Loading...
HomeMy WebLinkAbout1987-06-22 Board of Selectmen Minutes434 June 22, 1987 The Board held a regular meeting on this date with 4'members present: Chairman John Graham, Christine Smith, Kenneth. Crouch and Ramsey-Bahrawy.; Town Manager Paul Sharon. New En land Tele hone Petition- Elm St. The Board approved'(4-0) the petition to fnstall 10 feet of conduit along Elm St. Bradford Green Association Representatives of the local advocacy group, Bradford Green Assoc. met with the Board to discuss refuse-to-entergy facility concerns. Gerry Branca and Charles Kellog stated their concers for these types of facilities (both~the one propsoed for Haverhill and the Signal- Resco facility). Ms. Branca requested that the Board support their group by sending a to Senator Costello with our concerns for sighting a 2nd incinerator so close to North, Andover one, and a concernlfor storage of ash close to the river. The Board voted to take the discussion under advisement. Personnel Matter-Leone Hearin8 Atty. DiAdamo, representing John Leone, requestdd that the-hearing be conducted in open session. Town Counsel, Peter Shaheen reported that te purpose of the hearing is pursuant to the Board's action in December to suspend John Leone through June 30. Mr. Shaheen added that?the:Board's primary motive for the suspension was the criminal charges brought against Mr. Leone and they have not been dismissed, and Mr. Leone is not in a state of suspension with pay pursuant to a court order. Selectman Crouch asked what, if any, change in circum- stance has occured since the original suspension. Atty. DiAdamo relayed what he believed to be the history and the Board's motive for the original suspension, stressing that.Mr..Leone was injured while working for the Town and deserves some understanding. Atty. Shaheen stated that Mr. Leone would be like any other;employee injured i~ the line of duty if the':suspension were lifted. Upon a motion by Crouch, seconded by Bahrawy, evoted 3-1 (Smith opposed) to take the matter under advisement for 2~'days. Annual Appointments Town Manager Paul Sharon:Aiscussed a list of those whose terms are expiring and applicants for thoselpositions, as well as recommending incumbent town counsel Domenic Scalise and Peter Shaheen for reappointment. The following appointments were made: Cable TV Committee (~.'yr.'. term) Conservation Commission (3 yr. term) John Robinson George Dague Charles Manzi Richard Gacioch Constable John F. Manning Council on A~ins (term spedified) John Lafrance (1) Maria Rosati (i) ~ayMqnd Maynard (1) Arthur Lambert (2) John Lyons (2) Anne Hoessler (2) Elizabeth Phaneuf (2) Thomas Cantone (3) Helena McCall (3) Elsie Heinz (3) Zonin~ Bd. of Appeals (5 yrs.) Walter F. Soule ZBA Associate ~for. (3 yrs.) Raymond Vivenzio Guillermo Vicens Carl Schoene Con% Com. Volunteers (1 yr. Paul Tariot Henry Fink Historical Commission Maria Ward Local Arts Council Anne Low Pat Trombly Joan Thompson term) Recreation Council (re.tm) Eduis Detora (1) William P. McEvoy (1) Richard Shafer (1) Brian Finn (2) Jay McDonald (2) Joseph Welsh (2) William Lafond (3) John J. Driscoll (3) William Boutillier (3)? Board of Registrars (3 yrs.) Mary Alice Windle Seasonal Decorations (1 . Town Report Committee (1 yr. yr.~ Daniel Long Carrie Crouch Karen Robertson Michael Holland Peter Aziz Louise Aziz Fair Housins Committee David Aziz Preston Hall Note: New Town Charter required that the terms,of the Council on Aging and Recreation Council be staggered.: .Upon a motion..by Crouch,~ seconded, ky Smith, voted to determine the terms by drawing by lot from a hat. Discussion re: Balanced Growth Steerin$ Committee The Board discussed the Committee's prior reqeust for continuation and what their role should'be. Upon a motion by Smith;,seconded~by Crouch, voted 4~0 to have the Town Manager review with Karen Nelson whether the Committee should be continued and if so, in what capacity. Water quality Report Director of Public Works Paul Niman reviewed a chronology of event surrounding the boil order issued by DEQE as a result of giaria contamination. With regard to the proposed'thew treatment facility, Mr. Nima~ reported that construction should begin hopefully as early as Septmeber with a 24 month construction period~ Discussion continued relative to estimate costs, water line rehabilitation, and Stevens Pond hazards to pregnant womenand children.