HomeMy WebLinkAboutMiscellaneous - 11 DANA STREET 4/14/2015 (2) WILLIAM 1\�I[CKAVY CONSTRUCTION ILILC<
18 Academy Ave
Haverhill, MA 01835
978-361-6402
CONSTRUCTION CONTRACT
This G: nstruction Contract (hereinafter the "Contract")is hereby made
on l _/ by and between Janet Eichler of 11 Tyler Rd.,
North Andovr, MA 01845 (hereinafter "Client") and W McKay Construction
LLC of 18 Ac ademy Avenue, Haverhill, MA 01835 (hereinafter "Contractor)
collectively rl,4erred to herein as the "Parties".
ARTICLE x
A. Contra ,tor shall provide the following Construction Services (the
"Proje( t'), as agreed to in a signed Proposal related to said scope.
B. Client i:ngages Contractor and Contractor agrees to provide to Client
all necessary service , materials, and labor necessary for the
comp[:lion of the Project including, but not limited to , all building and
construction materials outlined in the signed scope. Material estimate
and all necessary tools and machinery needed for Project completion.
All construction materials should be new and of the highest quality,
unlesEi previously specified by the Client. ( r
C. Contra:ctor shall provide the construction services for the Project at
the pr iperty located at 11 Tyler Rd., North Andover, MA 01845.
D. The (; ontract shall be comprised of the following: this Construction
Contr;: ct, Plans, Specifications, Addenda, Drawings, Photos,
Propa gal, Material estimate if applicable all signed and witnessed, all
of whict, are attached hereto and are a part of this Contract as
exhibits
TICLE II
A. Con-!--actor will begin work on to be
completed Meted by 7//
B. In thi; event that Client and Contractor agree on changes to the
Proj::ct after this Contract is executed, the Parties will agree to
new time deadlines that are reasonable in light of the modifications
and -:hat schedule change will be signed and witnessed and
becc me a part of this Contract.
'I'ICLE III
A. In con., deration of the performance of this Contract, Client agrees to
pay Cc itractor the sum of $121,150.00 (the "Contract Price") on the
followir g payment schedule for the services.
B. Contractor shall receive a 25% deposit before the start of the Project
and thi; n Progress payments shall be made thereafter as reflected
progre;;sion of the Contractor's services continue through to
compl(:tion.
C. After ri: ceiving notification by Contractor of each stage of completion,
Client z)r its designee will inspect and approve the work or request
any nE I-essary adjustments to same. Client agrees to make payments
to Cor tractor after approving work. Payment shall only be adjusted
upon t I ie mutual consent of both Parties if due to unseen events or
the pa ameters of the work are expended materially beyond the terms
of the l,ontract. This Contract and associated fees will be modified
accord ingly in the form of Extra Work Orders which once signed and
witnes Ded to shall become a part of this Contract.
ARTICLE IV
A. All charges or modifications to the work ordered by Client must be
made in writing, with appropriate adjustments made to total payment
and pal;,meat schedule. The approval of both Parties shall be required
in the fc`rm of an Extra Work Order for substantial Project changes as
these ci ianges will effect date of completion, Project price, and
notifica': ons of these changes must be made in a timely manner.
B. If these changes should require additional expense to Contractor,
Contra(:for must make a claim for increase in payment, in writing to
Client if, a timely manner. Client must approve this claim for increase
in writir;g prior to any changes to the work, Project or schedule. All
such d(:cuments relating to changes to this Project must be signed
and witnessed to and will become a part of this Contract.
ARTICLE V
A. If Contr actor is delayed from completing required work due too
unavoii: able casualties, Client shall grant Contractor an extension for
the cor-ipletion of work equal to the delay. Unavoidable casualties
include but are not limited to, fire, flood or natural disasters, delayed
acquisition of materials or material delivery, and negligence or non-
payme,it on the part of the Client.
B. In the (,:vent of unavoidable casualties, Contractor shall properly
docum1.mt both the event and the impact of the event on Project
completion. Documentation shall be presented to Client in a timely
manner.
ARTICLE VI
A. If Conti actor fails to correct defective work or persistently fails to
supply materials or equipment in accordance with the Contract
docurr ,nts, Client may order Contractor to stop the work or any
portior thereof, until the cause for such order has been eliminated.
I'ICLE VII
A. Free ac ,ess to the work and the Project site shall be granted by
Contract for to Client, the designated agents of the Client, and all
necess:pry public authorities.
B. Contras:for agrees to keep the premises clean and orderly. Contractor
shall reinove all debris as needed during the hours of work in order to
maintain work conditions free of health or safety hazards.
ARTICLE VII
A. Con ractor shall conduct its activities in a professional manner and
adhi: re to reasonable wishes of Client in relation to its working
schE,dule. Additionally, Contractor's work shall adhere to and be in
compliance with both the Standard Practices of the Trades and
any relevant Manufacturers Specifications.
B. Con ractor shall protect all work adjacent to the Project site from
any ,Jamage resulting from the work of Contractor and shall repair
or rc place any damaged work at its own expenses. Contractor
shall take all precautions to protect persons from injury and
unn: cessary interference or inconvenience.
TICLE I%
A. Client ;: grees to hold harmless, indemnify and defend Contractor and
each iridividual or entity that is an agent, affiliate, partner, officer, or
stockh:►Ider of same against any and all claims, losses, liabilities,
damac;, s, and expenses, including legal fees, fines, judgments,
settlement amounts all made in connection with , or arising from
errors i 1 any representation or warranty made by Client under this
Contra, A, any breach of the Contract by Client, or any omission or
negligc:nt act or error by Client in connection with this Contract,
provide: d by such negligent act, omission, or error was not done at the
directi(: n of Contractor.
B. Contra .tor agrees to hold harmless, indemnify and defend Client and
each it dividual or entity that is an agent, affiliate, partner, officer, or
stockh-)lder of same against any and all claims, losses, liabilities,
damag es, and expenses, including legal fees, fines, judgments,
settlem(:,nt amounts all made in connection with , or arising from
errors it any representation or warranty made by Contractor under
this Cor tract, any breach of the Contract by Contractor, or any
omissicl i or negligent act or error by Contractor in connection with
this Cor tract, provided by such negligent act, omission, or error was
not dons; at the direction of Client.
ARTICLE X
A. Con°:-actor may be responsible for insurance to protect against any
propi,rty damage, bodily injury, death, or other claims for damages
that i nay result from the commission of the work, including general
liabi' ty insurance and workers compensation insurance for its
employees and/or subcontractors.
ARTICLE XI
A. Contras:for will be responsible for obtaining all the necessary permits
and Iic(:nses to fulfill the services specified in this Contract.
ARTICLE XII
A. Contractor is responsible for maintaining proper work, safety and
environmental protection standards. Contractor agrees to hold Client
harmle..s for all fines from federal, state or local agencies and
regulators. Contractor will work in compliance with all standards
require,i by EPA, OSHA and other applicable federal agencies.
Contractor will be responsible for paying all fines and judgments
levied ,y these agencies resultant from the performance of this
Contrai;t.
ARTICLE XIII
A. The re ationship created between the Parties shall be limited to that
of inde )endent contractors. Neither party shall undertake any actions
that wc:uld imply or seek to establish, any partnership , ownership,
emplo,,ment, joint venture, or trust relationship between the Parties,
except by amendment to this Contract.
ARTICLE XIV
A. Any dispute or claim related to or arising from this Contract, its
performance, breach, interpretation, validity, or enforceability, shall be
exclusil,ely(except as provided below) resolved by final binding
arbitrat' )n before AAA American Arbitration Association utilizing AAA
Commc rcial Arbitration Rules.
B. The arbitrator shall be selected using AAA procedures. The arbitrator
shall render a written decision within thirty calendar days of the
hearinc The arbitrator may award attorneys' fees or punitive,
incidental, consequential, treble, or other multiple or exemplary
damag:: s.
C. Award:, shall be final, binding, and non-appealable, with the
excepti�on of the grounds for appeal guaranteed by the Federal
Arbitrai on Act and applicable laws. All awards may be filed with one
or mort, courts, state, federal or foreign having jurisdiction over the
party a;lainst whom such award is rendered or its property, as a basis
of judg-nent and the issuance of execution of its collection.
ARTICLE XV
A. Both P irties are expressly prohibited from assigning this Contract or
any rights or interest flowing therefrom. Assignment will only occur
with th.,, express written consent of both Parties.
B. This C )ntract contains the entire agreement and understanding
betwee n the Parties and supersedes any prior or contemporaneous
written or oral Contracts, representations, and warranties between
them rs�specting the subject matter of this Contract.
C. This G:►ntract will be interpreted and enforced under the laws of the
State c F MA, without regard to conflict of laws.
IN WITNESS WHEREOF, the Parties hereto execute this Contract:
CLIENT
)"w Y
Authori.: Signature
Name ,,nd Title
CONTV:ACTOR
Authori ted Signature
Name ind Title License # 179265