream along Stiles Street for
approximately 250 feet the applicant doesn't own any
land on either side of the road. At approximately
station 16 + 50 the applicants land is on the easterly
portion of Stiles Street. The land on the westerly
' side of the road' is undeveloped. The applicants land
from station 14 + 50 to approximately sttation 23 + 00
is open meadow adjoining the road and wooded at the
wetlands line. The remainder of the property is
wooded.
' 2) Describe how the project will effect these features,
The land's contours will be reshaped where the houses .
will be built and where the driveways will be laid. In
addition, some regrading for Stiles Street will be
necessary. This recontouring will have an impact but
we have attempted to recontour the land following
existing contours.
' Approxiamtely 3,480 square feet of wetlands will be
filled. These wetlands will be filled for the
driveways to lots 7 and 8.
Much of the forest cover of the site will be removed
because of construction.
3) Provide a complete physical description of the project,
and relationship to surrounding area.
Thirteen houses will be built and approximately 2500
feet of roadway will be constructed. Water, sewer and
' drain lines will be laid.
The lots range in size from 1 to 3 acres.
' The project is consistent with the area's prevailing
land use of residential housing.
' c) Surface, Water, and Soils
' (1) Describe the location, extent, and type of existing
water and wetlands, including existing surface drainage
characteristics, both within and adjacent to the project;
A large portion of the site area is wetlands and will
for the most part be untouched by the project. Details
of the drainage can be found in the hydrology section
' of this report.
(2) Describe the methods to be used during construction to
control erosion and sedimentation; eg., use of sediment
basins and type of mulching, matting, or temporary
vegetation; describe approximate size and location of land
' to be cleared at, any given time and length of time .and
exposure; covering of soil stockpikes; and other control
methods used. Evalaute the effectiveness of proposed
' methods on the site and on the surrounding areas,
Erosion and sedimentation will be controlled by the use
' of fabric fencing, sedimentation areas and hay bales.
The location of fabric fencing is also shown on the
plans. Two rows of staked hale bales will be placed
' around each completed catch basin. See the erosion and G
sedimentation control plan included in this report.
j
3) Describe the permanent methods to be used to control
' erosion and sedimentation. Include description of
a. any areas subject to flooding or ponding,
b. proposed surface drainage system,
c. proposed land grading and permanent vegetative cover,
d. methods to be used to protect existing vegetation,
e. the relationship of the development to the topography,
1 f, any proposed alterations of shore lines, marshes or
seasonal wet areas,
g., any existing or proposed flood control or wetland
' easements,
h. estimated increase of peak run—off caused by altered
surface conditions, and methods used *to mitigate any
impact and/or return water to the soil,
i '
Erosion and sedimentation will be controlled on a
L ' permanent basis by the re-vegetation of all areas
disturbed by construction. According to the Planning
Board Regulations, the road shoulder will be loamed
and seeded. In areas of the homes, lawns will be
planted. For further discussion of drainage and
siltation, see Sections E and I of'this report.
' 4) Completely describe sewage disposal methods. Evaluate
impact of disposal methods on surface 'water, soils, and
' vegetation;
Sewage will be disposed of in septic systems which will
' be design according to state and town standards.
d) Subsurface Conditions.
(1) Describe any limitations on proposed project caused by
subsurface soil and water conditions, and methods to be used
' to overcome them;
Subsurface conditions that could be a limitation to the
project include high ground water (1'-6" below the
surface) . This will effect the elevation of the
foundations of the proposed houses and septic systems
construction. In areas with a high water table,
foundations can be constructed so that they are
completely above the ground water level. Septic
' systems will be raised.
(2) Describe procedures and findings of percolation tests
' conducted on the site;
Percolation tests were conducted on the site and the
' results are in this report in another section.
1:
' (3) Evaluate impact of sewage disposal methods on quality
of subsurface water;
Because septic systems will be designed to state
standards, they will not have an impact on ground water
quality.
e) Town Services
(1) Describe estimated traffic flow at peak periods and
proposed circulation pattern;
The traffic flow per day is estimated to be 156
vehicles. The peak flow would be 65 vehicles per hour.
1 '
' (2) Describe locations and number of vehicles accommodated
in parking areas;
Each home will have a driveway and most will have a
garage. Each home can accommodate at least 3 vehicles.
4
' (3) Describe effect of project on police and fire
protection services;
The construction of new roads and homes will increase
the work of the Police Department and Fire Department.
' (4) Describe effect of project on Public Works Department;
The project will increase the work of the Public Works
Department.
(5) Describe effect of project on educational services;
The project will eventually increase the number of
' school age children in North Andover.
' (6) Describe effect of project on the town water supply and
distribution system;
The town water supply will be expanded as a result of
' the project.
' (7) Describe effect of project on the town sewer system.
The project will not effect the town sewer system.
{
f) General Impact
i
(1) Summarize briefly environmental impact on entire town
' with supporting reasons.
The project will cause an increase in work for the
' public fire and highway departments. The home
construction will cause the removal of forest and
meadow. The subdivision will also mean more children
for the school systems.
' The benefits to the town will be increased tax revenues
and an increase in the human resources that the
' families that buy the homes will bring_ to North
Andover.
f,
r
a
SECTION VI
' HYDROLOGY
S
1
Gray Wood Estates
tSection VI
Drainage Analysis
The purpose of the analysis presented here was to:
' 1.) Develop a hydrologic model that describes the existing
drainage patterns and flow for the project site.
2.) To predict the effect of the project on the flow
' characteristics of the site.
' 3.) To develop a system of drainage structures and controls that
Y g
' would mitigate the effect of the project.
' The major hydrologic feature of the project site is a stream that
' has its source near Boston Hill, flows through the project site, and
discharges into a large wetland and pond area (at control point A in
' Figure 1) to the Skug River. The watershed area that contributes to
the stream flow is shown in Figure 1. The project area is shown as
the shaded portion of drainage areas 4,5,6 and 12.
The existing 100 year stream flows were predicted using a
methodology that combines the SCS Modified Soil Complex Cover Method,
methods presented in National Engineering Handbook; Section 4:
tHydrology , a type II stream as described by the National Weather
' Service, Hydrologic Determination of Water Wal' Areas for the Design
of Drainage Structures in Small Drainage Basins by V.T. Chow, and our
own computer model. A copy of the SCS soil conditions for the
' drainage area is shown in Figure 2. Using these soil types, CN values
as developed by the SCS, drainage area acreage measured by planimeter
' and the type II storm intensities, we were able to develop a
hydrograph for each drainage area and add the hydrographs together for
' a combined flow to CPA. See attached calculations and computer
' printouts.
' Areas 1-11, 13 and 14 flow to control part A through the stream.
' Area 12 flows overland directly to the wetland.
' For the proposed conditions, only areas 4,5,6 and 12 are effected
by the project. The CN values, lag times, and times of consentration
' were adjusted and all of the hydrographs rerun. The results are
attached.
' The analysis shows that there are two areas of concern:
1 .) Stream flow under and over Stiles Street.
' 2.) Peak off site flow.
The stream flow to Stiles Street at CPA shows an increase from
' 370 cfs to 376 cfs. The combined flow to the wetland shows an
' increase from 398.5 to 399 cfs. The total value increase to the
wetlands would be 20,000 cubic feet.
We are proposing to install a bridge over Stiles Street at the
stream to allow it to flow as it presently does; through a 30" pipe
and overtopping the road during storms. While the 30" pipe will stay
as it is, the storm flow spillway over Stiles Street will be reshaped
' to accomodate the bridge design. The following calculations show that
the flood level of the stream and hence the adjoining wetland will not
be changed by the project.
' As can be seen from the attached calculations the project will
' have little effect on the area wide hydrology, however we are
proposing a detention pond of approximately 20,000 cubic feet that
will collect road drainage and maintain the rate of flow off site as
compared to existing flows. This pond will provide storage for the
increased volume the project generates as well as reducing the peak
flow. It will also act as a siltation basin to prevent silt and road
salts from reaching the wetlands.
' We believe that the calculations presented here show that the
project will not cause any flooding or drainage problems down stream,
' and as designed meet Planning Board criteria.
Also attached are the calculations that show that the drainage
tstructures are adequate for handling the designed flow.
' The previous hydrograph shows that the total flow from the
drainage area would increase from 398.5 to 399.0 as a result of the
' project. To correct this we propose to take the entire drainage of
tthe southernly portion of Stiles Street to a detention pond.- The
following hydrographs show the street and adjoining drainage patterns.
� ' i
•
- ,. ,_._._ •,, • � it - _... .. .. ._. _ ,. . ._....�.. --- - - -•, - -
"".�\ 3ie•• •I a �<� ;�.�, � :..; � �\
. J
\ •r"I 4Y: P 1� '\•. V• 1 1.• q �: O �U ""•.a N u;\`.
� w -tn• -�- "�' •,y. .: ..e- "':Ya ° p -- 244-_. - + 0
l
n �u TSO l •p N� l .�
IV
CIA
86
o f a. I . � •• 1.
R IV
APB
, �•, o o \f, r' Q ^� M•1�* •• y '�D•`�- Q0 1 r 0' •x. 1 � `
gav D �
ll l •
' r
F16 LIRE' 1
115. 6 5. MQP
5/TE_LOCATION , .
' SCALES j��_2480 �
CNR15rUNSEN CNG/NEERAW INC
114 NIGNOZA AVE• w NAwCRN1L AW
1 A WDA
�,' :_-\l ` It k '.4 � SFC � 91B SA• � COB ..� aA �Wa 5 �Y"
' •r4� . 'r sAB '.: - .E' Ir +-cee 1 ,y -sp s.
CLC 7 Axatl_ c A N`A:
t l IW} � 1\ -`UA•• .•�� hl• h 1.. � SB , .6 MmA 8a6 � K -'• WaC �
.. `r WB \h . , XID flr ... 00 E !R \` .9 �P Wn 1y:� Pee •$,C. 614
re wra PIE B.�r�,:, W>e cae � >•aep WOODCHUCK
F. S, T .wP aB 1 s F •(I 's �+P j r.. H�[L +
�WrA YC. +�r �v{PeYD Wf0" •�'! I 1 yi{. ^CCD S rrvs't 4'
>6F O W B - AM ^/ PoE� W1C I 1,• � � CAD 1 4 �.�� i 1
CS •CA;
! -AIB ` a PAA. +Y PAp I J• ! •� w AJr i.. Cr0 .
1* BnB `+ y CCe t tr, w1E
e a 1y 31.•e•�ti 1 r `. I. •.♦. W.B Pp tr W '.. l `�� i � BP ,r- •Y
> • PaC f;J Ws8•. � a' wsC '.,\4 �8 &1B
8 r..'. '. Wr0 �,�� MC e r� p,a • 5 f4'' � d8 •
w1B-''. •Cr
�i;y PS8 ..i � \ - ."'• MD Ws8 � ND.: 'i., .•CCC i-.
' r _ �; :• � r '. NIC C •. .CAB '•_ '•
+r PSCy 'PeQ PaC Y i ` ,`♦ X18 CAB 'P�1
AIB ,
-• I 1 WA
V NC `
Yca�� ,.. r I - wic RIA \ ♦ wn IZ .: rYS -;`ra _ � ,1
Pap 11{ f, r
WfO , . , W18
p \ NIDA Y \ ��, �. ."p \. CCC •.♦ � � -0IG' Y J r.
I
1 ... kO µ ..-, � L .tip t♦ r+r a6-
Clp (( RIB ` GC Oh t•.. .� , ` o�r ::'
s• S+^ r ;.wIB PeB J WA- ! MC �• PIC \NC`
yCiGPM �`�I MC
me
" ltY r. CBCT MaB ` C�1 B; 0 PCC PIL.ht P v.e.'^ ..Yr •1 r 's`t I.
._-�� 1' A •Y (y��I PBC y < WB .siJ �•� f '�yl BY ' 1 ,�y1 F�r.;� �' I .EBB t +'l � ; iR h
,, `y�e�A t Y ,e Pod Ur P r.: 1 W10•.. ` Cb� ,+I! " s�; Msl y y I ` s p °! {� :� �.
'-ii 'H1B .CrE Wae � A � 1 a Y p .. I .viB' C ♦. , t'.t \ .;1.
�� r. CY, t RIB J � W1B RIB P Hdl! \,'Vs MC :,„ w ,': 1 n Mp •. RsA UB ..
� + ;.• S�Il! z 1 on ent: pkr!}••. f�r a 1 i�(���,J•
,.y t�,ti, y` :ii P � /{LT ♦ eW l *BB ..,. ` `1 .S v ,�%I� MC r 4 1cae ' .D� IM4� XIB
o i�'�� 4AAY WI �,. Y �C ,� a �PBC �i v J � `' 1 �.:, `li!• a - S, C�fi, '!� {„ ,I a r .;1 t,`.
, J( �$ ^. tli �''• F c �r h ,' �rV _ >>YrCBB.. 4 •i/ x 4 { `^fps � .. �i
a �'A.o a - �h�,_ ^4 P `: /I^'! s`. 1WM1 1 )f r� .� '`—A.h {pA •�:./--�C
V, f+ .fltB x tu'.. ;'..i' PAC 1 r \J Rib �• �i 1 f rh �Y CCE. &A-1
". 1 CJC, # 1 F• F.' •'
4;,1j • : q � n R I i 4i '. tMc1 r i 'I,a v ra 1.
It �i'..+I+ �P. ,PB r9 d4 I se P.D V1 5 !1 Cp f•..
v A ,
i nVIW/[ar waB I PAB i rC � �•' d A .Iss' RaC. Pao MC• �
4
URC 2 .
2
Il53 6. ,Sf M,4P
soil. CONDITION5
SULE= P'S ZOSO'
ir9R15T/AN6CN ENG/1VEER1N6,1W
//� /fENOZAgi/E ~fU4YFRklICL,Mr<L
PR#0
GRAY AND STILES
12-9-85
EXISTAREA 1
GSE1
' 100YR
TIME CFS TIME CFS
9 .0194 .67485519 12 1 .93 67. 14
9. 1 .05 1 .74 12. 1 1 .09 37.92
' 9.2 .07 2.44 12.2 .43 14.96
9.3 .07 2.44 12.3 .26 9.04
9.4 .07 2.44 12.4 . 18 6.26
9.5 .07 2.44 12.5 . 18 6.26
' 9.6 .07 2.44 12.6 . 18 6.26
9.7 .07 2.44 12.7 . 18 6.26
9.8 .07 2.44 12.8 . 18 6.26
' 9.9 .07 2.44 12.9 . 18 6.26
10 .07 2.44 13 . 18 6.26
10 . 1 .08 2.78 13. 1 . 13 4.52
10 .2 .09 3. 13 13.2 .09 3. 13
' 10 .3 .09 3. 13 13.3 .09 3. 13
10 .4 .09 3. 13 13.4 .09 3. 13
10 .5 .09 3. 13 13.5 . 09 3. 13
' 10 .6 .09 3. 13 13.6 .09 3. 13
10 .7 .09 3. 13 13.7 .09 3. 13
10 .8 .09 3. 13 13.8 .09 3. 13
10 .9 .09 3. 13 13.9 .09 3. 13
11 .09 3. 13 14 .09 3. 13
11 . 1 . 14 4.87 14. 1 .06 2.09
11 .2 . 18 6.26 14.2 .04 1 .39
' 11 .3 . 18 6.26 14.3 .04 1 .39
11 .4 . 18 6.26 14.4 .04 1 .39
11 .5 . 23 8 14.5 .04 1 .39
11 .6 36 12.52 14.6 .04 1 .39
11 .7 .68 23.65 14.7 .04 1 .39
11 .8 .98 34.09 14.8 .04 1 .39
11 .9 1 .64 57.05 14.9 .04 1 .39
15 .04 1 .39
C FACTOR - 3.45
AREA TIMEO 9.7
AREA TIME. 1 8
' PR
GRAYANLI STILES
12-9-85
EXISTAREA 2
GSE2
100YR
TIME CFS TIME CFS
9 .0178 .61919703 12 1 .74 60 .53
9. 1 .05 1 .74 12. 1 1 .23 42.79
9.2 . 06 2.09 12.2 .7 24.35
9.3 .07 2.44 12.3 .3 10 .44
9.4 . 07 2.44 12.4 .21 7.31
' 9.5 .07 2.44 12.5 . 18 6. 26
9.6 .07 2.44 12.6 . 18 6.26
9.7 .07 2.44 12.7 . 18 6. 26
' 9.8 . 07 2.44 12.8 . 18 6.26
9.9 .07 2.44 12.9 . 18 6. 26
10 .07 2.44 13 . 18 6.26
10 . 1 .08 2.78 13. 1 . 13 4.52
10 .2 .09 3. 13 13.2 . 11 3.83
1013 .09 3. 13 13.3 .09 3. 13
10 .4 .09 3. 13 13.4 .09 3. 13
10 .5 . 09 3. 13 13.5 .09 3. 13
10 .6 .09 3. 13 13.6 .09 3. 13
10 .7 .09 3. 13 13.7 .09 3. 13
10 .8 .09 3. 13 13.8 .09 3. 13
10 .9 .09 3. 13 13.9 .09 3. 13
11 .09 3. 13 14 .09 3. 13
11 . 1 . 13 4.52 14. 1 .06 2.09
11 .2 . 16 5.57 14.2 .05 1 .74
11 .3 . 18 6. 26 14.3 .04 1 .39
11 ,4 . 18 6.26 14.4 .04 1 .39
' 11 .5 .22 7.65 14.5 04 1 .39
11 .6 .34 11 .83 14.6 .04 1 .39
11 .7 .63 21 .92 14.7 .04 1 .39
11 .8 .89 30 .96 14.8 .04 1 .39
11 .9 1 .57 54.61 14.9 .04 1 .39
15 .04 1 . 39
C FACTOR - 3.45
' AREA TIMED 8.9
AREA TIME. 1 5.3
AREA TIME.2 3.6
PR#a
' GRAYANDSTILES
12-9-85
EXIST AREA 3
' GSE3
100YR
' TIME CFS TIME CFS
9 1E-03 .0352905 12 .47 16.59
9. 1 0 0 12. 1 .62 21 .88
' 9.2 .01 .35 12.2 .69 24.35
9.3 .02 .71 12.3 .63 22.23
9.4 . 03 1 .06 12.4 .53 18 .7
' 9.5 .03 1 .06 12.5 .32 11 .29 ,
9.6 .04 1 .41 12.6 . 15 5.29
9.7 .04 1 .41 12.7 . 11 3.88
' 9.8 .04 1 .41 12.8 .09 3. 18 ,
9.9 .04 1 .41 12. 9 .09 3. 18
10 .04 1 .41 13 .09 3. 18
10 . 1 .04 1 .41 13. 1 .09 3. 18
10 .2 .04 1 .41 13.2 .09 3. 18
10 .3 .04 1 .41 13.3 .08 2.82
10 .4 .04 1 .41 13.4 .07 2.47
' 10 .5 . 04 1 . 41 13.5 .06 2. 12
10 .6 .05 1 .76 13.6 .05 1 .76
10 .7 .05 1 .76 13.7 .05 1 .76
' 10 .8 .05 1 .76 13.8 .05 1 .76
10 .9 .05 1 .76 13.9 .05 1 .76
11 .05 1 .76 `14 .05 1 .76
11 . 1 .05 1 .76 14. 1 .05 1 .76
' 11 .2 .05 1 .76 14.2 - .04 1 .41
11 .3 .06 2. 12 14.3 .04 1 .41
11 .4 .07 2.47 14.4 .03 1 .06
11 .5 .09 8. 18 14.5 .02 .71
11 .6 . 11 3.88 14.6 .02 .71
11 .7 . 14 4.94 14.7 .02 .71
11 .8 . 2 7.06 14.8 .02 .71
11 .9 .32 11 .29 14.9 .02 .71
151 . 02 .71
C FACTOR - 3.5
AREA TIMEO .5
' AREA TIME. 1 1
AREA TIME.2 2
AREA TIME.3 2
AREA TIME.4 2
AREA TIMES 1 .8
PR#0
GRAYAND STILES
12-9-85
' EXIST AREA 4
GSE4
10OYR
TIME CFS TIME CFS
9 8E'-03 . 1855272 12 1 .49 34.55
9. 1 .02 .46 12. 1 1 .56 36. 18
9.2 .04 .93 12.2 1 .55 35.95
9.3 . 06 1 .39 12.3 1 . 42 32.93
9.4 .07 1 .62 12.4 1 .24 28.76
9.5 .09 2.09 12.5 .88 20 .41
9.6 . 1 '' 2.32 12.6 .49 11 .36
9.7 . 1 2.32 12.7 .32 7.42
9.8 . 1 2.32 12.8 .27 6.26
9.9 . 1 2.32 12.9 .25 5.8
10 . 1 2.32 13 .25 5 .8
10 . 1 . 11 2.55 13. 1 .23 5.33
10 .2 . 11 2.55 13.2 .21 4.87
10 .3 . 11 2.55 13.3 . 19 4.41
' 10 .4 . 12 2.78 13.4 . 17 3.94
10 .5 . 12 2.78 13.5 . 15 3.48
10 .6 . 13 3.01 13.6 . 13 3.01
10 .7 . 13 3.01 13.7 . 13 3.01
' 10 .8 . 13 3.01 13.8 . 13 3.01
10.9 . 13 3.01 13.9 . 13 3.01
11 . 13 3.01 14 . 13 3.01
1 1 1 . 15 3.48 14. 1 __ ..11 2.55
11 .2 . 17 3.94 14.2 . 1 2.32
11 .3 . 19 4.41 14.3 .09 2.09
11 .4 .21 4.87 14.4 .08 1 .86
11 .5 .25 5.8 14.5 .07 1 .62
11 .6 .33 7.65 14.6 .05 1 . 16
' 11 .7 .49 11 .36 14.7 .05 1 . 16
11 .8 . 69 16 14.8 .05 1 . 16
11 .9 1 . 13 26.21 14.9 .05 1 . 16
15 .05 1 . 16
C FACTOR - 2. 3
AREA TIMEO 4
AREA TIME. 1 4
AREA TIME.2 4
AREA TIME. 3 4
AREA TIME.4 4
AREA TIME.5 4
AREA TIME.6 1 .3
' PR#0
GRAYAND STILES
12-9-85
EXIST AREA 5
GSE5
' 100YR
TIME CFS TIME CFS
9 6E-03 . 1845189 12 1 .73 53.2
9. 1 .03 .92 12. 1 1 .84 56.59
9.2 .05 1 . 54 12.2 1 .35 41 .52
9.3 .08 2.46 12.3 .69 21 .22
9.4 .08 2.46 12.4 .34 10 .46
9.5 .08 2.46 12.5 .23 7.07
9 .6 .08 2.46 12.6 .2 6. 15
9. 7 .08 2.46 12.7 .2 6. 15
9 .8 .08 2.46 12.8 .2 6. 15
9.9 .08 2.46 12.9 .2 6. 15
10 .08 2.46 13 .2, 6. 15
10 . 1 .08 2.46 13. 1 . 19 5. 84
10 .2 .09 2.77 13.2 . 15 4.61
10 .3 . 1 3.08 13.3 . 12 3.69
10 .4 . 1 3.08 13.4 . 1 3.08
10 .5 . 1 3.08 13.5 . 1 3.08
10 .6 . 1 3.08 13.6 . 1 3.08
' 10.7 . 1 3.08 13.7 . 1 3.08
10 .8 . 1 3.08 13.8 . 1 3.08
10 .9 . 1 3.08 13.9 . 1 3.08
11 . 1 3.08 14 . 1 . 3.08
11 . 1 . 12 3.69 14. 1 .09 2.77
11 .2 . 15 4.61 14.2 .07 2. 15
11 .3 . 19 5. 84 14.3 .05 1 .54
11 .4 .2 6. 15 14.4 .04 1 .23
11 .5 .22 6.77 14.5 .04 1 .23
11 .6 .28 8.61 14.6 .04 1 .23
'
11 .7 .46 14. 15 14.7 .04 1 .23
11 .8 .76 23.37 14.8 .04 1 .23
11 .9 1 .22 37.52 14.9 .04 1 .23
15 .04 1 .23
C FACTOR - 3.05
AREA TIMEO 3
AREA TIME . 1 7. 1
AREA TIME.2 7. 1
AREA TIME.3 3. 1
' PR#a
GRAY AND STILES
' 12-9-85
EXIST AREA 6
GSEd
' 100YR
' TIME CFS TIME CFS
9 .0232 .73686564 12 2.7 85.76
9 . 1 .06 1 . 91 12. 1 2.09 66.38
9.2 .09 2.86 12.2 1 .43 45.42
9 .3 . 11 3.49 12.3 .76 24. 14
9.4 . 12 3.81 12.4 .41 13.02
9.5 . 12 3.81 12.5 .32 10 . 16
' 9.6 . 12 3.81 12.6 .29 9.21
9.7 . 12 3.81 12.7 .29 9.21
9.8 ' . 12 3.81 12.8 .29 9.21
' 9. 9 . 12 3.81 12.9 .29 9.21
10 . 12 3.81 13 .29 . 9.21
10 .1 . 13 4 . 13 13. 1 .23 7.31
' 10 .2 . 14 4.45 13.2 . 19 6.03
10 .3 . 14 4.45 13.3 . 16 5.08
10 .4 . 15 4.76 13.4 . 15 4.76
10 .5 . 15 4.76 13.5 . 15 4.76
' 10 .6 . 15 4.76 13.6 . 15 4.76
10.7 . 15 4.76 13.7 . 15 4.76
10 .6 . 15 4.76 13.8 . 15 4.76
' 10 .9 . 15 4.76 13.9 .1.5 4.76
11 . 15 4.76 14 . 15 4.76
11 . 1 .2 6.35 14. 1 . 11 3.49
' 11 .2 .25 7.94 14.2 .08 2.54
11 .3 .28 8. 89 14.3 .07 2.22
11 .4 .29 9.21 14.4 .06 1 .91
11 .5 .35 11 . 12 14.5 .06 1 .91
' 11 .6 .51 16.2 14.6 .06 1 .91
11 .7 .91 28.9 14.7 . 06 1 .91
11 .8 1 .32 41 .93 14.8 .06 1 .91
' 11 .9 2.28 72.42 14.9 .06 1 .91
15 . 06 1 . 91
' C FACTOR - 3. 15
AREA TIMEO 11 .6
' AREA TIME. 1 8.7
AREA TIME.2 5.8
AREA TIME.3 3
' PR#0
GRAY ANC► STILES
12-9-85
EXIST AREA 7
' GSE7
100YR
' TIME CFS TIME CFS
9 .0152 .46744788 12 2.23 68.58
9. 1 .05 1 .54 12. 1 1 .95 59.97
9.2 .07 2. 15 12.2 1 .46 44.9
9.3 .09 2.77 12.3 .81 24.91
9.4 . 1 3.08 12.4 .39 11 .99
' 9.5 . 1 3.08 12.5 .29 8.92
9.6 , . 1 3.08 12.6 .25 7.69
9 .7 . 1 3.08 12. 7 .25 7.69
' 9.8 . 1 3.08 12 .8 .25 7.69
9.9 . 1 3. 08 12.9 .25 7.69
10 . 1 3.08 13 .25 7.69
'
1011 . 11 3.38 13. 1 .21 6.46
10 .2 . 12 3.69 13.2 . 18 5.54
10 . 3 . 12 3.69 13.3 . 15 4.61
10 .4 . 13 4 13.4 . 13 4
' 10 .5 . 13 4 13.5 13 4
10 .6 . 13 4 13.6 . 13 4
10 .7 . 13 4 13. 7 . 13 4
10 .8 . 13 4 13 .8 . 13 4
10 .9 . 13 4 13.9 . 13 4
11 . 13 4 14 . 13 4
' 11 .1 . 16 4.92 14. 1 . 1 3.08
11 .2 .2 6. 15 14.2 .08 2.46
11 .3 .23 7.07 14.3 .06 1 .85
11 .4 .25 7.69 14.4 .05 1 .54
' 11 .5 .29 8.92 14.5 .05 1 .54
11 .6 .4 12.3 14.6 .05 1 .54
11 .7 .7 21 .53 14.7 .05 1 .54
' 11 .8 1 .05 32.29 14.8 .05 1 .54
11 .9 1 .77 54.43 14.9 .05 1 .54
15 .05 1 .54
C FACTOR - 3.05
I
' AREA TIMEO 7.6
AREA TIME. 1 7.6
AREA TIME.2 6
AREA TIME.3 4
GRAY AND STILES
12-9-85
EXIST AREA 8
GSEB
100YR
iTIME CFS TIME CFS
9 .01 .262158 12 1 .24 32.51
i 9. 1 03 .79 12. 1 .94 24.64
9.2 .04 1 .05 12.2 .49 12.85
9.3 . 05 1 . 31 12.3 .22 5. 77
' 9.4 .05 1 .31 12.4 15 3.93
9.5 . 05 1 .31 12.5 . 12 3. 15
9.6 .05 1 .31 12.6 . 12 3. 15
9.7 . 05 1 .31 12.7 . 12 3. 15
' 9,.8 r05 1 .31 12.8 . 12 3. 15
9.9 .05 1 .31 12.9 . 12 3. 15
10 .05 1 .31 13 . 12 3. 15
10 . 1 .05 1 .31 13. 1 . 1 2.62
10 .2 .06 1 .57 13.2 .07 1 .84
10 .3 .06 1 .57 13.3 .06 1 .57
' 10 .4 .06 1 . 57 13.4 .06 1 .57
10 .5 .06 1 .57 13.5 .06 1 .57
10 .6 .06 1 .57 13.6 .06 1 .57
10 .7 .06 1 .57 13.7 .06 1 .57
10 .8 .06 1 .57 13.8 .06 1 .57
10 .9 . 06 1 .57 13. 9 .06 1 .57
11 .06 1 .57 14 .06 1 .57
11 . 1 .09 2.36 14. 1 .05 1 .31
11 .2 . 11 2.88 14.2 .03 .79
11 .3 . 12 3. 15 14 .3 .02 .52
11 .4 . 12 3. 15 14.4 .02 .52
11 .5 . 15 3.93 14.5 .02 .52
11 .6 .22 5.77 14.6 .02 .52
11 .7 .41 10 .75 14.7 .02 .52
11 .8 .61 15.99 14.8 .02 .52
11 .9 1 .02 26. 74 14. 9 .02 .52
15 .02 .52
C FACTOR - 2.6
AREA TIMEO 5
AREA TIME. 1 5
AREA TIME.2 2.4
i
i
' PR#0
GRAY AND STILES
12-9-85 '
EXIST AREA 9
GSE9
100YR
TIME GFS TIME GFS
9 5.6E-03 . 141162 12 .95 23.95
9. 1 .02 .5 12. 1 .92 23. 19
9.2 .03 .76 12.2 .82 20 .67
9. 3 .04 1 .01 12.3 .57 14.37
9.4 .05 1 .26 12.4 .3 7.56
9.5 .05 1 .26 12.5 . 17 4.29
9 .6 .05 1 .26 12.6 . 13 3.28
9.7 .05 1 .26 12.7 . 12 3.02
9 .8 .05 1 .26 12.8 . 12 3.02
9.9 .05 1 .26 12.9 . 12 3.02
10 . 05 1 . 26 13 . 12 3.02
10 . 1 .05 1 .26 13. 1 . 11 2.77
10 .2 .05 1 .26 13.2 .09 2 .27
10 .3 .06 1 .51 13.3 .08 2.02
10 .4 .06 1 .51 13.4 .07 1 .76
10 .5 .06 1 .51 13.5 .06 1 .51
10 .6 .06 1 .51 13.6 .06 1 .51
10 .7 .06 1 . 51 13.7 .06 1 .51
10 .8 .06 1 .51 13.8 .06 1 .51
10 . 9 .06 1 .51 13.9 .06 1 .51
' 11 .06 1 .51 14 .06 1 .51
11 . 1 .08 2.02 14. 1 .05 1 .26
11 .2 .09 2.27 14.2 .04 1 .01
11 .3 . 1 2.52 14.3 .04 1 .01
11 .4 . 12 3.02 14.4 .03 .76
11 .5 . 14 3.53 14.5 .02 .5
11 .6 . 18 4.54 14.6 .02 .5
' 11 .7 .29 7.31 14.7 .02 .5
11 .8 .43 10 .84 14.8 .02 .5
11 .9 .73 18. 4 14.9 .02 .5
15 .02 .5
C FACTOR - 2.5
' AREA TIMEO 2.8
AREA TIME. 1 2.8
AREA TIME.2 2.8
AREA TIME.3 2.8
AREA TIME.4 1
PR#0
GRAY AND STILES
' 12-9-85
EXIST AREA 10
GSE10
' 100YR
TIME CFS TIME CFS
9 6E-03 . 1784691 12 1 . 15 34.21
9. 1 .02 .59 12. 1 1 .21 35.99
' 9.2 .03 .89 12.2 1 .19 35.4
9.3 .04 1 . 19 12.3 1 .06 31 .53
9.4 .06 1 .78 12.4 .89 26.47
9.5 .07 2.08 12.5 .55 16.36
9.6 .07 2.08 12.6 .28 8.33
9.7 .07 2.08 12.7 .22 6.54
9.8 .07 2.08 12.8 . 19 5.65
' 9.9 .07 2.08 12.9 . 19 5.65
10 .07 2.08 13 . 19 5.65
10 . 1 .08 2. 38 13.1 . 17 5.06
' 10 .2 .08 2.38 13.2 . 16 4.76
10. 3 .08 2.38 13.3 . 14 4. 16
10 .4 .09 2.68 13.4 . 12 3.57
10 .5 .09 2.68 13.5 . 11 3.27
' 10 .6 .09 2.68 13.6 .09 2.68
10 .7 .09 2.68 13.7 .09 2.68
1008 .09 2.68 13.8 .09 2.68
' 10 .9 .09 2.68 13.9 .09 2.68
11 .09 2.68 14 .09 2.68
11 . 1 . 11 3.27 14. 1 .08 2.38
11 .2 . 12 3.57 14.2 .07 2.08
11 .3 . 14 4. 16 14.3 .07 2.08
11 .4 . 16 4.76 14.4 .06 1 .78
11 .5 . 19 5. 65 14.5 .05 1, .49
11 .6 .25 7.44 14.6 .04 1 . 19
11 .7 .37 11 .01 14.7 .04 1 .19
11 .8 .52 15.47 14.8 .04 1 . 19
11 .9 .86 25.58 14.9 .04 1 . 19
15 .04 1 . 19
C FACTOR - 2.95
AREA TIMED 3
AREA TIME. 1 3. 1
' AREA TIME.2 3.2
AREA' TIME.3 3.2
AREA TtME.4 3. 1
AREA TIME.5 3
PR#0
' GRAY AND STILES
12-9-85
EXIST AREA 11
GSE 11
100YR
fTIME CFS TIME CFS
9 8E-03 .322656 12 .94 37.91
9. 1 .02 .81 12. 1 .83 33.48
' 9.2 .03 1 .21 12.2 .81 32.67
9.3 .04 1 .61 12.3 .71 28.64
9.4 .04 1 .61 12.4 .61 24.6
9.5 .05 2.02 12.5 .39 15.73
9 .6 .06 2.42 12.6 .2 8.07
9. 7 .06 2.42 12.7 . 16 6.45
9.8 .06 2.42 12. 8 . 14 5.65
9. 9 .06 2.42 12.9 . 14 5.65
10 .06 2.42 13 . 14 5.65
10 . 1 .06 2.42 13. 1 . 12 4.84
' 10 .2 .06 2.42 13.2 . 11 4.44
10 .3 .06 2.42 13.3 . 1 4.03
10 .4 .07 2.82 13.4 .09 3.63
10 .5 .07 2.82 13.5 .08 3.23
10 .6 .07 2.82 13.6 .07 2.82
10.7 .07 2.82 13.7 .07 2.82
10 .8 . 07 2.82 13.8 .07 2.82
10 .9 .07 2.82 13.9 .07 2.82
11 .07 2.82 14 .07 2.82
11 . 1 .09 3.63 14. 1 .06 2.42
11 .2 . 1 4.03 14.2 .05- 2.02
11 .3 . 11 4 .44 14. 3 :05 2.02
11 .4 . 12 4.84 14.4 .04 1 .61
11 .5 . 15 6.05 14.5 .03 1 .21
11 .6 .21 8.47 14 .6 .03 1 .21
11 .7 .34 13. 71 14.7 .03 1 .21
' 11 .8 .46 18.55 14 .8 .03 1 .21
11 .9 .8 32.27 14. 9 .03 1 .21
15 .03 1 .21
C FACTOR - 4
AREA TIMED 4
AREA TLME. 1 2
AREA TIME.2 2
AREA TIME.3 2
' AREA TIME.4 2
AREA TIME.5 2. 1
' PR#0
GRAY AND STILES
12-9-85
' EXIST AREA 12
GSE12
' 100YF
TIME CFS TIME GFS
9 8.4E-03 . 22021272 12 1 .3 34.08
' 9. 1 .02 .52 12. 1 1 .23 32.25
9.2 .04 1 .05 12 .2 1 .09 28.58
9.3 . 05 1 .31 12.3 .84 22.02
' 9.4 .06 1 .57 12.4 .49 12.85
9.5 . 07 1 . 84 12.5 .25 6.55
9.6 .07 1 .84 12.6 .2 5.24
' 9.7 . 07 1 . 84 12.7 . 17 4.46
9.8 .07 1 .84 12.8 . 17 4.46
9.9 .07 1 .84 12.9 . 17 4.46
10 .07 1 .84 13 . 17 4.46
10 . 1 .07 1 .84 13. 1 . 15 3.93'
10 .2 . 08 2. 1 13.2 . 13 3.41
10 .3 .08 2. 1 13.3 . 11 2. 88
10 .4 .08 2. 1 13.4 . 1 2 .62
10 .5 .09 2.36 13. 5 .09 2.36
10 .6 .09 2.36 13 .6 .09 2.36
' 10 .7 .09 2.36 13.7 .09 2.36
10 .8 .09 2.36 13.8 .09 2.36
10 . 9 .09 2.36 13. 9 .09 2.36
' 11 .09 2.36 14 .09 2.36
1141 . 11 2.88 14. 1 .07 1 .84
11 .2 . 13 3.41 14.2 .06 1 .57
113 . 14 3.67 14.3 .05 1 .31
11 .4 . 16 4. 19 14.4 .04 1 .05
11 ,5 . 19 4.98 14.5 .03 .79
11 .6 .25 6.55 14.6 .03 .79
11 .7 .41 10 .75 14.7 .03 .79
11 .8 .6 15.73 14.8 .03 .79
11 .9 1 .02 26.74 14.9 .03 .79
15 - .03 .79
C FACTOR 2.6
AREA TIMED 4.2
AREA TIME. 1 3.7
AREA TIME.2 3 .5
AREA TIME.3 3.3
AREA TIME.4 2.4
I�
I ' PR#0
GRAY AND STILES
' 12-9-85
EXIST AREA 13
GSE13
' 100YR
TIME CFS TIME CFS
' 9 3.6E-03 . 1451952 12 .48 19.36
9. 1 . 01 . .4 12. 1 .44 17.75
9.2 .01 .4 12.2 .38 15.33
' 9.3 .02 .81 12.3 .3 12. 1
9.4 .02 .81 12.4 . 19 7.66
9.5 .03 1 . 21 12.5 .09 3.63
' 9.6 .03 1 .21 12.6 .07 2.82
9.7 .03 1 .21 12.7 .06 2.42
9.8 .03 1 .21 12.8 .06 2.42
9.9 .03 1 .21 12.9 .06 2.42
' 10 .03 1 . 21 13 .06 2.42
10. 1 .03 1 .21 13. 1 .05 2.02
10.2 .03 1 .21 13.2 -.05 2.02
10 .3 .03 1 .21 13.3 .04 1 .61
10 .4 .03 1 .21 13.4 .04 1 .61
10 . 5 .03 1 .21 13.5 .03 1 .21
' 10 .6 . 03 1 .21 13.6 .03 1 .21
10 .7 .03 1 .21 13.7 .03 1 .21
10 .8 .03 1 .21 13.8 .03 1 .21
10 .9 .03 1 .21 13.9 .03 1 .21
' 11 .03 1 .21 14 .03 1 .21
11 . 1 . 04 1 .61 14.1 .03 1 .21
11 .2 .05 2.02 14.2 .02 .81
' 11 .3 .05 2.02 14.3 .02 .81
11 .4 . 06 2.42 14.4 .02 .81
11 .5 .07 2.82 14 .5 .01 .4
11 .6 . 1 4.03 14.6 .01 .4
11 .7 . 16 6.45 14 .7 .01 .4
11 .8 .23 9.28 14.8 .01 .4
11 . 9 .39 15.73 14.9 .01 .4
15 . 01 .4
C FACTOR - 4
AREA TIMEO 1 .8
AREA TIME. 1 1 .3
AREA TIME.2 1 .2
AREA TIME.3 1
AREA ,TIME.4 1
PR#0
' GRAY AND STILES
12-9-85
EXIST AREA 14
' GSE14
100YR
TIME CFS TIME GFS
9 1 .4E-03 .0564648 12 .41 16.54
' 9. 1 0 0 12. 1 .5 20 . 17
9.2 .01 .4 12 .2 .55 22. 18
9.3 .02 .81 12.3 .52 20 .97
9.4 .02 .81 12.4 .41 16.54
' 9.5 .03 1 .21 12.5 .29 11 .7
9.6 .03 1 .21 12.6 . 18 7.26
9.7 .03 1 .21 12.7 . 1 4.0.3
' 9 .8' .03 1 .21 12.8 .09 3.63
9.9 .03 1 .21 12.9 .08 3.23
10 .03 1 .21 13 .08 3.23
' 10 . 1 .03 1 .21 13. 1 .08 3.23
10 .2 .03 1 .21 13.2 .07 2.82
10 .3 .04 1 .61 13.3 .06 2.42
10 .4 .04 1 .61 13.4 .06 2.42
' 10 .5 .04 1 .61 13.5 .05 2.02
10 .6 .04 1 .61 13.6 .04 1 .61
10 .7 .04 1 . 61 13.7 . 04 1 .61
' 10 .8 .04 1 .61 13.8 .04 1 .61
10 .9 .04 1 .61 13.9 .04 1 .61
11 .04 1 .61 14 .04 1 .61
11 . 1 .04 1 .61 14.1 .04 1 .61
11 .2 .05 2.02 14.2 .04 1 .61
11 .3 .06 2.42 14.3 .03 1 .21
' 11 .4 .06 2.42 14.4 .03 1 .21
11 . 5 .08 3.23 14.5 .02 .81
11 .6 .09 3.63 14.6 .02 .81
11 .7 . 13 5.24 14.7 .02 .81
' 11 .8 . 18 7.26 14.8 .02 .51
11 .9 .3 12. 1 14.9 .02 .81
15 .02 . 81
' C FACTOR - 4
AREA TIMEO .7
AREA TI'ME. 1 .9
AREA TIME.2 1 .5
AREA TIME. 3 1 .7
' AREA TI'ME.4 1 .5
AREA TIiME.5 1
AREA TIHE.6 .7
0 0 0 0
GSE1-3 7 GSES-11 GSE13-14 GSE4-6 TOTAL GRAY AND STILES EXIST
' 1 0 .81 .4 0 1 .21 12-9-85
2 0 1 .8 .81 1 .38 3.99
3 0 2.5 .81 4 .38 7.69
4 1 .89 2.8 1 .61 6. 71 13.01
' 5 2.86 3.8 2.02 7.57 16.25
6 3.83 4.5 2.02 8.36 18.71
7 4. 14 4.5 2.42 8.59 19.65
' 8 7.97 5.79 2.42 8.59 24.77
9 9.02 6.31 2.42 8.59 26.34
10 9. 37 6.82 2.42 8.59 27.2
' 11 9.37 7.07 2.42 8.59 27.45
12 9.37 7.37 2.42 8.82 27.98
13 9.37 7.37 2.42 9.45 28.61
' 14 9.67 7.77 2.42 10 .08 29.94
15 9.98 8.07 2.82 10 .31 31 . 18
16 9.98 8.07 2.82 10 .62 31 .49
17 10 .29 8.07 2.82 10 .85 32.03
18 11 . 32 8.07 2.82 10 .85 33.06
19 12.02 8.33 2.82 10 .85 34.02
20 12.02 8.58 3.22 10 .85 34.67
' 21 12.02 9..39 3.63 10 .85 35.89
22 12.02 10 .38 3.63 11 .93 37.96
23 12.02 11 .09 4 .03 14 .9 42.04
24 12.94 12.08 4.84 18. 19 48.05
25 14 .53 13.89 6.45 19.91 54.78
26 15.8 17.2 8.87 21 .78 63.65
27 17. 13 24.23 12.51 27.38 81 .25
' 28 22. 19 33.94 19.36 41 .71 117.2
29 29.07 52.89 24.6 68.27 174.8
30 41 . 11 69. 16 25.01 105.6 240 .8
1 31 56. 1 73.86 27.43 160 . 1 317.4
32 86.67 76. 12 28.64 178.5 369.9
33 114.8 74.35 27.83 143.8 360 .7
' 34 129.8 74.19 25.81 99.57 329.3
35 132 . 1 69.03 23.79 63.36 288.2
36 155.2 69.57 18.96 40 .5 284.2
37 150 .9 71 .24 14. 12 27.67 263.9
' 32 94.92 60 .02 9.68 22.78 187.4
39 50 .88 44.82 6.45 21 .62 123.7
40 30 .35 31 .44 5.65 21 . 16 88.6
41 24.44 21 .98 5.25 21 . 16 72.83
,.. ' 42 23.39 16.94 4.84 20 .38 65.55
43 23.39 15.22 4.84 16.79 60.24
' 44 22. 16 13.96 4.43 14. 13 54.28
45 20 .88 12.97 3.63 12. 1 49.58
46 19.6 12.26 3.63 11 .32 46.81
' 47 18.64 11 .67 3.23 10 .85 44.39
48 14 .8 10 .89 2.82 10 .85 39.36
49 12.72 9.61 2.82 10 .85 36
50 12.02 9.09 2.82 10 .85 34.78
51 12.02 8.43 2.42 10 .85 33.72
52 12.02 7.48 2.42 10 .08 32 _
53 12.02 7. 18 2.42 7.96 29.58
54 10 .75 6.77 2.01 6. 17 25.7
55 10 . 13 6. 07 1 .61 5.31 23. 12
56 ' 9. 17 5.78 1 .61 4.76 21 .32_
57 8.51 5.48 1 .21 4.3 19.5
58 6.43 4.97 1 .21 4.3 16.91
59 5.38 4.2 .81 4.3 14.69
60 0 0 0 0 0
' EX1STiN6 GRAY AND STILES
GSE
1*1 .21
2*3.99
3*7.69
' 4*13.01
5 *16.25
6 *18.71
' 7 *19.65
8 *24.77'
_ 9 *26.34
10 *27.2
t11 *27.43
12 *27.98 -
13 *28.61
\' 14 *29.94
15 *31 . 18
16 *31 .49
17 *32.03
18 *33.06
19 *34.02
' 20 *34.67
21 *35.89
22 *371.96
23 *42.04
24 *48.05
25 *54.78
26 *63. 65
27 *81 .25
28 *117.2
29 *174.8
' 30 *240 .8
31 *317.4
32 *369.9
33 *360 .7'
`t 34 *329.3
35 *288.2
36 *284.2
37 *263.9
" 38 *187.4
l 39 *123.7
' 40 *88.6
41 *72.83
42 *65.55
43 *60 .24
44 *54.28
45 *49.58
46 *46.81
i' 47 *44.39
48 *39.36
49 *3d '
50 *34.78
51 *33,72
52 *32
' 53 *29.58
54 *25.7
55 *23. 12
56 *21 .32 -
' 57*19.5
58*16.91
59*14.69
' 60*0
' UFFbL. .
0 0 0 0 GRAY AND STILES
GSE1-3 7 OSES-11 GSE13-14 GSP4-6 TOTAL 12-9-85
1 0 . 81 .4 0 1 .21 PROPOSED
2 0 1 .8 .81 1 .66 4.27
3 0 2.5 .81 4.69 8
' 4 , 1 .89 2.8 1 .61 7.05 13.35
5 2.86 3.8 2.02 7.93 16.61
6 3.83 4.5 2.02 8.74 19.09
7 : 4 . 14 4.5 2.42 8.74 19.8
8 7.97 5.79 2.42 8.74 24.92
9 9.02 6.31 2.42 8.74 26.49
10 9.37 6.82 2.42 8.74 27.35
11 9.37 7.07 2.42 8.74 27.6
12 9.37 7.37 2.42 8.99 28. 15
13 9.37 7.37 2.42 9.62 28.78
' 14 9.67 7.77 2.42 10 .25 30 . 11
15 9.98 8.07 2.82 10 .49 31 .36
16 9.98 8.07 2.82 10 .8 31 .67
' 17 10 . 29 8.07 2.82 11 .05 32.23
18 11 .32 8.07 2.82 11 .05 33.26
19 12.02 8.33 2.82 11 .05 34.22
20 12.02 8.58 3.22 11 .05 34.87
21 12.02 9.39 3.63 11 .05 36.09
22 12.02 10 .38 3.63 12. 16 38. 19
23 12.02 11 .09 4.03 15. 16 42.3
-24 12.94 12.08 4.84 18.72 48.58
25 14.53 13.89 6.45 20 .47 55.34
26 15.8 17.2 8.87 22.65 64.52
' 27 17. 13 24.23 12.51 28.38 82.25
28 22. 19 33.94 19.36 43.44 118.9
29 29.07 52.89 24.6 71 .29 177.8
30 41 . 11 69. 16 25.01 111 .3 246.5
' 31 56. 1 73.86 27.43 167.3 324 .6
32 86.67 76. 12 28.64 185 376.4
33 114.8 74.35 27.83 148.4 365.3
34 129 .8 74. 19 25.81 101 .7 331 .5
35 132. 1 69.03 23.79 59.3 284.2
36 155.2 69.57 18.96 33. 68 277.4
37 150 .9 71 .24 14. 12 24.46 260 .7
38 94.92 60.02 9.68 22.03. 186.6
39 50 .88 44.82 6.45 21 .54 123.6
40 30 .35 31 .44 5.65 21 .54 88.98
1 41 24.44 21 .98 5.25 21 .54 73.21
42 23.39 16.94 4.84 20 .73 65.9
43 23. 39 15.22 4.84 16.86 60 .31
' 44 22. 16 13.96 4.03 14. 17 54.32
45 20 .88 12.97 3.63 12. 11 49.59
46 19. 6 12.26 3.63 11 .05 46.54
47 18.64 11 .67 3.23 11 .05 44 .59
48 14.8 10 .89 2.82 11 .05 39.56
49 12. 72 9.61 2.82 11 . 05 36.2
50 12.02 9.09 2.82 11 .05 34.98
51 12.02 8.43 2.42 11 .05 33.92
52 12. 02 7.48 2.42 10 .25 32. 17
53 12.02 7. 18 2.42 8. 11 29. 73
' 54 10 .75 6.77 2.01 6.06 25.59
55 10 . 13 6.07 1 .61 5. 18 22.99
56 9. 17 5.78 1 .61 4.62 21 . 18
57 8.51 5.48 1 .21 4.38 19.58
' 58 6.43 4.97 1 .21 4.38 16.99
59 5.38 4.2 .81 4.38 14.77
60 0 0 0 0 0
PROt�DS`J GRAY AND STILES
OSP 12-9-85
' 11 .21
2*4.27
3*$
' 4*13.35
5 *16.61
6 *19.09
7 *19.8
8 *24.92 I
9 *26. 49
10 *27.35 +I
' 11 *27.6
12 *28. 15
13 *28.78
14 *30 . 11
15 *31 .36
16 *31 .67
' 17 *32.23
18 *33,26
19 *34.22
20 *34.87'
' 21 *36.09
22 *38. 19
23 *42.3
24 *48.58
25 *55.34
26 *64.52
' 27 *82.25
28 *118. 9
29 *177.8
30 *246.5
' 31 *324.6
32 *376.4
*365.3 `
33 *331 .5
1 35 *284.2
36 *277.4
' 37 *260 .7
38 *186.6
39 *123.6
' 40 *88.98
41 *73.21
42 *65.9
43 *60 .31
44 *54.32
45 *49.59
46 *46. 54
' 47 *44,59
48 *39.56
49 *36.2
50 *34.98
51 *33.92
52 *32.17
53 *29.73
' 54 *25.59
55 *22.99
56 *21 . 18
' 57*19.58
58*16.99
59*14.77
60*0 _
' PR#0
GRAY AND STILES
12-9-85
PROPOSEDAREA 4
' GSP4
100YR
' TIME GFS TIME CFS
9 9.4E-03 .23221149 12 1 .69 41 .75 .
9. 1 .03 .74 12. 1 1 .73 42.74
9.2 .05 1 .24 12.2 1 .64 40 .51
9.3 .07 1 .73 12.3 1 .42 35.08
' 9.4 .08 1 .98 12.4 1 24.7
9.5 . 1 2.47 12.5 .55 13.59
9.6 . 1 2.47 12.6 .33 8.15
9.7 . 1 2.47 12.7 .27 6.67
' 9.8 . 1 2.47 12.8 .25 6. 18
9.9 . 1 2.47 12.9 .25 6. 18
10 . 1 2.47 13 .25 6. 18
10 . 1 . 11 2.72 13. 1 .23 5.68
10 .2 . 11 2.72 13.2 .2 4.94
10 .3 . 11 2.72 13.3 . 18 4.45
.' 10 .4 . 12 2.96 13.4 . 16 3.95
10 .5 . 12 2.95 13.5 .13 3.21
10 .6 . 13 3.21 13.6 . 13 3.21
10 . 7 . 13 3.21 13.7 . 13 3.21
10 .8 .13 3.21 13.8 . 13 3 .21
10 .9 . 13 3.21 13.9 . 13 3.21
11 . 13 3.21 14 . 13 3.21
' 11 . 1 . 15 3.71 14. 1 . 11 2.72
11 .2 . 17 4.2 14.2 . 1 2.47
11 .3 .2 4.94 14.3 .08 1 .98
11 .4 .22 5.43 14.4 .07 1 .73
11 .5 .27 6.67 14.5 .06 1 .45
11 .6 .35 8.65 14.6 .05 1 .24
11 .7 .53 13.09 14.7 .05 '_ 1 .24
11 .8 .77 19.02 14.8 .05 1 .24
11 .9 1 .29 31 .87 14.9 .05 1 .24
15 .05 1 .24
C FACTOR 2.45
' AREA TIMEO 4.7
AREA TIME. 1 4.7
AREA TIME.2 4 .7
' AREA TIME.3 4.7 .
AREA TIME.4 4.7
AREA TIMES 1 .7
' GRAY AND STILES
12-9-85
PROPOSED AREA 5
' GSP5
100YR
' TIME CFS TIME CFS
9 6E-03 . 1845189 12 1 .73 53.2
' 9. 1 . 03 .92 12. 1 1 .84 56.59
9.2 .05 1 .54 12.2 1 .35 41 .52
9.3 .08 2.46 12.3 .69 21.22
9.4 .08 2.46 12.4 .34 10 .46
' 9.5 .08 2.46 12.5 .23 7.07
9.6 .08 2.46 12.6 .2 6. 15
9.7 .08 2.46 12.7 .2 6. 15
' 9.8 .08 2.46 12.8 .2 6. 15"
9.9 .08 2.46 12.9 .2 6.15
10 .08 2.46 13 .2 6. 15
10 . 1 .08 2.46 13. 1 . 19 5.84
10 .2 .09 2.77 13.2 . 15 4.61
10 .3 . 1 3.08 13.3 . 12 3. 69
' 10 .4 .1 3.08 13.4 . 1 3.08
10 .5 . 1 3.08 13.5 . 1 3.08
10 .6 . 1 3.08 13.6 . 1 3.08
10 .7 . 1 3.08 13. 7 . 1 3.08
10 .8 . 1 3.08 13 .8 . 1 3.08
10 .9 - .1 3. 08 13.9 . 1 3.08
11 . 1 3.08 14 . 1 3.08
11 . 1 . 12 3.69 14. 1 .09 2.77
11 .2 . 15 4.61 14.2 .07 2. 15
11 . 3 . 19 5.84 14.3 .05 1 .54
11 .4 .2 6. 15 14.4 .04 1 .23
11 .5 .22 6.77 1.4-.5 .04 1 .23
11 .6 • .28 8.61 14.6 .04 1 .23
11 .7 .46 14. 15 14.7 .04 1 .23
11 .8 .76 23.37' 14.8 .04 1 .23
11 .9 1 .22 37.52 14.9 .04 1 .23
15 .04 1 .23
'._ C FACTOR - 3.05
AREA TIMEO 3
AREA TIME. 1 7. 1
AREA TIME.2 7. 1
AREA TIME.3 3. 1
PR#O
GRAY AND STILES
t 12-9-85
PROPOSED AREA 6
OSP6
100YR
TIME CFS TIME, CF8
' 9 .0232 .73686564 12 2.7 85.76
9. 1 .06 1 .91 12. 1 2.09 66.38
9.2 .09 2.86 12.2 1 .43 45. 42
' 9.3 . 11 3.49 12.3 .76 24. 14
9.4 . 12 3 .81 12.4 .41 13.02
9.5 . 12 3.81 12.5 .32 10 . 16
9.6 .12 3.81 12.6 .29 9.21
9. 7 . 12 3.81 12. 7 .29 9.21
9.8 . 12 3 .81 12.8 .29 9.21
9.9 . 12 3.81 12.9 .29 9.21
' 10 . 12 3.81 13 .29 9.21
10 . 1 . 13 4. 13 13. 1 .23 7.31
10 .2 . 14 4.45 13.2 . 19 6.03
' 10 .3 . 14 4.45 13.3 . 16 5.08
10 .4 . 15 4.76 13.4 . 15 4.76
10 .5 . 15 4.76 13.5 . 15 4.75
10 .6 . 15 4.76 13.6 . 15 4.76
10 .7 .. 15 4.76 13.7 . 15 4.76
10 .8 . 15 4.76 13.8 . 15 4.76
' 10 .9 . 15 4.76 13.9 . 15 4.76
11 . 15 4.76 14 . 15 4.76
11 . 1 .2 6.35 14. 1 .11 3.49
11 .2 .25 7.94 14 .2 .08 2.54
' 11 . 3 .28 8.89 14.3 .07 2.22
11 .4 29 9 .21 14.4 .06 1 .91
11 .5 .35 11 . 12 14.5 .06 1 .91
.51 16.2 14.6 .06 1 .91
11 .7 .91 28.9 14.7 .06 1 .91
11 .8 1 .32 41 .93 14.8 .06 1 .91
' 11 .9 2.28 72.42 14.9 06 1 .91
15 .06 1 .91
C FACTOR 3. 15
AREA TIMEO 11 .6
AREA TIME. 1 8.7
' AREA TIME.2 5.8
AREA TIME.3 3
PR#0
' GRAY AND STILES
12-9-85
PROPOSED AREA 12
' GSP12
100YR
' TIME CFS TIME CFS
9 .015 .4083615 12 1 .58 43.01
9. 1 .04 1 .09 12.1 1 . 17 31 .85
' 9.2 .05 1 .36 12.2 .83 22.6
9.3 .06 1 .63 12.3 .46 12.52
9.4 .07 1 .91 12.4 .24 6.53
' 9.5 .07 1 .91 12.5 . 19 5. 17
9.6 .07 1 .91 12.6 . 17 4.63
9.7 .07 1 .91 12.7 . 17 4.63
9.8 .07 1 .91 12.8 . 17 4.63
' 9.9 .07 1 .91 12.9 . 17 4.63
. 10 .07 1 .91 13 . 17 4.63
10. 1 .08 2. 18 13. 1 . 13 3. 54
' 10 .2 .08 2 . 18 13.2 . 11 2.99
10 .3 .08 2. 18 13.3 . 1 2.72-
10 .4 . 09 2.45 13.4 .09 2.45
10 .5 .09 2.45 13.5 .09 2.45
10 .6 .09 2. 45 13.6 .09 2.45
10 .7 .09 2.45 13.7 .09 2.45
10 .8 .09 2.45 13.8 .09 2.45
' 10 .9 .09 ' 2.45 13.9 .09 2.45
11 .09 2.45 14 .09 2.45
11 . 1 . 12 3.227 14. 1 .016 1 .63
' 11 .2 . 15 4.08 14.2 .05 1 .36
11 .3 . 16 4.36 14.3 .04 1 .09
11 .4 . 17 4.63 14.4 .03 .82
11 .5 .21 5.72 14.5 .03 .82
11 .6 .31 8.44 14.6 .03 .82
11 .7 .55 14.97 14.7 .03 .82
11 .8 .78 21 .23 14.8 .03 .82
11 .9 1 .37 37.3 14.9 .03 .82
15 .03 .82
' C FACTOR - 2.7
l
AREA TIMED 7. 5
' AREA TIME. 1 4.5
AREA TIME.2 3. 1
AREA TIME.3 2
f y,.
qqAA��
r PROO fi^
GRAY AND STILES
12-30-85
,
OFFSET:
'{ L. 0
GSE GSE12,. TOTAL
+ e� 2 3.99 1.03 0 0 5.04
3 7.69 1.31 0 0 4 � =
s 4 13.01 1.37 0 0 14.58
(j 5 16.25 1.64 0 0 Mop
6 18.71 1.84 0 0 20.55
1 7 19.63 1.84 0 0 21.49 ij
8 24.77 1.84 0 0 26.61
9 24.34 1.84 0 0 28.18
10 27.2 1.84 0 0 29.04 .
11 27.45 1.84 0 0 29.29
12 27.98 2.1 0 0 30.08
13 28.61 2.1 0 0 30.71 .
= l.> 14 29.94 2.1 0 0 32.04
c ; ,
15 31.18 2.36 0 0 33.54
16 31.49 2.36 0 0 _ 33.85
' (,) 17 32.03 2.36 0 0 34.39
v 18 33.06 2.36 0 0 35.42 44
19 34.02 2.36 0 0 36.38
l� 20 34.67 2.36 0 0 37.03
' 21 35.89 2.88 0 0 38.77 - r
r 22 37.96 3.41- 0 0 41.37 ,
' l 23 42.04 3.67 0 0 45.71 +
24 48.05 4.19 0 0 52.24 a ;
25 54.78 4.98 0 0 59.76
26 63.65 6.55 0 0 70.2
27 81.25 10.75 0 0 92 '
28 117.2 15.73 0 0 132.9
L 29 174.8 26.74 0 0201.5
f 30 240.8 34.08 0 0 274.8
31 317.4 32.25 0 0 349.6
32 369.9 28.58 O 0 398.4
' \ 33 360.7 22.02 0 0 382.7
34 329.3 12.85 0 0 342.1 !
.� 35 288.2 6.55 0 0 294.7 _
36 284.2 5.24 0 0 289.4
37 263.9 4.46 0 0 268.3 'tl
38 187.4 4.46 0 0 191.8 f
39 123.7 4.46 0 0
40 88.6 4.46 0 0 93.06
41 72.83 3.93 0 0 76.76 r "
42 65.55. : 3.41 0 0 68.96 `*
43 60.24 2.88 0 0 63.12. w
Y.3 44 54.28 2.62 0 0 56.9
45 49.58 2.36 0 0 31.94
46 46.61 2.36 0 0 49.t7
n�
47 44.39 2.36 0 0 46.75
' 48 39.36 2.36 0 041.72 49 36 2.36 0 _. .0 .. 38.36r"5�
50 34.78 2.36 0 0 $7.14 [ �-
' f 51 33.72 1.84 0 0 35.56 I '
52 32 1.57 0 0 33.57
53 29.58 1.31 0 0 30.89 a i
' ryi tl' 54 25.7 1.05 0 0 26.75
i 55 23.12 .79 0 0 23.91
,i 56 21.32 .79 0 0 22.11 i
+ i 57 19.5 .79 0 0 20.29 . k pt
.� 58 14.91 .79 0 0 17.7 a
_59 14.69 .79 0 0 15.48 "1
60 0 0 0 0
i
s'
1 Z
'fi
f�f �
`r. GRAY AND STILES
12-30-85
lv OFFSET:
1 0 0 0
GSP OSPI2 TOTAL 4.
1 0 1.09 0 0 1.09
2 4.27 1.36 0 0 5.63 .;".
3 8 1.63 0 0 9.63
�. 4 13.35 1.91 0 0 15.26 + ' �
' 5 16.61 1.91 0 0 18.52
6 19.D 9 1.91 0 0 2l
,�- 7 19.6 1.91 0 0 .21.71 '
8 24.92 1.91 0 0 26.83
9 26.49 . 1.91 0 0 28.4 "
10 27.35 1.91 0 0 29.26
q 11 27.6 2.18 D 0 29.78 _� t
= 1 12 28.15 2..18 0 0 30.33
1 13 28.78 2.18 0 0, 30.96 E „�
ak 14 30.11 2.45 0 0 32.54
15 31.36 2.45 0 0 33.81 Ty,
7 C� 16 31.67 2.45 0 0 34.12 �.
i 17 32.23 2.45 0 0 34.68 .4:°
4 18 33.26 2.45 0 0 35.71
1Y li. 19 34.22 2.45 0 0 36.67
20 34.87 2.45 0 - 0 37.32 fy,
21 36.09 3.27 0 0 39.36
22 38.19 4.08 0 0 42.27
s= 1 23 42.3 4.36 0 0 46.66
a 2448.58 4.63 0 0 53.21 1t
25- 55.34 5.72 0 0 61.06
' - Y 26 64.52 8.44 0 0 72.96 C�
x 27 82.25 - 14,97 0 0 97.22k. ,
28 118.9 21.23 0 0 140.1 q
1 29 177.8 37.3 0 0 215.1 4 ai
30 -246.5 - 43.01 0. 0 289.5 .
31 324.6 31.85 0 0 356.4 t A
32 376.4 22.6 0 0 - 399 !" '
' - 33 365.3 12.52 0 0 377.8 '
34 331.5 6.33 0 0 338
35 284.2 5.17 0 0 289.3 ''
36 277.4 4.63 0 0 282
' lL3 37 260.7 4.63 0 0 265.3 I +'
38 186.6 4.63 0 0 191.2
39 123.6 4.63 0 0 128.2
(J 40 88.98 4.63 0 0 93.61 •,3
- 41 73.21 3.54 0 0 76.75 1 ` U"
' 42 65.9 ` 2.99 0 0 68.e9
43 60.31 2.72 0 0 63.03
+ 44 54.32 2.45 0 0 56.77 i x4
45 49.59 2.45 0 0 52.04
46 46.54 2.45 0 0 48.99 .�
• - .; 47 44.59 2.45 0 0 47.04 "
' { 48 39.56 2.45 0 0 42.01
'i. 49 36.2 2.45 0 0 38.65 U .,.
50 34.98 2.45 0 0 37.43
51 33.92 1.63 0 0 35.55 pp
52 32.17 1,36 0 0 33.53 f '
\ 53 29.73 1.09 0 0 - 30.82
' 54 25.59 .82 0 0 26.41 l a r+3
55 22.99 .82 0 0 23.81
56 21.18 .82 0 0 22
1 57 19.58 .82 0 0 20.4
' :Jt 58 16.99 .82 0 0 17.81
59 14.77 .82 0 0 15.59 x''•
60 0 0 0 0 0 I +v
i 1 r t n
x k
j
STILES ROADWAY
12-23-25
PROPOSED
SETA
100 YR
TIME CFS TIME GFS
' 9 5.2E-04 .02464285212 .03 1 .42
9. 1 0 0 12. 1 .01 .47
9 .2 0 0 12.2 01 .47
' 9.3 0 0 12.3 0 0
9.4 0 0 12.4 0 0
9.5 0 0 12..5 0 0
9.6 0 0 12.6 0 0
9 .7 0 0 12.7 0 0
9.8 0 0 12 .8 0 0
9.9 0 0 12.9 0 -0
' 10 0 0 13 0 0
10 . 1 0 0 13. 1 0 0
10 .2 0 0 13. 2 0 0
' 10 .3 0 0 13.3 0 0
10 .4 0 0 13.4 0 0
10 .5 0 0 13.5 0 0
10 .6 0 0 13 .6 0 0
10 .7 0 0 13.7 0 0
10 .8 0 0 13.8 0 0
10 .9 0 0 13.9 0
11 0 0 14 0 0
11 . 1 0 0` 14. 1 0 0
11 .2 0 0 14.2 0 0
11 .3 0 0 14.3 0 0
11 .4 0 0 14.4 0 0
11 .5 0 0 14.5 0 0
11 .6 .01 .47 14 .6 0 0
11 .7 .01 .47 14.7 0 0
f 11 .8 .02 .95 14.8 0 0
I 11 . 9 .03 1 .42 14.9 0 0
15 0
C . FACTOR 4.7
' AREA TIMEO .26
PR#0
STILES ROADWAY
' 12-23-85
PROPOSED
SSTB
100 YR
' TIME CFS TIME CFS
9 1 .4E-03 .06211128 12 . 15 6.65
9. 1 0 0 12. 1 . 1 4. 44
9 .2 .01 .44 12.2 .03 1 .33
' 9.3 .01 .44 12.3 .02 _ .89
9.4 .01 .44 12.4 .01 44
9.5 .01 .44 12.5 .01 .44
9.6 .01 .44 12.6 .01 .44
9.7 .01 . 44 12.7 .01 .44
9.8 .01 .44 12 .8 01 .44
' 9.9 .01 .44 12.9 .01 .44
10 .01 .44 13 .01 - .44
10 . 1 .01 44 13. 1 .01 .44
10 .2 .01 .44 13.2 .01 .44
10 .3 .01 .44 13.3 .01 .44
10 .4 .01 .44 13.4 .01 .44
10 .5 .01 . 44 13.5 .01 .44
' 10 .6 .01 .44 13.6 .01 .44
10 . 7 .01 .44 13.7 .01 .44
10 .8 .01 .44 13.8 .01 .44
' 10 .9 .01 .44 13.9 .01 .44
11 .01 .44 14 .01 .44
11 . 1 .01 .44 14. 1 0 0
11 .2 .01 .44 14.2 0 0
11 .3 .01 .44 14.3 0 0
11 .4 .01 .44 14.4 0 0
11 .5 . 02 . 89 14.5 0 0
11 .6 .03 1 .33 14.6 0 0
11 .7 .05 2.22 14.7 0 0
11 .8 .08 3.55 14.8 0 0
11 .9 . 13 5.77 14.9 0 0
15 0 0
C FACTOR - 4.4
AREA TIMEO .7
AREA TIME. 1 .69
i
T
STILES ROADWAY
12-23-85
PROPOSED
' SSTC
100 YR
TIME CFS TIME CFS
9 1E-03 .0453735 12 .05 2.27
' 9. 1 0 0 12. 1 .02 .91
9.2 0 0 12.2 .01 .45
9.3 0 0 12.3 0 0
9 .4 0 0 12.4 0 0
9.5 0 0 12.5 0 0
9.6 0 0 12.6 0 0
9.7 0 0 12.7 0 0
' 9.8 0 0 12.8 0 0
9.9 0 0 12.9 0 0
10 0 0 13 0 0
10 . 1 0 0 13. 1 0 0
10 .2 0 0 13.2 0 0
10 .3 0 0 13.3 0 0
10 .4 0 0 13.4 0 0
' 10 .5 0 0 13.5_ 0 0
10 .6 0 0 13.6 0 0
10 . 7 0 0 13.7 0 0
10 .8 0 0 13.8 0 0
10 .9 0 0 13.9 0 0
11 0 0 14 0 - 0
11 . 1 0 0 14. 1 0 0
11 .2 0 0 14.2 0 0
11 .3 0 0 14.3 0 0
11 .4 0 0 14.4 0 0
11 .5 .01 .45 14 .5 0 0
11 .6 .01 . 45 14.6 0 0
11 .7 .02 91 14.7 0 0
11 . 8 .03 1 .36 14.8 0 0
11 .9 .06 2.72 14.9 0 0
15 0 0
I ' C FACTOR 4.5
AREA TIMED .5
T
' PR#0
STILES ROADWAY
12-23-85
' PROPOSED
SSTD
' 100 YR
TIME CFS TIME CFS
' 9 • 9. 18E-04 .044429731212 .05 2.42
9. 1 0 0 12.1 .01 .48 l
9.2 0 0 12.2 .01 .48
9.3 0 0 12.3 0 0
9. 4 0 0 12.4 0 0
9.5 0 0 12.5 0 0
9.6 0 0 12.6 0 0
' 9.7 0 0 12.7 0 0
9.8 0 0 12.8 0 0
9.9 0 0 12.9 0 0
100 0 13 0 0
10 . 1 0 0 13. 1 - 0 0
10 .2 0 0 13.2 0 0
10 .3 0 0 13 .3 0 0
' 10 .4 . 0 0 13.4 0 0
10 .5 0 0 13.5 0 0
10 .6 0 0 13.6 0 Q ,
10 .7 0 0 13.7 0 0
10 .8 0 0 13.8 0 0
10 .9 0 0 13.9 0 0
11 0 0 14 0 0
' . 11 . 1 0 0 14. 1 0 0
11 .2 0 0 14.2 0 0
11 .3 0 0 14.3 0 0
11 .4 0 0 14.4 0 0
11 .5 .01 .48 14 .5 0 0
11 .6 .01 . 48 14.6 0 0
11 .7 .02 .97 14.7 0 0
11 .8 .03 1 .45 14.8 0 0
11 .9 .06 2.9 14.9 0 0
15 0 0
C FACTOR 4.8
AREA TIMEO .459
1 �
' OFFSE"f . STILES ROADWAY
1 0 0 0 12-23-85
SSTA SSTB SSTC SSTD TOTAL
' 1 0 0 0 0 0
2 0 .44 0 0 . 44
0 .44 0 0 .44
4 0 .44 0 0 .44
5 0 .44 0 0 .44
6 0 .44 0 0 .44
' 7 0 .44 0 0 ,44
8 0 .44 0 0 .44
9 0 .44 0 0 .44
10 0 .44 0 0 .44
11 0 .44 0 0 .44
12 0 .44 0 0 .44
13 0 .44 0 0 .44
' 14 0 .44 0 0 .44
15 0 .44 0 0 .44
16 0 . 44 0 0 .44
' 17 0 .44 - 0 0 . 44
S 0 .44 0 0 .44
19 0 .44 0 0 .44
20 0 .44 0 0 .44
' 21 0 .44 0 0 .44
22 0 .44 0 0 44
23 0 .44 0 0 .44
' 24 0 .44 0 0 .44
25 0 .89 .45 . 48 1 .82
26 0 1 .33 .45 .48 2.26
27 47 2.22 .91 .97 4.57
28 .47 3.55 1 .36 1 .45 6.83
29 . 95 5.77 2.72 2.9 12.34
' 30 1 .42 6.65 2.27 2.42 12.76
31 1 .42 4.44 .91 .48 7.25
32 .47 1 .33 .45 .48 2.73
33 .47 .89 0 0 1 .36
34 0 44 0 0 .44
35 0 .44 0 0 .44
36 0 .44 0 0 .44
' 37 0 .44 0 0 44
38 0 .44 0 0 .44
$9 0 .44 0 0 .44
40 0 .44 0 0 .44
' . 41 0 .44 0 0 .44
42 0 .44 0 0 .44
43 0 .44 0 0 .44
44 0 .44 0 0 .44
45 0 .44 0 0 .44
46 0 .44 0 0 .44
' 47 0 .44 0 0 .44
48 0 .44 0 0 .44
49 0 .44 0 0 .44
50 0 .44 0 0 .44
51 d 0 0 0 0
52 0 0 0 0 0
53 0 0 0 0 0
54 0 0 0 0 0
55 0 0 0 0 0
56 0 0 0 0 0
57 0 0 0 0 0
58 0 0 0 0 0
59 0 0 0 0 0
60 0 0 0 n o
1 ► _
1
. R41a�W14Y l�lQf0111(l4GE
S�crlonl.. f�R E GN. _ R UIVOFF_ _ ___ v0( uMC
(/JGfZLS J CINGHESJ �Ga.GT)
S5T)!� 8s -
6z
5 BZ
_ ssrp O, y_6 . - 86
i
i
1
STI( E�5 - HY6AOLD GY
DETENDONa pont ( NF Lo Lo uzp to
-
7bTpL Acc.uml _AoND PoN
_hpl_9w . _ i t�Ft,o�,1ourFc ow_ swR.a6�, b*'rrr
(MIN) (cr-s) (cu. Fr) (cr-su, FT) (r-T)
01210.
168 - 6 83 7957 - ! I_) b - _5-164 .. . _ _OILtS, -
1
1921
1
X10 _ _� , I�-I _ _ ZZ�S� ? Z�.uo 1S , azo- --_: I.�I ------
30
- -306 - 4-5102J.,_ 0_ _ 6 U 7 o,S3_ -
0..: .. 0, 17
' GRIQY SM-s HKOROL-O&Y
bp.►wm6a 57Ruc-TUI2& [avApG1T1 S.
' biNAIV& )00 Y12 SToa��+rt
CNb 57?9 STRVC7URJF, 3LOPE IOD YR, FLOW C,OhpGaFY
' Ofz-o 21-04 /2 'I RGP 1007 `l /,YZ GF5 2,9 c>~ .5
2+oo 3t70 I Z" RGA 400-) OZ cF 5
3t70 L4+79IZ" i2cA , oyo '/% 2,U cps CFS
' 4f7S s+-9D )B" kcP 01b"' 6,7 cFS lot cps_
? 5+90 7f1S IS" P,cp , Do `�' 811 cF5 91Z ccS
Z THS- y+qb 181, Rch ,Dub `'� Ell cFS 9. Z CFS
x
? `1tNo I►t5a 2,q kc a , oD5 10'. cpS rS a CFS
W l]. SD RET PONE Zq Rt,P .oos `i' )D,"3 cF-s IS,0 CFS
Z
a 13t5a DEr, AoNU iZ" RCp . oro �� 2,� C:S 3,6 ccS
N
a
x
v
I' ,
,
Dv7"c.F r ora 1� Fa,�
1
b n
A .N
HE�1 b �p c c
IZ DJJa 007-.iF7'
Uz
Z abrTbM 0 F CHAAlNE C
a
z Co�
Sr� fir.,-��y.--;• .•
1 z = a•ao� �,,
r7nm OF
ZbS
Bpir',v7701%/
' PoNC�
a �
N
a
x
v
' OUTG
fit
��TN7"Idhl ,� 12'' l�lJa �iT
nON t�
c
NAnI
NSE
i '
i
1 _
G/ZtgY 61yiS S-)) LES - HORotoGY
:A219r __D fff_C.T..L.Y.__:P ._ -
_5T13.�AMLOW
S77(F�S ._ST. W
?'o THg_ _ST_p.F_nM___rHig7—OWS _Tv_ -
1 SE7)oh[ S__13IA1MS _bl-cMY__1ti _ _TK _STAM_�TD wNTI?v�__
.'-_ _ _ �o ► ►v_T_s_. ---.,�EGT_c�N.: �:---fJ�.�Q t nl S___.TN1�4U_G_�-l_. s��noN. /./__._: __
N_6_.A_ Efa�---T TU-C !t/3tZUC�-� - -I
SE-C7�U1�_ 1J1f4_t_ l ---7 -it2QU(� f-- CT_IUN__. 1L ?'v` TNS_-----
_. _ ,_ __ STTZ�h!�►_. .___ EC?70.N_
Cl _R1q..1NS---7YROQGH__,_SeC77v -- 13--
'
17 E s on%1 _ Tn cv/urr 0 t-
-S.177
SIT_G dF_._- :__CAN-De-0,(.-PT.-a].
To C-olu-r
- -_ A5SUM /4T.__N 0-- -T?V N f,I Al G.__C7_Gc U.1 S__1_U._THF 1c ATE,�,$KE6. .__
---- ---
4- S-nLS KYb�2o�o Y
--------- EX15T/NG _ CONO1TlON5 -- _
- -- ------ --- -- --- - -- --- — �; c
i
21
. 23
i
S
z9
I
_ =
.Z$ L
.1, --- _�_�_�._-77----GAS----- --- - -------
r
__._ Fad �__._ �•�-�T_- - o`t�R-___t�rr�C �-------_-___------ -----------
z =
_- -------V------.. __l Lid'. D _.__- --------- ----_ ----._ ._._. ---- - -----------
- ------ -- - - ----- -: ------ -- -- - --
- -- - - -- - - -- --- -- -- ---------
GRA � �- 5Ti LAS 4 H yO�U(.UG i
1
- - 1
,S
_
o
/� ;SOt, IV
- _ t } c
� 1
537 LF-S
EXISTING- CON
1 - _ - -- - - -- -
I
Fog.. . a C.,4�, /
goo
0 y- -- ---— --- — --- — — -
= 110107
z/3 _
1 `
I
1
�.. _ - - - -- --=-- EX 157/NG --
_ _
UA
Z
f- -
=.__1575.8 --
1
I �
fZ,7Y) (6.Ly, `I-) -------
QP
-QF'
1
VA
--- =- --�-----.-__ _I?� 1--_FTI ---------_-_---=--- ---_-. -=- - ----- - __
5.73.6 - 57.7__cFs_:_ - -
I ,
EbEV4774)N FLoI�/
_7D,sh _( p,pcpcFFvu)_: . . . . 33, 1-
Wo 3
3, 1Wo.3 Cr—s
72,76 �.___.-- -,---- _ _ _., :.� : B,Y yrs._ . _. . --
61t 7 Cr-S
80 1 CF S. .. : ._ .
CPS
�S _ 657,_7
Project 6RA f WQ()L) C-SI 101 TE J Client r—oRi�e S Page of
Subject. N Y61h 0C O GY Comptd.By �'" Data r 10—"
Detall 57'RP WM FGOW 4Ett=V477QNS Clt d.By Date
57-REAAI Ft, A/ VS ,
EX 15TIIVG GOAIbi nOMS
1
' 600-
Z
0D
Uz
tt y
w '
w
z �
w
z �
m
LL
H
to Zo
a
z J
U LL
' too
ill
o
' 69.0 70.0 11.0 72.0 73.0 W.0 75.0
aLE-yATlON OF 5TREAM A-r s-ra-E5 STREET (fiEET)__
CON6l7 ONS - -- --- .-- - - - _�
ol'os � amp, Gf2oss_SG�nnN: f�_T - -
' — PXI__S7NG----__1QU__J'R
0.3'3
_ . I __. U_S E ?RKIAL�2�0��b�_ LhfoQNN� G___6,,r ►Tf-r_ � __ :...: _ .._ _�:
S�.)E SOP" = Z Hop-Z 77.? 1 V.F.A7
1
DL✓TFat/I�n/�I jib !/S our&, T 6ES1 GN
V/rH : 140_-F-7_" 61q$E
..-.Cfi )CR _.
h
i
' S
' D0
_ -----------
Lt
----Lt R (22 o0)(. off-
osz�
■ use • - - - - - - --
k- 1.0
f
GRAY -
1 - - --- -
1 i A _7S S_-GT
1 .
i
1
1
_. ... .. bETENTION PONE OUT'LE-,T OE S )Gly/
HEpb OVat2_- Arae o.h. P:W LV . 774eOUGH P/P,E , Q -
1 '
3
_ r -
i
4y
C
I
i
li
1 �
DF,SIGN
DEP77-4 )N/ /P,/JPEZO OMS CHAMNE L
i
-- T-
36 = --
1
-- --
�� � - - -
.........
ST LES - N-1YrJ1�o�aG�'
_ ---- ---_---- - SEc.1 ori' __!_- ------- -- ---�__-----=
_0 -L�/JldC_ -
,._RUNOFF ------
GR4Y °I Tl L� - HYD OLoGY
- ��_L_QPM_=�1�Q--%--------- --=--- -------- --
RUNOFF=
s ECT 10 Nt
_.SLOPE
-- ----- - ---- - z�nr= o-�_t�o s CZE 6
.8,
1
1
GRAY ck STILES — HybkmoGY
_ SECTION S
Tc
1
- - --_RUNOFF_=-__
5EC.7-ION__ .6----
-=---------�u� -- --- -
_ SLOPE
SSUME -------_C N
-- -.-------_:
1
t
GRAY q- STILES HYDROLOGY
_._
F_REsLOC-AL
24.6`! CONS,
6OC_zo79 f. �(73 - -- --.
:
q H
.3.05--1 NC H E
L0N(y,;EST -F_LDw-PArH.= 500 FTS
_ SLOPE. =. _y0 r4- ------
_ -�.— _AS,SUM�.i_SAC►ZES_�L�i4CRE RCSi�N_�Z�?_�_��_!���R��wo.�p5�: F,vta hYO�+���—_, �.
1
GRIMY---*--.STILES. _:- HYbPOlA6Y
------
1 s EC.7-6N q_-
_ . LONGC,57_-FOW P_ArH_=--- -.1000. F_r. - - - -- - - -- -- -- -.
_SL.DFE ---
e�SSUME _RFSOENPAL
conr�.
- - --_LING = . 30--HJ2_=._.Ia__MIN - - - --- - -- - - - - --- - - .�- - -
._LZAA 0S :.. f ACU RESIDEIVIIpLy.6,b�9GR�5__W00bS. FAIR.
cAND!__
Tc
RUNUFF_
1
_ .__------- _ -_-- GRAY: -----:_ _- -
--- ._ -- - - - _ __-_-------- --�1C)$TIN.V -- -GONDITl6N� ---------- ---_---------��._- __
--------
LONGaS-r FibW_ ,_AT H =
t"IIN
_RU N OFF =
- -- - - _ - —� ---- — --
A__EA-_ __174_.tt .gds-- --- .____: ----- — --- -- - --------- -
4 QNGEST---FLOC!PA.T._H_
-
S,.!_�t�R�S._ .wP_O�S__ F.R. tR_layb�o�Q_G►c__coN0,-
40.-�
C.N.__•59 ($[683*•�. s�J+,.i[ay1)_=_ -- -- --
--- -- ---
- -- ------ ______ _-- GRAY 4 5r)LE --- HYbPOL.O&Y --- --- -- - --
�`ECTION 13
.LQN6E5T-__JcLow PATH = _ OO Fr -------
MIM_
-MIN ------ - - -- - - - --- ---
RUNOFF
SECT/ON
1 _ _
' GRAZ STILE-S, -yybpoi-7GY.
RROAOSF-u Con/D/770/VZ
per
LN
SEc-noN
L0t\tGZ-SLELDW_P._/97H
___ _ _ -- ---_-----------�_ 11�3�.61GtF.Ss-1N�Q�S-E9[t�L-LY -+-QG1C_�4N Ste-
C N = . 0 4b) t_. ?91C60 , 331t(73, .67 L-7
1 �
1 GRAY ANO STILES - NY13ROLOG` -
1
- -- -- --- PRo aosEb Con(L)1r lONS ---- -
5FCTION 6 --- - - - - - _ __
C N_ .o (il --+—'..uf ,25(6 0)_ +
_----------
RUNOPF
-13
- __ .__ -. ._ - --. A�sU���__f3__�►_��_��.__l..acrz� -reFSL?ErurJg-L----_.__�:__ ,�.._-
' __ __-___ =---------+:. Sf. !__/gciz.�s WooU�= G r Hr�aw ►� _-�--_--
-r t[
ZZ MIN--- - -- ---- --- --__-w__ _
Section VII
SOILS
y
' The attached soils map is copied from the North Essex Soil Survey ti
' Maps provided by the Soil Conservation Service. The map is
followed by a definition of the abbreviations that are on the
' maps.
i;
s
• r
a
RdA 46P6D ^s �'�n J „*�' li? CbB J„S4»�../ ; >»r CrC -•. s
45 �� MC •�
V58'
i
r - Wr8 e ' ' ' �y- g MC�d� .s 4 ;, RdA• , , i �j .
WsB
r •, Y s :,• 1 � ,. i�}- l�.4;•' H18 y\ J, 1 t �, t,,,• �dk :. r .. !
YMC
PH8S88j r '
Wh t_i.. WrA v'r 1. , r CbDs9 RIA r RotT
! Mo r / :�.4 ,;�,., {; C 4, Wh "� '�t ' s, ,4' CbB�, h MC •r '
' WSBr, y.. ..a ` ' : ♦�.,� d�'' °' '`' .'^+:.'r ,t : 'r.+v Wi8 `.tr t st�°.i , �iJ
u,p4..—^—.a{
MD'. 1 l t . 'F -Lh '{Iyf 1 ` �:hf��w a,e r `'• gni t��
`\� WSB �r '^ • + w' ',s• r ''� t 4 r-.
:r`./` J, p/ c �-►, t Nr;i?�C' \.,, ( -CbC f ..�p, '..yrrh. ,*-" r't t tiO
vv� ffi C t'
r1 , Z/ S •, ay./� , M "Y h r�'+r' 1 `r'wrr ii�
,. ' j ♦. • , rI WdB , sF r + r • e Lr' .�'i4 � iM1 M IY ;4
r J.. yy.l,t gir�.q/ '`t,} �) 'C ( r ' ir,6y��r S2 r. J y'r� h. ,t '�� I,'� R147•,4'1 .iJ ,
CrC.� } I a' ps / ri r ri7. - �'t •.� P u7 f .��.I7L.� yrt 4 i n r YL• ..
, )J_j�,l` r' 1" , � �[ff�;j J'J/1.01!! ' SrlS-...V. a 91(ZC ','h�` Y K1F )_ •, +1 a_. .. 5."i^•A44 , f
RS Pah + r„ ' WK
, , f ,r
/ s iK '"•�' t;-AlC7'C'r ' I.rc .tio r, �� .n �, r MC ,... i sPaC '�� MC tF y9.
,'!•� rt •.�� ''_ '1{s,: (. Wh.
' ` ' ' t '+*frS��Y Fr �y,•'.. ' '\ Cb8
iWsC
\ t ft
'• ''i w r3. ,) ` ILL MC 9r8 Pe 'PDB
PcE�b: f 4 j� ;' Sy,?.�'' t t,r"ti'i... e.., •i
s ;, ., ti:Nl+ `r •. s,iRoC , -,;4 +� r PcC ' PCE " f� ; f *•.Y>i11� r' .•r {by
� . "{ r41 1 fY „ � .' ♦Y ���}f r , 2i T Wf6 -:,Y .-•r/ � •.
�rUt ,!r '.`''rf.r1 ' ' '.i y y ' lyi:Jr^a.:{'�•-1.11 ` R ^} -.. �'�`� J r r;t w .
' J" i. / �! Cr�.. �r < St4 5.,' r ,, •st�JA'� . »r P 4 t Q +` r ,
t l rtlr y a� r
PbBc~' 'v e l\r r' r, r`, \�
1 v. a t v �''f .. ,*t c'4 • r.,y < \ t 4 ,Cb8:
I, Mc ;. ,ar >t, Rf , t a ,` r> Mcr Cb r
dr ° ' Wh , r ,."^{ , r , S C66
w : r '• * �+ Cb tG m r .:q, �r t 2r' a Jn.. ,oG t I . r
,Wt6 C i •,4 �, e
r � ' r. �,, ,?� Y w• b� _, WSB � Y r4 y��,. G s �;i 2t \
Wil RIB y`HALT ' , v MC �wl,r MC } CbO y i. MD
CbG°W Wt
t ,'yy ( RIB ( "� '�',r rvFJ ll ✓.. F `'t 1: ' •+}r1•' .C4Br1\�, l r '' 'i•Yt, t 1.
WsBt ' 'WTC ,;,• .t PCEr` dF.}I w` :1 t 'aa RI f, � r • - CbB .+ �C
t r, ,� of 4 f ' '" .,, , ,Se�ty ,Lrl Ql ,'' }.� n Y t �L•e _' Jt f '•4 .. '
< '�/'� r Y t �`?µ�''� atJv.2r'J �,4� ".i•1 c llt I•lil, Ja', '!_r"�v :,P 1•t 1 t J, �Lfp "1..G
/P � a'} l i�� L. /r �Y I rti J, X 1 'r a 1 ,.^tM✓r�li';�f
/,/-., t`A• PbC I H.:7 ,.7.i � r / t ',y ,= ryM �d Sft!A '.t�i �. r' �,/�° tP`C6C r r� y^`�. ',fel,
I��
r .,. rs D` � ! t. at�r 4( )"{!�r e 5 ti�4i.'at �t �, •.9 .il-�:11 t/ 1 t �.ari '4 f Y
Ai,a
r
W16 " .' %!r 1 ` , rr:1.0 1 1{ .1 ?;;CbB'C , CrC
'�•...•:r{ T ,� �,1 `r-\�/ r; t W h, ., r n.. #`t i� f•a r "�' /� ,P , `��
.LIrO�
CkC ;r MOB. ` Jc'>. r` .'.t .. •�
t,• ,., Pb8 •F,I, 'r.: .+. Wh ,Nr ' RoC : ROD r MC
OWN
1 /GUR9 3
1 5. 6 S. M,4P
Soic. COMO ON
r
'
5C46F:
C,4R/ST/A1V5EN 6NSIMFERING,1W..
//4 KENOZAAI/� �'�/Al/ERh�/LL,r{1.4.
1 .
' SectionVII
Soils Map Abbreviations
' CbB - Canton very stony fine sandy loam,
' 3 to 8 :percent slopes
' CbC - Canton very stony fine sandy loam,
8 to 15 percent slopes
' RiB - Ridgebury and Leicester extremely stony fine sandy loams,
3 to 8 percent slopes
Se - Scarboro mucky fine sandy loam
' Wh - Whitman extremely stony loam
i
TOP ANO 50B30/L L AYFR
1 - 2 '
2A10
SOIL LAYER 3
4
14-
1 6
3RO SO/L LAYER 7-w - OEPTN OF WATER TABLE
1 e
9
' io-u --umlr OF EXCAVQT/ON
OF TEST P/T
1
1 _
1
1 KEY TO TEST P17 PROer-IL ES
1
1
1
tCLIENT FORS REALTY
TEST MATE MARCH 2V 1995
' LOCATION GRAY & STILES
LOT NO
TEST PIT NO 1
1::NG I NEr.--- ; IRAN OCONNELL
t PEF C 'TEST NO
PERC RATE
I HI
a
5
G �w '
I O U
' REASON FOR LIMIT -
?ND SOIL "(YF-E: ORANGE SAND gt GRAVEL WITH COBBLE
LA'uiT SOIL TYPE NO LEDGE
I
I
CL..I:ENT F.:OFZBES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY & STILES
' LOT NO -
TEST PIT NO 2
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE _.
E
`i
5
b
I--� R_ -u
cq
113
' REAl3)ON FOFt LIMIT LEDGE. OR LARGE BOULDER
?ND SOIL TYPE GRAVEL WITH COBBLE AND BOULDERS.
LAST SOIL TYPE LEDGE OR LARGE BOULDER NO WATER
CLIENT FORBEE REALTY
TEST DATE MARCH 210 1905
LOCATION GRAY & STILES
LUT NO
TEST 'PIT NO
E=NGINEER DAN OCONNELL
PE;RC TEST No
PERC RATE
J
ti
5 -w
b
R
9
REASON FOR LIMIT
II ' i NDiO I L TYPE GLACIAL TILL WITH SOME CLAY AND COBBLELAST SOIL TYPE NO LEDGE
CLIENT
FORHES REALTY
' TEST DATE MARCH 20 1985
LOCATION GRAY Se STILES
LOTNO -
FEST PIT NO 4
ENGINEER DAN OCQNNELL
FERC TEST ND —•
F-'ERC RATE —
I�
1
•I
b
4
� CLI I
REASON FOR LIMIT —
' 2ND SOIL TYPE GLACIAL TILL WITH SOME CLAY
LAST" SOIL TYPE NO LEDGE
CLIENT FORBES REALTY
1
TEST DATE MARCH 20 1985
LOCATION GRAY & STILES
LOT NO -
TEST PIT NO 5
ENGINEER DAN OC:ONNE L L
PERC TEST NO
FERC FATE
71 11
� w
b
1 ► R
q
1 _
1
REASON FOR LIMIT
?ND SOIL TYPE GRAVEL & TILL WITH BOULDERS & COBBLE SOME CLAY
' LAST SOIL TYPE NO LEDGE
1
I �
' GLIENT FORB'"S REALTY
GEST DATE E MARCH 20 1985
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 6
ENGINEER DAN OCONNELL
F E RG 'TEST NO
FERC RATE -
5
1
7
1 R
4
i
1
Rk AE30N FOR LIMIT
SND SOIL TYPE GRAVEL & TILL WITH BOULDERS 8 CosBLE
LAST SOIL TYPE NO LEDGE
CLIENT FORBE.S REALTY
TEST DATE MARCH 20 19B5
LOCATION GRAY & STILES
' LOT NO -
TE ST P IT NO r
ENGINEER DAN OCONNELL
' FERC TEST NO
PEI M RATE
i
� '41
Ll -w
5
7
VIE 4t
' REASON FOR I.._IMIT
2ND SOIL TYPE GRAVEL & TILL WITH COBBLE-
LAST SOIL TYPE GRAVEL WITH CLAY NO LEDGE
1
1
' CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY &< STILES
'
LOT Na
TEST PIT NO 8
ENGINEER DAN OCONNELL
FERC TEST Na
' PERC RATE -
1 F--T= ~
5
b
H
t �
REASON FOR LIMIT -
2ND SOIL l'YPE. GRAVEL WITH TILL &< CLAY
LAST SOIL TYPE GRAVEL WITH CLAY
I '
CLIENT FORBES REALTY
TEST DATE MARCH 20
1985
LOCATION GRAY & STILES
LOT NO -
' TEST PIT NO 9
ENGINEER DAN OCONNELL
FERC TESL" NO
1='ERC RATE
S -w
y
S i
b
-u
8
9
REASON FOR LIMIT BOULDER
2ND SOILTYPE GRAVEL WITH CLAY & TILL. & BOULDER
LAST SOIL TYPE NO LEDGE
1
i
� 1
1
i
(WLIENT FORBES REALTY
'TEST DATE MARCH .�''L0 19185
LOCATION CRAY & STILES
LOT NO -
TEST PIT NO 10
ENQ I NEER DAN OCONNELL
PERO TEST NO
FERC RA"Z"E
1
'i
.b
7
H
io
iREASON FOR LIMIT -
2ND SOIL TYPE: GRAVEL. WITH TILL °c CLAY WITH COBBLE
iLAST SOIL TYPE NO LEDGE
' CLIENT P'C:RBE.S REALTY
TEST DATE MARC 0 1985
1 LOCATION GRAY 84 STILES
LOT NO
TEST PIT NO 1 1
' 1"NG I NIm ER DAN OCONNELL
PERC, TEST` NO
F''Ef-"(C HATE _
2
y
W
b
I
REASON FOR LIMIT 5C]l1LDFR
2ND SOIL TYPE GRAVEL. WITH TIL_L..
' LAST SOIL TYPE: GRAVEL WITH CLAY, COBBLE g, BOULDER
' CLIENT f=ORBES REALTY
CY
TEST DATE MARCH 20 19B5
LOCATION GRAY & STILE' S
LOT NO -
' TEST PIT NO 12
ENGINEER DAN UCONNELL
PERC TEST NO
FERC RATE
y
1 5
Fa
q
I CLU
REAS('.)N FOR LIMIT BOULDER
2NII ,"OIL. ..I...Yf''E:: GRAVC._'L_ WITH TILL
LAST SOIL TYPE GRAVEL WITH TILL. CLAY COBF4i_E °{ BOULDER
CLIENT FORBES REALTY
TEST" DATE MARCH 20 1985
Li)CATION GRAY & STILES
LOT NO
TEST PIT NO 1
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE
I �
L/771
y
-�-1 b
7 -W
I � 4
REASON FOR LIMIT LEDGE
SND SOIL TYPE:. COBBLE & BOULDERS
LAST SOIL TYPE SAND) CLAY & LEDGE
I
1
CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
'
LOCATION GRAY & ST I t-ES
LOT NO
TEST PIT NO 14
' ENGINEER DAN OCONNCL_L
FERC TEST NO
FERC RATE
2
5
R - /
' REASON FOR LIMIT LEDGE OR LARGE BOULDER
SND SOIL TYPE GRAVEL WITH SANDO CLAY, BOULDER, & COBBLE
LAST SOIL TYPE LEDGE OR LARGE BOULDER
CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY & STILES
TEST P I T NO 15
ENGINEER DAN OCONNE L L
FERC TEST' NO
FERC RATE
H
`I -w
S
t
H
1 C3
REASON FOR . LIMIT LEDGE_
2ND SOIL, TYPE GRAVEL WITH SAND & COBBLE
LAST SOIL TYPE LEDGE NO WATER
II '
' CLIENT F:URDES REALTY
'PEST DATE MARCH 20 1985
LOCATION GRAY & STILES
' LOT N(7
TEST PIT NO 16
LIVCINI ER DAN OCONNELL
FERC TEST" N0
' PE-RC RATE
1
i
Z
5
b
R `
9 -w
10
REASON- FOR LIMIT
2ND SOIL TYPE TILL WITH COBBLE
LAST GOIL TYPE TILL WITH CLAY NO LEDGE
' CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
' LOCATION GRAY ,°K. STILES
LOT NO
TEST FIT NO 17
' ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE
I
`i
5 " uv
I �
7
' 4
REASON FOR LIMIT BauLnER
2ND SOIL TYPE TILL WITH COBBLE & BOULDER
LAST SOIL TYPE TILL WITH CLAY, COBBI.,.E, & BOULDER; N0 LEDGE
CLIENT FOES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY &< STILES
' LOT NO -
TEST NIT NO le
ENGINEER DAYS GCDNNELL.
PE RC TEST NO
1::IERC RATE
i
rT
`i
5
' e -w
� R -u
1D
REASON FOR LIMIT LEDGE
2ND 5011- TYPE TILL. WITH GRAVEL COBBLE. & BOULDER
LAST SQIL TYPE LEDGE
' CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY & STILES
LOTNO
TEST PIT NO 19
ENGINEER DAN OCONNELL
FERC TEST NO -
PE:RC RATE
l
e
5
b
7 -w
8
q
� 4ii
' REASON FOR LIMIT
21\11 SOIL' TYPE TILL & GRAVEL WITH COBBLE
LAST SOIL TYPE TILL CLAY & GRAVEL NO LEDGE:
CLIENT FORBES REALTY `
TEST DATE MARCH 20 1985
' LOCATION GRAY & STILES
LOT IUO
TEST PIT NO 20
ENGINEER DAN OCONNELL
' PERC TEST NO
PERQ MATE
I �
5
' 13 -W
A
• kd
REASON FOR LIMIT" -
2ND SOIL TYPE TILL. WITH SOME CLAY
LAST !":TOIL TYPE GREY CLAY OR SILT NO LEDGE
CLIENT FORBES REALTY
TEST DATE MARCH 20 1985 !
LOCATION * GRAY & STILES
LOT NO -
TEST FIT NO 21
ENGINEER DAN OCONNELL
I ' PERQ TEST NO =
PERL" RATE
VyJ
y
5
7
8
li
I CLU
' REASON FOR LIMIT
2ND SOIL TYPE: TILL WITH CLAY
LAST a0Il TYPE GRAVEL WITH COBBLEICLAY & SAND} NO LEDGE
!
L
CLIENT' FORBES REALTY
' TEST DATE MARCH 20 198
LOCATION GRAY &a STILES
LOTNO --
TEST PIT NO 22
' ENGINEER DAN OCONNELL
FERC TEST NO
]::'ERC RATE
S f'
e -w
7 ,
4
REASON FOR LIMIT
2ND SOIL TYPE SANDY TIL0-GRAVEL &: COBBLE
' LAST (SOIL TYPE CLAY &c GRAVEL
7
{
f .
r
CLIENT FORBES REALTY
TEST DATE MARCH 20 198
' LOCATION GRAY & STILES
LOT 1\10
TEST PIT NO 23
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE -
i1
1 ,
1
z
C 5
r � e
7 -
1 �f � � q
1
r
REASON FOR LIMIT
2ND SOIL. TYPE: SANDY GRAVEL WITH COBBLE
LAST" SOIL TYPE GRAVEL WITH CLAY
f'
i
� r
1
r -
1
CLIENT FOR&ES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY & STILES
LOT NO
TEST FIT NO 24
ENGINEER DAN OCONNELL
' PE'RC TEST NO
FIERC RATE
ti
z "
J
5 -w
7
8 -w
9 r
to
1 '
' REASON 1:70R LIMIT -
2ND SOIL TYPE: TILL WITH GRAVEL & COL-BLE
LAST SOIL TYPE TILL WITH GRAVEL&CLAY
1 i
r
r
' CLIENT FORBES REALTY
TEST DATE MARCH 20 1985
LOCATION GRAY Svc STILES
LOT NO
TEST PIT NO 25
ENGINEER DAN OCONNELL
PERC TEST NO
PERC RATE
t
L
1
' S f
i
b k
I,
9
`0 4G
l
i
REASON FOR LIMIT
?ND SOIL TYPE GRAVEL WITH TILL
LAST SOIL TYPE GRAVEL WITH CLAY
a
j
E`r
v
CLIEN"I" FORBES REALTY
Tt ST DATE MARCH 21 1r�85
I '
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 26)
' ENGINEER DAN OCONNEL:L
1=E RC TEST NO
L ERC RATE -
a
Id
f5 "''ti
b
R
A
REASON FOR LIMIT
2ND SOIL TYPE GRAVEL. WITH TILL:
SOIL TYPE GRAVEL, WITH CLAY NO LEDGE
CLIENT FORBES REALTY
TEST DATE
MARCH 21 19£35
LOCATION CRAY & STILES
' LOT1\10
TEST PIT NO 27
ENGINEER DAN OCONNELL
' PERC; "FEST' NO
PE.RC RATE
1
�ja
1
R
O
1
'
REASON FOR LIMIT
LAND SOIL TYPE GREY SILT/CLAY
LAST SOIL- TYPE GRAVEL, SAND CLAY, NO LEDGE
I � ,
I �
' CL.IENT FORRES REALTY
TEST DA"Z"E MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
' TEST PIT NO 28
ENGINEER DAN OCONrIELL
FERC TEST NO
FERC RATE '
InTEi
I s
b
R -u
9 _
REASON FOR LIMIT
' 2ND SOIL TYPE SILTY GRAVEL
L(1Sl" SOIL TYPE GRAVEL WITH CLAY OR SILT. NO LEDGE
CLIENT FORS REALTY
TEST DATE MARCH 21 19B
LOCATION GRAY & STILES
LOT 1\10 -
TEST PIT NO 29
E11G I NEER DAN OCMONNELL
PERC:; TEST NO
FERC BATE -
i
M
b
7
TT B9
i4u
REASON FOR LIMIT
2ND SOIL TYPE SILTY GRAVEL-
' LAST SOIL TYPE NO LEDGE
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY ,oma STILES
LOT Na
TEST PIT NO ?O
ENGINEER DAN bCONNELL
FERC TEST NO
PERC RA"Z"E
i
y
� Ru
' REASON FOR LIMIT
2ND SOIL TYPE SANDY GRAVEL
LAST SOMI_ TYPE SILTY GRAVEL NO I_.EDGE
L,
1
1
CLIENT FORBES FEALTY
TEST DATE MARCH 21 1985
' LOCATION GRAY & STILES
LOT 1va
TEST PIT NO 31
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE
1
1
r-IH_n
i2
-vv 5
1
7
8
1 I
iqV
i
REASON FOR LIMIT
ND SOIL TYPE BANDY GRAVEL
1-4)61" SOIL. TYPE GRAVEL. WITH SILT-CLAY 1V0 LEDGE
I
' CL I ENI FORS REALTY
'VEST DATE MARCH 21 1985
LOCATION GRAY ?R STILES
LOT, NO
TEST PIT NO 32
ENGINEER DAN OCONNELL
PERO TEST NO
FERC: RATE
2
5
' 7
A
' REASON FOR LIMIT
2ND SOIL TYPE SANDY GRAVEL WITH TILL
L..AS'I' SOIL TYPE GRAVEL WITH SILT OR CLAY NO LEDGE
1
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
TEST FIT I✓IO 33
ENGINEER DAN OCONNELL
PERC TEST NO
' PERQ RATE -
J
a
8
f �
9 -w _
REASON FOR LIMIT
' 2ND SOIL TYPE GRAVEL WITH TILL
LAST SOIL TYPE GRAVEL WITH CLAY OR SILT. NO LEDGE
i
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO -
TEST PIT NO 34
ENGINEER DAN OCONNELL
PEF;C TEST NO
FERC HATE
1
1 H
1
2
1
b
7
1 e
9 -u
Ia
1
1
REASON FOR LIMIT
' 2ND SOIL TYPE GRAVEL WITH TILL
LAST SOIL. TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE
I 1
i
1
I
CLIENT F'ORBES REALTY
TES•"aT DATE MARCH 21 1985.
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 35
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE —
5
b
i 7
B
4u
t
REASON FOR LIMIT —
2ND SOIL TYPE GRAVEL WITH TILL
LAST SOIL TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE
y
' CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 36
ENGINEER DAN OCONNELL
' PERC TEST NO
FERC RATE
NXX
3 _w
7
8 -U
9
ip
REASON FOR LIMIT
2ND SOIL TYPE SANDY GRAVEL WITH TILL
LAST SOIL TYPE GREY SILT-- SAND NO LEDGE
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
TEST MIT NO 37
ENGINEER DAN OGONNELL
FERC TESL" NO
' P RC RATE T
a
g
b
R_
' � 4u
' REASON FOR LIMIT -
2ND SOILTYPE SANDY GRAVEL WITH TILL
LAST SOIL TYPE GRAVEL WITH SANT? & GREY SILT. NO LEDGE
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY '< STILES
' LOT NO
TEST PIT NO 38
ENGINEER DAN OCONNELL
' FERC TEST NO
FERC RATE
r
IAN
vv
ti
5
7
t 9
is
REASON FOR LIMIT
2ND SOIL TYPE GRAVEL WITH SAND & .GREY SILT
LAST SOIL TYPE GREY SANDY SILT
CLIENT FORSES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 39
ENGINEER DAN OCONNELL
' FERC TEST NO
FERC RATE
Ll
y-w
5
7
R -u
O
i.
' REASON FOR LIMIT
2ND SOIL TYPE GRAVEL WITH SAND & SILT
LAST SOIL TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE
t
I,
CLIENT FORBES REALTY
TESL" DATE MARCH 21 1985
LOCATION GRAY & STILES
' LOT NO -
TEST PIT NO 40
ENGINEER DAN OCONNELL
FERC TEST NO
' PERQ RATE
� 2
Li
5-w
9
REASON FOR LIMIT
2ND SOIL TYPE SANDY GRAVEL WITH TILL
LAST SOIL TYPE GRAVEL WITH SILT. NO LEDGE
4
CLIENT FORSES REALTY
' TEST DATE MARCH 21 1985
LOCATION GRAY %&. STILES
LOT No
TEST PIT NO 41
' ENGINEER DAN OCONNELL
PERE TEST NO
FERC RATE
z
S
X
b -
B
9 . .
i4U
REASON FOR LIMIT
:'ND SOIL TYPE SANDY GRAVEL WITH TILL
LAST SOIL TYPE SILTY GRAVEL. NO LEDGE_
is
t
' -CLIENT FORHES REALTY
TEST DATE MARCH 21 19B5
LOCATION DRAY & STILES
LOT NO'
TEST PIT NO 42
' ENGINEER DAN OCONVELL
FERC TEST NO
PERC RATE
'k.`.c` +
L �
`i
S
Q
' REASON FOR LIMIT LEDGE
2ND SOIL TYPE SANDY GRAVEL
LAST SOIL TYPE SANDY GRAVEL. lJI"rH SILT, COBBLE NO WATER
' CLIENT FORBES REALTY
TEST DATE MARCH 21' 1985
LOCATION GRAY u STILES
LOT NO
TEST FIT NO 43
ENGINEER DAN OCONNELL
' PERC TEST NO mm
FERC RATE
a
iH
■ fLi
5
b
7
H
9 -w
io
REASON FOR LIMIT LEDGE
2ND SOIL TYPE SANDY GRAVEL WITH SILTICOBBLE
LAST SOIL TYPE LEDGE NO WATER
CLIENT FORBES REALTY
TEST PATE MARCH 21 1985
LOCATION GRAY & STILES
LOTNO --
TEST F'I T NO 44
ENGINEER DAN OCONNELL
FERC TEST NO
FERC RATE
a
5-w
i
to
8
' REASON FOR LIMIT LEDGE
2ND SOIL TYPE SANDY GRAVEL WITH TILL BOULDERS & COBBLES
LAST SOIL TYPE LEDGE NO WATER
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
, LOCATION GRAY & STILES
LOT NO
TEST PIT NO 45
ENOINEER DAN OCONNELL
NERC TEST NO
FERC RATE
a
5
A
9
' REASON FOR LIMIT LEDGE
2ND SOIL TYPE SANDY GRAVEL WITH TILL,SILT
LAST SOIL TYPE LEDGE
CLIENT FORBES REALTY
TEST DATE MARCH 21 1985
LOCATION GRAY & STILES
LOT NO
TEST PIT NO 46
ENGINEER DAN OCONNELL
PEFtC TEST NO
FERC RATE
a
y
b u
7
8
1 � 9 '
is
' REASON FOR LIMIT LEDGE
2ND SOIL °TYPE SANDY GRAVEL WITH SILT) BOULDER St COBBLE
LAST SOIL TY1='E LEDGE j
Ld
a �
i-1 f�4
Lti L1
a
e
SECTION XII
EASEMENTS AND RIGHTS OF WAY
' See accompanying subdivision plans sheets 2, 3 and 4
1
1
f,
' SECTION IX
' WETLANDS PROTECTION ACT
,1
SECTION IX
' WETLANDS PROTECTION ACT
' The wetlands on site will be protected from siltation damage by
siltation fence. Fence backed by staked hay bales will surround the
working area and will be placed before work is to begin. The fence
.will be inspected by the engineer and both the Conservation Commission
' and Planning Board to insure proper installation. The fence will
remain in place until the slopes have been stabilized with loam and
seed. All silt will be removed from the area before removal of the
fence. Periodic inspections will be conducted by the engineer to make
sure that the fence is in good working condition.
' An area of 3480 SF of wetlands will be filled to provide access
(driveways) to lots 7 and 8 of the subdivision. A replacement area of
3980 SF will be provided to compensate for the loss. These areas are
shown on sheets 6 and 7 of the definitive' subdivision plans.
SECTION X
SITE ACCESS
t
SECTION X
SITE ACCESS
Access to the proposed site will be provided by Stiles Street. Stiles
Street intersects Gray Street at 750, and at a grade of 1.5%. The
' site distance from Stiles Street in eitherdirection is-approximatetly
220 feet. This distance provides for safe stopping for speeds up to
32 miles per hour under wet driving conditions on Gray Street, a
narrow winding road.
1
i
SECTION XI
' CONSTRUCTION SCHEDULE
Section XI
Construction Schedule
Week
Activity 1 2, 3 4 5 6 7 8 9 10 11 12 13 14
Cut trees and
remove debris 1----1
Install erosion control
fabric fence and
sedimentation areas 1----------1
Remove stumps and loam
from roadway and subgrade 1------ ---1
Install drainage system
& waterline in project 1-----------1
Set frames and grates
Gravel roadway 1-----------1
Pave binder 1-1
' Grade shoulders &
loam and seed 1--------1
Schedule is dependent upon weather conditions.
SECTION VIII
SILTATION AND EROSION CONTROL
Section VIII
Siltation and erosion control
Erosion and siltation will be controlled in the following manner:
-, As soon as the roadway right of way is cleared of trees and all of the
stumps are removed, siltation fence and hay bales should be placed
between the roadway and any sensitive areas. Erosion control should
also be placed at the bottom of all slopes in cut or fill. This form
' of erosion control is illustrated in figure 4: Sedimentation control
detail.
Crushed stone should be placed at the entrance of the roadway over the
full width of the cleared area for a distance of 50 feet to a depth of
4 inches to provide erosion control for the uphill grade into the
project.
1 When the drainage structures are installed in the roadway, the frames
and grates should be mortared and set to finish grade immediately. On
many projects the manholes and catch basins are left low and uncovered
after installation, and act as collectors of sediment and runoff. By
setting the frames and grates to finish grade they will be higher than
' the surrounding roadway until it is paved. This will prevent water
and sediment from entering the drainage system before the roadway is
paved. Temporary siltation ponds should be constructed at the
discharge end of all drain pipes, as shown on figure 5: Siltation
' pond detail. Hay bales should be placed around the catch basin inlets
after the roadway is paved, and should remain in place until the
shoulders and side slopes are stabilized with sufficient vegetation to
prevent erosion.
All slopes in construction areas throughout the site should be seeded
and mulched (or hydro seeded) as soon as construction in the areas is
complete. The stabilization and seeding of the slopes should not be
left as the last item of work on the project.
i
1
1
1
' 1
1
BALES TO BUTT C (Z)2'x Z"'x 3' 5TAKES LIM/T OF I
TOGETI/ER EACII BALE GRAD/NG i
L!M/T OF �c RIES
I' � ••, Illin • GRADING
0 6 .
If oil , Ek/ST/NG EROSION
GROUND L'ONTROL
�I 1� I FENCE
1 I AMY
.J EROS/ON
CONTROL
(�)�•"Z,." 3' FENCE EROS/ON CONTROL F,48R/C
STAKES 4,401 A95.9
�MAIZIFAL'MRE'O BY
gqL€ FOSS MANUi"AC'TUR/NG
OR EQUAL
FENCE BACKED
' BY STAKED AOY
W/RE T/E BQLFS -
1 fTYP. )•; •
1 !"x/"O,4K
ST,dkFMR)
did
5'"W
5Ki91M&NTQT/4N CONTROL DETQ/L
Ivor ro 5UL
i
URS' 4
1 NDT46�:
' LIA Y BAL€S TO BE RACED AND STAKFO BEFORE ,WORK
/S TO BEG!N AND REMAIN UNTIL SLOPES ARE STAB/tIZED
11711 LOAM AND SAND.' ALL SILTATION TRAPPEO BY
LIAY BALES 15 'TO' BE REMD!/E'O AND CLEANED.
2 - / 40 OAK STAKES Z 2 X 2 x 4 STAKES
a/❑ ❑ �❑ 0 /0 E3.100 ❑ Ay❑� ❑ ❑ 1� ❑ ❑
UAY 9AIEs
2"'x2"x 3 " STAKES
' TEMPORARY DRAINAGE
OUTLET
STONE
2" x Z" x 4" STAKES
i
1
5/L M TION POND DETW L
i NOT TO SCALE
1
916 UR E 5
/VOTE'POND TO BE CLE.4AfO AFTER EACH STORM