Brookfarm Estates-Partial Bond Release
Ms. Griffin stated that Tim Willett had received corrected as-builts from the developer of
Brookfarm Estates and that the grading was now correct for the site.
Mr. Angels motioned to a PARTIAL BOND RELEASE of $28,060.00 leaving a
remainder of $40,215.00 from Brookfam~ Estates, 2nd by Mr. Rowen. Voted 3-0 in favor
of.
Brookfarm Estates-Site Opening Bond Release
Mr. Rowen motioned to a FULL RELEASE of $5,000.00 from Brookfarm
Estates Site Opening Bond, 2nd by Mr. Angles. Voted 3-0 in favor of.
Forgetta's Flowers
The Planning Board endorsed the Forgetta's Flowers Site Plan Review plans
dated October 6, 2000 revised February 6, 2001.
Parcel F Flagship Drive-Informal Discussions
Mr. Mark Gross of MHF Designs representative for Ranger Development gave a brief
history of the site. Mr. Gross stated that the building had been approved 1996-97 and that
there had been problems with wetland violations and erosion control in the past. Mr.
Gross stated that the site was now stable.
Mr. Gross stated that Ranger Development was interested in placing a four-unit office
building at the site. The office building would be 62,000 SF total with three stories on
one side and two stories on the other. There would be two accesses off Flagship I~'ive.
Entrances would be located on the front and backside of the building. The parking lot
grade would be 4-5% with 9x18 parking spaces. Underground detention basins would be
used with fewer retaining walls at the site. The office building is shown as linear with a
flat roof. Mr. Gross stated that they hoped to use a design like the Gateway Building.
Mr. Gross stated that with a formal application Ranger Development is requesting
waivers for some requirements such as; the traffic impact study, Commonwealth review,
and Fiscal Impact/Community Impact Study. The Planning Board agreed to waive the
traffic impact study, the Commonwealth review was not applicable for this application
and the Planning Board would like to see the short version of the Fiscal
Impact/Community Impact study. The Planning Board also requested that the applicant
show snow removal for the site.
The Planning Board also instructed the applicant to look through the past decision for any
unusual conditions placed on the approval to ensure completion for abutters, to show the
distance from the nearest neighbor, and to show elevation from the site's roof to Marian
Drive.
Mr. Gross stated that Ranger Development would be having a neighborhood meeting to
find out the neighbors concerns before coming to the Planning Board.
Public Hearing (7:30):
1591 Osgood Street-Site Plan Review Special Permit
Mr. Tom Phalen engineer for the applicant, S.P.E.C. Realty Trust, stated that the site was
opposite Lucent Technology currently Jimmy's Pizza and miniature golf. The proposal
was to place six 30' wide 140'long self-storage structures where the miniature golf
course is and keep the restaurant. S.P.E.C. Realty Trust received approval from the
Zoning Board of Appeals for a variance. The mar setback from the I-S zone to the
Residential Zone located within the same property is 45', which is acceptable. Mr.
Phalen stated that the Fire Chief had approved of the proposed fencing surrounding the
property.
Mr. Phalen stated that traffic flow would decrease with the new use to a max flow of 10
vehicles per hour. The State Permit has been submitted and no response has been
received. Them is an existing curb cut for the two-way entry and egress. Parking is
proposed along each structure. Each unit would have a sprinkler.
Mr. Simons questioned the landscaping plan. Mr. Phalen stated that planting would be in
the island with the slope. Mr. Simons asked why landscaping is not provided along the
frontage of the plan? Mr. Phalen indicated that the parking had to remain there in order
to accommodate the Zoning Board of Appeals plan. Mr. Simons stated that had no
bearing on the Planning Board site plan when they consider approving the plan. Mr.
Simons stated that he would like additional landscaping along the frontage of the plan.
2
Mr. Phalen stated that they could move the building back five feet in order to
accommodate some additional landscaping and buffering on the plan.
Mr. Adan~s requested a possible modification to the plan. Mr. Adams would like to place
the third unit down into the slope to create front and back access to the unit. The
Planning Board informed Mr. Adams that he could request a change but a new drainage
study would need to be provided, as there would be additional impervious area in order to
accommodate the proposed modification. Ms. Griffin stated that current plan has been
reviewed by VHB and more points need to addressed. Mr. Phalen stated that he had met
with Tim Mclntosh of VHB and he believed they had resolved all remaining issues. Ms.
Griffin stated that VHB had not responded in writing that the outstanding issues had been
resolved. Ms. Griffin stated that furthermore, if this modification were submitted to the
Planning Board, the applicant would have to return to the Zoning Board of Appeals for a
modification pursuant to Robert Nicetta's memorandum.
The Planning Board instructed the applicant to provide a detailed picture of the proposed
fencing on the plans, provide one set of plans showing all revisions instead of multiple
plans referencing numerous revisions (ten sets of revised plans to be provided to the
Planning Department in order for the plans to be inserted into the Planning Board packets
for review), architectural renderings of the storage facility (10 sets with sections of the
buildings), elevations from all sides especially the view from Osgood Street (10 sets).
Mr. Simons suggested that the applicant consider locating parking away from the
frontage of the plan in order to place more landscaping there. All of these
modifications must be provided to the Planning Department by March 8, 2001 in order
for staff to have adequate time to review these modifications requested.
Discussions:
Foxwood-Update on request for action
Ms. Lescarbeau stated that she spoke with Mike Phillips today who infomied Ms.
Lescarbeau that Mike O'Neill had been retained to provide engineering services for
Foxwood Estates. Mr. O'Neill faxed a letter over to the Planning Department stating his
involvement with Foxwood and requested information so he could become familiar with
the issues. Ms. Lescarbean suggested that Mr. Phillips or a representative of Foxwood be
present at the March 20 Planning Board meeting for a report of progress instead of a
modification as suggested in the draft letter to Mr. Mark Johnson (attached).
Mr. Devlin stated that Mr. O'Neill should receive the VI-lB phased report, which is the
start of all the problems instead of using any of the short lists. Mr. Devlin does not want
the prioritize list used he would like to the whole list addressed.
Ms. Lescarbeau stated that the Planning Board was trying to work on behalf of the best
interest of the Town without accruing any cost to the Town. Mr. Devlin stated that they
had been working on resolving these issues for over 3 years with nothing be resolved
besides that the sprinkler company had been brought before the State Correctional Board.
Msi Lescarbeau commented that the Planning Board had pulled some bond money before
to have VHB prepare the phase report. Mr. Devlin stated that at a recent meeting
between Ms. Griffin, Mr. Scott, Foxwood residents and himself that the draft letter to Mr.
Johnson should state that a cost estimate would come from VHB to complete the drainage
issues. Ms. Griffin stated that there would be a cost for VHB to review the plans and
come up with an estimate to complete the work.
The Planning Board requested that the letter be revised to state that VHB will provide the
town with a cost estimate in order for the remaining work to be completed. The Planning
Board agreed that bond money would be pulled to pay the bill for YHB's services. The
Planning Board also instructed Ms. Griffin to send Mr. O'Neill the VHB Phase I report
and a request to come to the Planning Board meeting of March 20, 2001 with a schedule
of completion.
The Planning Board informed Mr. Devlin that Foxwood discussions does not require a
public hearing notice but that two of the Foxwood residents would be informed when
Foxwood Estates was placed on a Planning Board agenda.
Continued Public Hearings:
Wallace Street-One Lot Subdivision
Ms. Lescarbeau stated that she had gone on a site visit and noticed that the driveway of
32 Booth Street was located in the middle of the right of way. Mr. Bill Johnson stated
that they would like to build 50' of road but not the full width. In creating the 50' Ms.
Mary Jo Cieslewski of 32 Booth Street's driveway would be taken out of the right of
way. Ms. Lescarbeau commented that the proposeddfiveway is beyond the 50'.
The Planning Board instructed Mr. Johnson to revise the plans to show the grading,
contours, road profile and possible turn the proposed house to have the driveway come
off the roadway. The Planning Board informed Mr. Johnson that Ms. Cieslewski would
still have access to the roadway with little or no inconvenience to her.
Mr. Rowen motioned to CONTINUE the public hearing for Wallace Street
Subdivision until March 20, 2001, 2nd by Mr. Simons. Voted 3-0 in favor of.
Warrant Articles
Slope Bylaw.
Ms. Griffin stated that the closing for the Warrant Articles was March 19, 2001 and
suggested that the Planning Board get together for a workshop. The Planning Board
instructed Ms. Griffin to contact the Town of Andover to clarify why they utilized the
slope numbers that they do for further clarification.
Phased Development Amendment
Ms. Griffin stated she had included the phased development bylaw in the board
member's packets. Mr. Rowen indicated he had read the bylaw and was in agreement.
Mr Rowen motioned to INCLUDE the Phased Development Bylaw as a Zoning
· . · nd Mr
Amendment Warrant Article for the May 2001 Town Meeting, 2 by .
Simons. Voted 3-0 in favor of.
Mr. Simons motioned to ADJOURN the Planning Board meeting of February 20,
2001 at 10:00 p.m., 2nd by Mr. Rowen. Voted 3-0 in favor of.