Loading...
HomeMy WebLinkAboutPlanning Permit # 5/3/1995 Town of North Andover. 01 No DT era OFFICE OF 3a y�< ., °Z COMMUNITY DEVELOPMENT AND SERVICES ° . 146 Main Street KENNETH R.MAHONY North Andover,Massachusetts 01845 �SSpCHUS'' Director (508) 688-9533 May 3, 1995 Ms. Joyce Bradshaw Town Clerk 120 Main Street North Andover, MA 01845 Re: Special Permit - Watershed Protection District Lot 5 Brentwood Circle Dear Ms. Bradshaw: The North Andover Planning Board held a public hearing on March 21, 1995 in the Senior Center behind the Town Building, upon the application of John J. Burke, 71 Sutton Hill Road, North Andover, MA. , requesting a Special Permit under section 4 . 136 (Watershed Protection District) of the North Andover Zoning Bylaw. The legal notice was properly advertised in the. North Andover Citizen on February 22 and March 1, 1995 and all parties of interest were duly notified. The following members were present: Richard Nardella, Chairman, Joseph Mahoney, Vice Chairman and Richard Rowen, Clerk. _ The petitioner was requesting a special permit to allow the construction of a single family dwelling within the Watershed Protection District, outside the 100 ' wetland buffer zone, but within 325 ' of a tributary. The premises affected is lot 5 Brentwood Circle. Due to a lack of a quorum, the Planning Board was unable to open the public hearing. The public hearing will be opened on April 4, 1995. The Planning Board held a regular meeting on April 4, 1995. The following members were present: Richard Nardella, Chairman, Joseph Mahoney, Vice Chairman, Richard Rowen, Clerk, Alison Lescarbeau and John Simons. Mr. Rowen read the legal notice to open the public hearing. Scott Giles presented the plans to the Board. 1 BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Julie Parrino D.Robert Nicetta Michael Howard Sandra Starr Kathleen Bradley Colwell Ms. Colwell stated that it is a . grandfathered lot, prior to any zone changes. She recommended favorable action, lot will be on town sewer, hay bales will be used and work done outside the 100 foot buffer zone. Mike Kasabuski asked where the lot is located. Scott Giles pointed it out to him on a map. On a motion by Mr. Mahoney, seconded by Mr. Rowen, the public hearing was closed. The Planning Board held a regular meeting on April 18, 1995. The following members were present: Joseph Mahoney, Vice Chairman, Richard Rowen, Clerk, Alison Lescarbeau and John Simons. Joseph Mahoney, Acting Chairman, asked the Board members to read over the draft decision and have comments ready for the May 1, 1995 meeting. The Planning Board held a regular meeting on May 1, 1995. The following members were present: Richard Nardella, Chairman, Joseph Mahoney, Vice Chairman, Richard Rowen, Clerk and Alison Lescarbeau. The Planning Board discussed a bond. It was decided that because it is one lot and all work is to be completed outside of the 100 ' wetland buffer zone, no bond will be required. On a motion by Mr. Rowen, seconded by Ms. Lescarbeau, the Planning Board voted unanimously, to approve the Watershed Special Permit as amended. Attached are those conditions. Sincerely, North Andover Planning Board Richard A. Nardella, Chairman 2 Lot 5 Brentwood Circle Special Permit - Watershed Protection District The Planning Board makes the following findings regarding the application of John J. Burke, 71 Sutton Street, North Andover, MA 01845, dated February 13, 1995, requesting a Special Permit under Section 4. 136 (4) (a) of the North Andover Zoning Bylaw to allow surface and sub-surface discharge associated with the construction of a single family home within the Non-Discharge Zone of the Watershed Protection. District_ FINDINGS OF FACT: In accordance with 4. 136 (7) the Planning Board makes the finding that the intent of the Bylaw, as well as its specific criteria, are met. Specifically the Planning Board finds: A. that as a result of the proposed construction in conjunction with other uses nearby, there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. This finding is based upon a certification to this effect from a scientist educated in and possessing extensive experience in the science of hydrology. B. that there is no reasonable alternative location outside the Non-Disturbance or Non-Discharge Zones for any discharge or activity associated with the proposed construction as the entire lot is located within the Non- Discharge Zone. In accordance with Section 10. 31 of the North Andover Zoning Bylaw, the Planning Board makes the following findings: A. The specific site is an appropriate location for the proposed use as all stormwater management systems employ Best Management Practices; B. The use will not adversely affect the neighborhood as the lot is located in a residential zone; C. There will be no nuisance or serious hazard to vehicles or pedestrians; D. Adequate and appropriate facilities are provided for the proper operation of the proposed use; E. The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions: SPECIAL CONDITIONS: 1. This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: Plan titled: Plan of Land in North Andover, MA Owned by: Griffen Realty Trust Scale: 1" = 40 ' Dated: 2/7/95 Prepared by: Scott L. Giles, RPLS North Andover, MA Any changes made to these plans shall be approved by the Town Planner. Any changes deemed substantial by the Town Planner will require a public hearing and modification by the Planning Board. 2. In no instance shall the applicant's proposed construction be allowed to further impact the site than as proposed on the plan referenced in Condition # 1. 3 . Prior to any work on site: a. All erosion control measures must be in place and reviewed by the Town Planner. All work on the site will be monitored by the Planning Department and/or the Division of Public Works on a regular basis. b. The site shall have received all necessary permits and approvals from the North Andover Conservation Commission, Board of Health, and the Division of Public Works. Prior to FORM U verification (building permit issuance) : e►c __+I2s 945 a. All plans for the tie-in to the municipal sewer must be reviewed and approved by the Division of Public Works. 5. Prior to Planning Board verification of the Certificate of Occupancy: a. All subdrains and leach pits must be installed as shown on the plan. b. A permanent barrier (stone wall, hedge etc. ) must be placed along the Limit of Construction as shown on the plan and reviewed by the Town Planner. The area of maintained lawn must be limited to those areas outside of the limit of construction. Those areas within the limit of construction are to remain in their natural state. C. No pesticides, fertilizers, or chemicals shall be used in lawn care or maintenance. The applicant shall incorporate this condition as a deed restriction, a copy of the deed shall be submitted to the Planning Board and included in the file. d. The structure must contain a residential fire sprinkler system in conformance with the North Andover Fire Department. 6. Prior to release of the Performance Bond: a. The applicant shall submit a certified copy of an as- built plan which shows all construction, including sewer lines', leach pits and other pertinent site features. This as-built shall be submitted to the Town Planner for approval and shall be stamped by either a Registered Professional Land Surveyor or Practicing Engineer. 7. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 8. The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation. 9. The provisions of this conditional approval shall apply, to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. 10. This permit shall be deemed to have lapsed after a two (2) year period from the date on which the Special Permit was granted unless substantial use or construction has commenced. Therefore the permit will expire on IM/.� 1y cc. Director of Public Works Building Inspector Health Agent Assessor Conservation Administrator Police Officer Fire Chief Applicant Engineer File LotSbren.wpd