Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit # 6/9/2015
BUILDINGPERMIT o�"��T TOWN OF NORTH ANDOVER o APPLICATION FOR PLAN EXAMINATION Permit No#: Date Received �Rp�RArEo fx �5 �SSAGHU5 Date Issued: IMPORTANT:Applicant mut complete all items on this page LOCATION Print PROPERTY OWNER � 2E Zz � ., Print 100 Year Structure yes �no oMAP PARCEL: J ZONING DISTRICT: Historic District yes Machine Shop Village yes. bio TYPEF O IMPROVEMENT PROPOSED D USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: 'Demolition ❑ Other �,y^^ e e We I ❑ F r„,^, � f: �etlS,e1N��' � ood In ❑We��ands ❑ � er a ��„�,��„ DESCRIPTION OF WORK TO BE PERFORMED: ; Identification- Please Type or Print Clearly OWNER: Name: Phone: Address: Contractor Name ; -/A Phone: Email: Address: lM2dile c�/ Supervisor's Construction License: / Exp. Date: Home improvement License: Exp, Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE;BULDING PERMIT.$92.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED T$125.00 PER S.F. Total Project Cost: FEE: $ $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund r E,u,,�,„�y�, �,, ,���0� � E�-0� fA l II. �fjJl li IAORTH ? E 'r-I& r Alluuve ,'• rA MOP loo � 4 LAK. h ver, Mass, �) c5kc . d COC NIc Hew,CK �A�R'1TE0 Y'Qa`y�5 �S u BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT 044,„C4.11141 . 0 ........ BUILDING INSPECTOR has permission to erect�, , Foundation .......................... buildings on ...... ......r..............�•. .............. r � Rough to be occupied as .......T:il:�P.7co........LAP . ...............................................3 . _ ...........................::...... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. LAWLVYL 41 tjr-- PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final yPERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS COSTRCTI S TS Rough Service ........................................:...................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing-or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. May 15,2015 Page 1 of S Letter of Intent/Limited Notice-to-Proceed Agreement—Construction Management Services, MAC Locker Room Project Property: Campus of Merrimack College Andover/North Andover, MA 01810 Project: Renovations to the existing Hockey Locker Room facilities Owner: Merrimack College 315 Turnpike Street North Andover, MA 01845 Owner's Project Manager: Trident Project Advantage Group 155 N Broadway, 2nd Floor Salem, New Hampshire 03079 Architect of Record: DSK Architects & Planners 30 Monument Square Concord, MA 01742 Construction Manager: Channel Building Company, 355 Middlesex Ave Wilmington, MA 01887 Primary Contacts: Owner: Mr. Jeff Doggett, Chief Operating Officer or in his absence, Mr. Felipe Schwarz, Assistant Vice President, External Affairs Owner's Project Manager: Mr. Gino J. Baroni or in his absence, Mr. Marc Lehoullier Construction Manager: Jerry Diorio, Senior Vice President Channel Building Company. Q 2014 Trident Building,LLC Salem,New Hampshire—All Rights Reserved sAmerrimack 2015 cip projects\i.lockecsVinal-owner-cm loi-lntp mac locker reno-5-15-15 mjl(nim edits 5-18-15).doc July 11,2014 Page 2 of 8 Architect of Record: Michelle Ouellette, Project Manager DSK Architects & Planners Intent: It is the intent of the Owner & Construction Manager above to enter into a Construction Management Contract in an amount to be agreed upon. The overall construction budget is approximately $500,000. The negotiated amount shall be Cost plus a fee of 6% with a Guaranteed Maximum Price, delivered in an open book manner. An Initial Guaranteed Maximum Price ("IGMP") has been delivered to the Owner in the amount of $477,156.00 based upon Schematic Design documents by DSK Architects, dated 4/28/2015, and RFS MEP Schematic Narrative dated April 24, 2015. The Final Guaranteed Maximum Price ("FGMP") shall be delivered to the Owner upon completion (on or about June 1, 2015) of Construction Documents. All savings, if any shall revert to the Owner. A CM contingency shall be maintained by the Construction Manager in an amount not to exceed 5% of the Cost of the Work within the Guaranteed Maximum Price. The CM Fee for this work shall not exceed 6% of the Cost of the Work. The contract shall be based upon AIA A107, v. 2004. The language of the contract may be modified by the Owner and is subject to agreement between the parties. The material language shall be in substantial conformance to the previously agreed upon Construction Contract signed by both parties on April 6, 2015, for the Volpe Roof Repair project , except that this will be delivered at Cost plus a Fee with a Guaranteed Maximum Price. Owner's counsel is currently preparing the contract form. Until such time as the agreed upon Contract is executed by both parties, this Agreement shall include, by reference, those Terms and Conditions of the previously agreed upon Construction Contract executed on April 6, 2015. It is the Intent of the Parties to expeditiously execute a Construction Management Contract within thirty (30) days of this Letter of Intent and Limited Notice to Proceed Agreement, subject to proper due diligence by ®2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 3 of 8 the Parties, and agreement on a Guaranteed Maximum Price. Scope of Services: The Construction Manager shall provide Construction Management services (the "Services") as detailed in Exhibit A (Construction Manager's proposal, dated May 8, 2015, attached herewith and made a part hereof. In the event of any conflict between the provisions of the Exhibit A and the Terms and Conditions herein or other Exhibits attached hereto, the provisions of the April 6 2015 Agreement's Terms & Conditions and/or other Exhibits shall control. Design Build Mechanical, Electrical & Plumbing MEP): It is acknowledged by the Parties, that the design of MEP systems shall be as a Design-Build subcontract. The individual subcontractors will include the design and certification costs within their proposals to the Construction Manager. As the procurer of MEP/FP design services, the Responsibility for Code Compliance, basis of design narrative, and coordination of the MEP/FP designs shall remain with the Construction Manager. [Continued on Next Page] 0 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 4 of 8 Terms and Conditions Form Of Compensation — Cost plus a Fee: Services are to be provided on a Cost plus a fee of 6% of the Cost of the Work basis. The total amount of compensation due to the Construction Manager in consideration of the full performance of Services by the Construction Manager is the amount(s) set forth set forth above, released by each fully executed Individual Work Package Authorization(s), until the final Agreement is fully executed. The Owner shall pay the Construction Manager as Services are performed by the Construction Manager based upon the portion of Services properly completed, delivered, and accepted by the Owner. Retainer: None Design Services Reimbursable Expenses: None Billing Terms & Schedule: All billing by the Construction Manager shall be in a form acceptable to the Owner. No more than one billing shall be made in any calendar month and in accordance with the billing schedule established by the Owner. Each billing shall set forth all items for which the Construction Manager is to be paid and include all detail and back-up as requested by the Owner substantiating the Construction Manager's billing. Payment shall be due within thirty (30) days after the Owner receives a proper monthly bill. Other than for the actual non-payment of any amounts properly due and owing, in no event shall the Owner be liable for interest, penalties, expenses or attorneys fees. All billing shall be sent to the Owner at the address stated in this Agreement to the attention of Mr. Jeff Doggett, Chief Operating Officer, with a simultaneous copy emailed to Mr. Marc Lehoullier, Sr. Project Manager at Trident Building, LLC, Marc.Lehoullier(a-Tridentgrp.com. 0 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 5 of 8 Budget& Schedule Understanding: Owner and Construction Manager herein acknowledge and agree to work diligently toward meeting the Owner's budget and schedule requirements for the Project. Insurance— Minimum Limits: General Liability: $ 2,000,000. Professional Liability: $ N/A Worker's Compensation and Employee Liability: $ (As required by law) Excess Umbrella $4,000,000. The Construction Manager agrees that Merrimack College will be named as an additional insured and a certificate holder of said policies. Authorization To Proceed: The Construction Manager will commence and/or continue to proceed to provide Services in a continuous manner and may be authorized to proceed on additional work pursuant to execution by the Owner and the Construction Manager of Individual Work Package Authorization(s). Work Product: When the Construction Manager has been paid for the Services and/or work product performed by it hereunder, all reports, drawings, and other material either furnished or required to be provided under this Agreement to the Owner shall become the Owner's property and may be used by the Owner thereafter in such manner and for such purposes as the Owner may deem advisable for the intent of this project, without further employment of or additional compensation to the Construction Manager. Other than in the normal course of business requirements with its Construction Managers to perform its Services on the Project, the Construction Manager shall not release or disclose to any third party any reports, drawings, or other materials produced for the Owner on this Project without obtaining the Owner's prior written consent. Limited Liability: ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 6 of 8 No General or Limited Partner, Member, Manager, stockholder, officer, director, joint venture, beneficiary, trustee, employee, or other principals, agents, contractors or representatives (whether disclosed or undisclosed) of the Owner, Architect or the Owner's Project Manager shall be personally liable to the Construction Manager hereunder, for the Owner's payment obligations or otherwise. The Construction Manager hereby agrees to look solely to the assets of the Owner for the satisfaction of any liability of the Owner hereunder. Indemnification by Construction Manager: To the maximum extent permitted by law, the Construction Manager agrees to defend, pay, indemnify and save harmless the Owner, Architect and the Owner's Project Manager, their trustees, employees, or other principals, agents, Construction Managers or representatives (whether disclosed or undisclosed) from all suits, actions, claims, demands, damages or losses, expenses and/or costs of every kind and description on this Project to which the Owner or the Owner's project Manager may be subjected or put by reason of injury (including death) to persons or property resulting from, in connection with, or growing out of any act or commission or omission of the Construction Manager, its agents, servants, employees, visitors, guests or any person or corporation dealing with the Construction Manager. No Relationship: The Construction Manager acknowledges and agrees that the Architect and Owner's Project Manager are not a party to this Agreement and there exists no relationship, contractual or otherwise, between the Construction Manager, Architect or the Owner's Project Manager. Construction Manager Representations: The Construction Manager represents and warrants to the Owner that it is experienced and able to perform the Scope defined hereunder and future work contemplated in this Agreement and that it has the financial and bonding (if required) capacity and commitment to perform the Scope of Work, subject to proper reimbursement from the Owner. ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 7 of 8 Termination: If the Owner terminates the Construction Manager for any reason, including but not limited to the failure to execute the final Owner-Construction Manager agreement or to meet the Owner's budget and schedule requirements for the Project, under this Agreement, the Owner shall pay to the Construction Manager a sum equal to (i) all proper Cost if the Work expenses incurred to the effective date of termination, plus (ii) all proper costs to the effective date of termination of Services performed as directed under Individual Work Package Authorization(s). Publicity and Releases: The Construction Manager shall not use or release any information about this Project without first providing a written draft of any such materials for the Owner's review and then receipt of written approval to so release. Such approval shall be at the sole discretion of the Owner. Final Agreement: It is specifically understood that the Owner and Construction Manager agree to work diligently, reasonably and in a timely manner to prepare and execute the final Owner-Construction Management Agreement for the proposed Project. It is the Intent of the Parties to expeditiously execute said Owner modified A107 Construction Management Contract within 30 days of this Letter of Intent and Limited Notice to Proceed, subject to proper due diligence by the Parties. Jurisdiction: This Agreement shall be governed by the laws of the Commonwealth of Massachusetts. Waiver: The partial or complete invalidity of any one or more provisions of this Agreement shall not affect the validity or continuing and effect of any other provision. ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved July 11,2014 Page 8 of 8 AGREED AND ACCEPTED: OWNER: CONSTRUCTION MANAGER: Merrimack College Channel Building mpany _� By: ( cls)o Py4Ated Printed Title: 5L)A Title: iz Hereunto Duly Authorized Hereunto DLAy Authorized Date: T'?-z - /.�— Date: ®2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved INDIVIDUAL WORK PACKAGE AUTHORIZATION Number One (1) Pursuant to the terms and conditions of the Letter of Intent Agreement dated May 15, 2015, the Owner hereby directs the Construction Manager to perform the following work package for the Project. 1) See Exhibit A, Channel Building Company Estimate for Merrimack College-Volpe Locker Rooms (6 pages), dated 5-8-15 and Construction Scope of Work pages 1-6 2) The Owner hereby releases the following Services: • General Conditions: $40,000 • Demolition: $34,000 0 Miscellaneous Carpentry $20,000 • Doors & Hardware $11,700 Flooring $31,000 • Fire Protection $ 8,600 • Mechanical $50,000 • Electrical $25,000 Subtotal: $220,300 Fee @ 6% $ 13,218 Total Authorization: $233,300 (Page 1 of 2) ®2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved INDIVIDUAL WORK PACKAGE AUTHORIZATION Number One (1) The budget value of this Individual Work Package No.1 is stated to be Two Hundred Thirty Three Thousand Three Hundred ($233,300) Dollars Acknowledged and Agreed Acknowledged and Agreed OWNER: CONSTRUCTION MANAGER: Merrimack College Channel Buildin"ornpany. B By: I VA )b Printed Printed Title: Title: Ale Hereunto Duly Authorized Hereunto Duly Authorized Date: Date: (Page 2 of 2) ©2015 Trident Building,LLC Salem,New Hampshire--All Rights Reserved Date: 5.8.2015 EXHIBIT A-PROPOSAL Prepared By: CHANNEL BUILDING COMPMY Channel Building Company 355 Middlesex Avenue Wilmington,MA01887-2163 Project: Merrimack College -Volpe Locker Rooms Division Cost Cost/SF GENERAL CONDITIONS 87,018 11.60 DEMOLITION 34,000 4.53 SITEWORK 0 0.00 CONCRETE 3,900 0.52 MASONRY 18,500 2.47 STEEL&MISC IRON 1,750 0.23 ROUGH CARPENTRY 3,150 0.42 FINISH CARPENTRY 37,000 4.93 MOISTURE PROTECTION 0 0.00 ROOFING 2,500 0.33 METAL SIDING 0 0.00 DOORS&HARDWARE 11,700 1.56 OVERHEAD DOORS 0 0.00 WINDOWS&STOREFRONT 0 0100 DRYWALL 33,900 4.52 EIFS 0 0.00 ACOUSTICAL 14,500 1.93 TILE&FLOORING 31,000 4.13 PAINTING 12,500 1.67 SPECIALITIES 2,900 0.39 EQUIPMENT 0 0.00 SPRINKLER 8,600 1.15 PLUMBING 22,925 3.06 HVAC 53,227 7.10 ELECTRICAL 50,800 6.77 Sub Total Trades 429,870 57.32 Sub Total 429,870 Overhead&Fee 25,792 6.00% Contingency 21,493 6.00% Project Total 477,156 63.62 Total Square Footage 7500 _ DIV 1 Item Unit Quantity Unit Price Subtotal Subcontractor GENERAL CONDITIONS Site Design&Engineering Is 1 0.00 0 Architectural Is 1 0.00 0 Structural Engineering Inc 1 0.00 0 Sprinkler Engineering Inc 0 1.00 0 Plumbing Engineering Inc 0 1.00 0 H.V.A.C.Engineering n/a 0 1.00 0 Electrical Engineering Inc 0 1.00 0 Survey 1 0.00 0 Project Management wk 4.5 4,600.00 20,700 Project Coordinator wk 3.0 1,900.00 5,700 Supervision wk 10 4,000.00 40,000 Carpentry wk 0 1,800.00 0 Laborer wk 2 2,000.00 4,000 Testing services 0 Temp office/storage trailer mo 0 250.00 0 Temp telephone mo 0 225.00 0 Temp water nic 0 250.00 0 Temp.Electric mo 0 500.00 0 First aid equipment Is 0 250.00 0 Temp Toilet mo 3 150.00 450 Uitlity company fees nic 0 nic 0 Sewer linkage fee Is 1 0.00 0 Winter conditions nic 0 nic 0 Dumpsters ea 3 8.00 24 Small tools&fastners mo 3 250.00 750 Safety&Protection Is 3 750.00 2,250 Punch List Is 1 1,500.00 1,500 Final cleaning Is 1 2,500.00 2 500 BuiidngThese pull from top GL Insu 4,937,These pull from top Subtotal 87,018 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.2 DEMOLITION Demolition sub 1 29,500.00 29,500 Diversified Trenching sub 1 4,500.00 4,500 Diversified 0 1.00 0 Subtotal 34,000 _ Item Unit Quantity Unit Price Subtotal Subcontractor DIV.2 SITEWORK Excatate&backfill stair sub 1 0.00 0 0 1.00 0 In Demo 0 1.00 0 1 0.00 0 1 0.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.3 CONCRETE Form-Work Sub Bid sub 0 0.00 0 Flat-Work Sub Bid sub 0 0.00 0 Ready Mix Sub Bid vndr 0 1.00 0 Rebar/Slab Pinning Is 0 0.00 0 WWW-MESH 6X6 2.9 x2.9 sf 0 0.05 0 Misc.Forn�Work&Material L&M I&m 0 1.00 0 Formwork-Stair hr 0 60.00 0 Formwork-interior piers ea 0 1.00 0 Formwork/Pour-slab/Trench hr 40 60.00 2,400 Formwork-tie footings If 0 1.00 0 Tie rebar to 0 60.00 0 Formwork-misc materials Is 0 1.00 0 Place&finish slab on grade sf 0 0.45 0 Place&finish slab on deck sf 0 1.00 0 Grout base plates EA 0 35.00 0 Equipment pits allow 0 1.00 0 Rebar&mesh vndr 0 1.00 0 Ready mix-footings cy 0 90.00 0 Ready mix-walls cy 0 90.00 0 Ready mix duct bank 700'3'x2.5' cy 0 90.00 0 Ready mix-tie walls cy 0 1.00 0 Ready mix-piers cy 0 1.00 0 Ready mix-tie footings cy 0 1.00 0 Ready mix-5"sog cy 10 150.00 1,500 Ready mix-4"sog cy 0 1.00 0 Ready mix-transformer pad 8'x 8' cy 0 90.00 0 Form and pour trans-pad sfca 0 1.00 0 Ready mix-stair cy 0 130.00 0 Form&pour stair pads sf 0 1.00 0 Pre Cast Stairs 6 risers ea 0 0.00 0 Concrete pump day 0 1.00 0 Vapor barrier sf 0 0.02 0 Joint filler strips If 0 0.29 0 Slab stop If 0 1.00 0 Subtotal 3,900 Item Unit Quantity Unit Price Subtotal Subcontractor DIVA MASONRY Infill/toothing sub00 18; 500 00 : 18,5 0 0.00 _ . ..0.; 0 1.00 0 Subtotal 18,500 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.5 STEEL&MISC IRON Misc iron 1 0.00 0 Lintels 1 1,250.00 1,250 Rebar/Slab Pinning 1 500.00 500 Stair nosings 0 1.00 0 Railings 1 0.00 0 0 1.00 0 0 1.00 0 Subtotal 1,750 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.6 ROUGH CARPENTRY FR Blocking ea 1 750.00 750 Labor wk 1 2,400.00 2,400 PT Blocking If 0 0.00 0 Misc Material Is 0 0.00 0 0 0.00 0 Subtotal 3,150 Item Unit Quantity Unit Price Subtotal Subcontractor DIVA FINISH CARPENTRY 0 1.00 0 sub 1 28,000.00 28,000 Trickett 0 1.00 0 Valliant Industries$30,500 Locker Install wk 3 3,000.00 9,000 0 1.00 0 Subtotal 37,000 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.7 MOISTURE PROTECTION -- 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.7 ROOFING sub 0 0.00 0 Skate Sharpening Ventelation sub 1 2,500.00 2,500 ea 0 0.00 0 0 1.00 0 0 1.00 0 Subtotal 2,500 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.7 METAL PANELS 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.8 DOORS&HARDWARE VENDOR BID vndr 1 6,200.00 6,200 Quarters Misc Is 1 2,500.00 2,500 0 1.00 0 INSTALLATION labor 40 75.00 3,000 Subtotal 11,700 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.8 OVERHEAD DOORS 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.8 WINDOWS&STOREFRONT 0 1.00 0 ea 0 0.00 0 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.9 DRYWALL SS&GWB sub 1 33,900.00 33,900 0 1.00 0 0 1.00 0 Metro Walls$33,895 0 1.00 0 Levco 0 1.00 0 Subtotal 33,900 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.9 EIFS 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.9 ACOUSTICAL 0 1.00 0 ACT Grid&Tile sub 1 14,500.00 14,500 All-Bright Systems 0 1.00 0 0 1.00 0 GSA-$14,750 0 1.00 0 0 1.00 0 Subtotal 14,500 Item Unit Quantity Unit Price Subtotal Subcontractor DIVA TILE&FLOORING 0 1.00 0 Skate Tile/Carpet TileMnyl Base Sub 1 26,000.00 26,000 Kingdom Patch ceras is tile sub 1 2,000.00 2,000 Floor Prep sub 1 3,000.00 3,000 Allowance 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 31,000 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.9 PAINTING 0 1.00 0 Painting sub 1 12,500.00 12,500 King 0 1.00 0 Noonan$14,740 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 12,500 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.10 SPECIALITIES VENDOR BID vndr 0 1.00 0 Misc Accessories repair/replace/reuse Is 1 500.00 500 0 1.00 0 INSTALL ACCESSORIES labor 40 60.00 2,400 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 2,900 Item Unit Quantity Unit Price Subtotal Subcontractor DIVA 1 EQUIPMENT SUB BID sub 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 0 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.15 SPRINKLER Is 1 0.00 0 Superior-$1,700 engineering sub 1 6,900.00 6,900 included 0 1.00 0 Engineering sub 1 1,700.00 1,700 Tri-State$8,600 0 1.00 0 Subtotal 8,600 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.15 PLUMBING sub 1 20,425.00 20,425 Palmer&Sicard 0 1.00 0 Engineering sub 1 2,500.00 2,500 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 22,925 _ Item Unit Quantity Unit Price Subtotal Subcontractor DIV.15 HVAC sub 1 50,727.00 50,727 Palmer&Sicard 0 1.00 0 Engineering sub 1 2,500.00 2,500 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 53,227 Item Unit Quantity Unit Price Subtotal Subcontractor DIV.16 ELECTRICAL 1 0.00 0 Engineering sub 1 1,500.00 1,500 Amore-$54,375 Permit sub 1 0.00 0 Fire Alarm sub 1 0.00 0 Gate City-$49,300+1,500 Lighting sub 1 0.00 0 Emergency Lighting sub 1 0.00 0 0 1.00 0 General sub 1 49,300.00 49,300 0 1.00 0 0 1.00 0 0 1.00 0 0 1.00 0 Subtotal 50,800 CHANNEL EWIL"MG COMPANY A Full-Service Construction Company • e • • • _ DIVISION I —GENERAL CONDITIONS I. Full time, on-site construction supervision. 2. General labor. 3. Project administration by Project Manager based at Channel office. 4. Weekly construction meetings at the site with the Project Manager,Architect and Owner or his agent present. Construction schedule and progress, and information or actions required by the Owner, Architect and Contractor shall be reviewed. The Contractor shall up-date construction schedule monthly. Contractor shall prepare meeting minutes. 5. Cost of building permit. 6. Dumpster to be located on site. Location to be chosen by owner. 7. Jobsite computer with connectivity to Channel office. 8. Lifts and staging as required. 9. Reprographics. 10. Small tools and equipment, including rentals. 11. Materials testing of soils, concrete and steel as required by code per Allowance (see Allowances). 12. Clean up and dumpster fees. 13. Final cleaning. 14. Submittals shall be reviewed in accordance with requirements of the Agreement. Copies shall be submitted for Owner review and approval. Required submittals include information relating to major building components and equipment, such as samples, product data and shop drawings. 15. Site safety including third party inspections. 16. Cutting and patching. 17. One (1) year material and labor warranty for all work. 18. General Liability Insurance. 19. Closeout documents shall include maintenance procedures for all installed materials and equipment,warranties, subcontractor list, shop drawings and product data, and as-built drawings. 20. Testing by Owner. DIVISION 2A— DEMOLITION I. Demolish and remove all existing masonry walls per drawings. 2. Demolish and remove interior partitions, doors (save for reuse as required) and windows as noted. 3. Demolish and remove all existing flooring, ceiling and finishes. 355 Middlesex Avenue ■ Wilmington,MA o1887-2163 ■ 978.657.7300 • Fax 978.657.7788 www.channelbuilding.com PAGE 1 CHANNEL B AUMNC COMPANY A Full-Service Construction Company 4. Demolish and remove all Plumbing, HVAC and Electrical/Low Voltage Equipment as per drawings, upon completion of make safe by associated MEP trades. 5. Saw cut concrete slab, remove concrete for underground plumbing. DIVISION 3 — CONCRETE I. F&I concrete patching at utility trenching at interior. Trench infill includes poly vapor barrier 6 mil thick, welded wire mesh and dowels to existing slab. DIVISION 4—MASONRY 1. Infill existing openings at CMU walls as noted per drawings. 2. Install a lintel as required to support CMU at new masonry openings. DIVISION 5 —METALS I. Supply lintels at new masonry openings. DIVISION 6 —WOOD AND PLASTICS I. Wood blocking as required. 2. Men's mud room and Women's dressing to have approx. 16" wide cubbies. Maple veneer plywood with high impact resistant PVC 3mm edges, all lockers are open and will have 3 internal shelves (fixed). 3. Common Hall, Plam cabinets with Plam Top 4. Men's and Women's Lounge, Plam cabinets with Plam top 5. Stick Cutting, Open Maple base cabinets with Maple "Butcher Block" type tops 6. Men's Locker Rm, 5 Tier ADJ wall shelves 7. Fire retardant treated wood a. For mounting of mechanical and electrical equipment, if required. DIVISION 6—ROOFING I. Provide flashing for roof penetration for ventilation for Skate Sharpening System 355 Middlesex Avenue ■ Wilmington,MA o1887-2163 • 978.657.7300 ■ Fax 978657.7788 www.channelbuilding.com PAGE 2 CHANNEL SUILI,IPM COMPANY A Full-Service Construction Company • DIVISION 8— DOORS AND WINDOWS / GLASS AND GLAZING 2. Wood Doors All wood doors are rotary natural birch, Flush with particleboard core, and are unfinished for field priming& painting (by others) Qnty Description: 1 4070 Prep'd for hinges & Rim Exit Device 1 3070 Flush Dutch Door, Prep'd for hinges & Cylindrical Lock 1 3070 Prep'd for hinges only (Push/Pull) 1 2068 Prep'd for hinges & Cylindrical Lock 1 3070 Pair—Equal 1'6" Leafs, Prep'd for hinges only (Pulls/Mag Catches) 3. Aluminum Frames All aluminum frames are knockdown 487 Series with 2" snap on Type 2 trim , and are Mill Finish for field painting(by others) Qnty Description: 1 4070 Prep'd for hinges & Rim reinforced 1 3070 Dutch Door frame, Prep'd for hinges & strike 1 3070 Prep'd for hinges only(Push/Pull) 1 2068 Prep'd for hinges & strike 1 3070 Pair— Equal 1'6" Leafs, Prep'd for hinges only (Pulls/Mag Catches) 3 3070 Prep'd for hinges & strike 3 3070 Prep'd for hinges, & rim type electric strike, 1 8040 Borrowed Lite Frame (no mullions) 4. Hardware Qnty: Description x Finish: 19 Hinges x US26D I Schlage AL Series Cylindrical Locksets x US26D I Schlage AL Series Cylindrical Passage x US26D I Rim Exit Device x US26D 2 Electric Strikes x 32D 2 Closer x sp. Alum 3 Pull Plates x US26D I Push Plate x US26D I Mag Catch x US26D 355 Middlesex Avenue ■ Wilmington,MA 01887-2163 ■ 978.657.7300 Fax 978.657.7788 www.channelbuilding.com PAGE 3 lossmsm CHANNEL BCALMNGi COMPANY A Full-Service Construction Company I Dutch Door Bolt x US26D 2 Kickplate x US32D DIVISION 9— FINISHES I. Provide 5/8" type X drywall as indicated on plans. 2. Provide a level 4 drywall finish at exposed areas 3. Provided acoustical caulk at base of all new partitions. 4. Provide GWB patching at demolished partition locations per demo plan. 5. Provide patching allowance of 16hrs for existing GWB ceilings. 6. Provide 20 ga ProStud interior framing at new partitions as indicated on plans. 7. All painted surfaces (i.e. GWB, door frames, and doors requiring paint) shall receive one (1) coat primer appropriate for surface type and two (2) coats pre- cat epoxy finish paint. 8. F&I Acoustical Ceiling — Armstrong Angled Tegular Cortega #704A, 2' x 2' reveal-edge tile; with Armstrong Prelude XL grid, 15/16", White.. 9. Supply and install interlocking crumb rubber skate resistant floor tiles, Glue Down, -- 3/8" thick with 10% color flecking in areas indicated on Finish Schedule. 10. Supply and install carpet the based on $38 per square yard allowance (material and labor) in areas indicated on Finish Schedule. 11. Patch ceramic tile at restrooms as required. 12. Supply and install vinyl wall base in areas indicated on Finish Schedule. 13. $3,000.00 Allowance provided for floor prep. DIVISION 10—SPECIALTIES I. $500.00 included to repair/replace/reuse accessories as required. DIVISION I I — EQUIPMENT No work included DIVISION 12—FURNISHINGS No work included 355 Middlesex Avenue • Wilmington,MA o1887-2163 C 978.657.7300 ■ Fax 978.657.7788 www.channelbuilding.com PAGE 4 CHANNEL OUILOIP40 CdMPANY A Full-Service Construction Company • ® t DIVISION 13 —SPECIAL CONSTRUCTION No work included DIVISION 14—CONVEYING SYSTEMS No work included. Division 15 & 16 Trades are Design Build and include fully Engineered and stamped drawings DIVISION 1SA— PLUMBING 1. Provide three Elkay PSR22193 S.S. Sinks with 4205.000 CP American standard Faucets. 2. Provide one Clarion AN6436BF34 Shower stall with Symmons S96-300-1330-1-4- X 3. Provide one A/S White wall 1.28 gallon flush commercial grade toilet with open front seat and Sloan G2-8111-1.28 flush valve. 4. Provide one A/S commercial grade white wall hung sink with Sloan EBF-85-4CP faucet and grid strainer. 5. Remove existing master mixing valve in the woman's coaches' office and replace with new resized unit. 6. Remove existing water piping to commercial washing machine. Cap and make safe. 7. Remove existing gas pipe to commercial dryer back to main cap and make safe. 8. Connect new sanitary waste and vent piping to existing piping in immediate area. 9. Connect new water piping to existing piping in immediate area. DIVISION 1513—FIRE PROTECTION I. Drawings to be approved by the N. Andover Fire Department 2. Relocating existing sprinkler outlets to cover new layout to code. 3. Adding new sprinkler outlets off existing mains or lines to cover new layout to code. 4. Chrome semi recessed pendant heads in areas with ceilings. 5. Pendant heads to be centered in ceiling tiles. 355 Middlesex Avenue ■ Wilmington,MA 01887-2163 . 978.657.730o ■ Fax 978.657.7788 www.channelbuilding.com PAGE 5 CHANNEL MJILXNNO CN3M ,. A Full-Service Construction Company DIVISION 15C— HVAC I. Provide pre demolition air survey 2. Provide survey of the interior condition of the existing duct trunk lines 3. Provide demolition of all existing supply and exhaust BRANCH lines 4. Demolition is considered drop to floor for removal by others 5. Provide and install new galvanized steel supply and exhaust branch lines To serve new room configuration 6. Provide ventilation for Skate Sharpening System. 7. Provide and install approximately forty (40) new RGD's 8. Provide post construction balancing services DIVISION 16— ELECTRICAL I. Disconnect and make-safe power to all existing electrical fixtures, electrical & HVAC equipment. 2. Provide temporary power and lighting as required. 3. Provide and install receptacles as required. 4. Provide and install power to TV's as shown on the drawings. S. Provide and install room switches and occupancy sensors as required. 6. Provide and install light fixtures as shown on the drawings. 7. Provide and install EBU's and Exit signs as required. 8. Provide and install Fire Alarm Devices as stated and required. 9. Provide and install boxes and sleeves for Tel/Data cables in the office area (Cables FBO). 10. Demo as shown on the drawings. 355 Middlesex Avenue ■ Wilmington,MA o1887-2163 ■ 978.657.73oo ■ Fax 978.657.7788 www.channelbuilding.com PAGE 6 Massachusetts -Department payment ot'Public Safety of Building�eguiatiohs .a �o;st;Uc�.un and Standards License: CS-079411 `tel rTS DAVID A ME1007 �>�` HAV ERHHILLST L 1►3A _ 1 commissioner Expiration 01/01/2017