Loading...
HomeMy WebLinkAboutNOLAN, JOHN i f MUM HIH RECESVK�1 TOWN OF NORTH ANDOVER OANiEt1lL TOW4 EVER MASSACHUSETTS NORM ,`{ JUL -V ny f NORTH t 9 ' 44 O•.Jo ra�'tO L O Any appeal shall be filed within (20) days after the �53�{ date of filing of this Notice CNUSet4g In the Office of the Town Clerk. NOTICE OF DECISION Date.luLy. J.8.,, d989. . . . . . . . .. . . . . . . Date of Hearing . July.l3. .19$9. . . Petition of John.J..Nolan: Parthenon Development Corp. Inc. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . Premises affected , play. Fit, Hill, Chestnut STreet. . . . . . •.. . . . . . Referringto the above petition for a special permit from the requirements of the so as to permit .tkae. cp;4struct}pp. pt, 44, �glwp. . .17.WiWrivi ,ggrjtqirjiijq .4 ,tq 3 units After a public hearing given on the above date, the Planning Board voted Conditionally to •APPRova . . . • • • • •the Special Permits. . . . . . . . . . . . . . . . . . . • . . based upon the following conditions: cc: Director of Public Works Board of Public Works Signed Highway Surveyor Building Inspector George.EezAa. .dz. .Chai.rlAarl . . . . . . Board of Health Conservation Commission John.SiraonS» .Glezk . . . . . . . . . . . . . . Assessors Police Chief ErlCh.Allt2SCh@ . . . . . . . . . . . . . . .. . . Fire Chief Applicant �i0401 .T+e4ZY. . . . . . . .. . . . . . . . . . . Engineer Interested Parties File .. . . . . . .planning B oard "' ,� Town of OFFICES OF: 3r •�� �.<g 120 Main street BUILDING �. NORTH ANDOVER North Andover, CONSERVATION Massachusetts 01845 HEALTH DIVISION OF (508) 682-6483 a PLANNING PLANNING & COMMUNITY DEVELOPMENT KAREN H.P. NELSON, DIRECTOR July 18 , 1989 Mr. Daniel Long, Town Clerk Town Hall 120 Main Street North Andover, MA 01845 Re : Rosemont, PRD Planned Residential Development, Special Permit under Section 8. 5 of the Zoning Bylaw Dear Mr . Long : The North Andover Planning Board held a public hearing on March 16 , 1989 in the Town Hall, Selectmen' s Meeting Room. The hearing was duly advertised in the North Andover Citizen on March 2, 1989 and March 9, 1989 and parties of interest were properly notified. The meeting was called to order by the George Perna, Vice Chairman. Also present were John Simons , Clerk and Erich Nitzsche . Paul Hedstrom, Chairman, arrived at 8: 55 p . m. Michael Leary was absent. The petitioner seeks approval to construct a Planned Residential Development (PRD ) containing 44 housing units, pursuant to the provisions of M.G. L. Chapter 40A, Section 9 and under the requirements of the Zoninq Bylaws, Section 8 . 5 and Section 8. 3 of the Town of North Andover. The parcel of land contains 45 . 8 acres of land and known as Clay Pit Hill . John Simons read the legal notice to open the public hearing. A letter from the Fire Department was also read. John Nolan, Parthenon Development, spoke to the Board on what was being proposed . 1 . 44 homes - 17 buildings containing 2 to 3 units 2 . Located off Chestnut Street near Mill Road on approximately 46 acres. 3 . 65% open space . 4 . Maximum 3 units per building 5 . Units to be from 1 ,800 sq. ft. to 2 ,800 sq. ft. 6 . 2 and 3 bedroom units with 2 car garage 7 . Tennis court, putting green Page 2 : Nancy Leask, Land Planner for Sasaki Associates, spoke on an emergency access road from the Holly Ridge Subdivision. Ms . Leask showed the Board a cross section of the property and elevations. Rip-rap to be placed in two sections . Paul Hedstrom asked the grade of the road. John Nolan said the grade of the road was 8 . 30 . Henry Fink, Turnpike Street, questioned the word grant in an easement. John Nolan said grant was to homeowners . Veronica Mandry, Summer Street, questioned the percentage of open space and where is the water going to flow. John Nolan addressed the question on the flow of the water. He said that there would be a series of detention ponds and that the rate of flow was the same. Phil Christiansen, Christiansen & Sergi , spoke in behalf of ZMC Trust. He submitted a letter regarding the pump station. John Nolan cited that the first choice was Holly Ridge pump station, the owners of Holly Ridge wanted a substantial amount. Mr. Nolan said that he chose the Osgood pumping station. A brief discussion took place on the drainage. Mr. MacLeod said there were off-site drainage improvements . George Perna wants minus impact on Mosquito Brook. A motion was made by John Simons to continue the public hearing until the First meeting in April and schedule a site visit. The motion was seconued by George Perna and voted unanimous by those present. On April 27 , 1989 the Planning Board held a regular meeting. The following members were present: George Perna, Vice Chairman; John Simons, Clerk; Erich Nitzsche and Michael Leary. Paul Hedstrom arrived at 10 : 25 p. m. John Nolan recapped the drainage analysis . He said the sewer would tie into the pumping station at the Holly Ridge Subdivision and that a drainage analysis was done on Mosquito Brook watershed. The preliminary results were zero (0 ) run-off in the 2 , 10, 25 and 100 year storm event. John Showed the Board front and back views of the two unit buildings . Each unit is single family. Photos of the rip-rap to be used at the entrance to the project were shown. George Perna questioned the number of units . John Nolan said that forty-four ( 44 ) units were proposed. George also stated that the subterria.n water was a big problem, that under ground streams ran to Mill Road. Erich Nitzsche said that ground water tables were needed. John Nolan said he would check with his engineer for those tables . george Perna asked if there was a problem with the many concerns the Board ani' Town Departments had, a total of seventy ( 70) . John replied, no and he would be ready for the May 11 , 1989 meeting. A motion was made by John Simons to continue the public hearing until May i" , 1989 . The motion was seconded by Michael Leary and voted unanimous by those present. Page 3: The North Andover planning Board held a regular meeting on May 11 , 1989 . The following members were present: George Perna, Vice Chairman; John Simons, Clerk; Erich Nitzsche and Michael Leary. Paul Hedstrom arrived at 10 : 05 p. m. John Simons read the letter Chris Huntress sent to the applicant. John Nolan presented the Board with a package that addressed the concerns that the Board had with the proposed project. George Perna stated that he was still concerned with the subsurface water. Bill MacLeod explained to the Board the water tables. There is a new drainage system on Chestnut Street. David Gorden, Andover Consultants; Kurt Young, Wetlands Protection, Inc; spoke on drainage . John Cronin, resident, had a lengthy discussion with Bill MacLeod on the drainage . Katherine Lawery commented on health concerns and the intormation submitted . A motion was made by George Perna to close the public hearing, review the documents in the file and draft a decision. The motion was seconded by Erich Nitzsche and voted unanimous by those present. On June 15 , 1989 the Planning Board held a regular meeting in the Library/Conference Room. The following members were present: George Perna, Vice Chairman; John Simons, Clerk; Erich Nitzsche and Michael Leary. Paul Hedstrom, Chairman, arrived at 8: 35 p. m. A motion was made by George Perna to accept the Form A Plan for Rosemont. The Board to get the final draft of the approval . A motion was made by George Perna to approve the PRD for Rosemont subject to the Board reviewing the draft decision prepared , supplemented by a letter from D. P .W. for their requests, John Simons input and Erich Nitzsche ' s input. The motion was seconded by Erich Nitzsche . The proposed project will be done in phases. The project will take three years . George Perna will have the ultimate signing authority. John Simons requested a bond for erosion control. John Simons asked for a condition. on screening. After this discussion the Board voted unanimously. On July 13 , 1989 , the Planning Board held a regular meeting. The following members were present: George Perna, Chairman; John Simons, Clerk; Michael Leary and Erich Nitzsche . Rosemont PRD was put on the agenda for discussion at the request of John Nolan. Chris Huntress, Environmental Planner, had the final draft of the decision . George Perna said that the only issue remaining was the bonding for erosion control of the road . Erich Nitzsche asked if Mr Nolan had received a letter from the owner of Holly Ridge for permission to tie into the sewer. Mr. Nolan said there was a letter and it should be in the file . George Perna wanted a condition added to the approval, that any deviation of the plans/profile will be submitted to the Planning Board for approval . George also wanted the following as a condition: "Construction shall commence within one year and shall be completed in 5 years as of the date of this approval or the applicant shall appear before the Planning Board. _aye 4 . John Simons asked about phasing of construction. Ellen Murphy said the phasing was delineated on the plans by different colors . The Board members also wanted a bond for erosion control put in a condition. The amount of the bond to be $20,000 . 00 . A motion was made by John Simons to approve the Rosemont PRD Project su;oject to the written list of conditions with the following edits; as written, 27 conditions plus : Condition #14 after the word "minimum" insert "and shall be in accordance with the submitted plans . Condition #26 indent a. ) Construction shall commence within one ( l , year and shall be 100% complete within five ( 5 ) years of the date of this approval or the applicant shall appear before the Planning Board; and b) . The phasing of construction shall be in accordance with the detailed plans submitted by the applicant. Add: Condition: The applicant shall provide adequate bonding for erosion and sedimentation control in the amount of $20,000. Erich Nitzsche wanted a condition added : "Any substantial deviation from submitted building profiles , sections, elevations or footprints shall be resubmitted to the Planning Board for approval. The :notion was seconded by Erich Nitzsche and voted unanimously by the Board to approve the Rosemont PRD . Sincerely, PLANNING BOA Georg Perna � Chairman / jle CC : Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Conservation Commission Assessors Police Chief Fire Chief Applicant Engineer File Rosemont PRD , Conditional Approval 1 . As-built Plans and profiles shall include the edge of "trunkline" of the woods to insure compatibility with drainage computations . 2 . Plans show one bench mark on Sheet 6 which does not indicate datum. In accordance with the Planning Board Regulations , there shall be a separate bench mark on each plan/profile sheet which shall be saved during construction. 3 . Detention basins shall be dimensioned to readily determine if design complies with the As-built Plans . 4 . Any portion of "Rosemont Drive" where the grades exceed 6% , shall have granite curbing installed. 5 . Prior to occupancy, all units shall have residential fire sprinklers installed. 6 . :Hydrants shall be installed as determined by NAFD . 7 . Fire Alarm and detection devices ( systems ) to be approved by the NAFD . 8 . A gate shall be installed at the emergency access off of Holly Ridge Road. A supra box shall be installed and necessary keys given to the NAFD 9 . Within all phases of construction, all drainage facilities including detention basins shall be constructed and erosion controlled prior to issuing a Certificate of Occupancy for any units within that phase . lid. Definitive PRD Plans shall clearly show proposed roadway dimensions throughout, including tangent radii , total length and control angle of each and every curve . 11 . As-built Plans and profiles shall be submitted to the Planning Board for approval prior to final release of DPW bond money. The As-built Plans shall also include topographic plans of all detention ponds. 12 . All Planning Board Order of Conditions are to be filed together with the Special Permit at the Registry of Deeds. 13 , Throughout all lands, tree cutting shall be in accordance with the submitted plans and shall be kept to a minimum in order to minimize erosion and preserve the natural features of the site . Also, the developer shall inform the Town Planner when significant tree cutting is to occur in order that the Planner may determine the need to be present. 14 . The contractor shall contact Dig-Safe at least 72 hours prior to commencing any excavation. 15 . Gas, telephone, cable and electric utilities shall be installed as specified by the respective utility companies . 16 . Ali catch basins shall be protected with hay bales to prevent siltation into the drain lines during road construction. 17 . No open burning shall be done except as is permitted during burning season under Fire Department Regulations . 18 . No underground fuel. storage facilities will be installed except as may be required by Town Regulations . 19 . Permanent house numbers will be posted on dwellings prior to occupancy, 20 . Stop signs shall be located at the entrance onto Chestnut Street, and at all intersections leading into Rosemont Drive . 21 . Wetland Preservation Ines Report refers to a "Program Coordinator" . T e Planning Board shall require that Wetlands Preservation Inc . be the Program Coordinator. If WPI is found to be unsuitable for this position by either party involved, then the Town Planner shall approve a suitable replacement at the developers expense . 22 . The maintenance and operation of the proposed booster water pumping station will be the responsibility of the owner. The station shall not reduce the residual pressure in the Chestnut Street water main to less than 20 psi under any operating condition. The final design of the pumping station, including the location, site grading, landscaping and appurtenances of the booster station shall be shown on the plan, and shall be subject to review and approval by the North Andover DPW. 23 . The invert of the sewer at the manholes of station 4 + 0 on the emergency access lane shall be lowered to provide proper vertical separation between the water and sewer mains . 24 . A sewer system extension permit from the Division of Water Pollution Control of the Mass . Department of Environmental Quality Engineering, and written permission from the owner to enter the Holly Ridge Road Pumping Station must be obtained prior to issuance of a sewer extension permit by the Division of Public Works . 25 . Permission to open the street and construct roadway and utilities within the Holly Ridge Road right-of-way must be obtained from the owner of that subdivision prior to the applicant receiving a Certificate of Occupancy for any dwelling . 26 . The following construction schedule shall be part of this conditional approval : a. Construction shall commence within one ( 1 ) year and shall be 100% complete within five ( 5 ) years of the date of this approval or the applicant shall appear before the Planning Board. b. The phasing of construction shall be in accordance with the detailed plans submitted by the applicant. 27 . The applicant shall provide adequate bonding for erosion and sedimentation control in the amount of $20,000 .00 28 . Any substantial deviation from submitted building profiles, sections, elevations or footprints shall be resubmitted to the Planning Board for approval . The following plans are deemed approved by this decision: Plans Entitled: "Rosemont" Definitive Site Plan. Dated: February 28, 1989 Revised: May 11 , 1989 . Sheets L1 thru L27 CC : Director of Public Works Board of Public Works Highway Surveyor Conservation Commission Building Inspector Board of Health Assessors Police Chief Fire Chief Applicant Engineer File 'T DIVISION Of- PLANNING AND COMMUNITY DEVELOPMENT TOWN OF NORTH ANDOVER MASSACI•IUSETTS PLANNING` BOARD.. rn APPLICATION FOR' SITE PLAN REVIEW - SPECIAL PERMIT, ago . o�= � rn Under Section 8..3 .of the Town', of North Andover Zoning; Bylaw. r r,r c*+ rn r o:;az--) 1 . ) 'Applicant/Pet it.ioners : John J. Nolan �" Address. 853 Turnpike Street North Andove'r, MA01845 c� :Phone:F. 689-8900 .. - _•� co 2. ) -Ow ner'sh ip : Parthenon Development Group, Inc. `Address: . 853 Turnpike Street North Andover, MA 01845 Phone.:. •'689-8900 3. ) Location of the •projeat• : Clay Pit Hill :Address: Chestnut Street , — ..Assessors Map. # 98B, "~---._.... ..........._..._..___ Deed Recorded -in: Essex County North Registry of Deeds Registry of Deeds: Boal:. -2693 . _ ._.Nage ..ZO or Land Court Certificate No _ Book, .. ,.._ Page _ 4. ) ' Size `of the Building _ 7069 _ - _• .square feet Height 2-.1/2 4 _ l _Stcaries _�30 __ _Feet Occupancy or . Use •Residentiay TYP.e of Construction _ 5. ) Size of Existing. BLAilding _Na Existing Buildings on the site Height, Stoa-16s ........ Feet occupancy or. Use ..Type of Construction 6r.:.1 :.`-C.lassif1'cation;bf the froject (!3eaF Section .8.33 of the Zoning 'Bylaw) Major' PRD .Intermediate _ y 'Minor INI=0RMA7IOIV REQUIRED FOR SITE. .PLAN REVIEW TYPE OF DEVELOPMENT PROPOSED MAJOR INTERMEDIATE MINOR TYPE OF INFORMATION REQUIRED: XX X L 1 . Nur th , Arrow/Location Map .. X K .' X. _ Y 2 survey of . the .Lot/Parcel X . X k ._ 3. Na6e/nescr. iption of Project ,.XX X If .., Easements%Legal 'Condttions X _X X �_.. 5. Topography` K '. •X• X 6. Zoning Information X " X X 7. Stormw4ter Drainage Plan X• X ' X 0. 136i1ding(s) Location X X X ~__,• 9. Location of Parking/Walkways X X X _ 10. Lcar_ation . of Wetlands X _ X 111 Lnrzation of Walls%Signs X X X _�_,•,_ 12 . . Lor_otion of Roadways/Drives 13., Outdoor Stora e/Display Area X, X9 I� _....._... i, ' nd a' in Plan, _ -� 1 La sc X X Q 15. Refuse Areas' 'X X D _ `16. Lighting Facilities � . L L'7. Drainage Basin Stud X •' 0 Y 9 i 0 a. lr3 . Traffic Impact Study Y I' X Iq. Commonwealth Review X Required" Information ` :O hnformation :may be. requea Letj. by th4•a rLinning Board 01easp 'supply :ten . W ), c:upit,4 n.f the above .information to .' the Town Planner with this application. r (3. ) Advertising f=ee; Filing Fee : 4. ) Petitioners SignaturEi; Every application t ar. t, ion I.ry the Board shall be made on a form approved by the Board . Thet,r- 'Formsshall be furnished by the Town Clerk upon request . Any commur,icati0r1 Pup-porting P ' t• be an application shall be treated as mere n7tice• .ol' intentiorr to seek relief until such time as it is made on the nfi'icir.rl: application form. All information called for by the form sh:il. l he '1i.yrrii=h-nd by the applicant in the manner therein prescribed in accordance With the requirements of Section 8. 3. Every application shall !•.rt> tt.rhrnittr• d with a list of "Parties in Interest" which shall inr. lude tlrr. . .. tit: ionor• , abutters, owners of land directly opposite on any public_ n' l.rr• iv,;to street or .way and abutters to the the abutters withiTl ' thr'L-Q hi.xir(lced feet of the property line all as they appear on -the mr)T t rf�c.r?,rtic.able tax list , notwithstanding that the land ci-f r.nv c3u*--h - owner. 'is located in another city or town, the Planninn Roarcl r,P tho Tnwn and the Planning [bard of every abutting city or- to(,n'i , LIST OF Fr1F? I LES Ir•1 INTEREST NAME 6UL)F?IcSS Joseph G. Anderson 125 Rea,'Street Ellen J. Anderson North Andover, MA 01845 Steve Andreadakis 30 Mill Road Mary Andreadakis North Andover, MA 01845 Frayne Bredbury 710 Chestnut Street. Josie M. Bredbury North Andover, MA. 01845 Julius A. Deltwas Cyr Associates 100 Water Street Lawrence, MA 01840 Timothy M. Finnegan Holly Ridge Lot 9 North Andover, MA 01845 Greater. Lawrence Community Antenna, Inc. 466..Essex'Street Lawrence, MA 01840 Jefferson Office Park Limited Partnership 39 Brighton Avenue Allston, MA 02134 Donald F. Johnston S Co., Inc. 114 Boston Road North Andover, MA 01845 . Robert F. Madden 111 Rea Street Lorraine M. Madden North Andover, MA 01845 Benjamin C. Osgood, Jr. 69 Old Village lane North Andover, MA 01845 Gilbert 0. Rea 44 Rea Street North Andover, MA 01845 ZMC Realty Trust 401 Andover Street John F. McGarry, Trustee North Andover, MA 01845 ADD ADD 111CTIAL t_;1Irt::Tc3 , II- hICCE55ARY ANY QUESTIONS SHOULD. Big DIPEC FFA 1C] T11[r'. PLANNING OFFICE. AT 6B5-4775