HomeMy WebLinkAbout1992-10-14OCTOBBR 14t ~992 ~OZHT MBBTZNQ PL~tlNZHG BOARD & CONBBRVATIOH CX:)MMZSBZOH George Perna called the Planning Board meeting to order at 7:55 p.m. HEMBBR8 PRBfJBI~ John Draper, Joseph Mahoney and Richard Rowen, Associate Member. John Simons arrived at approximately 9:00 p.m., Richard Nardella arrived at 8:05 p.m. Also present were Karen H.P. Nelson, Director of Planning & Community Development, Richard Doucette, Conservation Administrator and Bob Leyland, Intern for the Division of Planning & Community Development. The Conservation Commission was present. PUBLXCHBARIN~ MEADOWOOD DBFINITIVB SUBDIVISION & SPECT~T. John Draper read the two legal notices to open the public hearings on the Planning Board applications. A1 Manzi, Conservation Commission Member read the Notice of Intent legal notice. Steve Stapinski, Merrimack Engineering, presented both Boards with a package of the proposed development. Material furnished: Definitive Plans Statement of Environmental Impact with drainage/soil computations. List of waivers Master Plan of entire R-6 Zoning District. The location of the proposed is south of Hillside Road. Commonwealth of Massachusetts The has Willow Street listed as a public way. The area enclosed by Route 114, Hillside Road and Route 125 was rezoned to R6, allowing for the highest density for single family homes in the Town. The proposed plan shows 5,000 sq. ft. upland area/lot 28 lots in total improve Willow Street 400 ft. from By-Pass. Town Sewer from the Industrial Park, which can be extended for future development of the master plan concept. Town water a. old 6" main dead-ends at hydrant - main not adequate, therefore propose 12" main from Industrial Park and interconnect 6" pipe at hydrant. b. looped within the subdivision c. 2 hydrants for fire protection drainage in compliance with subdivision regulations. Willow Street to be paved to 26 feet up to Towle house, plus 30' radius roadway at intersection. Widen Rte 125 by 30 ft. for full decel lane and widen north direction for accel lane. Wetlands PreSemt&tion 70 sq. ft. to be · disrupted during construction of utilities, (10-14 day time frame) replace area with same grade and culvert remain and provide wetland replacement plan. 84 sq.ft. - replace 25 sg. ft. at mouth of new culvert Detention area, Lot 8 - plant with wetland plant species (run-off 0% rate of run-off). Pond oversized but makes up for area where detention is not provided. Development team is the same as those of Phillips Common. There are four types of 2 story/attached garage homes. The tree line will be preserved. There is some shallow ledge on the site. The closest house is 25 feet from wetlands. No clearing beyond 25 foot no-cut setback. ImDrovg~ents - Off-site Traffic Engineer MADPW- install traffic control devices, striping, widening, paving. Lot C - out to existing drive on Lot B Lot B - out to 125 on existing drive Future Plans (Master Plan) Dated October 1992 on a scale of 1"=100', schematic only (submitted to Planning Board only). A maximum of 48 lots includes 12 of existing houses, plus the proposed 28 lots in Meadowood. Planninu Board waivers Re~auested 2. 3. 4. 40' right-of-way vs (50') in keeping with Willow Street Centerline radius 80 ft. at loop intersection vs (150') 22 ft widths - vs (26') 4' sidewalk vs (5') Conservation Waivers Reauested e 3. 4. 5. DEP - Notice of Intent filed, but no file number provided. 50' not cut reduced to 25' - 27' Lot i drainage ditch LOt 3, 4, and 5 lot line ditch construction - pipe outlet Detention pond 10' to edge of wetland. "Tot Lot" reserve area for playground within right-of- way, benches, equipment, 1% pitch. Thomas Laudani, Developer, presented the Boards with additional information. 1. 2 footprints, 4 different facades/styles 2. 35'x25' footprint including garage 3. create quality product at entry level price range 4. young couples, empty nesters, commuters need for a tot lot. 5. will work with D.P.W./Planning Department on tot lot design 6. project phasing - break into roadway December 1, binder in May 93' - 18 months build-out after binder. The following questions were raised by members of the Planning Board and answered by the developer: Amount of open space - 30% Wetlands Restriction Sidewalks - North side along existing Willow Street Lots close to Route 125 By-Pass - Visual barrier, fence, berm plantings feasibility - economic feasibility - 1,400 ft roadway, ledge, sewer impact fees, Town fees, dictate the number of lots achieved into this density. A restrictive covenant will be placed along the eastern boundary of said property from the 25' no-cut buffer zone. The developer would prefer not to put in fire sprinklers. A vote of the Planning Board is needed. Material Installations has contacted the developer and wants to work together to create a buffer zone between the industrial park and the proposed development. The meeting adjourned at 10:20 p.m. George D. Perna, Chairman