Loading...
HomeMy WebLinkAboutGRAY WOODS ESTATES Notice to APPLICARr/TOWN CLERK and Certification of Action of Planning Board on Definitive Subdivision Plan entitled: GRAY WOOD-ESTATES By: CHIRISTIANSEN ENGINEEk dated December 27, 19 85 * * Revised: March 22, .1986 ' mor$lttxe���3��o�imt� d�s�sxx4ti �x��xe�c�� �i�4�x�xx �4}�xatis�l$tsx , That the record owners of the subject land forthwith exec =cord , 00 a "coven with the land", or otherwise provi��eeswithin for the con- struction of ways Lti s installation of municipal said sub- division, all as provide L. c. q1 , S. $ 2. That all such construction stallations shall in all respects conform to the governing rules re s of this Board. 3. That, as re by the North. Andover Boar Health in its report to this Board, no ding or other structure shall be aced upon Lots No. as shown on said Plan wi he prior cons= said Board of Health. 4, . Other .conditions: In the event that no appeal shall have been taken from said approval within twenty days from this date, the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. � * � � * �r +� � � * � � * a * � * � we � * ars► * � � * �e � � * � �tat * � * The North Andover Planning Board has DISAPPROVED said plant for the following reasons. . _ See attached 12 reasons. 9B, W� sr 6 � add u. ulvr. �INi NORTH A,NAOVM PLANNIW BOARD Date: _', a2ril 3 , 1986 „�, � By: M,i eba�i p-1 P.: $nhP_-r9g - r hairman ' FORM C hC£tYED DAME LLdtj R APPLICATION FOR APPROVAL OF DEFINITIVE PLANDRunT� Ah3_0 Deceey ll 30 - , 19 , y... To the Planning Board of the Town of North Andover: The undersigned, being the applicant as defined under Chapter 41., Section 61—Ll for approval of a proposed subdivision shown on a plan entitled Gr��od Estates ' rr. r�r.. r~ i rrrrrrr. rr� b Christiansen Engineering r dated 12/27 „ = Y ,.. being land bounded as follows: Southerly by Gray Std�aterly by N.A. rimprovement Society & Daiulis Bros. Const-;"l' Northerly by. Chas. Ward Reservation Land and Easterly hereby submits s plan as a DEFINITIVE plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of plan. Title References North Essex Deeds, Book Page ; or Certificate of Title No. , Registration Book..# pages; or Other: Inst. ## .14565 Said plan has( has not(X) evolved from a preliminary plan submitted to the Board of 19 and approved (with modifications) ( ) ' disapproved ( oa , 19 i ,-,_.,__-_._The undersigned..hereby:_applies for the approval of..said.DXFINITIP& plan by the Board, and in furtherance thereof hereby agrees to abide by the Boardte Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said DEFINITIVE plan by the Board: , 1. To install utilities in accordance with the rules and regulations of the Planning Board, the Public Works Department, the Highway Surveyor, the Board of Health, and all general as well as zoning bar-laws of said Town, as are applicable to the installation of utilities within the limits of ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Iv and V of the Rules and Regulations , of the Planning Board and the approved DEFINITIVE plant profiles and cross sections of the same, Said plan, profiles, cross sections and construction specifications are specifically, by reference, incorporated herein and made a part of this application. This application and the covenants and agree— ments herein shall be binding upon all heirs, executors, administrators, successors' grantees of the whole or d assigns of the , gr a part of said land, and ass gn undersigned; and 3• To complete the aforesaid installations and construction withint (2) j years from the date hereof. ` Received by..Town Clerks Dates Signature of Applican 4 Times Forbol Ilea 1114 401 Andover St. Signature: Address r DEFINITIONS SECTION Developer: Forbes Realty, Thomas Laudani and James Philbin, 401 Andover Street, North Andover, MA and its successors. The Board: shall mean the Planning .Board of the Town of North Andover, MA (120 Main Street, North Andover, MA) . The 'Rules: shall mean the Rules and Regulations Governing the Subdivision of. Land - North Andover, MA issued by said Board and as amended through this date. The Plan: shall mean sheets one through eleven, of the Definitive Plan of "Gray Wood Estates" prepared by Christiansen Fnqineering, Inc. , 114 Kenoza Ave. , Haverhill , MA dated December 27, 1985 revised March 22, 1986. I i adl a3naM HiHON U313 NA 91�(Il �131liV� t9�A13�3l1 April 7, 1986 Decision — Disapproval Definitive Plan of Land Gray Wood Estates dated 12/27/85, rev. 3/22/86 1 . Applicant has not provided a fifty (50) foot roadway width from Gray Street through to station 22 + 75. In accordance with the Planning Board' s Rules and Regulations, Section IV, 4.2.a, street width shall be a minimum of 50 feet and the applicant can provide for proper width since he owns land along one side of the roadway or the other. Roadway widening easement is not sufficient in the opinion of the Board to provide proper access-egress, maintenance of the roadway and proper side shoulders for the health, safety and welfare of the proposed dwellings. For lessening congestion in such ways that will be safe and convenient for travel, for reducing danger in the operation of motor vehicles, for securing safety in the case of fire or other emergencies, for insuring compliance with the applicable zoning ordinances, for securing adequate provision for water, sewerage, drainage, electric utilities and other requirements in a subdivision. 2. The proposed roadway alignment at the intersection of Gray Street does not provide the proper setbacks in the designated Residence 2 district in Table 2 of the Zoning Bylaw for the existing dwelling. 3. Applicant has not demonstrated how to construct the roadway for its full width in areas of cut and fill without encroachment onto land of abutters to the East from station 2 + 0 through to station 15 + 50. The topographic plans show side slopes which contradict the typical roadway cross section on the plans and in accordance with the Planning Board's Rules and Regulations. 4. The applicant has not complied with the Board of Health Regulations (see correspondence dated 1/15/86, 2/24/86 and 3/24/8'6) . - Applicant has not fully demonstrated how dwelling and related on-site sanitary leaching fields shall be designed and constructed to protect and secure adequate provisions for sewerage and drainage and ensuring sanitary conditions. - Applicant has not provided information as required under Sec. II, B,10; applicant has not provided locations of test pits l through 16, no test pit or percolation data has been provided for lots 5 through 9 inclusive. Due to the close proximity of the wetlands to proposed leacrhing fields and the high spring water table and not withstanding the fact that some proposed leaching fields do not meet the specifications of Title 5, the State Sanitary Code, Regulation 3. 7, in its jurisdiction of ensuring certain i I i slope requirements for the design and construction of on-site leaching fields and certain minimum distances from subsurface drains and not withstanding that the Town of North Andover ' s Planning Board' s Rules and Regulations, Section II,B, 3 states, "No land shall be subdivided unless it is of such character that it can be used for building purposes without danger to health and safety. No land shall be subdivided unless the subdivision plan shall provide means of drainage and sanitary sewerage disposal adequate in the opinion of the Board to fully protect the public health." - The Planning Board is of the opinion that lots 2, 3,4, 7,8, 12 and 13 shall be considered non buildable lots and shall remain as open space to protect the integrity of the wetlands, to ensure against additional flooding of existing residents on Penni Lane and on land of the North Andover Improvement Society and to protect the health of residents of the Town of North Andover. 5. The Planning Board will not grant the applicant a waiver of Strict compliance under M.G.L. Chapter 40A, Section 81-R and Section IV.A.4.a and II .B.S.a concerning the length of Dead End Streets in the Rules, specifically that which is designated Stiles Street. 6. The applicant has not demonstrated compliance with the Rules of the Planning Board, specifically Section III,B, l,d,e and Section III, B, 3,k,m,n and p. 7. The subdivision plans do not indicate locations of stone bound monuments in accordance with Sec. V. L, throughout the subdivision. 8. The subdivision plans do not indicate pipe sizes into or out of the proposed detention pond. Insufficient detail has been shown to fully depict and demonstrate how the proposed ponding area will be constructed, dikes or berm, excavated and type of finish , surface. Applicant should have prcwided detailed cross-sections with spring water tables and detailed the proposed activity with proper side slopes from the roadway and edge of wetlands and shown how the public safety would have been protected to prevent vehicles from entering said pond. - The Planning Board is of the opinion that the drainage analysis as submitted by the applicant which does not sufficiently detail the existing and proposed watersheds and has not properly safeguarded against further flooding of the wetland adjacent to the Penni Lane residences. - No flood plain elevations have been submitted or delineated on the plans. 8. The subdivision plans as submitted proposed driveways across the vegetated wetlands to serve lots 7 and 8, the Planning Board is of the opinion that detailed cross sections should have been submitted to ensure proper side slope protection to preven# the integrity of the slopes, wetland and driveways. No data was submitted as to drainagle calculations or size of proposed drain pipe under the driveways to ensure against flooding and overlapping of the proposed driveways. No data was submitted regarding the depth of peat in the driveway crossing nor detailed provisions to show a contractor how to preperly construct said crossing to protect the integrity of the driveway. 9. A Notice of Intent has not been filed with the North Andover Conservation Commission as required under Chapter 131, Wetlands Protection Act and the local Conservation Commission' s regulations. - In accordance with the Conservation Commission' s letter dated January 23, 1986: o There is a possibility that the wetland boundaries are inaccurate. If this is so then several lots would be unbuildable. o There is a discrepancy on a wetland boundary between IEP and Christiansen Engineering on lots 12 and 13. o Wetland replacement plan is required for lots 7 and 8. o Off site wetlands need to be shown north of lot 7 and 6. 10. Applicant has not provided the Planning Board with any detail of the proposed steel bridge to allow for proper analysis by the Town of North Andover to ensure the safety, health and welfare for the inhabitants of the Town of North Andover. The Planning Board is of the opinion that such structural detail be submitted prior to the approval of a subdivision that proposes to serve residential dwellings with fire and police protection and other related services incident to residences . If a proposed bridge were to be built, what is the effect of removing the existing drain pipe and roadway that presently serves as flood control devices. No data regarding that matter has been submitted to the Planning Board. 11. No Datum for the existing bench marks have been submitted. In accordance with the rules and regulations, this subdivision must be on the same datum as the Penni Lane subdivision to allow the Planning Board to have reference to the watershed and flood elevations of the mutual wetland areas. Bench marks should have been established throughout the subdivision in permanent locations. The Planning Board is of the opinion that wooden stakes set in the roadway, leaching areas or proposed house locations would be destroyed as soon as any construction starts and are not considered permanent. 12. No documentation has been submitted to the Planning Board which indicates the status or ownership of Stiles Street and the applicants right to access said street. cc: Highway Surveyor Board of Public Works Tree Warden Fire Chief Police Chief Conservation Commission Building Inspector Board of Health Assessor Applicant Engineer File i CNQM 7FR/NG REPORT FOR 6RA Y WOOD ESTA Ti 5 IN t NORT1/ ANDOV4CR, MA. 1 i 1 1 1 1 t CRR/ST/ANSEN ENG/NEER/NG, /Nc. //4 KENOZA .4V9NL/E - 14AVYRII/LL, MA. GRAY WOOD ESTATES ' INDEX j � I INTRODUCTION II CROSS REFERENCE FOR COMPLIANCE OF THE APPLICATION OF GRAY WOOD ESTATES WITH NORTH ANDOVER SUBDIVISION REGULATIONS III FORMS IV VARIANCE FROM REGULATIONS V ENVIRONMENTAL REPORT VI HYDROLOGY ' VII SOILS A) Soil Survey of Essex County, Massachusetts, Northern part B) Site Testing ' VIII SILTATION AND EROSION CONTROL IX WETLANDS PROTECTION ACT (CHAPTER 131, SECTION 40) X SITE ACCESS XI CONSTRUCTION SCHEDULE XII EASEMENTS i L I ' INDEX OF FIGURES ' FIGURE IA SITE LOCATION FIGURE 1 WATERSHED ' FIGURE 2 WATERSHED SOIL CONDITIONS FIGURE 3 SITE SOIL CONDITIONS FIGURE 4 SEDIMENTATION CONTROL DETAIL FIGURE 5SILTATION POND DETAIL s i - i i ' SECTION I t, INTRODUCTION f; Gray Wood Estates is a proposed 22.5 acre subdivision located in the southwest section of North Andover', Massachusetts. The site is located to the north of Gray Street, just west of Penni Lane (See figure 1A) . The subdivision will contain 13 building lots. Access to the ' project site will be provided by Stiles Streets an existing street that will be improved and reconstructed from its i ,present condition. t i 4 N` �- s48 ///'���•••���•'''t•� d �o i __� , ' , � "w' �� •1 ��� )p\.fah . �"\ •� to .w•• � 1�°b ��\ i��id t.��' � O + �•;_ •, 0� 0�^. ,rv'�-"I5� /. ' ..J I °�'� •"" • �m ���;\¢ ',,I IXC• U � i � �� p � tj f� r � 5 may= ,`' � � �� O �° "' '(f\•V }•S Y,• }• • \ vY- ry IIx �;,�' O "1 •', O�� 0 _ lr...J AO`s' P 1 \ �. ice.� ti �.� _°•' o .. com o L'a' S,• ,•� 47 \ �Ye• r �••I �'°" _"^ •"^�M•�-� U .t�0 p f-•d _ �. �`f6+�. \ 4 ���qqq,,, � ,,I .-• 'IF�(� ..d•�•_ ? .� f'` .�V�'.� •If s� QO ' 0 � � e] 9Ci\ 0 � �� \ v •• �� mow. ,,. � ,\. '/tti ~•4�• ••' !f (� ly�J/��//''��°���^�•� :� Ot •,l 1� •• ��ty — -.a..� 01• � ' o• .e� O .° 1'� °1 •�� \ °..\ J7S ac� \\� `� ,.•�` � J . �. � � : `� � Ate: a .• oa I o :�• � �.\ � ._;, ppm w- � f �• ../ � _ w. 'to V d ,1 �47 ✓/ � M°� � \..�� \til/��� `} � O,��� •"Y• \ ./r� �.. ' US [` 1 ��• ,(lp �•/./�,• /'.,i�.lp `• •y J �`-',�c'.�.`�_iu�'1-C '\�w� }•' � _ � �q.lJl ° fix: �- °� ,`�"/`•`� � �.• 0`0'e o '� •c M• • • r, MI •,ate r• ,!A •r- Ip '1(i.�•� 'AL1., i._\.. C' I!lcJ O 1_ -,t.`\ .. a4"� +• L� FIGURE IA SITE Loc4TION SCdLE� CRROTIAMMN ENGINEERING, INC 114 KEN42d dVE. -4,dJIMA&L-MA- <1 Section II Crows Reference for Compliance of the application of Gray Wood Estates For Approval of a Definitive Subdivision Flan to they North Andover Planning Board Rules, and Regulations ' Governing the Subdivision of Land Section II ' Cross Reference for Compliance of the Application of Gray Wood Estates for Approval of a Definitive Subdivision Plan to the North Andover Planning Board Rules and Regulations Governing the Subdivision of Land The cross reference list that follows is provided to assist the ' reviewer of this application in locating where in this definitive plan application requirements specified in the "Rules and Regulations Governing the Subdivision of Land, North Andover, MA." are met. The number in the cross reference list corresponds directly with Section ' III Bl and III B3 of the regulations. Regulation Application Reference 1 . Submission: ' a) Copies of application Submitted as req. b) Form C ' Form D Section III c) Key Map Sheet 1 ' d) Seepage Test Data Section VII ' e) Drainage Analysis Section VI f) Easements Section XII ' g) Environmental Report Section V h) Construction Schedule Section XI i) Soil Types Section VII percolation test results ' j) submittal fee $1750 k) erosion and sediment control Plan during construction See sheets 5,6,7 after construction & Section VII ' 2. Notice to Town Clerk: Cover letter 3. Form and Contents: ' a) Applicant & address Owner & address Engineer & address See title block b) zone(s) See cover sheet c) title See title block d) , Form E See Section III ' e) North Point Date scale ' legend See each sheet ' f) Boundary Survey See sheets 2-4 g) Existing streets: stations curves paving right-of-way See sheets 2-7 ' Proposed streets: stations See sheets 2-7 curves paving right-of-way h) proposed lot: dimensions, area, number See sheets 2-4 ' i) existing easements proposed easements See sheets 2-4 ' j) existing drainage lines proposed drainage lines See sheets 5-10 k) topographic contours: ' existing proposed watershed adjacent to site See sheets"5,6,7 ' cut and fills edge of wetlands spot elevations See sheets 5,6,7 ' 1) foliage line See sheets 5,6,7 ' m) location of observation and See sheets 5,6,7 percolation test holes ' results n) existing major site features See sheets 5,6,7 ' o) location, bearing and length of: streets, lot lines, way lines and boundaries Sheets 2,3,4 permanent monuments location: p) profiles of streets, sewers, ' drains, waterline, BM Sheets 8,9,10 r q) Typical cross section Sheet 11 ' r') action of Board Sheets 1-4 s ' s) Existing septic systems Sheets 5,6,7 j t) land of Owner not subdivded Section VII i i' 9 t t FORM C REEti pu �` APPLICATION FOR APPROVAL OF DEFINITIVE PLARC%� �';`�;L';ER Dece*gk 30122� 19 8t; To the Planning Board of the Town of North Andover: The undersigned, being the applicant as defined under Chapter 41, Section 81-Lf for approval of a proposed subdivision shown on a plan entitled Gray Wood Estates by Christiansen Engineering dated 12/27 being land bounded as follows: Southerly by Gray St. i Westerly by N.A._ Improvement Society & Daiulis Bros. Const._ i Northerly by Chas. Ward - - Reservation Land and Easterly !Y various ovFnpr hereby submits said plan as a DEFINITIVE plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of said plan. Title Reference: North Essex Deedst Book , Page ; or Certificate of Title No. , Registration Book page.; or Other: Inst. # 14565 Said plan has( ) has not(X) evolved from a preliminary plan submitted to the Board of l9 and approved (with modifications) ( ) 1 disapproved ( on 19 _ _._._The •undersigned..hereby-applies for the approval of..said DEFINITIVE plan i by the Board, and in furtherance thereof hereby agrees to abide by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andovert upon approval of said DEFINITIVE plan by the Board: 1. To install utilities. in accordance with the rules and regulations of the Planning Board, the Public Works Departmentt the Highway Surveyor, the Board of Health, and &.11 general as well as zoning bye-laws of said Townt as are applicable to the installation of utilities within the limits of ways and streets; I` 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Tv and V of the Rules and Regulations of the Planning Board and the approved DEFINITIVE plan, profiles and cross 1` sections of the same. Said plant profiles, cross sections and construction specifications are specifically, by reference, incorporated herein and made a part of this application. This application and the covenants and agree- ments herein shall,be binding upon all heirs, executors, administrators, II successors, grantees of the whole or part of said land, and assigns of the undersigned; and 3. To complete the aforesaid installations and construction within t (2) years from the date hereof. 1 . Received by Town Clerk: Dates Signature of Appliean Times 401 Andover S t e Signature: Address v Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board on Definitive Subdivision Plan entitled: By: dated 19 ._.- The North Andover Planning Board has voted to APPROVE said plane sn63ect to the following conditions 1. That the record owners of the subject land forthwith execute and record a "covenant running-with the landnl or otherwise provide securityfor the r struction of ways and the installation of municipal services within said sub- division, all as provided "by G.L. c. 41, S. 81-U. 2. That all such construction and installations shall in all rospects conform to the governing rules and regulations of this Board, 3. That, as required by the North Andover Board of Health in its report to this Board, no building or other structure shall be built or placed upon Lots No, as shown on said Plan without the prior consent of said Board of Health. - 4o Other .conditions: In the event that no appeal shall have been taken from said approval within twenty days from this date, the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. e * _1 The North Andover Planning Board has DISAPPROVED said plan, for the following reasons: II 1 NORTH ANDOVER PLANK M BOARD Dates By; 1 _ 4 FORM D DESIGNER' S CERTIFICATE December 30 ► 19 85 ' .TO' THE `-�LANNI NG BOARD ,QF THE , TOWN OF NORTH ANDOVER In preparing the plan e n t i t I ed Gray Wood Estates I hereby certify that the above named plan and iccompanyinq data is true and correct .to the accuracy required by the cur-ent Rules and Regulations Governing the Subdivision of Land in North Andover, Massachusetts , and my source. of information about the location of boundaries shown on said plan. were . one or more, of the following ; 1 . Deed from 169 Trust t.o Forbes Realtr 'Trust dated 7/9/85 ;and recorded in the Inst. #14565_ Regi s•try in Book Page 2 . Other plans , as, follows Plan by Christiansen Engineering dated 12/11/85, 1 NERD #7215. #9742► #4184, .#7124 3 . Oral information furnished by 1 ' 4 Actual measurement on the. around from a sta :•tin'g pointestablished by Penni Ln. ' S Other Sources . w ' Signed ( Sea I, '.of Erigin-.eer or ( RegisterrAL fession.alEng'ineer or Surveyor ) Registernd Surveyor} Christiansen En ineerin 14 Kenoza Ayeal gaverhill , Address FORM E ' CERTIFIED LIST OF ABUTTERS becember 90.. , 19 85 TO THE PLANNING BOARD OF THE TOWN OF NORTH ANDOVER : The undersigned $ being an applicant for approval of, a Definitive Plan of -a proposed subdivisidn entitled Gray Wood Estates submits the following sketch of the land in the subdivision listing the ' names of the adjoining owners in their relative . positions and indicating the address of' ea(.�i abutter on the sketch or in a separate list , ' in-- cluding owners of land separated from the su divi n storeet . ' S n u r e of AW ican Fomes Realty Trust Address 401 Andover St. , N. Andover ' 19 TO THE PLANNING BOARD OF THE TONIN OF NORTH ANDOVER : r _ t ' This in to certi. fy ' that at the time'" of the last assessme.nt . for taxation made by the Town of North Andover , the names and addresses of the partie! I � assessed as adjoining owners to the parcel' of land shown above were as ' above written , except as fol lows i h 'Assessor List of Abutters - Cray arv-1 Stiles Subdivision Jahn F. and Marie B. Tierney, 6 Penni Lane ' James and 3evesta Co5ta�s, IB Penna Lane ' Marilyn J . Titus, 30 Penni Lane Pawl J. and kPaula M. King , 42 Penni Lane Thema_, J . and , Jean A. Onei 1 , 54 Penni Lane L<awrenre :.and Janet Ros:aenbaum, 66 Penni Lane= a F BUi l tiers Inc. , 90 Penni Lane ' 1-iughi and I:.aren French , 102 Penni Lane Joseph :and Louise Baessiere 114 Penni Lane ' r;hiarles and Jane Nelson , 31 Cray Street Marilyn A. Stella, 162 Cray Street ' Micthael J . and Barbara A. Stella, lBo Cray Street ' 1-'rancis C-iuodhUe, 91 Boston Street Christine Stewart , 68 Boston Hill. Road ' Mary A. Stella, 103 F''utni::tm Road Charle-s Ward Reservation Clonservation Land ' North Andover Improvement: Society --- Town of North Andover ' neIults Brothers Construction Company , 513 Collins Street , Lynne, MR. X1`''02 1 1 t SECTION IV VARIANCE FROM REGULATIONS i i Section IV Variance from Regulations ` We ask for a waiver from each of the following regulations for ' the reasons listed below. P . Regulation ref. Request for Variance i. B.lc The town zoning map is at a scale of ' 1:1000, therefore our key map is at 1:1000 rather than the 1:600 called for by Reg B.1.c. 3.k Cross hatching of cuts and fills was nor done on the grading sheet because we felt it ' would make the site grading sheets unreadable. 3.p Proposed grades are shown in black rather ' that red. The drawings are set up in such a way that existing and proposed can be distinguished without colors. Furthermore, ' color is of no value when making prints from the originals. ' 1V, A.2.a The width of the existing roadway varies from the required fifty foot width of the subdivision regulations. i SECTION V ENVIRONMENTAL REPORT 1 Section V ' Environmental Report ' This Statement of Environmental Impact is presented by first giving the specific wording of the subsection as given in Part III-B-5 of the Rules and Regulations followed by the applicant's response to that ' specific request for information. Part III b 5. The statement of Environmental Impact should include the following: a) A set of plans at uniform scale shall be submitted in conjunction with the Environmental Impact Statement, encompassing the entire subdivision on a single sheet not larger that 42" by 60" showing the following: (1) Present and proposed topography at two (2) foot intervals, with graphic drainage analysis, location of ' existing structures, including fences and walls; See design sheets 5, 6 and 7 (2) Vegetative cover analysis, including identification of general cover type, (wooded, cropland brush, wetland, etc.), location of all major tree groupings, plus other outstanding trees or other botanical features, important wildlife habitats, and identification of areas not to be disturbed by ' construction; See design sheets 5, 6 and 7; Lot 1 shown on sheet 5 ' consists of meadow and orchard. Lots 2, 3 and 4 are wooded but have recently beencutfor lumber. A large portion of lots 2, 3 and 4 are wetlands as shown by the ' wetlands line. Lots 13, 12, 11 and 10 shown on sheet 6 are fields with a large portion of the lots being wetland. Lots 5 and 6 are forested. Lots 7, 8 and 9 consists of both forest and wetland. (3) Approximate surface and subsurface water level and ' seasonal high ground water mark; Subsurface water levels are generally l'6" - 6'0" from the surface. The surface water ranges from elevation 69 92 in the west of the site to 90 - 94 on the east of the site. t (4) Soil types based un U.S.D.A Soils study and location of soil percolation. tests. ' The soil types are discussed in section VII of the definitive plan application. b) Physical Environment ' (1) Describe the general physical conditions of the site, •. including amounts and varieties of vegetation, general ' topography, unusual geologic, scenic, and historical features, trails and open space links and indigenous wildlife; Stiles Street is an existing undeveloped road bounded by two stone walls. An existing are house is at the westerly side of Stiles Street at its intersection with Gray Road. Stiles proceeds generally in a northerly direction. The land to the west of Stiles Street, for a distance of 500 feet, is part of an orchard. From ' the point where the orchard ends to a point where Stiles Street crosses a stream, (approximately station 14) the land was until recently wooded. A lumbering operation has cleared most of the land up to the large ' wetlands that is on the site. All of the land to the east of Stiles Street, in this same area has been subdivided and is the backyards of the homes on Penni Lane. Proceeding from the stream along Stiles Street for approximately 250 feet the applicant doesn't own any land on either side of the road. At approximately station 16 + 50 the applicants land is on the easterly portion of Stiles Street. The land on the westerly ' side of the road' is undeveloped. The applicants land from station 14 + 50 to approximately sttation 23 + 00 is open meadow adjoining the road and wooded at the wetlands line. The remainder of the property is wooded. ' 2) Describe how the project will effect these features, The land's contours will be reshaped where the houses . will be built and where the driveways will be laid. In addition, some regrading for Stiles Street will be necessary. This recontouring will have an impact but we have attempted to recontour the land following existing contours. ' Approxiamtely 3,480 square feet of wetlands will be filled. These wetlands will be filled for the driveways to lots 7 and 8. Much of the forest cover of the site will be removed because of construction. 3) Provide a complete physical description of the project, and relationship to surrounding area. Thirteen houses will be built and approximately 2500 feet of roadway will be constructed. Water, sewer and ' drain lines will be laid. The lots range in size from 1 to 3 acres. ' The project is consistent with the area's prevailing land use of residential housing. ' c) Surface, Water, and Soils ' (1) Describe the location, extent, and type of existing water and wetlands, including existing surface drainage characteristics, both within and adjacent to the project; A large portion of the site area is wetlands and will for the most part be untouched by the project. Details of the drainage can be found in the hydrology section ' of this report. (2) Describe the methods to be used during construction to control erosion and sedimentation; eg., use of sediment basins and type of mulching, matting, or temporary vegetation; describe approximate size and location of land ' to be cleared at, any given time and length of time .and exposure; covering of soil stockpikes; and other control methods used. Evalaute the effectiveness of proposed ' methods on the site and on the surrounding areas, Erosion and sedimentation will be controlled by the use ' of fabric fencing, sedimentation areas and hay bales. The location of fabric fencing is also shown on the plans. Two rows of staked hale bales will be placed ' around each completed catch basin. See the erosion and G sedimentation control plan included in this report. j 3) Describe the permanent methods to be used to control ' erosion and sedimentation. Include description of a. any areas subject to flooding or ponding, b. proposed surface drainage system, c. proposed land grading and permanent vegetative cover, d. methods to be used to protect existing vegetation, e. the relationship of the development to the topography, 1 f, any proposed alterations of shore lines, marshes or seasonal wet areas, g., any existing or proposed flood control or wetland ' easements, h. estimated increase of peak run—off caused by altered surface conditions, and methods used *to mitigate any impact and/or return water to the soil, i ' Erosion and sedimentation will be controlled on a L ' permanent basis by the re-vegetation of all areas disturbed by construction. According to the Planning Board Regulations, the road shoulder will be loamed and seeded. In areas of the homes, lawns will be planted. For further discussion of drainage and siltation, see Sections E and I of'this report. ' 4) Completely describe sewage disposal methods. Evaluate impact of disposal methods on surface 'water, soils, and ' vegetation; Sewage will be disposed of in septic systems which will ' be design according to state and town standards. d) Subsurface Conditions. (1) Describe any limitations on proposed project caused by subsurface soil and water conditions, and methods to be used ' to overcome them; Subsurface conditions that could be a limitation to the project include high ground water (1'-6" below the surface) . This will effect the elevation of the foundations of the proposed houses and septic systems construction. In areas with a high water table, foundations can be constructed so that they are completely above the ground water level. Septic ' systems will be raised. (2) Describe procedures and findings of percolation tests ' conducted on the site; Percolation tests were conducted on the site and the ' results are in this report in another section. 1: ' (3) Evaluate impact of sewage disposal methods on quality of subsurface water; Because septic systems will be designed to state standards, they will not have an impact on ground water quality. e) Town Services (1) Describe estimated traffic flow at peak periods and proposed circulation pattern; The traffic flow per day is estimated to be 156 vehicles. The peak flow would be 65 vehicles per hour. 1 ' ' (2) Describe locations and number of vehicles accommodated in parking areas; Each home will have a driveway and most will have a garage. Each home can accommodate at least 3 vehicles. 4 ' (3) Describe effect of project on police and fire protection services; The construction of new roads and homes will increase the work of the Police Department and Fire Department. ' (4) Describe effect of project on Public Works Department; The project will increase the work of the Public Works Department. (5) Describe effect of project on educational services; The project will eventually increase the number of ' school age children in North Andover. ' (6) Describe effect of project on the town water supply and distribution system; The town water supply will be expanded as a result of ' the project. ' (7) Describe effect of project on the town sewer system. The project will not effect the town sewer system. { f) General Impact i (1) Summarize briefly environmental impact on entire town ' with supporting reasons. The project will cause an increase in work for the ' public fire and highway departments. The home construction will cause the removal of forest and meadow. The subdivision will also mean more children for the school systems. ' The benefits to the town will be increased tax revenues and an increase in the human resources that the ' families that buy the homes will bring_ to North Andover. f, r a SECTION VI ' HYDROLOGY S 1 Gray Wood Estates tSection VI Drainage Analysis The purpose of the analysis presented here was to: ' 1.) Develop a hydrologic model that describes the existing drainage patterns and flow for the project site. 2.) To predict the effect of the project on the flow ' characteristics of the site. ' 3.) To develop a system of drainage structures and controls that Y g ' would mitigate the effect of the project. ' The major hydrologic feature of the project site is a stream that ' has its source near Boston Hill, flows through the project site, and discharges into a large wetland and pond area (at control point A in ' Figure 1) to the Skug River. The watershed area that contributes to the stream flow is shown in Figure 1. The project area is shown as the shaded portion of drainage areas 4,5,6 and 12. The existing 100 year stream flows were predicted using a methodology that combines the SCS Modified Soil Complex Cover Method, methods presented in National Engineering Handbook; Section 4: tHydrology , a type II stream as described by the National Weather ' Service, Hydrologic Determination of Water Wal' Areas for the Design of Drainage Structures in Small Drainage Basins by V.T. Chow, and our own computer model. A copy of the SCS soil conditions for the ' drainage area is shown in Figure 2. Using these soil types, CN values as developed by the SCS, drainage area acreage measured by planimeter ' and the type II storm intensities, we were able to develop a hydrograph for each drainage area and add the hydrographs together for ' a combined flow to CPA. See attached calculations and computer ' printouts. ' Areas 1-11, 13 and 14 flow to control part A through the stream. ' Area 12 flows overland directly to the wetland. ' For the proposed conditions, only areas 4,5,6 and 12 are effected by the project. The CN values, lag times, and times of consentration ' were adjusted and all of the hydrographs rerun. The results are attached. ' The analysis shows that there are two areas of concern: 1 .) Stream flow under and over Stiles Street. ' 2.) Peak off site flow. The stream flow to Stiles Street at CPA shows an increase from ' 370 cfs to 376 cfs. The combined flow to the wetland shows an ' increase from 398.5 to 399 cfs. The total value increase to the wetlands would be 20,000 cubic feet. We are proposing to install a bridge over Stiles Street at the stream to allow it to flow as it presently does; through a 30" pipe and overtopping the road during storms. While the 30" pipe will stay as it is, the storm flow spillway over Stiles Street will be reshaped ' to accomodate the bridge design. The following calculations show that the flood level of the stream and hence the adjoining wetland will not be changed by the project. ' As can be seen from the attached calculations the project will ' have little effect on the area wide hydrology, however we are proposing a detention pond of approximately 20,000 cubic feet that will collect road drainage and maintain the rate of flow off site as compared to existing flows. This pond will provide storage for the increased volume the project generates as well as reducing the peak flow. It will also act as a siltation basin to prevent silt and road salts from reaching the wetlands. ' We believe that the calculations presented here show that the project will not cause any flooding or drainage problems down stream, ' and as designed meet Planning Board criteria. Also attached are the calculations that show that the drainage tstructures are adequate for handling the designed flow. ' The previous hydrograph shows that the total flow from the drainage area would increase from 398.5 to 399.0 as a result of the ' project. To correct this we propose to take the entire drainage of tthe southernly portion of Stiles Street to a detention pond.- The following hydrographs show the street and adjoining drainage patterns. � ' i • - ,. ,_._._ •,, • � it - _... .. .. ._. _ ,. . ._....�.. --- - - -•, - - "".�\ 3ie•• •I a �<� ;�.�, � :..; � �\ . J \ •r"I 4Y: P 1� '\•. V• 1 1.• q �: O �U ""•.a N u;\`. � w -tn• -�- "�' •,y. .: ..e- "':Ya ° p -- 244-_. - + 0 l n �u TSO l •p N� l .� IV CIA 86 o f a. I . � •• 1. R IV APB , �•, o o \f, r' Q ^� M•1�* •• y '�D•`�- Q0 1 r 0' •x. 1 � ` gav D � ll l • ' r F16 LIRE' 1 115. 6 5. MQP 5/TE_LOCATION , . ' SCALES j��_2480 � CNR15rUNSEN CNG/NEERAW INC 114 NIGNOZA AVE• w NAwCRN1L AW 1 A WDA �,' :_-\l ` It k '.4 � SFC � 91B SA• � COB ..� aA �Wa 5 �Y" ' •r4� . 'r sAB '.: - .E' Ir +-cee 1 ,y -sp s. CLC 7 Axatl_ c A N`A: t l IW} � 1\ -`UA•• .•�� hl• h 1.. � SB , .6 MmA 8a6 � K -'• WaC � .. `r WB \h . , XID flr ... 00 E !R \` .9 �P Wn 1y:� Pee •$,C. 614 re wra PIE B.�r�,:, W>e cae � >•aep WOODCHUCK F. S, T .wP aB 1 s F •(I 's �+P j r.. H�[L + �WrA YC. +�r �v{PeYD Wf0" •�'! I 1 yi{. ^CCD S rrvs't 4' >6F O W B - AM ^/ PoE� W1C I 1,• � � CAD 1 4 �.�� i 1 CS •CA; ! -AIB ` a PAA. +Y PAp I J• ! •� w AJr i.. Cr0 . 1* BnB `+ y CCe t tr, w1E e a 1y 31.•e•�ti 1 r `. I. •.♦. W.B Pp tr W '.. l `�� i � BP ,r- •Y > • PaC f;J Ws8•. � a' wsC '.,\4 �8 &1B 8 r..'. '. Wr0 �,�� MC e r� p,a • 5 f4'' � d8 • w1B-''. •Cr �i;y PS8 ..i � \ - ."'• MD Ws8 � ND.: 'i., .•CCC i-. ' r _ �; :• � r '. NIC C •. .CAB '•_ '• +r PSCy 'PeQ PaC Y i ` ,`♦ X18 CAB 'P�1 AIB , -• I 1 WA V NC ` Yca�� ,.. r I - wic RIA \ ♦ wn IZ .: rYS -;`ra _ � ,1 Pap 11{ f, r WfO , . , W18 p \ NIDA Y \ ��, �. ."p \. CCC •.♦ � � -0IG' Y J r. I 1 ... kO µ ..-, � L .tip t♦ r+r a6- Clp (( RIB ` GC Oh t•.. .� , ` o�r ::' s• S+^ r ;.wIB PeB J WA- ! MC �• PIC \NC` yCiGPM �`�I MC me " ltY r. CBCT MaB ` C�1 B; 0 PCC PIL.ht P v.e.'^ ..Yr •1 r 's`t I. ._-�� 1' A •Y (y��I PBC y < WB .siJ �•� f '�yl BY ' 1 ,�y1 F�r.;� �' I .EBB t +'l � ; iR h ,, `y�e�A t Y ,e Pod Ur P r.: 1 W10•.. ` Cb� ,+I! " s�; Msl y y I ` s p °! {� :� �. '-ii 'H1B .CrE Wae � A � 1 a Y p .. I .viB' C ♦. , t'.t \ .;1. �� r. CY, t RIB J � W1B RIB P Hdl! \,'Vs MC :,„ w ,': 1 n Mp •. RsA UB .. � + ;.• S�Il! z 1 on ent: pkr!}••. f�r a 1 i�(���,J• ,.y t�,ti, y` :ii P � /{LT ♦ eW l *BB ..,. ` `1 .S v ,�%I� MC r 4 1cae ' .D� IM4� XIB o i�'�� 4AAY WI �,. Y �C ,� a �PBC �i v J � `' 1 �.:, `li!• a - S, C�fi, '!� {„ ,I a r .;1 t,`. , J( �$ ^. tli �''• F c �r h ,' �rV _ >>YrCBB.. 4 •i/ x 4 { `^fps � .. �i a �'A.o a - �h�,_ ^4 P `: /I^'! s`. 1WM1 1 )f r� .� '`—A.h {pA •�:./--�C V, f+ .fltB x tu'.. ;'..i' PAC 1 r \J Rib �• �i 1 f rh �Y CCE. &A-1 ". 1 CJC, # 1 F• F.' •' 4;,1j • : q � n R I i 4i '. tMc1 r i 'I,a v ra 1. It �i'..+I+ �P. ,PB r9 d4 I se P.D V1 5 !1 Cp f•.. v A , i nVIW/[ar waB I PAB i rC � �•' d A .Iss' RaC. Pao MC• � 4 URC 2 . 2 Il53 6. ,Sf M,4P soil. CONDITION5 SULE= P'S ZOSO' ir9R15T/AN6CN ENG/1VEER1N6,1W //� /fENOZAgi/E ~fU4YFRklICL,Mr<L PR#0 GRAY AND STILES 12-9-85 EXISTAREA 1 GSE1 ' 100YR TIME CFS TIME CFS 9 .0194 .67485519 12 1 .93 67. 14 9. 1 .05 1 .74 12. 1 1 .09 37.92 ' 9.2 .07 2.44 12.2 .43 14.96 9.3 .07 2.44 12.3 .26 9.04 9.4 .07 2.44 12.4 . 18 6.26 9.5 .07 2.44 12.5 . 18 6.26 ' 9.6 .07 2.44 12.6 . 18 6.26 9.7 .07 2.44 12.7 . 18 6.26 9.8 .07 2.44 12.8 . 18 6.26 ' 9.9 .07 2.44 12.9 . 18 6.26 10 .07 2.44 13 . 18 6.26 10 . 1 .08 2.78 13. 1 . 13 4.52 10 .2 .09 3. 13 13.2 .09 3. 13 ' 10 .3 .09 3. 13 13.3 .09 3. 13 10 .4 .09 3. 13 13.4 .09 3. 13 10 .5 .09 3. 13 13.5 . 09 3. 13 ' 10 .6 .09 3. 13 13.6 .09 3. 13 10 .7 .09 3. 13 13.7 .09 3. 13 10 .8 .09 3. 13 13.8 .09 3. 13 10 .9 .09 3. 13 13.9 .09 3. 13 11 .09 3. 13 14 .09 3. 13 11 . 1 . 14 4.87 14. 1 .06 2.09 11 .2 . 18 6.26 14.2 .04 1 .39 ' 11 .3 . 18 6.26 14.3 .04 1 .39 11 .4 . 18 6.26 14.4 .04 1 .39 11 .5 . 23 8 14.5 .04 1 .39 11 .6 36 12.52 14.6 .04 1 .39 11 .7 .68 23.65 14.7 .04 1 .39 11 .8 .98 34.09 14.8 .04 1 .39 11 .9 1 .64 57.05 14.9 .04 1 .39 15 .04 1 .39 C FACTOR - 3.45 AREA TIMEO 9.7 AREA TIME. 1 8 ' PR GRAYANLI STILES 12-9-85 EXISTAREA 2 GSE2 100YR TIME CFS TIME CFS 9 .0178 .61919703 12 1 .74 60 .53 9. 1 .05 1 .74 12. 1 1 .23 42.79 9.2 . 06 2.09 12.2 .7 24.35 9.3 .07 2.44 12.3 .3 10 .44 9.4 . 07 2.44 12.4 .21 7.31 ' 9.5 .07 2.44 12.5 . 18 6. 26 9.6 .07 2.44 12.6 . 18 6.26 9.7 .07 2.44 12.7 . 18 6. 26 ' 9.8 . 07 2.44 12.8 . 18 6.26 9.9 .07 2.44 12.9 . 18 6. 26 10 .07 2.44 13 . 18 6.26 10 . 1 .08 2.78 13. 1 . 13 4.52 10 .2 .09 3. 13 13.2 . 11 3.83 1013 .09 3. 13 13.3 .09 3. 13 10 .4 .09 3. 13 13.4 .09 3. 13 10 .5 . 09 3. 13 13.5 .09 3. 13 10 .6 .09 3. 13 13.6 .09 3. 13 10 .7 .09 3. 13 13.7 .09 3. 13 10 .8 .09 3. 13 13.8 .09 3. 13 10 .9 .09 3. 13 13.9 .09 3. 13 11 .09 3. 13 14 .09 3. 13 11 . 1 . 13 4.52 14. 1 .06 2.09 11 .2 . 16 5.57 14.2 .05 1 .74 11 .3 . 18 6. 26 14.3 .04 1 .39 11 ,4 . 18 6.26 14.4 .04 1 .39 ' 11 .5 .22 7.65 14.5 04 1 .39 11 .6 .34 11 .83 14.6 .04 1 .39 11 .7 .63 21 .92 14.7 .04 1 .39 11 .8 .89 30 .96 14.8 .04 1 .39 11 .9 1 .57 54.61 14.9 .04 1 .39 15 .04 1 . 39 C FACTOR - 3.45 ' AREA TIMED 8.9 AREA TIME. 1 5.3 AREA TIME.2 3.6 PR#a ' GRAYANDSTILES 12-9-85 EXIST AREA 3 ' GSE3 100YR ' TIME CFS TIME CFS 9 1E-03 .0352905 12 .47 16.59 9. 1 0 0 12. 1 .62 21 .88 ' 9.2 .01 .35 12.2 .69 24.35 9.3 .02 .71 12.3 .63 22.23 9.4 . 03 1 .06 12.4 .53 18 .7 ' 9.5 .03 1 .06 12.5 .32 11 .29 , 9.6 .04 1 .41 12.6 . 15 5.29 9.7 .04 1 .41 12.7 . 11 3.88 ' 9.8 .04 1 .41 12.8 .09 3. 18 , 9.9 .04 1 .41 12. 9 .09 3. 18 10 .04 1 .41 13 .09 3. 18 10 . 1 .04 1 .41 13. 1 .09 3. 18 10 .2 .04 1 .41 13.2 .09 3. 18 10 .3 .04 1 .41 13.3 .08 2.82 10 .4 .04 1 .41 13.4 .07 2.47 ' 10 .5 . 04 1 . 41 13.5 .06 2. 12 10 .6 .05 1 .76 13.6 .05 1 .76 10 .7 .05 1 .76 13.7 .05 1 .76 ' 10 .8 .05 1 .76 13.8 .05 1 .76 10 .9 .05 1 .76 13.9 .05 1 .76 11 .05 1 .76 `14 .05 1 .76 11 . 1 .05 1 .76 14. 1 .05 1 .76 ' 11 .2 .05 1 .76 14.2 - .04 1 .41 11 .3 .06 2. 12 14.3 .04 1 .41 11 .4 .07 2.47 14.4 .03 1 .06 11 .5 .09 8. 18 14.5 .02 .71 11 .6 . 11 3.88 14.6 .02 .71 11 .7 . 14 4.94 14.7 .02 .71 11 .8 . 2 7.06 14.8 .02 .71 11 .9 .32 11 .29 14.9 .02 .71 151 . 02 .71 C FACTOR - 3.5 AREA TIMEO .5 ' AREA TIME. 1 1 AREA TIME.2 2 AREA TIME.3 2 AREA TIME.4 2 AREA TIMES 1 .8 PR#0 GRAYAND STILES 12-9-85 ' EXIST AREA 4 GSE4 10OYR TIME CFS TIME CFS 9 8E'-03 . 1855272 12 1 .49 34.55 9. 1 .02 .46 12. 1 1 .56 36. 18 9.2 .04 .93 12.2 1 .55 35.95 9.3 . 06 1 .39 12.3 1 . 42 32.93 9.4 .07 1 .62 12.4 1 .24 28.76 9.5 .09 2.09 12.5 .88 20 .41 9.6 . 1 '' 2.32 12.6 .49 11 .36 9.7 . 1 2.32 12.7 .32 7.42 9.8 . 1 2.32 12.8 .27 6.26 9.9 . 1 2.32 12.9 .25 5.8 10 . 1 2.32 13 .25 5 .8 10 . 1 . 11 2.55 13. 1 .23 5.33 10 .2 . 11 2.55 13.2 .21 4.87 10 .3 . 11 2.55 13.3 . 19 4.41 ' 10 .4 . 12 2.78 13.4 . 17 3.94 10 .5 . 12 2.78 13.5 . 15 3.48 10 .6 . 13 3.01 13.6 . 13 3.01 10 .7 . 13 3.01 13.7 . 13 3.01 ' 10 .8 . 13 3.01 13.8 . 13 3.01 10.9 . 13 3.01 13.9 . 13 3.01 11 . 13 3.01 14 . 13 3.01 1 1 1 . 15 3.48 14. 1 __ ..11 2.55 11 .2 . 17 3.94 14.2 . 1 2.32 11 .3 . 19 4.41 14.3 .09 2.09 11 .4 .21 4.87 14.4 .08 1 .86 11 .5 .25 5.8 14.5 .07 1 .62 11 .6 .33 7.65 14.6 .05 1 . 16 ' 11 .7 .49 11 .36 14.7 .05 1 . 16 11 .8 . 69 16 14.8 .05 1 . 16 11 .9 1 . 13 26.21 14.9 .05 1 . 16 15 .05 1 . 16 C FACTOR - 2. 3 AREA TIMEO 4 AREA TIME. 1 4 AREA TIME.2 4 AREA TIME. 3 4 AREA TIME.4 4 AREA TIME.5 4 AREA TIME.6 1 .3 ' PR#0 GRAYAND STILES 12-9-85 EXIST AREA 5 GSE5 ' 100YR TIME CFS TIME CFS 9 6E-03 . 1845189 12 1 .73 53.2 9. 1 .03 .92 12. 1 1 .84 56.59 9.2 .05 1 . 54 12.2 1 .35 41 .52 9.3 .08 2.46 12.3 .69 21 .22 9.4 .08 2.46 12.4 .34 10 .46 9.5 .08 2.46 12.5 .23 7.07 9 .6 .08 2.46 12.6 .2 6. 15 9. 7 .08 2.46 12.7 .2 6. 15 9 .8 .08 2.46 12.8 .2 6. 15 9.9 .08 2.46 12.9 .2 6. 15 10 .08 2.46 13 .2, 6. 15 10 . 1 .08 2.46 13. 1 . 19 5. 84 10 .2 .09 2.77 13.2 . 15 4.61 10 .3 . 1 3.08 13.3 . 12 3.69 10 .4 . 1 3.08 13.4 . 1 3.08 10 .5 . 1 3.08 13.5 . 1 3.08 10 .6 . 1 3.08 13.6 . 1 3.08 ' 10.7 . 1 3.08 13.7 . 1 3.08 10 .8 . 1 3.08 13.8 . 1 3.08 10 .9 . 1 3.08 13.9 . 1 3.08 11 . 1 3.08 14 . 1 . 3.08 11 . 1 . 12 3.69 14. 1 .09 2.77 11 .2 . 15 4.61 14.2 .07 2. 15 11 .3 . 19 5. 84 14.3 .05 1 .54 11 .4 .2 6. 15 14.4 .04 1 .23 11 .5 .22 6.77 14.5 .04 1 .23 11 .6 .28 8.61 14.6 .04 1 .23 ' 11 .7 .46 14. 15 14.7 .04 1 .23 11 .8 .76 23.37 14.8 .04 1 .23 11 .9 1 .22 37.52 14.9 .04 1 .23 15 .04 1 .23 C FACTOR - 3.05 AREA TIMEO 3 AREA TIME . 1 7. 1 AREA TIME.2 7. 1 AREA TIME.3 3. 1 ' PR#a GRAY AND STILES ' 12-9-85 EXIST AREA 6 GSEd ' 100YR ' TIME CFS TIME CFS 9 .0232 .73686564 12 2.7 85.76 9 . 1 .06 1 . 91 12. 1 2.09 66.38 9.2 .09 2.86 12.2 1 .43 45.42 9 .3 . 11 3.49 12.3 .76 24. 14 9.4 . 12 3.81 12.4 .41 13.02 9.5 . 12 3.81 12.5 .32 10 . 16 ' 9.6 . 12 3.81 12.6 .29 9.21 9.7 . 12 3.81 12.7 .29 9.21 9.8 ' . 12 3.81 12.8 .29 9.21 ' 9. 9 . 12 3.81 12.9 .29 9.21 10 . 12 3.81 13 .29 . 9.21 10 .1 . 13 4 . 13 13. 1 .23 7.31 ' 10 .2 . 14 4.45 13.2 . 19 6.03 10 .3 . 14 4.45 13.3 . 16 5.08 10 .4 . 15 4.76 13.4 . 15 4.76 10 .5 . 15 4.76 13.5 . 15 4.76 ' 10 .6 . 15 4.76 13.6 . 15 4.76 10.7 . 15 4.76 13.7 . 15 4.76 10 .6 . 15 4.76 13.8 . 15 4.76 ' 10 .9 . 15 4.76 13.9 .1.5 4.76 11 . 15 4.76 14 . 15 4.76 11 . 1 .2 6.35 14. 1 . 11 3.49 ' 11 .2 .25 7.94 14.2 .08 2.54 11 .3 .28 8. 89 14.3 .07 2.22 11 .4 .29 9.21 14.4 .06 1 .91 11 .5 .35 11 . 12 14.5 .06 1 .91 ' 11 .6 .51 16.2 14.6 .06 1 .91 11 .7 .91 28.9 14.7 . 06 1 .91 11 .8 1 .32 41 .93 14.8 .06 1 .91 ' 11 .9 2.28 72.42 14.9 .06 1 .91 15 . 06 1 . 91 ' C FACTOR - 3. 15 AREA TIMEO 11 .6 ' AREA TIME. 1 8.7 AREA TIME.2 5.8 AREA TIME.3 3 ' PR#0 GRAY ANC► STILES 12-9-85 EXIST AREA 7 ' GSE7 100YR ' TIME CFS TIME CFS 9 .0152 .46744788 12 2.23 68.58 9. 1 .05 1 .54 12. 1 1 .95 59.97 9.2 .07 2. 15 12.2 1 .46 44.9 9.3 .09 2.77 12.3 .81 24.91 9.4 . 1 3.08 12.4 .39 11 .99 ' 9.5 . 1 3.08 12.5 .29 8.92 9.6 , . 1 3.08 12.6 .25 7.69 9 .7 . 1 3.08 12. 7 .25 7.69 ' 9.8 . 1 3.08 12 .8 .25 7.69 9.9 . 1 3. 08 12.9 .25 7.69 10 . 1 3.08 13 .25 7.69 ' 1011 . 11 3.38 13. 1 .21 6.46 10 .2 . 12 3.69 13.2 . 18 5.54 10 . 3 . 12 3.69 13.3 . 15 4.61 10 .4 . 13 4 13.4 . 13 4 ' 10 .5 . 13 4 13.5 13 4 10 .6 . 13 4 13.6 . 13 4 10 .7 . 13 4 13. 7 . 13 4 10 .8 . 13 4 13 .8 . 13 4 10 .9 . 13 4 13.9 . 13 4 11 . 13 4 14 . 13 4 ' 11 .1 . 16 4.92 14. 1 . 1 3.08 11 .2 .2 6. 15 14.2 .08 2.46 11 .3 .23 7.07 14.3 .06 1 .85 11 .4 .25 7.69 14.4 .05 1 .54 ' 11 .5 .29 8.92 14.5 .05 1 .54 11 .6 .4 12.3 14.6 .05 1 .54 11 .7 .7 21 .53 14.7 .05 1 .54 ' 11 .8 1 .05 32.29 14.8 .05 1 .54 11 .9 1 .77 54.43 14.9 .05 1 .54 15 .05 1 .54 C FACTOR - 3.05 I ' AREA TIMEO 7.6 AREA TIME. 1 7.6 AREA TIME.2 6 AREA TIME.3 4 GRAY AND STILES 12-9-85 EXIST AREA 8 GSEB 100YR iTIME CFS TIME CFS 9 .01 .262158 12 1 .24 32.51 i 9. 1 03 .79 12. 1 .94 24.64 9.2 .04 1 .05 12.2 .49 12.85 9.3 . 05 1 . 31 12.3 .22 5. 77 ' 9.4 .05 1 .31 12.4 15 3.93 9.5 . 05 1 .31 12.5 . 12 3. 15 9.6 .05 1 .31 12.6 . 12 3. 15 9.7 . 05 1 .31 12.7 . 12 3. 15 ' 9,.8 r05 1 .31 12.8 . 12 3. 15 9.9 .05 1 .31 12.9 . 12 3. 15 10 .05 1 .31 13 . 12 3. 15 10 . 1 .05 1 .31 13. 1 . 1 2.62 10 .2 .06 1 .57 13.2 .07 1 .84 10 .3 .06 1 .57 13.3 .06 1 .57 ' 10 .4 .06 1 . 57 13.4 .06 1 .57 10 .5 .06 1 .57 13.5 .06 1 .57 10 .6 .06 1 .57 13.6 .06 1 .57 10 .7 .06 1 .57 13.7 .06 1 .57 10 .8 .06 1 .57 13.8 .06 1 .57 10 .9 . 06 1 .57 13. 9 .06 1 .57 11 .06 1 .57 14 .06 1 .57 11 . 1 .09 2.36 14. 1 .05 1 .31 11 .2 . 11 2.88 14.2 .03 .79 11 .3 . 12 3. 15 14 .3 .02 .52 11 .4 . 12 3. 15 14.4 .02 .52 11 .5 . 15 3.93 14.5 .02 .52 11 .6 .22 5.77 14.6 .02 .52 11 .7 .41 10 .75 14.7 .02 .52 11 .8 .61 15.99 14.8 .02 .52 11 .9 1 .02 26. 74 14. 9 .02 .52 15 .02 .52 C FACTOR - 2.6 AREA TIMEO 5 AREA TIME. 1 5 AREA TIME.2 2.4 i i ' PR#0 GRAY AND STILES 12-9-85 ' EXIST AREA 9 GSE9 100YR TIME GFS TIME GFS 9 5.6E-03 . 141162 12 .95 23.95 9. 1 .02 .5 12. 1 .92 23. 19 9.2 .03 .76 12.2 .82 20 .67 9. 3 .04 1 .01 12.3 .57 14.37 9.4 .05 1 .26 12.4 .3 7.56 9.5 .05 1 .26 12.5 . 17 4.29 9 .6 .05 1 .26 12.6 . 13 3.28 9.7 .05 1 .26 12.7 . 12 3.02 9 .8 .05 1 .26 12.8 . 12 3.02 9.9 .05 1 .26 12.9 . 12 3.02 10 . 05 1 . 26 13 . 12 3.02 10 . 1 .05 1 .26 13. 1 . 11 2.77 10 .2 .05 1 .26 13.2 .09 2 .27 10 .3 .06 1 .51 13.3 .08 2.02 10 .4 .06 1 .51 13.4 .07 1 .76 10 .5 .06 1 .51 13.5 .06 1 .51 10 .6 .06 1 .51 13.6 .06 1 .51 10 .7 .06 1 . 51 13.7 .06 1 .51 10 .8 .06 1 .51 13.8 .06 1 .51 10 . 9 .06 1 .51 13.9 .06 1 .51 ' 11 .06 1 .51 14 .06 1 .51 11 . 1 .08 2.02 14. 1 .05 1 .26 11 .2 .09 2.27 14.2 .04 1 .01 11 .3 . 1 2.52 14.3 .04 1 .01 11 .4 . 12 3.02 14.4 .03 .76 11 .5 . 14 3.53 14.5 .02 .5 11 .6 . 18 4.54 14.6 .02 .5 ' 11 .7 .29 7.31 14.7 .02 .5 11 .8 .43 10 .84 14.8 .02 .5 11 .9 .73 18. 4 14.9 .02 .5 15 .02 .5 C FACTOR - 2.5 ' AREA TIMEO 2.8 AREA TIME. 1 2.8 AREA TIME.2 2.8 AREA TIME.3 2.8 AREA TIME.4 1 PR#0 GRAY AND STILES ' 12-9-85 EXIST AREA 10 GSE10 ' 100YR TIME CFS TIME CFS 9 6E-03 . 1784691 12 1 . 15 34.21 9. 1 .02 .59 12. 1 1 .21 35.99 ' 9.2 .03 .89 12.2 1 .19 35.4 9.3 .04 1 . 19 12.3 1 .06 31 .53 9.4 .06 1 .78 12.4 .89 26.47 9.5 .07 2.08 12.5 .55 16.36 9.6 .07 2.08 12.6 .28 8.33 9.7 .07 2.08 12.7 .22 6.54 9.8 .07 2.08 12.8 . 19 5.65 ' 9.9 .07 2.08 12.9 . 19 5.65 10 .07 2.08 13 . 19 5.65 10 . 1 .08 2. 38 13.1 . 17 5.06 ' 10 .2 .08 2.38 13.2 . 16 4.76 10. 3 .08 2.38 13.3 . 14 4. 16 10 .4 .09 2.68 13.4 . 12 3.57 10 .5 .09 2.68 13.5 . 11 3.27 ' 10 .6 .09 2.68 13.6 .09 2.68 10 .7 .09 2.68 13.7 .09 2.68 1008 .09 2.68 13.8 .09 2.68 ' 10 .9 .09 2.68 13.9 .09 2.68 11 .09 2.68 14 .09 2.68 11 . 1 . 11 3.27 14. 1 .08 2.38 11 .2 . 12 3.57 14.2 .07 2.08 11 .3 . 14 4. 16 14.3 .07 2.08 11 .4 . 16 4.76 14.4 .06 1 .78 11 .5 . 19 5. 65 14.5 .05 1, .49 11 .6 .25 7.44 14.6 .04 1 . 19 11 .7 .37 11 .01 14.7 .04 1 .19 11 .8 .52 15.47 14.8 .04 1 . 19 11 .9 .86 25.58 14.9 .04 1 . 19 15 .04 1 . 19 C FACTOR - 2.95 AREA TIMED 3 AREA TIME. 1 3. 1 ' AREA TIME.2 3.2 AREA' TIME.3 3.2 AREA TtME.4 3. 1 AREA TIME.5 3 PR#0 ' GRAY AND STILES 12-9-85 EXIST AREA 11 GSE 11 100YR fTIME CFS TIME CFS 9 8E-03 .322656 12 .94 37.91 9. 1 .02 .81 12. 1 .83 33.48 ' 9.2 .03 1 .21 12.2 .81 32.67 9.3 .04 1 .61 12.3 .71 28.64 9.4 .04 1 .61 12.4 .61 24.6 9.5 .05 2.02 12.5 .39 15.73 9 .6 .06 2.42 12.6 .2 8.07 9. 7 .06 2.42 12.7 . 16 6.45 9.8 .06 2.42 12. 8 . 14 5.65 9. 9 .06 2.42 12.9 . 14 5.65 10 .06 2.42 13 . 14 5.65 10 . 1 .06 2.42 13. 1 . 12 4.84 ' 10 .2 .06 2.42 13.2 . 11 4.44 10 .3 .06 2.42 13.3 . 1 4.03 10 .4 .07 2.82 13.4 .09 3.63 10 .5 .07 2.82 13.5 .08 3.23 10 .6 .07 2.82 13.6 .07 2.82 10.7 .07 2.82 13.7 .07 2.82 10 .8 . 07 2.82 13.8 .07 2.82 10 .9 .07 2.82 13.9 .07 2.82 11 .07 2.82 14 .07 2.82 11 . 1 .09 3.63 14. 1 .06 2.42 11 .2 . 1 4.03 14.2 .05- 2.02 11 .3 . 11 4 .44 14. 3 :05 2.02 11 .4 . 12 4.84 14.4 .04 1 .61 11 .5 . 15 6.05 14.5 .03 1 .21 11 .6 .21 8.47 14 .6 .03 1 .21 11 .7 .34 13. 71 14.7 .03 1 .21 ' 11 .8 .46 18.55 14 .8 .03 1 .21 11 .9 .8 32.27 14. 9 .03 1 .21 15 .03 1 .21 C FACTOR - 4 AREA TIMED 4 AREA TLME. 1 2 AREA TIME.2 2 AREA TIME.3 2 ' AREA TIME.4 2 AREA TIME.5 2. 1 ' PR#0 GRAY AND STILES 12-9-85 ' EXIST AREA 12 GSE12 ' 100YF TIME CFS TIME GFS 9 8.4E-03 . 22021272 12 1 .3 34.08 ' 9. 1 .02 .52 12. 1 1 .23 32.25 9.2 .04 1 .05 12 .2 1 .09 28.58 9.3 . 05 1 .31 12.3 .84 22.02 ' 9.4 .06 1 .57 12.4 .49 12.85 9.5 . 07 1 . 84 12.5 .25 6.55 9.6 .07 1 .84 12.6 .2 5.24 ' 9.7 . 07 1 . 84 12.7 . 17 4.46 9.8 .07 1 .84 12.8 . 17 4.46 9.9 .07 1 .84 12.9 . 17 4.46 10 .07 1 .84 13 . 17 4.46 10 . 1 .07 1 .84 13. 1 . 15 3.93' 10 .2 . 08 2. 1 13.2 . 13 3.41 10 .3 .08 2. 1 13.3 . 11 2. 88 10 .4 .08 2. 1 13.4 . 1 2 .62 10 .5 .09 2.36 13. 5 .09 2.36 10 .6 .09 2.36 13 .6 .09 2.36 ' 10 .7 .09 2.36 13.7 .09 2.36 10 .8 .09 2.36 13.8 .09 2.36 10 . 9 .09 2.36 13. 9 .09 2.36 ' 11 .09 2.36 14 .09 2.36 1141 . 11 2.88 14. 1 .07 1 .84 11 .2 . 13 3.41 14.2 .06 1 .57 113 . 14 3.67 14.3 .05 1 .31 11 .4 . 16 4. 19 14.4 .04 1 .05 11 ,5 . 19 4.98 14.5 .03 .79 11 .6 .25 6.55 14.6 .03 .79 11 .7 .41 10 .75 14.7 .03 .79 11 .8 .6 15.73 14.8 .03 .79 11 .9 1 .02 26.74 14.9 .03 .79 15 - .03 .79 C FACTOR 2.6 AREA TIMED 4.2 AREA TIME. 1 3.7 AREA TIME.2 3 .5 AREA TIME.3 3.3 AREA TIME.4 2.4 I� I ' PR#0 GRAY AND STILES ' 12-9-85 EXIST AREA 13 GSE13 ' 100YR TIME CFS TIME CFS ' 9 3.6E-03 . 1451952 12 .48 19.36 9. 1 . 01 . .4 12. 1 .44 17.75 9.2 .01 .4 12.2 .38 15.33 ' 9.3 .02 .81 12.3 .3 12. 1 9.4 .02 .81 12.4 . 19 7.66 9.5 .03 1 . 21 12.5 .09 3.63 ' 9.6 .03 1 .21 12.6 .07 2.82 9.7 .03 1 .21 12.7 .06 2.42 9.8 .03 1 .21 12.8 .06 2.42 9.9 .03 1 .21 12.9 .06 2.42 ' 10 .03 1 . 21 13 .06 2.42 10. 1 .03 1 .21 13. 1 .05 2.02 10.2 .03 1 .21 13.2 -.05 2.02 10 .3 .03 1 .21 13.3 .04 1 .61 10 .4 .03 1 .21 13.4 .04 1 .61 10 . 5 .03 1 .21 13.5 .03 1 .21 ' 10 .6 . 03 1 .21 13.6 .03 1 .21 10 .7 .03 1 .21 13.7 .03 1 .21 10 .8 .03 1 .21 13.8 .03 1 .21 10 .9 .03 1 .21 13.9 .03 1 .21 ' 11 .03 1 .21 14 .03 1 .21 11 . 1 . 04 1 .61 14.1 .03 1 .21 11 .2 .05 2.02 14.2 .02 .81 ' 11 .3 .05 2.02 14.3 .02 .81 11 .4 . 06 2.42 14.4 .02 .81 11 .5 .07 2.82 14 .5 .01 .4 11 .6 . 1 4.03 14.6 .01 .4 11 .7 . 16 6.45 14 .7 .01 .4 11 .8 .23 9.28 14.8 .01 .4 11 . 9 .39 15.73 14.9 .01 .4 15 . 01 .4 C FACTOR - 4 AREA TIMEO 1 .8 AREA TIME. 1 1 .3 AREA TIME.2 1 .2 AREA TIME.3 1 AREA ,TIME.4 1 PR#0 ' GRAY AND STILES 12-9-85 EXIST AREA 14 ' GSE14 100YR TIME CFS TIME GFS 9 1 .4E-03 .0564648 12 .41 16.54 ' 9. 1 0 0 12. 1 .5 20 . 17 9.2 .01 .4 12 .2 .55 22. 18 9.3 .02 .81 12.3 .52 20 .97 9.4 .02 .81 12.4 .41 16.54 ' 9.5 .03 1 .21 12.5 .29 11 .7 9.6 .03 1 .21 12.6 . 18 7.26 9.7 .03 1 .21 12.7 . 1 4.0.3 ' 9 .8' .03 1 .21 12.8 .09 3.63 9.9 .03 1 .21 12.9 .08 3.23 10 .03 1 .21 13 .08 3.23 ' 10 . 1 .03 1 .21 13. 1 .08 3.23 10 .2 .03 1 .21 13.2 .07 2.82 10 .3 .04 1 .61 13.3 .06 2.42 10 .4 .04 1 .61 13.4 .06 2.42 ' 10 .5 .04 1 .61 13.5 .05 2.02 10 .6 .04 1 .61 13.6 .04 1 .61 10 .7 .04 1 . 61 13.7 . 04 1 .61 ' 10 .8 .04 1 .61 13.8 .04 1 .61 10 .9 .04 1 .61 13.9 .04 1 .61 11 .04 1 .61 14 .04 1 .61 11 . 1 .04 1 .61 14.1 .04 1 .61 11 .2 .05 2.02 14.2 .04 1 .61 11 .3 .06 2.42 14.3 .03 1 .21 ' 11 .4 .06 2.42 14.4 .03 1 .21 11 . 5 .08 3.23 14.5 .02 .81 11 .6 .09 3.63 14.6 .02 .81 11 .7 . 13 5.24 14.7 .02 .81 ' 11 .8 . 18 7.26 14.8 .02 .51 11 .9 .3 12. 1 14.9 .02 .81 15 .02 . 81 ' C FACTOR - 4 AREA TIMEO .7 AREA TI'ME. 1 .9 AREA TIME.2 1 .5 AREA TIME. 3 1 .7 ' AREA TI'ME.4 1 .5 AREA TIiME.5 1 AREA TIHE.6 .7 0 0 0 0 GSE1-3 7 GSES-11 GSE13-14 GSE4-6 TOTAL GRAY AND STILES EXIST ' 1 0 .81 .4 0 1 .21 12-9-85 2 0 1 .8 .81 1 .38 3.99 3 0 2.5 .81 4 .38 7.69 4 1 .89 2.8 1 .61 6. 71 13.01 ' 5 2.86 3.8 2.02 7.57 16.25 6 3.83 4.5 2.02 8.36 18.71 7 4. 14 4.5 2.42 8.59 19.65 ' 8 7.97 5.79 2.42 8.59 24.77 9 9.02 6.31 2.42 8.59 26.34 10 9. 37 6.82 2.42 8.59 27.2 ' 11 9.37 7.07 2.42 8.59 27.45 12 9.37 7.37 2.42 8.82 27.98 13 9.37 7.37 2.42 9.45 28.61 ' 14 9.67 7.77 2.42 10 .08 29.94 15 9.98 8.07 2.82 10 .31 31 . 18 16 9.98 8.07 2.82 10 .62 31 .49 17 10 .29 8.07 2.82 10 .85 32.03 18 11 . 32 8.07 2.82 10 .85 33.06 19 12.02 8.33 2.82 10 .85 34.02 20 12.02 8.58 3.22 10 .85 34.67 ' 21 12.02 9..39 3.63 10 .85 35.89 22 12.02 10 .38 3.63 11 .93 37.96 23 12.02 11 .09 4 .03 14 .9 42.04 24 12.94 12.08 4.84 18. 19 48.05 25 14 .53 13.89 6.45 19.91 54.78 26 15.8 17.2 8.87 21 .78 63.65 27 17. 13 24.23 12.51 27.38 81 .25 ' 28 22. 19 33.94 19.36 41 .71 117.2 29 29.07 52.89 24.6 68.27 174.8 30 41 . 11 69. 16 25.01 105.6 240 .8 1 31 56. 1 73.86 27.43 160 . 1 317.4 32 86.67 76. 12 28.64 178.5 369.9 33 114.8 74.35 27.83 143.8 360 .7 ' 34 129.8 74.19 25.81 99.57 329.3 35 132 . 1 69.03 23.79 63.36 288.2 36 155.2 69.57 18.96 40 .5 284.2 37 150 .9 71 .24 14. 12 27.67 263.9 ' 32 94.92 60 .02 9.68 22.78 187.4 39 50 .88 44.82 6.45 21 .62 123.7 40 30 .35 31 .44 5.65 21 . 16 88.6 41 24.44 21 .98 5.25 21 . 16 72.83 ,.. ' 42 23.39 16.94 4.84 20 .38 65.55 43 23.39 15.22 4.84 16.79 60.24 ' 44 22. 16 13.96 4.43 14. 13 54.28 45 20 .88 12.97 3.63 12. 1 49.58 46 19.6 12.26 3.63 11 .32 46.81 ' 47 18.64 11 .67 3.23 10 .85 44.39 48 14 .8 10 .89 2.82 10 .85 39.36 49 12.72 9.61 2.82 10 .85 36 50 12.02 9.09 2.82 10 .85 34.78 51 12.02 8.43 2.42 10 .85 33.72 52 12.02 7.48 2.42 10 .08 32 _ 53 12.02 7. 18 2.42 7.96 29.58 54 10 .75 6.77 2.01 6. 17 25.7 55 10 . 13 6. 07 1 .61 5.31 23. 12 56 ' 9. 17 5.78 1 .61 4.76 21 .32_ 57 8.51 5.48 1 .21 4.3 19.5 58 6.43 4.97 1 .21 4.3 16.91 59 5.38 4.2 .81 4.3 14.69 60 0 0 0 0 0 ' EX1STiN6 GRAY AND STILES GSE 1*1 .21 2*3.99 3*7.69 ' 4*13.01 5 *16.25 6 *18.71 ' 7 *19.65 8 *24.77' _ 9 *26.34 10 *27.2 t11 *27.43 12 *27.98 - 13 *28.61 \' 14 *29.94 15 *31 . 18 16 *31 .49 17 *32.03 18 *33.06 19 *34.02 ' 20 *34.67 21 *35.89 22 *371.96 23 *42.04 24 *48.05 25 *54.78 26 *63. 65 27 *81 .25 28 *117.2 29 *174.8 ' 30 *240 .8 31 *317.4 32 *369.9 33 *360 .7' `t 34 *329.3 35 *288.2 36 *284.2 37 *263.9 " 38 *187.4 l 39 *123.7 ' 40 *88.6 41 *72.83 42 *65.55 43 *60 .24 44 *54.28 45 *49.58 46 *46.81 i' 47 *44.39 48 *39.36 49 *3d ' 50 *34.78 51 *33,72 52 *32 ' 53 *29.58 54 *25.7 55 *23. 12 56 *21 .32 - ' 57*19.5 58*16.91 59*14.69 ' 60*0 ' UFFbL. . 0 0 0 0 GRAY AND STILES GSE1-3 7 OSES-11 GSE13-14 GSP4-6 TOTAL 12-9-85 1 0 . 81 .4 0 1 .21 PROPOSED 2 0 1 .8 .81 1 .66 4.27 3 0 2.5 .81 4.69 8 ' 4 , 1 .89 2.8 1 .61 7.05 13.35 5 2.86 3.8 2.02 7.93 16.61 6 3.83 4.5 2.02 8.74 19.09 7 : 4 . 14 4.5 2.42 8.74 19.8 8 7.97 5.79 2.42 8.74 24.92 9 9.02 6.31 2.42 8.74 26.49 10 9.37 6.82 2.42 8.74 27.35 11 9.37 7.07 2.42 8.74 27.6 12 9.37 7.37 2.42 8.99 28. 15 13 9.37 7.37 2.42 9.62 28.78 ' 14 9.67 7.77 2.42 10 .25 30 . 11 15 9.98 8.07 2.82 10 .49 31 .36 16 9.98 8.07 2.82 10 .8 31 .67 ' 17 10 . 29 8.07 2.82 11 .05 32.23 18 11 .32 8.07 2.82 11 .05 33.26 19 12.02 8.33 2.82 11 .05 34.22 20 12.02 8.58 3.22 11 .05 34.87 21 12.02 9.39 3.63 11 .05 36.09 22 12.02 10 .38 3.63 12. 16 38. 19 23 12.02 11 .09 4.03 15. 16 42.3 -24 12.94 12.08 4.84 18.72 48.58 25 14.53 13.89 6.45 20 .47 55.34 26 15.8 17.2 8.87 22.65 64.52 ' 27 17. 13 24.23 12.51 28.38 82.25 28 22. 19 33.94 19.36 43.44 118.9 29 29.07 52.89 24.6 71 .29 177.8 30 41 . 11 69. 16 25.01 111 .3 246.5 ' 31 56. 1 73.86 27.43 167.3 324 .6 32 86.67 76. 12 28.64 185 376.4 33 114.8 74.35 27.83 148.4 365.3 34 129 .8 74. 19 25.81 101 .7 331 .5 35 132. 1 69.03 23.79 59.3 284.2 36 155.2 69.57 18.96 33. 68 277.4 37 150 .9 71 .24 14. 12 24.46 260 .7 38 94.92 60.02 9.68 22.03. 186.6 39 50 .88 44.82 6.45 21 .54 123.6 40 30 .35 31 .44 5.65 21 .54 88.98 1 41 24.44 21 .98 5.25 21 .54 73.21 42 23.39 16.94 4.84 20 .73 65.9 43 23. 39 15.22 4.84 16.86 60 .31 ' 44 22. 16 13.96 4.03 14. 17 54.32 45 20 .88 12.97 3.63 12. 11 49.59 46 19. 6 12.26 3.63 11 .05 46.54 47 18.64 11 .67 3.23 11 .05 44 .59 48 14.8 10 .89 2.82 11 .05 39.56 49 12. 72 9.61 2.82 11 . 05 36.2 50 12.02 9.09 2.82 11 .05 34.98 51 12.02 8.43 2.42 11 .05 33.92 52 12. 02 7.48 2.42 10 .25 32. 17 53 12.02 7. 18 2.42 8. 11 29. 73 ' 54 10 .75 6.77 2.01 6.06 25.59 55 10 . 13 6.07 1 .61 5. 18 22.99 56 9. 17 5.78 1 .61 4.62 21 . 18 57 8.51 5.48 1 .21 4.38 19.58 ' 58 6.43 4.97 1 .21 4.38 16.99 59 5.38 4.2 .81 4.38 14.77 60 0 0 0 0 0 PROt�DS`J GRAY AND STILES OSP 12-9-85 ' 11 .21 2*4.27 3*$ ' 4*13.35 5 *16.61 6 *19.09 7 *19.8 8 *24.92 I 9 *26. 49 10 *27.35 +I ' 11 *27.6 12 *28. 15 13 *28.78 14 *30 . 11 15 *31 .36 16 *31 .67 ' 17 *32.23 18 *33,26 19 *34.22 20 *34.87' ' 21 *36.09 22 *38. 19 23 *42.3 24 *48.58 25 *55.34 26 *64.52 ' 27 *82.25 28 *118. 9 29 *177.8 30 *246.5 ' 31 *324.6 32 *376.4 *365.3 ` 33 *331 .5 1 35 *284.2 36 *277.4 ' 37 *260 .7 38 *186.6 39 *123.6 ' 40 *88.98 41 *73.21 42 *65.9 43 *60 .31 44 *54.32 45 *49.59 46 *46. 54 ' 47 *44,59 48 *39.56 49 *36.2 50 *34.98 51 *33.92 52 *32.17 53 *29.73 ' 54 *25.59 55 *22.99 56 *21 . 18 ' 57*19.58 58*16.99 59*14.77 60*0 _ ' PR#0 GRAY AND STILES 12-9-85 PROPOSEDAREA 4 ' GSP4 100YR ' TIME GFS TIME CFS 9 9.4E-03 .23221149 12 1 .69 41 .75 . 9. 1 .03 .74 12. 1 1 .73 42.74 9.2 .05 1 .24 12.2 1 .64 40 .51 9.3 .07 1 .73 12.3 1 .42 35.08 ' 9.4 .08 1 .98 12.4 1 24.7 9.5 . 1 2.47 12.5 .55 13.59 9.6 . 1 2.47 12.6 .33 8.15 9.7 . 1 2.47 12.7 .27 6.67 ' 9.8 . 1 2.47 12.8 .25 6. 18 9.9 . 1 2.47 12.9 .25 6. 18 10 . 1 2.47 13 .25 6. 18 10 . 1 . 11 2.72 13. 1 .23 5.68 10 .2 . 11 2.72 13.2 .2 4.94 10 .3 . 11 2.72 13.3 . 18 4.45 .' 10 .4 . 12 2.96 13.4 . 16 3.95 10 .5 . 12 2.95 13.5 .13 3.21 10 .6 . 13 3.21 13.6 . 13 3.21 10 . 7 . 13 3.21 13.7 . 13 3.21 10 .8 .13 3.21 13.8 . 13 3 .21 10 .9 . 13 3.21 13.9 . 13 3.21 11 . 13 3.21 14 . 13 3.21 ' 11 . 1 . 15 3.71 14. 1 . 11 2.72 11 .2 . 17 4.2 14.2 . 1 2.47 11 .3 .2 4.94 14.3 .08 1 .98 11 .4 .22 5.43 14.4 .07 1 .73 11 .5 .27 6.67 14.5 .06 1 .45 11 .6 .35 8.65 14.6 .05 1 .24 11 .7 .53 13.09 14.7 .05 '_ 1 .24 11 .8 .77 19.02 14.8 .05 1 .24 11 .9 1 .29 31 .87 14.9 .05 1 .24 15 .05 1 .24 C FACTOR 2.45 ' AREA TIMEO 4.7 AREA TIME. 1 4.7 AREA TIME.2 4 .7 ' AREA TIME.3 4.7 . AREA TIME.4 4.7 AREA TIMES 1 .7 ' GRAY AND STILES 12-9-85 PROPOSED AREA 5 ' GSP5 100YR ' TIME CFS TIME CFS 9 6E-03 . 1845189 12 1 .73 53.2 ' 9. 1 . 03 .92 12. 1 1 .84 56.59 9.2 .05 1 .54 12.2 1 .35 41 .52 9.3 .08 2.46 12.3 .69 21.22 9.4 .08 2.46 12.4 .34 10 .46 ' 9.5 .08 2.46 12.5 .23 7.07 9.6 .08 2.46 12.6 .2 6. 15 9.7 .08 2.46 12.7 .2 6. 15 ' 9.8 .08 2.46 12.8 .2 6. 15" 9.9 .08 2.46 12.9 .2 6.15 10 .08 2.46 13 .2 6. 15 10 . 1 .08 2.46 13. 1 . 19 5.84 10 .2 .09 2.77 13.2 . 15 4.61 10 .3 . 1 3.08 13.3 . 12 3. 69 ' 10 .4 .1 3.08 13.4 . 1 3.08 10 .5 . 1 3.08 13.5 . 1 3.08 10 .6 . 1 3.08 13.6 . 1 3.08 10 .7 . 1 3.08 13. 7 . 1 3.08 10 .8 . 1 3.08 13 .8 . 1 3.08 10 .9 - .1 3. 08 13.9 . 1 3.08 11 . 1 3.08 14 . 1 3.08 11 . 1 . 12 3.69 14. 1 .09 2.77 11 .2 . 15 4.61 14.2 .07 2. 15 11 . 3 . 19 5.84 14.3 .05 1 .54 11 .4 .2 6. 15 14.4 .04 1 .23 11 .5 .22 6.77 1.4-.5 .04 1 .23 11 .6 • .28 8.61 14.6 .04 1 .23 11 .7 .46 14. 15 14.7 .04 1 .23 11 .8 .76 23.37' 14.8 .04 1 .23 11 .9 1 .22 37.52 14.9 .04 1 .23 15 .04 1 .23 '._ C FACTOR - 3.05 AREA TIMEO 3 AREA TIME. 1 7. 1 AREA TIME.2 7. 1 AREA TIME.3 3. 1 PR#O GRAY AND STILES t 12-9-85 PROPOSED AREA 6 OSP6 100YR TIME CFS TIME, CF8 ' 9 .0232 .73686564 12 2.7 85.76 9. 1 .06 1 .91 12. 1 2.09 66.38 9.2 .09 2.86 12.2 1 .43 45. 42 ' 9.3 . 11 3.49 12.3 .76 24. 14 9.4 . 12 3 .81 12.4 .41 13.02 9.5 . 12 3.81 12.5 .32 10 . 16 9.6 .12 3.81 12.6 .29 9.21 9. 7 . 12 3.81 12. 7 .29 9.21 9.8 . 12 3 .81 12.8 .29 9.21 9.9 . 12 3.81 12.9 .29 9.21 ' 10 . 12 3.81 13 .29 9.21 10 . 1 . 13 4. 13 13. 1 .23 7.31 10 .2 . 14 4.45 13.2 . 19 6.03 ' 10 .3 . 14 4.45 13.3 . 16 5.08 10 .4 . 15 4.76 13.4 . 15 4.76 10 .5 . 15 4.76 13.5 . 15 4.75 10 .6 . 15 4.76 13.6 . 15 4.76 10 .7 .. 15 4.76 13.7 . 15 4.76 10 .8 . 15 4.76 13.8 . 15 4.76 ' 10 .9 . 15 4.76 13.9 . 15 4.76 11 . 15 4.76 14 . 15 4.76 11 . 1 .2 6.35 14. 1 .11 3.49 11 .2 .25 7.94 14 .2 .08 2.54 ' 11 . 3 .28 8.89 14.3 .07 2.22 11 .4 29 9 .21 14.4 .06 1 .91 11 .5 .35 11 . 12 14.5 .06 1 .91 .51 16.2 14.6 .06 1 .91 11 .7 .91 28.9 14.7 .06 1 .91 11 .8 1 .32 41 .93 14.8 .06 1 .91 ' 11 .9 2.28 72.42 14.9 06 1 .91 15 .06 1 .91 C FACTOR 3. 15 AREA TIMEO 11 .6 AREA TIME. 1 8.7 ' AREA TIME.2 5.8 AREA TIME.3 3 PR#0 ' GRAY AND STILES 12-9-85 PROPOSED AREA 12 ' GSP12 100YR ' TIME CFS TIME CFS 9 .015 .4083615 12 1 .58 43.01 9. 1 .04 1 .09 12.1 1 . 17 31 .85 ' 9.2 .05 1 .36 12.2 .83 22.6 9.3 .06 1 .63 12.3 .46 12.52 9.4 .07 1 .91 12.4 .24 6.53 ' 9.5 .07 1 .91 12.5 . 19 5. 17 9.6 .07 1 .91 12.6 . 17 4.63 9.7 .07 1 .91 12.7 . 17 4.63 9.8 .07 1 .91 12.8 . 17 4.63 ' 9.9 .07 1 .91 12.9 . 17 4.63 . 10 .07 1 .91 13 . 17 4.63 10. 1 .08 2. 18 13. 1 . 13 3. 54 ' 10 .2 .08 2 . 18 13.2 . 11 2.99 10 .3 .08 2. 18 13.3 . 1 2.72- 10 .4 . 09 2.45 13.4 .09 2.45 10 .5 .09 2.45 13.5 .09 2.45 10 .6 .09 2. 45 13.6 .09 2.45 10 .7 .09 2.45 13.7 .09 2.45 10 .8 .09 2.45 13.8 .09 2.45 ' 10 .9 .09 ' 2.45 13.9 .09 2.45 11 .09 2.45 14 .09 2.45 11 . 1 . 12 3.227 14. 1 .016 1 .63 ' 11 .2 . 15 4.08 14.2 .05 1 .36 11 .3 . 16 4.36 14.3 .04 1 .09 11 .4 . 17 4.63 14.4 .03 .82 11 .5 .21 5.72 14.5 .03 .82 11 .6 .31 8.44 14.6 .03 .82 11 .7 .55 14.97 14.7 .03 .82 11 .8 .78 21 .23 14.8 .03 .82 11 .9 1 .37 37.3 14.9 .03 .82 15 .03 .82 ' C FACTOR - 2.7 l AREA TIMED 7. 5 ' AREA TIME. 1 4.5 AREA TIME.2 3. 1 AREA TIME.3 2 f y,. qqAA�� r PROO fi^ GRAY AND STILES 12-30-85 , OFFSET: '{ L. 0 GSE GSE12,. TOTAL + e� 2 3.99 1.03 0 0 5.04 3 7.69 1.31 0 0 4 � = s 4 13.01 1.37 0 0 14.58 (j 5 16.25 1.64 0 0 Mop 6 18.71 1.84 0 0 20.55 1 7 19.63 1.84 0 0 21.49 ij 8 24.77 1.84 0 0 26.61 9 24.34 1.84 0 0 28.18 10 27.2 1.84 0 0 29.04 . 11 27.45 1.84 0 0 29.29 12 27.98 2.1 0 0 30.08 13 28.61 2.1 0 0 30.71 . = l.> 14 29.94 2.1 0 0 32.04 c ; , 15 31.18 2.36 0 0 33.54 16 31.49 2.36 0 0 _ 33.85 ' (,) 17 32.03 2.36 0 0 34.39 v 18 33.06 2.36 0 0 35.42 44 19 34.02 2.36 0 0 36.38 l� 20 34.67 2.36 0 0 37.03 ' 21 35.89 2.88 0 0 38.77 - r r 22 37.96 3.41- 0 0 41.37 , ' l 23 42.04 3.67 0 0 45.71 + 24 48.05 4.19 0 0 52.24 a ; 25 54.78 4.98 0 0 59.76 26 63.65 6.55 0 0 70.2 27 81.25 10.75 0 0 92 ' 28 117.2 15.73 0 0 132.9 L 29 174.8 26.74 0 0201.5 f 30 240.8 34.08 0 0 274.8 31 317.4 32.25 0 0 349.6 32 369.9 28.58 O 0 398.4 ' \ 33 360.7 22.02 0 0 382.7 34 329.3 12.85 0 0 342.1 ! .� 35 288.2 6.55 0 0 294.7 _ 36 284.2 5.24 0 0 289.4 37 263.9 4.46 0 0 268.3 'tl 38 187.4 4.46 0 0 191.8 f 39 123.7 4.46 0 0 40 88.6 4.46 0 0 93.06 41 72.83 3.93 0 0 76.76 r " 42 65.55. : 3.41 0 0 68.96 `* 43 60.24 2.88 0 0 63.12. w Y.3 44 54.28 2.62 0 0 56.9 45 49.58 2.36 0 0 31.94 46 46.61 2.36 0 0 49.t7 n� 47 44.39 2.36 0 0 46.75 ' 48 39.36 2.36 0 041.72 49 36 2.36 0 _. .0 .. 38.36r"5� 50 34.78 2.36 0 0 $7.14 [ �- ' f 51 33.72 1.84 0 0 35.56 I ' 52 32 1.57 0 0 33.57 53 29.58 1.31 0 0 30.89 a i ' ryi tl' 54 25.7 1.05 0 0 26.75 i 55 23.12 .79 0 0 23.91 ,i 56 21.32 .79 0 0 22.11 i + i 57 19.5 .79 0 0 20.29 . k pt .� 58 14.91 .79 0 0 17.7 a _59 14.69 .79 0 0 15.48 "1 60 0 0 0 0 i s' 1 Z 'fi f�f � `r. GRAY AND STILES 12-30-85 lv OFFSET: 1 0 0 0 GSP OSPI2 TOTAL 4. 1 0 1.09 0 0 1.09 2 4.27 1.36 0 0 5.63 .;". 3 8 1.63 0 0 9.63 �. 4 13.35 1.91 0 0 15.26 + ' � ' 5 16.61 1.91 0 0 18.52 6 19.D 9 1.91 0 0 2l ,�- 7 19.6 1.91 0 0 .21.71 ' 8 24.92 1.91 0 0 26.83 9 26.49 . 1.91 0 0 28.4 " 10 27.35 1.91 0 0 29.26 q 11 27.6 2.18 D 0 29.78 _� t = 1 12 28.15 2..18 0 0 30.33 1 13 28.78 2.18 0 0, 30.96 E „� ak 14 30.11 2.45 0 0 32.54 15 31.36 2.45 0 0 33.81 Ty, 7 C� 16 31.67 2.45 0 0 34.12 �. i 17 32.23 2.45 0 0 34.68 .4:° 4 18 33.26 2.45 0 0 35.71 1Y li. 19 34.22 2.45 0 0 36.67 20 34.87 2.45 0 - 0 37.32 fy, 21 36.09 3.27 0 0 39.36 22 38.19 4.08 0 0 42.27 s= 1 23 42.3 4.36 0 0 46.66 a 2448.58 4.63 0 0 53.21 1t 25- 55.34 5.72 0 0 61.06 ' - Y 26 64.52 8.44 0 0 72.96 C� x 27 82.25 - 14,97 0 0 97.22k. , 28 118.9 21.23 0 0 140.1 q 1 29 177.8 37.3 0 0 215.1 4 ai 30 -246.5 - 43.01 0. 0 289.5 . 31 324.6 31.85 0 0 356.4 t A 32 376.4 22.6 0 0 - 399 !" ' ' - 33 365.3 12.52 0 0 377.8 ' 34 331.5 6.33 0 0 338 35 284.2 5.17 0 0 289.3 '' 36 277.4 4.63 0 0 282 ' lL3 37 260.7 4.63 0 0 265.3 I +' 38 186.6 4.63 0 0 191.2 39 123.6 4.63 0 0 128.2 (J 40 88.98 4.63 0 0 93.61 •,3 - 41 73.21 3.54 0 0 76.75 1 ` U" ' 42 65.9 ` 2.99 0 0 68.e9 43 60.31 2.72 0 0 63.03 + 44 54.32 2.45 0 0 56.77 i x4 45 49.59 2.45 0 0 52.04 46 46.54 2.45 0 0 48.99 .� • - .; 47 44.59 2.45 0 0 47.04 " ' { 48 39.56 2.45 0 0 42.01 'i. 49 36.2 2.45 0 0 38.65 U .,. 50 34.98 2.45 0 0 37.43 51 33.92 1.63 0 0 35.55 pp 52 32.17 1,36 0 0 33.53 f ' \ 53 29.73 1.09 0 0 - 30.82 ' 54 25.59 .82 0 0 26.41 l a r+3 55 22.99 .82 0 0 23.81 56 21.18 .82 0 0 22 1 57 19.58 .82 0 0 20.4 ' :Jt 58 16.99 .82 0 0 17.81 59 14.77 .82 0 0 15.59 x''• 60 0 0 0 0 0 I +v i 1 r t n x k j STILES ROADWAY 12-23-25 PROPOSED SETA 100 YR TIME CFS TIME GFS ' 9 5.2E-04 .02464285212 .03 1 .42 9. 1 0 0 12. 1 .01 .47 9 .2 0 0 12.2 01 .47 ' 9.3 0 0 12.3 0 0 9.4 0 0 12.4 0 0 9.5 0 0 12..5 0 0 9.6 0 0 12.6 0 0 9 .7 0 0 12.7 0 0 9.8 0 0 12 .8 0 0 9.9 0 0 12.9 0 -0 ' 10 0 0 13 0 0 10 . 1 0 0 13. 1 0 0 10 .2 0 0 13. 2 0 0 ' 10 .3 0 0 13.3 0 0 10 .4 0 0 13.4 0 0 10 .5 0 0 13.5 0 0 10 .6 0 0 13 .6 0 0 10 .7 0 0 13.7 0 0 10 .8 0 0 13.8 0 0 10 .9 0 0 13.9 0 11 0 0 14 0 0 11 . 1 0 0` 14. 1 0 0 11 .2 0 0 14.2 0 0 11 .3 0 0 14.3 0 0 11 .4 0 0 14.4 0 0 11 .5 0 0 14.5 0 0 11 .6 .01 .47 14 .6 0 0 11 .7 .01 .47 14.7 0 0 f 11 .8 .02 .95 14.8 0 0 I 11 . 9 .03 1 .42 14.9 0 0 15 0 C . FACTOR 4.7 ' AREA TIMEO .26 PR#0 STILES ROADWAY ' 12-23-85 PROPOSED SSTB 100 YR ' TIME CFS TIME CFS 9 1 .4E-03 .06211128 12 . 15 6.65 9. 1 0 0 12. 1 . 1 4. 44 9 .2 .01 .44 12.2 .03 1 .33 ' 9.3 .01 .44 12.3 .02 _ .89 9.4 .01 .44 12.4 .01 44 9.5 .01 .44 12.5 .01 .44 9.6 .01 .44 12.6 .01 .44 9.7 .01 . 44 12.7 .01 .44 9.8 .01 .44 12 .8 01 .44 ' 9.9 .01 .44 12.9 .01 .44 10 .01 .44 13 .01 - .44 10 . 1 .01 44 13. 1 .01 .44 10 .2 .01 .44 13.2 .01 .44 10 .3 .01 .44 13.3 .01 .44 10 .4 .01 .44 13.4 .01 .44 10 .5 .01 . 44 13.5 .01 .44 ' 10 .6 .01 .44 13.6 .01 .44 10 . 7 .01 .44 13.7 .01 .44 10 .8 .01 .44 13.8 .01 .44 ' 10 .9 .01 .44 13.9 .01 .44 11 .01 .44 14 .01 .44 11 . 1 .01 .44 14. 1 0 0 11 .2 .01 .44 14.2 0 0 11 .3 .01 .44 14.3 0 0 11 .4 .01 .44 14.4 0 0 11 .5 . 02 . 89 14.5 0 0 11 .6 .03 1 .33 14.6 0 0 11 .7 .05 2.22 14.7 0 0 11 .8 .08 3.55 14.8 0 0 11 .9 . 13 5.77 14.9 0 0 15 0 0 C FACTOR - 4.4 AREA TIMEO .7 AREA TIME. 1 .69 i T STILES ROADWAY 12-23-85 PROPOSED ' SSTC 100 YR TIME CFS TIME CFS 9 1E-03 .0453735 12 .05 2.27 ' 9. 1 0 0 12. 1 .02 .91 9.2 0 0 12.2 .01 .45 9.3 0 0 12.3 0 0 9 .4 0 0 12.4 0 0 9.5 0 0 12.5 0 0 9.6 0 0 12.6 0 0 9.7 0 0 12.7 0 0 ' 9.8 0 0 12.8 0 0 9.9 0 0 12.9 0 0 10 0 0 13 0 0 10 . 1 0 0 13. 1 0 0 10 .2 0 0 13.2 0 0 10 .3 0 0 13.3 0 0 10 .4 0 0 13.4 0 0 ' 10 .5 0 0 13.5_ 0 0 10 .6 0 0 13.6 0 0 10 . 7 0 0 13.7 0 0 10 .8 0 0 13.8 0 0 10 .9 0 0 13.9 0 0 11 0 0 14 0 - 0 11 . 1 0 0 14. 1 0 0 11 .2 0 0 14.2 0 0 11 .3 0 0 14.3 0 0 11 .4 0 0 14.4 0 0 11 .5 .01 .45 14 .5 0 0 11 .6 .01 . 45 14.6 0 0 11 .7 .02 91 14.7 0 0 11 . 8 .03 1 .36 14.8 0 0 11 .9 .06 2.72 14.9 0 0 15 0 0 I ' C FACTOR 4.5 AREA TIMED .5 T ' PR#0 STILES ROADWAY 12-23-85 ' PROPOSED SSTD ' 100 YR TIME CFS TIME CFS ' 9 • 9. 18E-04 .044429731212 .05 2.42 9. 1 0 0 12.1 .01 .48 l 9.2 0 0 12.2 .01 .48 9.3 0 0 12.3 0 0 9. 4 0 0 12.4 0 0 9.5 0 0 12.5 0 0 9.6 0 0 12.6 0 0 ' 9.7 0 0 12.7 0 0 9.8 0 0 12.8 0 0 9.9 0 0 12.9 0 0 100 0 13 0 0 10 . 1 0 0 13. 1 - 0 0 10 .2 0 0 13.2 0 0 10 .3 0 0 13 .3 0 0 ' 10 .4 . 0 0 13.4 0 0 10 .5 0 0 13.5 0 0 10 .6 0 0 13.6 0 Q , 10 .7 0 0 13.7 0 0 10 .8 0 0 13.8 0 0 10 .9 0 0 13.9 0 0 11 0 0 14 0 0 ' . 11 . 1 0 0 14. 1 0 0 11 .2 0 0 14.2 0 0 11 .3 0 0 14.3 0 0 11 .4 0 0 14.4 0 0 11 .5 .01 .48 14 .5 0 0 11 .6 .01 . 48 14.6 0 0 11 .7 .02 .97 14.7 0 0 11 .8 .03 1 .45 14.8 0 0 11 .9 .06 2.9 14.9 0 0 15 0 0 C FACTOR 4.8 AREA TIMEO .459 1 � ' OFFSE"f . STILES ROADWAY 1 0 0 0 12-23-85 SSTA SSTB SSTC SSTD TOTAL ' 1 0 0 0 0 0 2 0 .44 0 0 . 44 0 .44 0 0 .44 4 0 .44 0 0 .44 5 0 .44 0 0 .44 6 0 .44 0 0 .44 ' 7 0 .44 0 0 ,44 8 0 .44 0 0 .44 9 0 .44 0 0 .44 10 0 .44 0 0 .44 11 0 .44 0 0 .44 12 0 .44 0 0 .44 13 0 .44 0 0 .44 ' 14 0 .44 0 0 .44 15 0 .44 0 0 .44 16 0 . 44 0 0 .44 ' 17 0 .44 - 0 0 . 44 S 0 .44 0 0 .44 19 0 .44 0 0 .44 20 0 .44 0 0 .44 ' 21 0 .44 0 0 .44 22 0 .44 0 0 44 23 0 .44 0 0 .44 ' 24 0 .44 0 0 .44 25 0 .89 .45 . 48 1 .82 26 0 1 .33 .45 .48 2.26 27 47 2.22 .91 .97 4.57 28 .47 3.55 1 .36 1 .45 6.83 29 . 95 5.77 2.72 2.9 12.34 ' 30 1 .42 6.65 2.27 2.42 12.76 31 1 .42 4.44 .91 .48 7.25 32 .47 1 .33 .45 .48 2.73 33 .47 .89 0 0 1 .36 34 0 44 0 0 .44 35 0 .44 0 0 .44 36 0 .44 0 0 .44 ' 37 0 .44 0 0 44 38 0 .44 0 0 .44 $9 0 .44 0 0 .44 40 0 .44 0 0 .44 ' . 41 0 .44 0 0 .44 42 0 .44 0 0 .44 43 0 .44 0 0 .44 44 0 .44 0 0 .44 45 0 .44 0 0 .44 46 0 .44 0 0 .44 ' 47 0 .44 0 0 .44 48 0 .44 0 0 .44 49 0 .44 0 0 .44 50 0 .44 0 0 .44 51 d 0 0 0 0 52 0 0 0 0 0 53 0 0 0 0 0 54 0 0 0 0 0 55 0 0 0 0 0 56 0 0 0 0 0 57 0 0 0 0 0 58 0 0 0 0 0 59 0 0 0 0 0 60 0 0 0 n o 1 ► _ 1 . R41a�W14Y l�lQf0111(l4GE S�crlonl.. f�R E GN. _ R UIVOFF_ _ ___ v0( uMC (/JGfZLS J CINGHESJ �Ga.GT) S5T)!� 8s - 6z 5 BZ _ ssrp O, y_6 . - 86 i i 1 STI( E�5 - HY6AOLD GY DETENDONa pont ( NF Lo Lo uzp to - 7bTpL Acc.uml _AoND PoN _hpl_9w . _ i t�Ft,o�,1ourFc ow_ swR.a6�, b*'rrr (MIN) (cr-s) (cu. Fr) (cr-su, FT) (r-T) 01210. 168 - 6 83 7957 - ! I_) b - _5-164 .. . _ _OILtS, - 1 1921 1 X10 _ _� , I�-I _ _ ZZ�S� ? Z�.uo 1S , azo- --_: I.�I ------ 30 - -306 - 4-5102J.,_ 0_ _ 6 U 7 o,S3_ - 0..: .. 0, 17 ' GRIQY SM-s HKOROL-O&Y bp.►wm6a 57Ruc-TUI2& [avApG1T1 S. ' biNAIV& )00 Y12 SToa��+rt CNb 57?9 STRVC7URJF, 3LOPE IOD YR, FLOW C,OhpGaFY ' Ofz-o 21-04 /2 'I RGP 1007 `l /,YZ GF5 2,9 c>~ .5 2+oo 3t70 I Z" RGA 400-) OZ cF 5 3t70 L4+79IZ" i2cA , oyo '/% 2,U cps CFS ' 4f7S s+-9D )B" kcP 01b"' 6,7 cFS lot cps_ ? 5+90 7f1S IS" P,cp , Do `�' 811 cF5 91Z ccS Z THS- y+qb 181, Rch ,Dub `'� Ell cFS 9. Z CFS x ? `1tNo I►t5a 2,q kc a , oD5 10'. cpS rS a CFS W l]. SD RET PONE Zq Rt,P .oos `i' )D,"3 cF-s IS,0 CFS Z a 13t5a DEr, AoNU iZ" RCp . oro �� 2,� C:S 3,6 ccS N a x v I' , , Dv7"c.F r ora 1� Fa,� 1 b n A .N HE�1 b �p c c IZ DJJa 007-.iF7' Uz Z abrTbM 0 F CHAAlNE C a z Co� Sr� fir.,-��y.--;• .• 1 z = a•ao� �,, r7nm OF ZbS Bpir',v7701%/ ' PoNC� a � N a x v ' OUTG fit ��TN7"Idhl ,� 12'' l�lJa �iT nON t� c NAnI NSE i ' i 1 _ G/ZtgY 61yiS S-)) LES - HORotoGY :A219r __D fff_C.T..L.Y.__:P ._ - _5T13.�AMLOW S77(F�S ._ST. W ?'o THg_ _ST_p.F_nM___rHig7—OWS _Tv_ - 1 SE7)oh[ S__13IA1MS _bl-cMY__1ti _ _TK _STAM_�TD wNTI?v�__ .'-_ _ _ �o ► ►v_T_s_. ---.,�EGT_c�N.: �:---fJ�.�Q t nl S___.TN1�4U_G_�-l_. s��noN. /./__._: __ N_6_.A_ Efa�---T TU-C !t/3tZUC�-� - -I SE-C7�U1�_ 1J1f4_t_ l ---7 -it2QU(� f-- CT_IUN__. 1L ?'v` TNS_----- _. _ ,_ __ STTZ�h!�►_. .___ EC?70.N_ Cl _R1q..1NS---7YROQGH__,_SeC77v -- 13-- ' 17 E s on%1 _ Tn cv/urr 0 t- -S.177 SIT_G dF_._- :__CAN-De-0,(.-PT.-a]. To C-olu-r - -_ A5SUM /4T.__N 0-- -T?V N f,I Al G.__C7_Gc U.1 S__1_U._THF 1c ATE,�,$KE6. .__ ---- --- 4- S-nLS KYb�2o�o Y --------- EX15T/NG _ CONO1TlON5 -- _ - -- ------ --- -- --- - -- --- — �; c i 21 . 23 i S z9 I _ = .Z$ L .1, --- _�_�_�._-77----GAS----- --- - ------- r __._ Fad �__._ �•�-�T_- - o`t�R-___t�rr�C �-------_-___------ ----------- z = _- -------V------.. __l Lid'. D _.__- --------- ----_ ----._ ._._. ---- - ----------- - ------ -- - - ----- -: ------ -- -- - -- - -- - - -- - - -- --- -- -- --------- GRA � �- 5Ti LAS 4 H yO�U(.UG i 1 - - 1 ,S _ o /� ;SOt, IV - _ t } c � 1 537 LF-S EXISTING- CON 1 - _ - -- - - -- - I Fog.. . a C.,4�, / goo 0 y- -- ---— --- — --- — — - = 110107 z/3 _ 1 ` I 1 �.. _ - - - -- --=-- EX 157/NG -- _ _ UA Z f- - =.__1575.8 -- 1 I � fZ,7Y) (6.Ly, `I-) ------- QP -QF' 1 VA --- =- --�-----.-__ _I?� 1--_FTI ---------_-_---=--- ---_-. -=- - ----- - __ 5.73.6 - 57.7__cFs_:_ - - I , EbEV4774)N FLoI�/ _7D,sh _( p,pcpcFFvu)_: . . . . 33, 1- Wo 3 3, 1Wo.3 Cr—s 72,76 �.___.-- -,---- _ _ _., :.� : B,Y yrs._ . _. . -- 61t 7 Cr-S 80 1 CF S. .. : ._ . CPS �S _ 657,_7 Project 6RA f WQ()L) C-SI 101 TE J Client r—oRi�e S Page of Subject. N Y61h 0C O GY Comptd.By �'" Data r 10—" Detall 57'RP WM FGOW 4Ett=V477QNS Clt d.By Date 57-REAAI Ft, A/ VS , EX 15TIIVG GOAIbi nOMS 1 ' 600- Z 0D Uz tt y w ' w z � w z � m LL H to Zo a z J U LL ' too ill o ' 69.0 70.0 11.0 72.0 73.0 W.0 75.0 aLE-yATlON OF 5TREAM A-r s-ra-E5 STREET (fiEET)__ CON6l7 ONS - -- --- .-- - - - _� ol'os � amp, Gf2oss_SG�nnN: f�_T - - ' — PXI__S7NG----__1QU__J'R 0.3'3 _ . I __. U_S E ?RKIAL�2�0��b�_ LhfoQNN� G___6,,r ►Tf-r_ � __ :...: _ .._ _�: S�.)E SOP" = Z Hop-Z 77.? 1 V.F.A7 1 DL✓TFat/I�n/�I jib !/S our&, T 6ES1 GN V/rH : 140_-F-7_" 61q$E ..-.Cfi )CR _. h i ' S ' D0 _ ----------- Lt ----Lt R (22 o0)(. off- osz� ■ use • - - - - - - -- k- 1.0 f GRAY - 1 - - --- - 1 i A _7S S_-GT 1 . i 1 1 _. ... .. bETENTION PONE OUT'LE-,T OE S )Gly/ HEpb OVat2_- Arae o.h. P:W LV . 774eOUGH P/P,E , Q - 1 ' 3 _ r - i 4y C I i li 1 � DF,SIGN DEP77-4 )N/ /P,/JPEZO OMS CHAMNE L i -- T- 36 = -- 1 -- -- �� � - - - ......... ST LES - N-1YrJ1�o�aG�' _ ---- ---_---- - SEc.1 ori' __!_- ------- -- ---�__-----= _0 -L�/JldC_ - ,._RUNOFF ------ GR4Y °I Tl L� - HYD OLoGY - ��_L_QPM_=�1�Q--%--------- --=--- -------- -- RUNOFF= s ECT 10 Nt _.SLOPE -- ----- - ---- - z�nr= o-�_t�o s CZE 6 .8, 1 1 GRAY ck STILES — HybkmoGY _ SECTION S Tc 1 - - --_RUNOFF_=-__ 5EC.7-ION__ .6---- -=---------�u� -- --- - _ SLOPE SSUME -------_C N -- -.-------_: 1 t GRAY q- STILES HYDROLOGY _._ F_REsLOC-AL 24.6`! CONS, 6OC_zo79 f. �(73 - -- --. : q H .3.05--1 NC H E L0N(y,;EST -F_LDw-PArH.= 500 FTS _ SLOPE. =. _y0 r4- ------ _ -�.— _AS,SUM�.i_SAC►ZES_�L�i4CRE RCSi�N_�Z�?_�_��_!���R��wo.�p5�: F,vta hYO�+���—_, �. 1 GRIMY---*--.STILES. _:- HYbPOlA6Y ------ 1 s EC.7-6N q_- _ . LONGC,57_-FOW P_ArH_=--- -.1000. F_r. - - - -- - - -- -- -- -. _SL.DFE --- e�SSUME _RFSOENPAL conr�. - - --_LING = . 30--HJ2_=._.Ia__MIN - - - --- - -- - - - - --- - - .�- - - ._LZAA 0S :.. f ACU RESIDEIVIIpLy.6,b�9GR�5__W00bS. FAIR. cAND!__ Tc RUNUFF_ 1 _ .__------- _ -_-- GRAY: -----:_ _- - --- ._ -- - - - _ __-_-------- --�1C)$TIN.V -- -GONDITl6N� ---------- ---_---------��._- __ -------- LONGaS-r FibW_ ,_AT H = t"IIN _RU N OFF = - -- - - _ - —� ---- — -- A__EA-_ __174_.tt .gds-- --- .____: ----- — --- -- - --------- - 4 QNGEST---FLOC!PA.T._H_ - S,.!_�t�R�S._ .wP_O�S__ F.R. tR_layb�o�Q_G►c__coN0,- 40.-� C.N.__•59 ($[683*•�. s�J+,.i[ay1)_=_ -- -- -- --- -- --- - -- ------ ______ _-- GRAY 4 5r)LE --- HYbPOL.O&Y --- --- -- - -- �`ECTION 13 .LQN6E5T-__JcLow PATH = _ OO Fr ------- MIM_ -MIN ------ - - -- - - - --- --- RUNOFF SECT/ON 1 _ _ ' GRAZ STILE-S, -yybpoi-7GY. RROAOSF-u Con/D/770/VZ per LN SEc-noN L0t\tGZ-SLELDW_P._/97H ___ _ _ -- ---_-----------�_ 11�3�.61GtF.Ss-1N�Q�S-E9[t�L-LY -+-QG1C_�4N Ste- C N = . 0 4b) t_. ?91C60 , 331t(73, .67 L-7 1 � 1 GRAY ANO STILES - NY13ROLOG` - 1 - -- -- --- PRo aosEb Con(L)1r lONS ---- - 5FCTION 6 --- - - - - - _ __ C N_ .o (il --+—'..uf ,25(6 0)_ + _---------- RUNOPF -13 - __ .__ -. ._ - --. A�sU���__f3__�►_��_��.__l..acrz� -reFSL?ErurJg-L----_.__�:__ ,�.._- ' __ __-___ =---------+:. Sf. !__/gciz.�s WooU�= G r Hr�aw ►� _-�--_-- -r t[ ZZ MIN--- - -- ---- --- --__-w__ _ Section VII SOILS y ' The attached soils map is copied from the North Essex Soil Survey ti ' Maps provided by the Soil Conservation Service. The map is followed by a definition of the abbreviations that are on the ' maps. i; s • r a RdA 46P6D ^s �'�n J „*�' li? CbB J„S4»�../ ; >»r CrC -•. s 45 �� MC •� V58' i r - Wr8 e ' ' ' �y- g MC�d� .s 4 ;, RdA• , , i �j . WsB r •, Y s :,• 1 � ,. i�}- l�.4;•' H18 y\ J, 1 t �, t,,,• �dk :. r .. ! YMC PH8S88j r ' Wh t_i.. WrA v'r 1. , r CbDs9 RIA r RotT ! Mo r / :�.4 ,;�,., {; C 4, Wh "� '�t ' s, ,4' CbB�, h MC •r ' ' WSBr, y.. ..a ` ' : ♦�.,� d�'' °' '`' .'^+:.'r ,t : 'r.+v Wi8 `.tr t st�°.i , �iJ u,p4..—^—.a{ MD'. 1 l t . 'F -Lh '{Iyf 1 ` �:hf��w a,e r `'• gni t�� `\� WSB �r '^ • + w' ',s• r ''� t 4 r-. :r`./` J, p/ c �-►, t Nr;i?�C' \.,, ( -CbC f ..�p, '..yrrh. ,*-" r't t tiO vv� ffi C t' r1 , Z/ S •, ay./� , M "Y h r�'+r' 1 `r'wrr ii� ,. ' j ♦. • , rI WdB , sF r + r • e Lr' .�'i4 � iM1 M IY ;4 r J.. yy.l,t gir�.q/ '`t,} �) 'C ( r ' ir,6y��r S2 r. J y'r� h. ,t '�� I,'� R147•,4'1 .iJ , CrC.� } I a' ps / ri r ri7. - �'t •.� P u7 f .��.I7L.� yrt 4 i n r YL• .. , )J_j�,l` r' 1" , � �[ff�;j J'J/1.01!! ' SrlS-...V. a 91(ZC ','h�` Y K1F )_ •, +1 a_. .. 5."i^•A44 , f RS Pah + r„ ' WK , , f ,r / s iK '"•�' t;-AlC7'C'r ' I.rc .tio r, �� .n �, r MC ,... i sPaC '�� MC tF y9. ,'!•� rt •.�� ''_ '1{s,: (. Wh. ' ` ' ' t '+*frS��Y Fr �y,•'.. ' '\ Cb8 iWsC \ t ft '• ''i w r3. ,) ` ILL MC 9r8 Pe 'PDB PcE�b: f 4 j� ;' Sy,?.�'' t t,r"ti'i... e.., •i s ;, ., ti:Nl+ `r •. s,iRoC , -,;4 +� r PcC ' PCE " f� ; f *•.Y>i11� r' .•r {by � . "{ r41 1 fY „ � .' ♦Y ���}f r , 2i T Wf6 -:,Y .-•r/ � •. �rUt ,!r '.`''rf.r1 ' ' '.i y y ' lyi:Jr^a.:{'�•-1.11 ` R ^} -.. �'�`� J r r;t w . ' J" i. / �! Cr�.. �r < St4 5.,' r ,, •st�JA'� . »r P 4 t Q +` r , t l rtlr y a� r PbBc~' 'v e l\r r' r, r`, \� 1 v. a t v �''f .. ,*t c'4 • r.,y < \ t 4 ,Cb8: I, Mc ;. ,ar >t, Rf , t a ,` r> Mcr Cb r dr ° ' Wh , r ,."^{ , r , S C66 w : r '• * �+ Cb tG m r .:q, �r t 2r' a Jn.. ,oG t I . r ,Wt6 C i •,4 �, e r � ' r. �,, ,?� Y w• b� _, WSB � Y r4 y��,. G s �;i 2t \ Wil RIB y`HALT ' , v MC �wl,r MC } CbO y i. MD CbG°W Wt t ,'yy ( RIB ( "� '�',r rvFJ ll ✓.. F `'t 1: ' •+}r1•' .C4Br1\�, l r '' 'i•Yt, t 1. WsBt ' 'WTC ,;,• .t PCEr` dF.}I w` :1 t 'aa RI f, � r • - CbB .+ �C t r, ,� of 4 f ' '" .,, , ,Se�ty ,Lrl Ql ,'' }.� n Y t �L•e _' Jt f '•4 .. ' < '�/'� r Y t �`?µ�''� atJv.2r'J �,4� ".i•1 c llt I•lil, Ja', '!_r"�v :,P 1•t 1 t J, �Lfp "1..G /P � a'} l i�� L. /r �Y I rti J, X 1 'r a 1 ,.^tM✓r�li';�f /,/-., t`A• PbC I H.:7 ,.7.i � r / t ',y ,= ryM �d Sft!A '.t�i �. r' �,/�° tP`C6C r r� y^`�. ',fel, I�� r .,. rs D` � ! t. at�r 4( )"{!�r e 5 ti�4i.'at �t �, •.9 .il-�:11 t/ 1 t �.ari '4 f Y Ai,a r W16 " .' %!r 1 ` , rr:1.0 1 1{ .1 ?;;CbB'C , CrC '�•...•:r{ T ,� �,1 `r-\�/ r; t W h, ., r n.. #`t i� f•a r "�' /� ,P , `�� .LIrO� CkC ;r MOB. ` Jc'>. r` .'.t .. •� t,• ,., Pb8 •F,I, 'r.: .+. Wh ,Nr ' RoC : ROD r MC OWN 1 /GUR9 3 1 5. 6 S. M,4P Soic. COMO ON r ' 5C46F: C,4R/ST/A1V5EN 6NSIMFERING,1W.. //4 KENOZAAI/� �'�/Al/ERh�/LL,r{1.4. 1 . ' SectionVII Soils Map Abbreviations ' CbB - Canton very stony fine sandy loam, ' 3 to 8 :percent slopes ' CbC - Canton very stony fine sandy loam, 8 to 15 percent slopes ' RiB - Ridgebury and Leicester extremely stony fine sandy loams, 3 to 8 percent slopes Se - Scarboro mucky fine sandy loam ' Wh - Whitman extremely stony loam i TOP ANO 50B30/L L AYFR 1 - 2 ' 2A10 SOIL LAYER 3 4 14- 1 6 3RO SO/L LAYER 7-w - OEPTN OF WATER TABLE 1 e 9 ' io-u --umlr OF EXCAVQT/ON OF TEST P/T 1 1 _ 1 1 KEY TO TEST P17 PROer-IL ES 1 1 1 tCLIENT FORS REALTY TEST MATE MARCH 2V 1995 ' LOCATION GRAY & STILES LOT NO TEST PIT NO 1 1::NG I NEr.--- ; IRAN OCONNELL t PEF C 'TEST NO PERC RATE I HI a 5 G �w ' I O U ' REASON FOR LIMIT - ?ND SOIL "(YF-E: ORANGE SAND gt GRAVEL WITH COBBLE LA'uiT SOIL TYPE NO LEDGE I I CL..I:ENT F.:OFZBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY & STILES ' LOT NO - TEST PIT NO 2 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE _. E `i 5 b I--� R_ -u cq 113 ' REAl3)ON FOFt LIMIT LEDGE. OR LARGE BOULDER ?ND SOIL TYPE GRAVEL WITH COBBLE AND BOULDERS. LAST SOIL TYPE LEDGE OR LARGE BOULDER NO WATER CLIENT FORBEE REALTY TEST DATE MARCH 210 1905 LOCATION GRAY & STILES LUT NO TEST 'PIT NO E=NGINEER DAN OCONNELL PE;RC TEST No PERC RATE J ti 5 -w b R 9 REASON FOR LIMIT II ' i NDiO I L TYPE GLACIAL TILL WITH SOME CLAY AND COBBLELAST SOIL TYPE NO LEDGE CLIENT FORHES REALTY ' TEST DATE MARCH 20 1985 LOCATION GRAY Se STILES LOTNO - FEST PIT NO 4 ENGINEER DAN OCQNNELL FERC TEST ND —• F-'ERC RATE — I� 1 •I b 4 � CLI I REASON FOR LIMIT — ' 2ND SOIL TYPE GLACIAL TILL WITH SOME CLAY LAST" SOIL TYPE NO LEDGE CLIENT FORBES REALTY 1 TEST DATE MARCH 20 1985 LOCATION GRAY & STILES LOT NO - TEST PIT NO 5 ENGINEER DAN OC:ONNE L L PERC TEST NO FERC FATE 71 11 � w b 1 ► R q 1 _ 1 REASON FOR LIMIT ?ND SOIL TYPE GRAVEL & TILL WITH BOULDERS & COBBLE SOME CLAY ' LAST SOIL TYPE NO LEDGE 1 I � ' GLIENT FORB'"S REALTY GEST DATE E MARCH 20 1985 LOCATION GRAY & STILES LOT NO TEST PIT NO 6 ENGINEER DAN OCONNELL F E RG 'TEST NO FERC RATE - 5 1 7 1 R 4 i 1 Rk AE30N FOR LIMIT SND SOIL TYPE GRAVEL & TILL WITH BOULDERS 8 CosBLE LAST SOIL TYPE NO LEDGE CLIENT FORBE.S REALTY TEST DATE MARCH 20 19B5 LOCATION GRAY & STILES ' LOT NO - TE ST P IT NO r ENGINEER DAN OCONNELL ' FERC TEST NO PEI M RATE i � '41 Ll -w 5 7 VIE 4t ' REASON FOR I.._IMIT 2ND SOIL TYPE GRAVEL & TILL WITH COBBLE- LAST SOIL TYPE GRAVEL WITH CLAY NO LEDGE 1 1 ' CLIENT FORBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY &< STILES ' LOT Na TEST PIT NO 8 ENGINEER DAN OCONNELL FERC TEST Na ' PERC RATE - 1 F--T= ~ 5 b H t � REASON FOR LIMIT - 2ND SOIL l'YPE. GRAVEL WITH TILL &< CLAY LAST SOIL TYPE GRAVEL WITH CLAY I ' CLIENT FORBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY & STILES LOT NO - ' TEST PIT NO 9 ENGINEER DAN OCONNELL FERC TESL" NO 1='ERC RATE S -w y S i b -u 8 9 REASON FOR LIMIT BOULDER 2ND SOILTYPE GRAVEL WITH CLAY & TILL. & BOULDER LAST SOIL TYPE NO LEDGE 1 i � 1 1 i (WLIENT FORBES REALTY 'TEST DATE MARCH .�''L0 19185 LOCATION CRAY & STILES LOT NO - TEST PIT NO 10 ENQ I NEER DAN OCONNELL PERO TEST NO FERC RA"Z"E 1 'i .b 7 H io iREASON FOR LIMIT - 2ND SOIL TYPE: GRAVEL. WITH TILL °c CLAY WITH COBBLE iLAST SOIL TYPE NO LEDGE ' CLIENT P'C:RBE.S REALTY TEST DATE MARC 0 1985 1 LOCATION GRAY 84 STILES LOT NO TEST PIT NO 1 1 ' 1"NG I NIm ER DAN OCONNELL PERC, TEST` NO F''Ef-"(C HATE _ 2 y W b I REASON FOR LIMIT 5C]l1LDFR 2ND SOIL TYPE GRAVEL. WITH TIL_L.. ' LAST SOIL TYPE: GRAVEL WITH CLAY, COBBLE g, BOULDER ' CLIENT f=ORBES REALTY CY TEST DATE MARCH 20 19B5 LOCATION GRAY & STILE' S LOT NO - ' TEST PIT NO 12 ENGINEER DAN UCONNELL PERC TEST NO FERC RATE y 1 5 Fa q I CLU REAS('.)N FOR LIMIT BOULDER 2NII ,"OIL. ..I...Yf''E:: GRAVC._'L_ WITH TILL LAST SOIL TYPE GRAVEL WITH TILL. CLAY COBF4i_E °{ BOULDER CLIENT FORBES REALTY TEST" DATE MARCH 20 1985 Li)CATION GRAY & STILES LOT NO TEST PIT NO 1 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE I � L/771 y -�-1 b 7 -W I � 4 REASON FOR LIMIT LEDGE SND SOIL TYPE:. COBBLE & BOULDERS LAST SOIL TYPE SAND) CLAY & LEDGE I 1 CLIENT FORBES REALTY TEST DATE MARCH 20 1985 ' LOCATION GRAY & ST I t-ES LOT NO TEST PIT NO 14 ' ENGINEER DAN OCONNCL_L FERC TEST NO FERC RATE 2 5 R - / ' REASON FOR LIMIT LEDGE OR LARGE BOULDER SND SOIL TYPE GRAVEL WITH SANDO CLAY, BOULDER, & COBBLE LAST SOIL TYPE LEDGE OR LARGE BOULDER CLIENT FORBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY & STILES TEST P I T NO 15 ENGINEER DAN OCONNE L L FERC TEST' NO FERC RATE H `I -w S t H 1 C3 REASON FOR . LIMIT LEDGE_ 2ND SOIL, TYPE GRAVEL WITH SAND & COBBLE LAST SOIL TYPE LEDGE NO WATER II ' ' CLIENT F:URDES REALTY 'PEST DATE MARCH 20 1985 LOCATION GRAY & STILES ' LOT N(7 TEST PIT NO 16 LIVCINI ER DAN OCONNELL FERC TEST" N0 ' PE-RC RATE 1 i Z 5 b R ` 9 -w 10 REASON- FOR LIMIT 2ND SOIL TYPE TILL WITH COBBLE LAST GOIL TYPE TILL WITH CLAY NO LEDGE ' CLIENT FORBES REALTY TEST DATE MARCH 20 1985 ' LOCATION GRAY ,°K. STILES LOT NO TEST FIT NO 17 ' ENGINEER DAN OCONNELL FERC TEST NO FERC RATE I `i 5 " uv I � 7 ' 4 REASON FOR LIMIT BauLnER 2ND SOIL TYPE TILL WITH COBBLE & BOULDER LAST SOIL TYPE TILL WITH CLAY, COBBI.,.E, & BOULDER; N0 LEDGE CLIENT FOES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY &< STILES ' LOT NO - TEST NIT NO le ENGINEER DAYS GCDNNELL. PE RC TEST NO 1::IERC RATE i rT `i 5 ' e -w � R -u 1D REASON FOR LIMIT LEDGE 2ND 5011- TYPE TILL. WITH GRAVEL COBBLE. & BOULDER LAST SQIL TYPE LEDGE ' CLIENT FORBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY & STILES LOTNO TEST PIT NO 19 ENGINEER DAN OCONNELL FERC TEST NO - PE:RC RATE l e 5 b 7 -w 8 q � 4ii ' REASON FOR LIMIT 21\11 SOIL' TYPE TILL & GRAVEL WITH COBBLE LAST SOIL TYPE TILL CLAY & GRAVEL NO LEDGE: CLIENT FORBES REALTY ` TEST DATE MARCH 20 1985 ' LOCATION GRAY & STILES LOT IUO TEST PIT NO 20 ENGINEER DAN OCONNELL ' PERC TEST NO PERQ MATE I � 5 ' 13 -W A • kd REASON FOR LIMIT" - 2ND SOIL TYPE TILL. WITH SOME CLAY LAST !":TOIL TYPE GREY CLAY OR SILT NO LEDGE CLIENT FORBES REALTY TEST DATE MARCH 20 1985 ! LOCATION * GRAY & STILES LOT NO - TEST FIT NO 21 ENGINEER DAN OCONNELL I ' PERQ TEST NO = PERL" RATE VyJ y 5 7 8 li I CLU ' REASON FOR LIMIT 2ND SOIL TYPE: TILL WITH CLAY LAST a0Il TYPE GRAVEL WITH COBBLEICLAY & SAND} NO LEDGE ! L CLIENT' FORBES REALTY ' TEST DATE MARCH 20 198 LOCATION GRAY &a STILES LOTNO -- TEST PIT NO 22 ' ENGINEER DAN OCONNELL FERC TEST NO ]::'ERC RATE S f' e -w 7 , 4 REASON FOR LIMIT 2ND SOIL TYPE SANDY TIL0-GRAVEL &: COBBLE ' LAST (SOIL TYPE CLAY &c GRAVEL 7 { f . r CLIENT FORBES REALTY TEST DATE MARCH 20 198 ' LOCATION GRAY & STILES LOT 1\10 TEST PIT NO 23 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE - i1 1 , 1 z C 5 r � e 7 - 1 �f � � q 1 r REASON FOR LIMIT 2ND SOIL. TYPE: SANDY GRAVEL WITH COBBLE LAST" SOIL TYPE GRAVEL WITH CLAY f' i � r 1 r - 1 CLIENT FOR&ES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY & STILES LOT NO TEST FIT NO 24 ENGINEER DAN OCONNELL ' PE'RC TEST NO FIERC RATE ti z " J 5 -w 7 8 -w 9 r to 1 ' ' REASON 1:70R LIMIT - 2ND SOIL TYPE: TILL WITH GRAVEL & COL-BLE LAST SOIL TYPE TILL WITH GRAVEL&CLAY 1 i r r ' CLIENT FORBES REALTY TEST DATE MARCH 20 1985 LOCATION GRAY Svc STILES LOT NO TEST PIT NO 25 ENGINEER DAN OCONNELL PERC TEST NO PERC RATE t L 1 ' S f i b k I, 9 `0 4G l i REASON FOR LIMIT ?ND SOIL TYPE GRAVEL WITH TILL LAST SOIL TYPE GRAVEL WITH CLAY a j E`r v CLIEN"I" FORBES REALTY Tt ST DATE MARCH 21 1r�85 I ' LOCATION GRAY & STILES LOT NO TEST PIT NO 26) ' ENGINEER DAN OCONNEL:L 1=E RC TEST NO L ERC RATE - a Id f5 "''ti b R A REASON FOR LIMIT 2ND SOIL TYPE GRAVEL. WITH TILL: SOIL TYPE GRAVEL, WITH CLAY NO LEDGE CLIENT FORBES REALTY TEST DATE MARCH 21 19£35 LOCATION CRAY & STILES ' LOT1\10 TEST PIT NO 27 ENGINEER DAN OCONNELL ' PERC; "FEST' NO PE.RC RATE 1 �ja 1 R O 1 ' REASON FOR LIMIT LAND SOIL TYPE GREY SILT/CLAY LAST SOIL- TYPE GRAVEL, SAND CLAY, NO LEDGE I � , I � ' CL.IENT FORRES REALTY TEST DA"Z"E MARCH 21 1985 LOCATION GRAY & STILES LOT NO ' TEST PIT NO 28 ENGINEER DAN OCONrIELL FERC TEST NO FERC RATE ' InTEi I s b R -u 9 _ REASON FOR LIMIT ' 2ND SOIL TYPE SILTY GRAVEL L(1Sl" SOIL TYPE GRAVEL WITH CLAY OR SILT. NO LEDGE CLIENT FORS REALTY TEST DATE MARCH 21 19B LOCATION GRAY & STILES LOT 1\10 - TEST PIT NO 29 E11G I NEER DAN OCMONNELL PERC:; TEST NO FERC BATE - i M b 7 TT B9 i4u REASON FOR LIMIT 2ND SOIL TYPE SILTY GRAVEL- ' LAST SOIL TYPE NO LEDGE CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY ,oma STILES LOT Na TEST PIT NO ?O ENGINEER DAN bCONNELL FERC TEST NO PERC RA"Z"E i y � Ru ' REASON FOR LIMIT 2ND SOIL TYPE SANDY GRAVEL LAST SOMI_ TYPE SILTY GRAVEL NO I_.EDGE L, 1 1 CLIENT FORBES FEALTY TEST DATE MARCH 21 1985 ' LOCATION GRAY & STILES LOT 1va TEST PIT NO 31 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE 1 1 r-IH_n i2 -vv 5 1 7 8 1 I iqV i REASON FOR LIMIT ND SOIL TYPE BANDY GRAVEL 1-4)61" SOIL. TYPE GRAVEL. WITH SILT-CLAY 1V0 LEDGE I ' CL I ENI FORS REALTY 'VEST DATE MARCH 21 1985 LOCATION GRAY ?R STILES LOT, NO TEST PIT NO 32 ENGINEER DAN OCONNELL PERO TEST NO FERC: RATE 2 5 ' 7 A ' REASON FOR LIMIT 2ND SOIL TYPE SANDY GRAVEL WITH TILL L..AS'I' SOIL TYPE GRAVEL WITH SILT OR CLAY NO LEDGE 1 CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO TEST FIT I✓IO 33 ENGINEER DAN OCONNELL PERC TEST NO ' PERQ RATE - J a 8 f � 9 -w _ REASON FOR LIMIT ' 2ND SOIL TYPE GRAVEL WITH TILL LAST SOIL TYPE GRAVEL WITH CLAY OR SILT. NO LEDGE i CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO - TEST PIT NO 34 ENGINEER DAN OCONNELL PEF;C TEST NO FERC HATE 1 1 H 1 2 1 b 7 1 e 9 -u Ia 1 1 REASON FOR LIMIT ' 2ND SOIL TYPE GRAVEL WITH TILL LAST SOIL. TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE I 1 i 1 I CLIENT F'ORBES REALTY TES•"aT DATE MARCH 21 1985. LOCATION GRAY & STILES LOT NO TEST PIT NO 35 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE — 5 b i 7 B 4u t REASON FOR LIMIT — 2ND SOIL TYPE GRAVEL WITH TILL LAST SOIL TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE y ' CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO TEST PIT NO 36 ENGINEER DAN OCONNELL ' PERC TEST NO FERC RATE NXX 3 _w 7 8 -U 9 ip REASON FOR LIMIT 2ND SOIL TYPE SANDY GRAVEL WITH TILL LAST SOIL TYPE GREY SILT-- SAND NO LEDGE CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO TEST MIT NO 37 ENGINEER DAN OGONNELL FERC TESL" NO ' P RC RATE T a g b R_ ' � 4u ' REASON FOR LIMIT - 2ND SOILTYPE SANDY GRAVEL WITH TILL LAST SOIL TYPE GRAVEL WITH SANT? & GREY SILT. NO LEDGE CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY '< STILES ' LOT NO TEST PIT NO 38 ENGINEER DAN OCONNELL ' FERC TEST NO FERC RATE r IAN vv ti 5 7 t 9 is REASON FOR LIMIT 2ND SOIL TYPE GRAVEL WITH SAND & .GREY SILT LAST SOIL TYPE GREY SANDY SILT CLIENT FORSES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO TEST PIT NO 39 ENGINEER DAN OCONNELL ' FERC TEST NO FERC RATE Ll y-w 5 7 R -u O i. ' REASON FOR LIMIT 2ND SOIL TYPE GRAVEL WITH SAND & SILT LAST SOIL TYPE GRAVEL WITH SILT OR CLAY. NO LEDGE t I, CLIENT FORBES REALTY TESL" DATE MARCH 21 1985 LOCATION GRAY & STILES ' LOT NO - TEST PIT NO 40 ENGINEER DAN OCONNELL FERC TEST NO ' PERQ RATE � 2 Li 5-w 9 REASON FOR LIMIT 2ND SOIL TYPE SANDY GRAVEL WITH TILL LAST SOIL TYPE GRAVEL WITH SILT. NO LEDGE 4 CLIENT FORSES REALTY ' TEST DATE MARCH 21 1985 LOCATION GRAY %&. STILES LOT No TEST PIT NO 41 ' ENGINEER DAN OCONNELL PERE TEST NO FERC RATE z S X b - B 9 . . i4U REASON FOR LIMIT :'ND SOIL TYPE SANDY GRAVEL WITH TILL LAST SOIL TYPE SILTY GRAVEL. NO LEDGE_ is t ' -CLIENT FORHES REALTY TEST DATE MARCH 21 19B5 LOCATION DRAY & STILES LOT NO' TEST PIT NO 42 ' ENGINEER DAN OCONVELL FERC TEST NO PERC RATE 'k.`.c` + L � `i S Q ' REASON FOR LIMIT LEDGE 2ND SOIL TYPE SANDY GRAVEL LAST SOIL TYPE SANDY GRAVEL. lJI"rH SILT, COBBLE NO WATER ' CLIENT FORBES REALTY TEST DATE MARCH 21' 1985 LOCATION GRAY u STILES LOT NO TEST FIT NO 43 ENGINEER DAN OCONNELL ' PERC TEST NO mm FERC RATE a iH ■ fLi 5 b 7 H 9 -w io REASON FOR LIMIT LEDGE 2ND SOIL TYPE SANDY GRAVEL WITH SILTICOBBLE LAST SOIL TYPE LEDGE NO WATER CLIENT FORBES REALTY TEST PATE MARCH 21 1985 LOCATION GRAY & STILES LOTNO -- TEST F'I T NO 44 ENGINEER DAN OCONNELL FERC TEST NO FERC RATE a 5-w i to 8 ' REASON FOR LIMIT LEDGE 2ND SOIL TYPE SANDY GRAVEL WITH TILL BOULDERS & COBBLES LAST SOIL TYPE LEDGE NO WATER CLIENT FORBES REALTY TEST DATE MARCH 21 1985 , LOCATION GRAY & STILES LOT NO TEST PIT NO 45 ENOINEER DAN OCONNELL NERC TEST NO FERC RATE a 5 A 9 ' REASON FOR LIMIT LEDGE 2ND SOIL TYPE SANDY GRAVEL WITH TILL,SILT LAST SOIL TYPE LEDGE CLIENT FORBES REALTY TEST DATE MARCH 21 1985 LOCATION GRAY & STILES LOT NO TEST PIT NO 46 ENGINEER DAN OCONNELL PEFtC TEST NO FERC RATE a y b u 7 8 1 � 9 ' is ' REASON FOR LIMIT LEDGE 2ND SOIL °TYPE SANDY GRAVEL WITH SILT) BOULDER St COBBLE LAST SOIL TY1='E LEDGE j Ld a � i-1 f�4 Lti L1 a e SECTION XII EASEMENTS AND RIGHTS OF WAY ' See accompanying subdivision plans sheets 2, 3 and 4 1 1 f, ' SECTION IX ' WETLANDS PROTECTION ACT ,1 SECTION IX ' WETLANDS PROTECTION ACT ' The wetlands on site will be protected from siltation damage by siltation fence. Fence backed by staked hay bales will surround the working area and will be placed before work is to begin. The fence .will be inspected by the engineer and both the Conservation Commission ' and Planning Board to insure proper installation. The fence will remain in place until the slopes have been stabilized with loam and seed. All silt will be removed from the area before removal of the fence. Periodic inspections will be conducted by the engineer to make sure that the fence is in good working condition. ' An area of 3480 SF of wetlands will be filled to provide access (driveways) to lots 7 and 8 of the subdivision. A replacement area of 3980 SF will be provided to compensate for the loss. These areas are shown on sheets 6 and 7 of the definitive' subdivision plans. SECTION X SITE ACCESS t SECTION X SITE ACCESS Access to the proposed site will be provided by Stiles Street. Stiles Street intersects Gray Street at 750, and at a grade of 1.5%. The ' site distance from Stiles Street in eitherdirection is-approximatetly 220 feet. This distance provides for safe stopping for speeds up to 32 miles per hour under wet driving conditions on Gray Street, a narrow winding road. 1 i SECTION XI ' CONSTRUCTION SCHEDULE Section XI Construction Schedule Week Activity 1 2, 3 4 5 6 7 8 9 10 11 12 13 14 Cut trees and remove debris 1----1 Install erosion control fabric fence and sedimentation areas 1----------1 Remove stumps and loam from roadway and subgrade 1------ ---1 Install drainage system & waterline in project 1-----------1 Set frames and grates Gravel roadway 1-----------1 Pave binder 1-1 ' Grade shoulders & loam and seed 1--------1 Schedule is dependent upon weather conditions. SECTION VIII SILTATION AND EROSION CONTROL Section VIII Siltation and erosion control Erosion and siltation will be controlled in the following manner: -, As soon as the roadway right of way is cleared of trees and all of the stumps are removed, siltation fence and hay bales should be placed between the roadway and any sensitive areas. Erosion control should also be placed at the bottom of all slopes in cut or fill. This form ' of erosion control is illustrated in figure 4: Sedimentation control detail. Crushed stone should be placed at the entrance of the roadway over the full width of the cleared area for a distance of 50 feet to a depth of 4 inches to provide erosion control for the uphill grade into the project. 1 When the drainage structures are installed in the roadway, the frames and grates should be mortared and set to finish grade immediately. On many projects the manholes and catch basins are left low and uncovered after installation, and act as collectors of sediment and runoff. By setting the frames and grates to finish grade they will be higher than ' the surrounding roadway until it is paved. This will prevent water and sediment from entering the drainage system before the roadway is paved. Temporary siltation ponds should be constructed at the discharge end of all drain pipes, as shown on figure 5: Siltation ' pond detail. Hay bales should be placed around the catch basin inlets after the roadway is paved, and should remain in place until the shoulders and side slopes are stabilized with sufficient vegetation to prevent erosion. All slopes in construction areas throughout the site should be seeded and mulched (or hydro seeded) as soon as construction in the areas is complete. The stabilization and seeding of the slopes should not be left as the last item of work on the project. i 1 1 1 ' 1 1 BALES TO BUTT C (Z)2'x Z"'x 3' 5TAKES LIM/T OF I TOGETI/ER EACII BALE GRAD/NG i L!M/T OF �c RIES I' � ••, Illin • GRADING 0 6 . If oil , Ek/ST/NG EROSION GROUND L'ONTROL �I 1� I FENCE 1 I AMY .J EROS/ON CONTROL (�)�•"Z,." 3' FENCE EROS/ON CONTROL F,48R/C STAKES 4,401 A95.9 �MAIZIFAL'MRE'O BY gqL€ FOSS MANUi"AC'TUR/NG OR EQUAL FENCE BACKED ' BY STAKED AOY W/RE T/E BQLFS - 1 fTYP. )•; • 1 !"x/"O,4K ST,dkFMR) did 5'"W 5Ki91M&NTQT/4N CONTROL DETQ/L Ivor ro 5UL i URS' 4 1 NDT46�: ' LIA Y BAL€S TO BE RACED AND STAKFO BEFORE ,WORK /S TO BEG!N AND REMAIN UNTIL SLOPES ARE STAB/tIZED 11711 LOAM AND SAND.' ALL SILTATION TRAPPEO BY LIAY BALES 15 'TO' BE REMD!/E'O AND CLEANED. 2 - / 40 OAK STAKES Z 2 X 2 x 4 STAKES a/❑ ❑ �❑ 0 /0 E3.100 ❑ Ay❑� ❑ ❑ 1� ❑ ❑ UAY 9AIEs 2"'x2"x 3 " STAKES ' TEMPORARY DRAINAGE OUTLET STONE 2" x Z" x 4" STAKES i 1 5/L M TION POND DETW L i NOT TO SCALE 1 916 UR E 5 /VOTE'POND TO BE CLE.4AfO AFTER EACH STORM OR ON A W9FKL Y BAS/S DURING CONSTRUCT/OAI