HomeMy WebLinkAboutInstallation Report - 91 FULLER ROAD 3/20/2015 PROFESSIONAL
STRUCTURAL ENGINEERING
P.O. BOX 958 DESIGN SERVICES
E. HAMPSTEAD, NH 03826
(603) 329-5540
FAX (603) 329-6406 RESIDENTIAL^COMMERCIAL- INDUSTRIAL
March 3,2015
Mr.Aaron Scarpello
AMS Home improvements
2 Magnolia Ave
Salem,New Hampshire 03079
RE: Client requested On-site Inspection,Evaluation&Structural Engineering Certification of Installed
Main Level Wall Replacement Structural Support Beam as Constructed for direct compliance to the
Massachusetts State Building 8'Edition for renovation in progress at 91 Fuller Road,North Andover,MA
Dear Aaron,
As per your request,on Tuesday,March 3,2015,1 have physically inspected&reviewed the design
specifications for the Wall Replacement Main Support Structural Beam for the renovation project in progress
at 91 Fuller Road,North Andover,MA.
As based on my Evaluation,the Gang Lam:4- 13/4"x 9'/4"LVL is adequate as specified for construction
(with the required completion of the thru bolting)&is in direct compliance to the Massachusetts State Building
Code 8h Edition for the required design loading.
Thank you,
let
SAI R
W
MOW
11�alrvt J.Moccia PES STRUGTIURAL
No.33297
Regi Structural En
President,Hampstead Cons
cc: North Andover Building Dept.
0-0.Box oft
2
r`�"��u�R'CR�iSFfi/i iM W� �•� �' j�� it�i"^`n•�a��
F
�
iU4{iC A a
FEMUNnALO R URAL r:
Zt3'bS
,yPC
.t`'1 -� EST' 110.
S111J1 T - Jos
LL-
D£S�Glfl:l? "BY ATL .�1
C8$�18 BY DAT$
sig
♦pia d
cr
SIC
r�
' Pel
O&MOd"d -A
tOF-
fSYRUCRML Mamma
�rt���`Box 9�S �y��y�� �"�!a�' `� � #3� t SE�VIC�S
L i'MYf�'p f NH YVPfr� ` _.
FAXOM39944M
0,
TZTvB � } _ Ito.
„ter ;ray
DESIGNED IT CBE��BD 'BYvi
DATA
a- ''j'7
- �c'-"
M
SAse-
d
X� �1► �I
Ve EE;�
4A
pp
ez
29
PROFESSOKAL
F-HAMftrW,14H OWS
f A k �.
MAX
JVD+ go.
S1#YtJBC? MET so,.
DES—Icy D BY DATE CHUZZ ? IT l?ATI�
4
TIC
{ k
-" .:-
5-51 °
row
� �'