HomeMy WebLinkAbout1993-11-02Planning Boar~ Meeting
Minutes
November 2, 1993
Senior Center
The meeting wa~ called to order at 7:15 p.m.
Richard Nardella, Chairman, Joseph Mahoney. Clerk, Richard Rowen.
John Simons, Vice Chairman, arrived at 7:30 p.m. Also present were
Karen Nelson, Director of Planning & Community Development and
Kathleen Bradley Colwell, Town Planner. John Daghlian and John
Draper were absent.
Discs_Uaa ion
North Andover Estates
Ms. Colwell gave an overview of the conditions.
rainstorm over the weekend caused entrance slope to slump
again, approximately 3 feet of mud on roadway and across
the street
slopes behind house being, stabilized with rocks
Mr. John Nolan
rip-rap of stone on entire slope necessary
top soil came down, clay basically stayed in place
Ms. Colwell stated that the Board may want a stamped engineering
plan so that these measures to fix slope work, cannot have measures
that do not work with people living up there.
Mr. Nardella. asked why no catch basin at end of Rosemont cul-de-
sac,
Why no curbing on bottom of Rosemont?
Begin at edge of driveway
Building Inspector issue to review concerns specifically
on Lot 38
directing applicant to work with Building and Planning
Mr. Rowen stated that the street to Holly Ridge must be opened for
safety issues.
Mr. Nardella stated that catch basins are above the street. Hr.
Nolan told the Board that the catch basins are being lowered.
Mr. Nardella asked what is going to be done behind the house? He's
not satisfied with hand drawn drawings. Mr. Nolan answered, rip-
rap slope coming off on Chestnut Street and behind the houses.
Engineer coming to review the entrance slope.
Mr. Robert Nicetta, Building Inspector, made the following
comments:
slopes on residential property is under control of the
Zoning Officer
tried to handle slopes with the Planning Board
soil very susceptible to mud
trench, drains, stones can all be used to fix situation
received a plan last week for fixing the slope with rocks
need blasting or tailing stones
Mr. Thomas Frangois, Toll Brothers
stripped loam off the slope, brought in blasted stone to
put on the slope
filter fabric will not be used
rocks will be pounded into slope with machine
drain at bottom will be constructed
Mr. Nicetta asked where does drain tie into drain system.
Mr. Nardella asked Mr. Perna, Director of D.P.W.
there should be a catch basin at the end of cul-de-sac on
Rosemont, why berm built at end of driveway?
Mr. Perna discussed top of hill and berm, will put cape cod berm in
because sidewalks raised.
Mr. Nardella stated that the Planning Board Department does not
want to tell North Andover Estates exactly what to do, but they
need to fix slope.
Mr. Nardella stated there is a need to support Building Inspector
in his determinations.
Briokstone ProPerties - Updat-
The deal regarding the location of the entrance way has not been
signed. Not recorded at Registry of Deeds
Mr. Nicetta, Building Inspector, stated when building permit
pulled, can only stop structural work, not site work (driveway,
parking). Mr. Nicetta talked with project manager from DEP,
Brickstone Properties has permission to move piles, State of Maine
will accept piles, may start moving piles on Friday.
Town Departments have not signed off on Certificate of Occupancy.
Mrs. Phyllis Zimmerman asked where the road through parking lot
will go? Mr. Nolan told her the following:
1. around edge of parking lot; or
2. where existing easement is
Hickory Hill - Lot Release - Lot 28
Mr. Mahoney read
release of Lot 28.
On a motion by Mr.
to release Lot 28.
a letter from Thomas Zahoruiko requesting the
The Board is holding a $5,000 performance bond.
Simons, seconded by Mr. Rowen, the Board voted
Rocky Brook - ~D~ate
Mr. Peter Breen
11/14/91 final signature on plans, therefore the two year
period for constructing and installing roadway and
utilities not up yet.
Ms. Nelson and Mr. Nardella to discuss Coventry electric bill.
road constructed to base coat
shoulders seeded
1,900' dead end road
sprinkler systems required
process gravel to be put in this week
hot top
Meadowood IX - Siqn Mylar
The Planning Board signed mylar and covenant. Ail documents were
in order· $15,000 performance guarantee placed in escrow account.
Public Hoarinas
400 Groat Pond Road - 8~ecial Permit - Watershed District
Mr. Mahoney read the legal notice to open the public hearing.
Ms. Colwell told the Board that there were no staff issues. The
Town should support efforts to connect to Town sewer.
Mr. Bernard Pacquin, from Dana Perkins, gave the following
information to the Board:
waste water pump station will be installed
force main installed
gravity line installed - in the same trench
dual pumps, 24 hour storage
Essex County Greenbelt owns property that fronts on Great
Pond Road may build barn or greenhouse in the future on
the site and tie it into the gravity line
Mr. Walter Saxe
property is an asset to the family, want to keep it up to
date
will need to tie-in in the future anyway with new septic
system regulations
Mr. Pacquin
3 car parking lot/emergency access to be constructed
· 35 to 40 feet away from edge of lake
Ms. Colwell discussed gravel vs. paving and oil trap.
Mr. Pacquin - need a vertical separation for oil trap that is not
easily attainable on-site.
Mr. Nardella asked why not slope away from the lake~ 'Mr. Pacquin
told him, need to slope with current driveway·
Mr. Mahoney asked what happens with current tank. Mr. Pacquin told
him, pumped of solids, filled.
On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board voted
to close the public hearing and directed staff to draft Special
Permit decision to discuss at next meeting.
Motion by Mr. Rowen, seconded by Mr. Mahoney, the board voted to
amend the previous motion by voting to approve project with
decision filed and reviewed by staff.
585 Dale Street - Special Permit- Watershed District
Ms. Colwell directed applicant to change the location of the
addition. The following issues were discussed:
family room - I story on a foundation
material not stock piled within 100' of Watershed
add hay bales/silt fence line
gutters to tie into existing dry wells
relocation of leach pit, no different termination
On a motion by Mr. Mahoney, seconded by Mr. Rowen the Board voted
to close the public hearing.
On a motion by Mr. Rowen, seconded by Mr. Simons the Board voted
to approve the Special Permit with decision reviewed by staff.
Cobblestone Crosslnq II - Definitive Subdivisio~/SDecial pe?m~t p~n
Mr. Steve Stapinski presented a conventional subdivision plan
showing 5 new lots and one lot with an existing lot. He presented
a PRD plan with Lot B eliminated, explained calculation of open
space.
Mr. Nardella - When Board entered into discussions of Cobblestone
Modification, assumed that new documents and plan filed at
Registry.
Mr. Stapinski - Plan filed, but new documents never filed,
easements, open space documents need to be created and filed, house
designs need to be modified. Mr. Nardella asked at what point in
the process do these new decrements get filed. They will be filed
when modification approved and new documents are drafted.
',99" needs to get gates on dumpster.
Add 50' buffer zone and no-cut to plan.
On a motion by Mr. Rowen, seconded by Mr. Simons, the Board voted
to close the public hearing.
seven oaks - Def nitive Subdivision
Calculate fees for PRD and subtract amounts paid already.
Mr. James Grifoni agreed to withdraw the application.
On a motion by Mr. Simons, seconded by Mr. Rowen, the Board voted
to accept the withdrawal without prejudice.
The Planning Board wants to review fee schedule at workshop.
Decisions
Cobblestone Crossina II - Definitive Subdivision - SDeo~&l Permit
PRD
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board voted
to'approve the definitive subdivision as amended.
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board voted
to approve the Special Permit for a PRD as amended. The Chairman
voted in the affirmative.
Bite Visit - Headowood II
A site visit is scheduled for Saturday, November 6, 1993 at 8:00
Decisions
White Birch I! - Definitive Subdivision - Special Permit PRD
keep Lot i from accessing through Cherise Circle
angle lot line away from grading
Mr. Simons would support moving house closer to White Birch lane,
going for a variance.
Need to add hemlock and spruce on plans, add sidewalk detail.
On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board voted
to approve the subdivision decision as amended.
On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board voted
to approve the Special Permit, as amended. The Chairman also voted
in the affirmative.
Christmas Tree Estates - Definitive Subdivision - Special Per, it
Mr. Simons needs to talk with Essex County Greenbelt prior to
rendering decision.
Mr. Rowen would like to see revised plans prior to making decision.
Staff to contact Greenbelt.
The matter was taken under advisement.
The meeting adjourned at 10:30 p.m.
~ Richard A. Nardella,
Chairman