TOWN OF NORTH ANDOVER
MASSACHUSETTS
NORTNti;4 1.
O • Op
Any appeal shall be fired
within (20) days after the r
date of filing of this Notice C64U5ES�
in the Office of the Town
Clerk. NOTICE OF DECISION
i
i
Date. , , November 20,• 1989• • . . • • •
Noember 161989-
Date of Hearing . . .. . . . ... .... .. .
Petition ofSanlau Realty Trust
. . . . . . . .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Premises affected ,109-123 Main street
. . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .
Referring to the above petition for a special permit from the requirements
North Andover Zoning Bylaw - Section 8.36 — Revisions to Approved Site Plan
of the . . . . . .
modify . . . • •
sol as to prix •the.Site•Plan .approved • May 12, 1986. for• back• enbankment.of
• . . . . . . . .
landsca�inc� .and .rip-rap wall. . •
. .. .. . .. . . .. . . . . ..
After a public hearing given on the above date, the Planning Board voted
Conditionally
toApprpve. . . . . . . . .the . . .S;te,Plan Modification . . . . . . . . . . . . .. . . . . . . . . . .
based upon the following conditions:
i
Sign d
cc: Director of Public Works O"
Board of Public Works G@49e Perna,, Jr..,. Chairman. , . . . .
Highway Surveyor Simons Clerk
Conservation Commission �R�38 " " ' • '� . • . . . . • . • . . " ' •
Board of Health Erich Nitzsche
Building Inspector • . . . . . . . . . . • . . • • . . . . "" . •• . .
Assessors
Police Chief, Fire Chief
Applicant, Engineer
File, Interested Parties John Draper . .
Planning Board
OFFICES OF: d?' Town of 120 Main Street
• North Andover
BUILDING NORTH ANDOVER Massachusetts 01845
CONSERVATION *� N��
HEALTH DIVISION OF (508)682.6483
PLANNING
PLANNING & COMMUNITY DEVELOPMENT
KAREN H.P. NELSON, DIRECTOR
November 20, 1989
Mr. Daniel Long, Town Clerk
Town Heil
120 Hai,. Street
North Andover, MA 01845 Re : Sanlau Realty Trust
Site Plan Modification
Dear :r. Long:
'rrre North Andover Planning Board held a public hearing on July
13 , 1e9 , upon the application of Sanlau Realty Trust, 231 Sutton
Street, North Andover, MA, requesting approval of a Site Plan
Review Modification, pursuant to the provisions of the North
Andover Zoning Bylaw, Section 8 . 36 , Revisions to Approved Site
Plan. The hearing was duly advertised in the North Andover Citizen
on June 22 and June 29 , 1989 and all parties of interest were
notited. The following members were present: George Perna,
Chairman; John Simons, Clerk; Erich Nitzsche and Michael Leary.
The petitioner seeks modification of an approved Site Plan
Review.
Joar_ Simons read the legal notice to open the public hearing.
Let'te4s were read :from Chris Huntress, Environmental Planner and
Bob Nice-tta, Building Inspector.
Huntress explained to the Board what the applicant was
proposing on the modification of the site plan. He wants to take
oft from the Order of Conditions, the concrete retaining wall that
was supposed to be built. He would like to construct a rip-rap
retain_nc; wall to hold back the silt. Present at the public
hearincr were Santo Messina, Ann Messina and Sheldon Penoir,
architect for the Housing Authority.
A lengthy discussion took place on boundary lines and the
po,�itio: of the building built by the Housing Authority, between
the appi:i_cant and the architect and the Board.
Page
George Perna stated that the issue being the retaining wall
and shoud be resolved with the Building Inspector.
Ar. updated As-Built Plan is needed before a site visit. Also
needec—are documents for easements and/or land swap.
A motion was made by John Simons to continue the public
hearing . The motion was seconded by Erich Nitzsche and voted
by those present.
; August 10, 1989, the Planning Board held a regular meeting.
The f,_iiowing members were present: George Perna, Jr. Chairman;
Erich Nitzsche and Jack Graham. Paul Hedstrom arrived at 9: 05 p. m.
John Simons was absent.
A motion was made by Jack Graham to continue the public
hearinr, until the Board had a quorum.
O . Axgust 24, 1989 the Planning Board held a regular meeting.
The foil :wing members were present: George Perna, Jr. , Chairman;
John '�imons, Clerk; Erich Nitzsche and Jack Graham.
, ohn Simons read a letter that was sent to the applicant from
Chris c:untress, Planner. The letter was on the concerns the Board
had ex.p.-:essed.
George Perna stated what the Board is looking now, to put back
the ra_taining wall as it was originally on the approved plans.
zan .o Messina spoke to the Board on the condition of the site
as i.,. -e_iates to the retaining wall , citing that it was a mess.
Mr. "Ie ',s a.na stated that erosion from the Housing Authority was the
reason .'::ar the conditions on site . Mr. Messina wantg to plant
juniper .rees to control the site . The Board wants a retaining
wall , e: c!ht feet high.
ie Minnicucci , Housing Authority Director, spoke to the
Board the easements not being recorded.
A r;iotion was made by John Simons to continue the public
hearin and set up a site visit and workshop. The site visit will
be Septe^'ber 6 , 1989 . Chris Huntress to set the time and notify
Hope : innicucci , Anna O'Connor, Santo Messina, Ann Messina and Bill
Hmur .a The motion was seconded by Erich Nitzsche and voted
unaninous by those present.
+-yrs Jctober 19, 1989, the Planning Board held a regular
meeting; . The following members were present: George Perna, Jr. ,
Chair an; John Simons , Clerk; Jack Graham and John Draper. Erich
Nitzscht! arrived at 8 : 15 p. m.
Page
John Simons read a letter from the applicant requesting an
extension on the public hearing.
. motion was made by John Simons to continue the public
hearirir *-o November 16 , 1989. The motion was seconded by Erich
Nitzscre and voted unanimous by those present.
On :November 16 , 1989 the Planning Board held a regular
meetin,Q . The following members were present: George Perna, Jr. ,
Chairman; John Simons , Clerk; Erich Nitzsche, Jack Graham and John
Draper. .
+ ris Huntress , Planner, stated that he had received revised
plans of the retaining wall but they were not drawn to scale .
111 t4essina stated that the landscape plan had not been
addres._ec: because he was going to plant grass.
Huntress, gave the Board a copy of a draft decision.
The Pins need to be drawn to scale and a Professional Land
Surveyo•,:• stamp is needed.
Crich Nitzsche asked of the boundary lines were correct.
Chris Lr.tress asked that the fire lane and no parking be painted
on the way behind the building. Erich Nitzsche wanted language put
in the iecision relative to the trees being replaced if they should
die . Chris Huntress to find the technical name for the style of
retaining wall that will be used in the back of the building.
A :notion was made by Erich Nitzsche to close the public
hear,,-:,.. and approve the draft decision as amended. The motion was
seconded by John Draper and voted unanimous by those present.
Sincerely,
Planning Board
George Perna, Jr. ,
• �
Chairman
cc : ")rector of Public Works
Board of Public Works
Highway Surveyor
Conservation Commission
=a.rd of Health
B: ilding Inspector
Assessors
!'o-lice Chief
Chief
Applicant
E: qineer
SAN LAU REALTY TRUST
; Site Plan Review Modification.
The Planning Board makes the following findings regarding this
Special Permit as required by section 8.3 of the Zoning Bylaws:
1. The proposed use and site design for this lot are
appropriate, due to it's location in Town.
2 . Adequate vehicular and pedestrian access into the surrounding
site has been provided.
3 . The applicant has met the requirements of the Town for Site
Plan Review as stated in Section 8.3 of the Zoning Bylaw.
4. Adequate and appropriate facilities will be provided for the
proper operation of the proposed use.
The Planning Board finds under Section 8.35 of the Zoning Bylaw
that the proposed site plan, together with the following
conditions, complies with the Town Bylaw requirements.
Upon reaching the above findings, the Planning Board approves
this Special Permit based upon the following conditions which
shall be submitted to the Board prior to signing the documents to
be filed with the North Essex Registry of Deeds.
1. The final plans, which shall be filed with the North Essex
Registry of Deeds, shall include the following in one
packet:
a. Proposed Retaining Wall for San Lau Realty Trust.
Dated November 14, 1989.
(With appropriate revisions as noted in this decision)
b. Landscape Plan, as approved by the Town Planner.
All plans shall be on 24" x 36" sheets
2. All Planning Board Order of Conditions, issued herein, are
to be placed upon the recorded Final Plans, ( Cover Sheet )
prior to endorsement and filing with the Registry of Deeds.
3 . Any Plants, Trees or Shrubs that have been incorporated
into the Landscape Plan approved in this decision, that die
within one year from the date of this approval, shall be
replaced by the owner. If the applicant fails to comply
with this condition a modification to this approval shall
be required by the Planning Board.
4 . All prior conditions, that are not herein modified by this
decision, are to remain in full force and effect.
5. The roadway behind the buildings shall maintain a twenty
two (22) foot width at minimum, and in no instance shall
the wall or curbing be brought closer to the building than
as shown on the approved plans.
6. Prior to the endorsement of the record plans a final
landscape plan shall be submitted to, and approved by the
Town Planner. Said plan shall be part of the record plans
and shall be filed with the North Essex Registry of Deeds.
7. All construction shall commence by May 1, 1990, and shall
be complete by July 1, 1990.
8. The Plan entitled Proposed Retaining Wall for San Lau
Realty Trust, Dated 11/14/89, is not drawn to the scale
shown on the plan. The plan shall be redrawn to scale and
approved by the Planning Board prior to endorsement and
filing with the Registry of Deeds.
9. A Fire Lane shall be delineated on the ground along the
entire back portion of the project and shall be approved by
the NAFD. This is to keep vehicles from blocking the 360
degree access to this site. Any vehicles found unattended
in this lane shall be subject to a ticket or tow.
10. Final Site Plan shall be stamped and signed by a
Professional Land Surveyor, certifying that all buildings,
property lines and retaining walls are shown as found on
the site.
11. Prior to a Certificate of Occupancy being issued for any
structures, the site shall be reviewed by the Planning
Board. Any additional screening as may be reasonably
required by the Planning Board shall be added at the owners
expense.
cc: Director of Public Works
Board of Public Works
Highway Surveyor
Building Inspector
Board of Health
Assessors
Conservation Commission
Police Chief
Fire Chief
Applicant
Engineer
File