April 30, 2004
North Andover Planning Board
Ms. Julie Parrino, Town Planner
27 Charles Street
North Andover, MA 01845
RE: 225 Bridal Path
Dear Ms. Parrino:
On behalf of our Client, Howell Design&Build, an As-built plan and certification is
hereby submitted for the site located at 255 Bridal Path.
A site visit was conducted on November 24, 2003 to determine compliance. Observed
conditions are consistent with the approved construction plan dated 7/31/03, latest
revision dated 9/3/03. All work has been completed outside the 100' Non-Disturbance
Zone.
Respectfully,
HANCOCK ASSOCIATES � ra has
RICHARD
DOHERTY
~" No 3143
�
15'r
Richard F. Doherty,P.E. "' µ i01`4 At�t�
Senior Project Manager
Enclosure
Cc: Howell Design&Build
DANVERS OFFICE: BOLTON OFFICE:
185 Centre Street, Danvers, MA 01923 626 Main Street, Bolton, MA 01740
Phone: (978) 777-3050 Fax: (978) 774-7816 Phone: (978) 779-6767 Fax: (978) 779-2228
HSA @hancockassociates.com bolton @hancockassociates.com
www.hancockassociates.com