HomeMy WebLinkAbout1967-10-09 Board of Selectmen Minutes450 october 9,
The Board of selectmen met on ibis date and all members cf the Board were present.
Thomas Driscoll, 34 Second Stre'et, was drawn for Jury duty, November 6, at salem..
TREE HEARinG:
petition was approved for removal of a tree requested by Lloyd Banchmenn, 94 Rain St.
POLE REARI~GS: ~
petition approved for conduit location on Chadwick street and for a Joint.pole reloce-
tion on state Highway By-pass, 3 poles. -
GASOL~E BIDS:
0nly one bid was received for town department gasuline deliveries; ~_th~e bid ??s..fro,m ...
Gulf~ 0ii Co. who is the' present isuPplier. The bid'.'was given to ~ulfii~ho:,'subi~Itted :' the ,1.-
net price for .Regular gasoline..0239 and for premium..Q2239.
POLE REIDCATI~:
~'A petition was approved for the relocation of a pole on P~y St; Hearing unnecessary.
.:
petition was signed by theBoard for re~moursemnm ,'cz Chapte~)~O project
· f of funds'to be paid .for Salem St..reconstructionj
·Highway SUrVeyor for pa2mant.
'i~PetitionLwas :approved to '. excavate.for,gas service~n Farnum Street'.
'.NARSTG~' ST. TUt~-A-RO~D: ' · ~'- , '" ~
:alled from'K. Erekorian,· Traffic; Engineer, advised the B
Narstun ~eetlwas,i~ the process of;being, constructed.
waverley. Rd; ,from Naas. Avanue :exit off, .Rt.u49~;
· directional, exits: r~tueeted by' the"Board 'would:
~ recently' signed b~,Bcar~', was received on recanstruction
TAKING' R~fl~E~ATZ~: land itaking damage agreement-in the
or l~nd';take~ iby Dept~ of. Public Works. tu reconst~uction work. ,~Town:. CounseL: proper to have ~this matter taken up 'at the. annmal~
, INVITATt~S~ TO:.NEETINGS: ....
The Board~received~the, following notices: Hearing:i Re: New. England Tel. &:iTel'.
N
~lle~te~:frbm J; Berkover advised tha~ the salem: street~ shoulders :which~
were in vet , that they be regraded and
covered wSth, sand.: ',The:contractor.:cou~d!'do this
ii s-uffictant balance in',the presant,allot~ent were
available; -the work would have.to be~acComplishedmextjear under ~aj:Force
;,He' stated:that' the Resident Engineer had:informed ,the depar~ thati:the
,werei~ .good, candition~hen .the contractor cbmpleted'.his;work, ,but*,ithe~Mail~. :., '
the: shoulder te reach the mail boxes 'causing uneven~ edges of which-:lth,
way SUrVeyor complained. He went on to.state .that gravel shoulders-;require,,a~c
period of"time' to'be properly.cure~ in order to stabilize:' thom'which ha~lnot',been~-i;¼,
Mr.~ Nicetta 1stated in a letter to the Board that 'he disagreed ,with the proposal;_~,~that
the contractor had bee~ paid~,forldoing .this work once, 'and;. therefore, should: not',be paid
a second time to do the work properly~ Ee said the 'Con~raCtor should be made ~o..correct
the condition of these shoulders which was caus~d.-by improper compacting of, the gravell ,' ......
before penetrating with'asphalt.
STREET Iff~TI~G: ~OD ST. · ·
survey received for~improvad, street lighting tabled indefinitely per motion' cf~
This survey was made for Harwood Street, request of the Board.
Request from ~.c~n of Middleton re p.ersc~ln, el Board.proced.ures :rex'erred to uae personnel Bd~
Request ,for repatr cf Prospect Stree~ rex-erredto, xae Highway Surveyor. .