HomeMy WebLinkAboutBuilding Permit # 6/9/2015 -m
TOWN OF NORTH ANDOVER
I APPLICATION FOR PLAN EXAMINATION I - -
Permit NO:
Date Received •� ,<.
��SSAC aaus���y
Date Issued:
IMPORTANT: Applicant must complete all items on this page
LOCATION Z ar� Pz ;
Print
PROPERTY OWI "n Ln . �
`=Prlht
MAP NO: PARCEL. 1 ZONING QISTRICT` Historic District yes
Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building W10ne family
❑ Addition ❑ Two or more family ❑ Industrial
❑ Alteration No. of units: ❑ Commercial
Repair, replacement ❑ Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
C7 Septre Well CI'Floodplain' - [I'Wetlands [1Watershed District
❑Vllata /Sewer.
i
E
Identification Please Type or Print Clearly)
i
OWNER: Name: i`iY1Can Phone: qq o
Address: Z.Lv® DcAle_ L+, t Co Aoc4_0-4 /A O VN
CONTRACTOR Name. Phone;'
( Ci( ec o(,Oesl `)(A 06 x, LC
Address..
Supervisors Construction License Exp. Date:
113-h
Homy°Improvement License: Exp.. Date:
� 3
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. I
,VC) " I`
Total Project Cost. $ 5Lk_, b 00 FEE: $
Check No.: Receipt No.:
NOT : Persons con racting with unregistered contractors do not have access to tie guaranty fund
S(6nature of Agent/Owner Signature of contractor
r
t%ORTH
0-%WM-% of -V TAnk MA
ncto V
® �`' a+►
•
C® LAKE hA
ver, `ass, W
cocHicnew.cK
ADRATED P'QP���
S U
BOARD OF-HEALTH
L D Food/Kitchen
PER T Septic System
THIS CERTIFIES THAT .K,,C�W'�,.,. ., ., BUILDING INSPECTOR
................ . ..... ...... ....................................
. Foundation
has permission to erect .......................... buil 'ngs on .. ... b............. . ............ .
o Rough
to be occupied as .... ., .......-.-..'..--...................................... Chimney
provided that the person accepting this permit shalfin every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESSCONSTRUCTI T S Rough
Service
................ .. .... ............................................. Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required t® Occupy Buildin Rough
Islay in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approvedthe Building Inspector. Burner
Street No.
Smoke Det.
..........
construction ( energy audits I consultation I design
171Qt1Cl1SIbuilders, 30 Holiday Lane, Hampstead, NH j 603.329.8113
Standard FormOt Agreement for Construction
AGREEMENT made as of the Twenty fifth day of May in the year Two Thousand Fifteen
BETWEEN the Owner:
Duncan Kelly
240 Dale St.
N. Andover, Ma, 01845
P. 978-683-3622
E. I.kel ly 1974@ya hoo.com
and Mancusi Builders, LLC:
Norman Mancusi
30 Holiday Lane
Hampstead, NH 03841
P. 603.329.81 13
E. mancusibuilders@gmail.com
for the following Project:
Make repairs to the home that were affected by water damage caused by ice damming.
The Owner and Mancusi Builders, LLC agree as follows.
TABLE OF ARTICLES (DB01)
1 MANCUSI BUILDERS,LLC'S RESPONSIBILITIES
2 OWNER'S RESPONSIBILITIES
3 COPYRIGHTS AND LICENSES
4 CLAIMS AND DISPUTES
S TERMINATION OR SUSPENSION
6 COMPENSATION
This Standard Form of Agreement
7 MISCELLANEOUS PROVISIONS contains elements harvested from
the AIA A201-2007 and AIA
8 SCOPE OF THE AGREEMENT B102-2007 as credited to the
American Institute of Architects. All
contracts cited have been lawfully
ARTICLE 1 MANCUSI BUILDERS, LLC'S RESPONSIBILITIES acquired by Mancusi Builders, LLC
§ 1.1 Mancusi Builders, LLC shall provide the following professional services and Work:
.1 Construction Repair work. for the use and drafting of this
document.
EM
'
0000001�I�II 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
IM96
construction I energy audits ( consultation ( design
mancUSlbuilders, 30 Holiday Lane, Hampstead, NH j 603.329.81 13
§ 1.2 Mancusi Builders, LLC shall perform its services and Work consistent with the professional skill and care ordinarily provided by designers
and contractors practicing in the some or similar locality under the same or similar circumstances. The Mancusi Builders, LLC shall perform its
services and Work as expeditiously as is consistent with such professional skill and care and the orderly progress of the Project.
§ 1.3 Mancusi Builders, LLC shall identify a representative authorized to act on behalf of the Mancusi Builders, LLC with respect to the Project.
That representative being named: Norman Mancusi
§ 1.4 Except with the Owner's knowledge and consent, Mancusi Builders, LLC shall not engage in any activity, or accept any employment,
interest or contribution that would reasonably appear to compromise Mancusi Builders, LLC's professional judgment with respect to this Project.
§ 1.5 Mancusi Builders, LLC shall maintain the following insurance for the duration of this Agreement. If any of the requirements set forth below
exceed the types and limits Mancusi Builders, LLC normally maintains, the Owner shall reimburse Mancusi Builders, LLC for any additional cost:
.1 General Liability
$1,000,000 per occurrence ($2,000,000 aggregate]
.2 Workers' Compensation
$50,000 per occurrence
§ 1.6 SUPERVISION AND CONSTRUCTION PROCEDURES
§ 1.6.1 Mancusi Builders, LLC shall design, supervise and direct the Work, using Mancusi Builders, LLC's best skill and attention. Mancusi
Builders, LLC shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures and for
coordinating all portions of the Work under the Contract. Mancusi Builders, LLC shall evaluate the jobsite safety thereof and shall be fully and
solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures.
§ 1.6.2 Mancusi Builders, LLC shall be responsible to the Owner for acts and omissions of Mancusi Builders, LLC's Subcontractors and their
agents and employees, and other persons or entities performing portions of the Work for, or on behalf of, Mancusi Builders, LLC or any of its
Subcontractors.
§ 1.6.3 Mancusi Builders, LLC shall be responsible for inspection of Work already performed to determine that such portions are in proper
condition to receive subsequent Work and conform with the Construction Documents. The term Construction Documents refer to the final drawings
created by Mancusi Builders, LLC and consultants that have been approved by the Owner prior to the start of the Work carried out by Mancusi
Builders, LLC, or by Subcontractors or Sub-Subcontractors.
§ 1.7 LABOR AND MATERIALS
§ 1.7.1 Mancusi Builders, LLC shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water,
heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or
permanent and whether or not incorporated or to be incorporated in the Work.
§ 1.7.2 Mancusi Builders, LLC shall enforce strict discipline and good order among Mancusi Builders, LLC's employees and other persons
carrying out the Work. Mancusi Builders, LLC shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to
them.
§ 1.8 WARRANTY
Mancusi Builders, LLC warrants to the Owner that materials and equipment furnished under the Contract will be of good quality and new unless
designed otherwise. Mancusi Builders, LLC further warrants that the Work will be free from defects; except for those inherent in the quality of the
Work the Construction Documents require or permit. Work, materials, or equipment not conforming to these requirements may be considered
EM
construction ) energy audits I consultation I design
manCUSIbuilders, 30 Holiday Lane, Hampstead, NH j 603.329.81 13
defective. Mancusi Builders, LLC's warranty excludes remedy for damage or defect caused by abuse, alterations to the Work not executed by
Mancusi Builders, LLC, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage.
§ 1.9 TAXES
Mancusi Builders, LLC shall pay sales, consumer, use and similar taxes for the Work provided by Mancusi Builders, LLC that are legally enacted
when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect.
§ 1.10 PERMITS, FEES, NOTICES AND COMPLIANCE WITH LAWS
§ 1.10.1 Mancusi Builders, LLC shall secure and pay for the building permit as well as for other permits, fees, licenses, and inspections by
government agencies necessary for proper execution and completion of the Work that are customarily secured after execution of the Contract
and legally required at the time bids are received or negotiations concluded.
§ 1.10.2 Mancusi Builders, LLC shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and
regulations, and lawful orders of public authorities applicable to performance of the Work.
§ 1.10.3 If Mancusi Builders, LLC performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and
regulations, or lawful orders of public authorities, Mancusi Builders, LLC shall assume appropriate responsibility for such Work and shall bear the
costs attributable to correction. Unless otherwise negotiated by the Owner.
§ 1.11 CONCEALED OR UNKNOWN CONDITIONS
§ 1.1 1.1 If Mancusi Builders, LLC encounters conditions at the site that are(1) subsurface or otherwise concealed physical conditions that differ
materially from those indicated in the Construction Documents or(2) unknown physical conditions of an unusual nature, that differ materially from
those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Construction
Documents, Mancusi Builders, LLC shall promptly provide notice to the Owner before conditions are disturbed and in no event later than 21 days
after first observance of the conditions. If Mancusi Builders, LLC determines that they differ materially and cause an increase or decrease in cost
of, or time required for, performance of any part of the Work, Mancusi Builders, LLC will establish an equitable adjustment in the Contract Sum
or Contract Time, or both. If Mancusi Builders, LLC determines that the conditions at the site are not materially different from those indicated in the
Construction Documents and that no change in the terms of the Contract is justified, Mancusi Builders, LLC shall continue with the Work.
§ 1.1 1.2 If, in the course of the Work, Mancusi Builders, LLC encounters human remains or recognizes the existence of burial markers,
archaeological sites or wetlands not indicated in the Construction Documents, Mancusi Builders, LLC shall immediately suspend any operations
that would affect them and shall notify the Owner. Upon receipt of such notice, the Owner shall promptly take any action necessary to obtain
governmental authorization required to resume the operations. Mancusi Builders, LLC shall continue to suspend such operations until otherwise
instructed by the Owner but shall continue with all other operations that do not affect those remains or features. Requests for adjustments in the
Contract Sum and Contract Time arising from the existence of such remains or features may be made as provided in Article 4.
§ 1.12 ALLOWANCES
§ 1.12.1 Mancusi Builders, LLC shall include in the Contract Sum all allowances stated in the Construction Documents. Items covered by
allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but Mancusi Builders, LLC shall not be
required to employ persons or entities or source items to whom Mancusi Builders, LLC has reasonable objection.
§ 1.12.2 Unless otherwise provided in the Construction Documents,
.1 Allowances shall cover the cost to Mancusi Builders, LLC of materials and equipment delivered at the site and all required taxes, less
applicable trade discounts;
.2 Mancusi Builders, LLC's costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses
contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; and
011111111
r J construction ( energy audits I consultation ( design
mancuSlbuilders, 30 Holiday Lane, Hampstead, NH ( 603.329.81 13
.3 Whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The
amount of the Change Order shall reflect(1) the difference between actual costs and the allowances under Section 3.8.2.1 and 12j
changes in Mancusi Builders, LLC's costs; and
.4 In the event of faulty or defective products as provided by the Manufacturer or Supplier that Mancusi Builders, LLC determines will
require replacement or modification and cause an increase or decrease in cost of, or time required for, performance of any part of the
Work, Mancusi Builders, LLC will establish an equitable adjustment in the Contract Sum or Contract Time, or both through a Change
Order.
§ 1.12.3 Materials and equipment under an allowance shall be selected by the Owner with reasonable promptness or by a date agreed upon
between Mancusi Builders, LLC and the Owner that conforms to the project needs and timeline.
§ 1.13 TIME
§ 1.13.1 Mancusi Builders, LLC shall achieve Substantial Completion of the entire Work not later than July thirty first, two thousand fifteen.
(7.31.15).
§ 1.13.2 If Mancusi Builders, LLC is delayed at any time in the commencement or progress of the Work by an act or neglect of the Owner, or
of an employee of; or by changes ordered in the Work; or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other
causes beyond Mancusi Builders, LLC's control; or by delay authorized by the Owner pending mediation and litigation; or by other causes that
Mancusi Builders, LLC determines may justify delay, then the Contract Time shall be extended by Change Order for such reasonable time as
Mancusi Builders, LLC and Owner may determine.
§ 1.13.3 Claims relating to time shall be made in accordance with applicable provisions of Article 4.
§ 1.14 CUTTING AND PATCHING
§ 1.14.1 Mancusi Builders, LLC shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit
together properly. All areas requiring cutting, fitting and patching shall be restored to the condition existing prior to the cutting, fitting and
patching or unless otherwise specified.
§ 1.15 SITE MAINTANENCE
§ 1.15.1 Mancusi Builders, LLC shall keep the premises and surrounding area free from accumulation of waste materials or rubbish/recyclables
caused by operations under the Contract. At completion of the Work, Mancusi Builders, LLC shall remove waste materials, rubbish/recycling,
Mancusi Builders, LLC's tools, construction equipment, machinery and surplus materials from and about the Project.
§ 1.15.3 Mancusi Builders, LLC shall sort waste/recyclables and maintain an orderly slight as per guidelines of NHGBC and third party
energy certification guidelines if applicable.
§ 1.16 ACCESS TO WORK
The Contractor shall provide the Owner access to the Work in preparation and progress wherever located.
§ 1.17 SUBCONTRACTORS
§ 1.17.1 A Subcontractor is a person or entity who has a direct contract with Mancusi Builders, LLC to perform a portion of the Work at the
site. The term "Subcontractor" is referred to throughout the Contract as if singular in number and means a Subcontractor or an authorized
representative of the Subcontractor.
§ 1.17.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work
at the site. The term "Sub-subcontractor" is referred to throughout the Contract as if singular in number and means a Sub-subcontractor or an
authorized representative of the Sub-subcontractor.
§ 1.17.3 By appropriate agreement, written where legally required for validity, Mancusi Builders, LLC shall require each Subcontractor, to the
extent of the Work to be performed by the Subcontractor, to be bound to Mancusi Builders, LLC by terms of the Contract, and to assume toward
U
.............
umuuuuui 'ui�uum construction j energy audits I consultation I design
CT1C111CUSIbuilders,, 30 Holiday Lane, Hampstead, NH j 603.329.8113
Mancusi Builders, LLC all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which Mancusi
Builders, LLC, by these Documents, assumes toward the Owner. Each subcontract agreement shall preserve and protect the rights of the Owner
under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice
such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights,
remedies and redress against Mancusi Builders, LLC that Mancusi Builders, LLC, by the Contract, has against the Owner. Where appropriate,
Mancusi Builders, LLC shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. Mancusi Builders, LLC shall make
available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract and Construction
Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and
conditions of the proposed subcontract agreement that may be at variance with the Contract and Construction Documents. Subcontractors will
similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors.
§ 1.17.4 If the Work has been suspended for more than 30 days, the Subcontractor's compensation shall be equitably adjusted for increases
in cost resulting from the suspension.
ARTICLE 2 OWNER'S RESPONSIBILITIES
§ 2.1 Unless otherwise provided for under this Agreement, the Owner shall provide information, in a timely manner regarding requirements for
and limitations on the Project, including a written program which shall set forth the Owner's objectives, schedule, constraints and criteria,
including space requirements and relationships, flexibility, expandability, special equipment, systems and site requirements, as well as any
materials or services to be secured by the Owner, consultants, or contracts. Within 15 days after receipt of a written request from Mancusi
Builders, LLC, or unless otherwise noted, the Owner shall furnish the requested information or materials as necessary and relevant for Mancusi
Builders, LLC to evaluate, give notice of or enforce lien rights and perform the Work.
§ 2.2 The Owner shall identify a representative authorized to act on the Owner's behalf with respect to the Project. That representative being
named: Duncan Kelly. The Owner shall render decisions and approve Mancusi Builders, LLC's submittals in a timely manner in order to
avoid unreasonable delay in the orderly and sequential progress of Mancusi Builders, LLC's services and Work.
§ 2.31 The Owner shall coordinate the services of its own consultants with those services provided by Mancusi Builders, LLC. Upon Mancusi
Builders, LLC's request, the Owner shall furnish copies of the scope of consulting services in the contracts between the Owner and the Owner's
consultants. The Owner shall furnish the services of consultants other than those designated in this Agreement, or authorize Mancusi Builders, LLC
to furnish them as an Additional Service, when Mancusi Builders, LLC requests such services and demonstrates that they are reasonably required
by the scope of the Project. The Owner shall require that its consultants maintain professional liability insurance as appropriate to the services
provided.
§ 2.4 The Owner shall furnish all legal, insurance and accounting services, including auditing services, that may be reasonably necessary at
any time for the Project to meet the Owner's needs and interests.
§ 2.5 The Owner shall provide prompt written notice to Mancusi Builders, LLC if the Owner becomes aware of any fault or defect in the
Project, including errors, omissions or inconsistencies in Mancusi Builders, LLC's Instruments of Service.
§ 2.6 The Owner shall provide prompt payment and in accordance with Article 6.
§ 2.7 The Owner shall provide reasonable and secure access to the site in order to facilitate performance of any part of the Work. The owner
shall provide adequate space or services and maintain the space and services as determined within reason by Mancusi Builders, LLC for
deliveries of materials, parking, preparation, cutting, assembly, staging, material storage, equipment storage, waste rpanagement, temporary
bathroom facilities, and other needs as required for the performance of any part of the Work. The Owner shall furnish Mancusi Builders, LLC
reasonable means of access throughout the progress of the Work to enter the site or areas required to adequately perform the Scope of Work for
Mancusi Builders, LLC, it's Subcontractors, Inspectors, and other necessary parties. The owner shall maintain and ensure that a minimum of ten
j 101 feet around the exterior perimeter of the site, building, or area of Work, as well as any of the aforementioned spaces in Articles 1 and 2, as
INNI
I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I I�I II Illl II dllllllluuuuuuuuuuuuu construction i energy audits i consultation I design
mancusibuilders,, 30 Holiday Lane, Hampstead, NH j 603.329.81 13
well as routes of access to these areas be clear of debris, furniture, objects, impacts of current weather conditions such as snow, and other
hazards. Mancusi Builders, LLC shall notify the Owner in advance of access requirements in which the Owner shall comply.
ARTICLE 3 COPYRIGHTS AND LICENSES
§ 3.1 Mancusi Builders, LLC shall have the right to include photographic or artistic representations of the design of the Project among Mancusi
Builders, LLC's promotional and professional materials. Mancusi Builders, LLC shall be given reasonable access to the completed Project to make
such representations. However, Mancusi Bunters, LLC's materials shall not include the Owner's confidential or proprietary information if the
Owner has previously advised Mancusi Builders, LLC in writing of the specific information considered by the Owner to be confidential or
proprietary. The Owner shall provide professional credit for Mancusi Builders, LLC in the Owner's promotional materials for the Project.
ARTICLE 4 CLAIMS AND DISPUTES
§ 4.1 The Owner and Mancusi Builders, LLC shall commence all claims and causes of action, whether in contract, tort, or otherwise, against
the other arising out of or related to this Agreement in accordance with the requirements of the method of binding dispute resolution selected in
this Agreement within the period specified by applicable law, but in any case not more than 10 years after the date of Substantial Completion of
the Work. The Owner and Mancusi Builders, LLC waive all claims and causes of action not commenced in accordance with this Section 4.1.1.
§ 4.2 To the extent damages are covered by property insurance, the Owner and Mancusi Builders, LLC waive all rights against each other and
against the consultants, Subcontractors, Sub-subcontractors agents and employees, each of the other, for damages caused by fire or other causes
of loss to the extent covered by property insurance obtained or other property insurance applicable to the Work, except such rights as they have
to proceeds of such insurance held by the Owner as fiduciary. The Owner or Mancusi Builders, LLC, as appropriate, shall require of the
consultants, Subcontractors, Sub-subcontractors agents and employees any of them similar waivers in favor of the other parties enumerated
herein. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a
person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the
insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged.
§ 4.3 Mancusi Builders, LLC and Owner waive consequential damages for claims, disputes or other matters in question arising out of or
relating to this Agreement. This mutual waiver is applicable, without limitation, to all consequential damages due to either party's termination of
this Agreement, except as specifically provided in Section 5.7.
§ 4.4 Claims, disputes or other matters in question between the parties shall be subject to and decided by arbitration in accordance with local
laws unless the parties mutually agree otherwise.
ARTICLE S TERMINATION OR SUSPENSION
§ 5.1 If the Owner fails to make payments to Mancusi Builders, LLC in accordance with this Agreement, such failure shall be considered
substantial nonperformance and cause for termination or, at Mancusi Builders, LLC's option, cause for suspension of performance of services and
Work under this Agreement. If Mancusi Builders, LLC elects to suspend services or Work, Mancusi Builders, LLC shall give seven days' written
notice to the Owner before suspending services or Work. In the event of a suspension of services or Work, Mancusi Builders, LLC shall have no
liability to the Owner for delay or damage caused the Owner because of such suspension of services or Work. Before resuming services or
Work, Mancusi Builders, LLC shall be paid all sums due prior to suspension and any expenses incurred in the interruption and resumption of
Mancusi Builders, LLC's services and Work. Mancusi Builders, LLC's fees for the remaining services and Work and the time schedules shall be
equitably adjusted.
§ 5.2 If the Owner suspends the Project, Mancusi Builders, LLC shall be compensated for services and Work performed prior to notice of such
suspension. When the Project is resumed, Mancusi Builders, LLC shall be compensated for expenses incurred in the interruption and resumption
IN
r construction energy audits ( consultation I design
manCLaSlbuilders, 30 Holiday Lane, Hampstead, NH 1 603.329.81 13
of Mancusi Builders, LLC's services and Work. Mancusi Builders, LLC's fees for the remaining services and Work and the time schedules shall be
equitably adjusted.
§ 5.3 If the Owner suspends the Project for more than twenty 120) cumulative days for reasons other than the fault of Mancusi Builders, LLC,
Mancusi Builders, LLC may terminate this Agreement by giving not less than seven (7) days' written notice.
§ 5.4 Either party may terminate this Agreement upon not less than seven (7)days'written notice should the other party fail substantially to
perform in accordance with the terms of this Agreement through no fault of the party initiating the termination.
§ 5.5 The Owner may terminate this Agreement upon not less than twenty 1201 days' written notice to the Mancusi Builders, LLC for the
Owner's convenience and without cause.
§ 5.6 In the event of termination not the fault of the Mancusi Builders, LLC, Mancusi Builders, LLC shall be compensated for services and Work
performed prior to termination, together with Reimbursable Expenses then due and all Termination Expenses as defined in Section 5.7.
§ 5.7 Termination Expenses are in addition to compensation for Mancusi Builders, LLC's services and Work and include expenses directly
attributable to termination for which Mancusi Builders, LLC is not otherwise compensated, plus an amount for Mancusi Builders, LLC's anticipated
profit on the value of the services and Work not performed by Mancusi Builders, LLC.
ARTICLE 6 COMPENSATION
§ 6.1 The Owner shall compensate the Mancusi Builders, LLC for services and Work described in Section 1.1 as set forth below, or in the
attached exhibit or scope document incorporated into this Agreement in Section 9.2.
TOTAL SERVICES AND WORK COMPENSATION. Fifty four thousand dollars ($54,000) as divided:
.1 Initial Payment
$24,646.84
.2 Drywall repairs completed
$9,000.00
.3 Substantial completion
$9,000.00
.4 Upon inspection approval
$11,353.16
§ 6.2 COMPENSATION FOR REIMBURSABLE EXPENSES
§ 6.2.1 Reimbursable Expenses are in addition to compensation for Mancusi Builders, LLC's professional services and Work and include
expenses incurred by Mancusi Builders, LLC and Mancusi Builders, LLC's consultants, Subcontractors, and Sub-subcontractors directly related to
the Project, as follows:
.1 Transportation and authorized out-of-town travel and subsistence;
.2 Long distance services, dedicated data and communication services, teleconferences, Project Web sites, and extranets;
.3 Fees paid for securing approval of authorities having jurisdiction over the Project;
.4 Printing, reproductions, plots, standard form documents;
.5 Postage, handling and delivery;
.6 Expense of overtime work requiring higher than regular rates, if authorized in advance by the Owner;
.7 Renderings, models, mock-ups, professional photography, signage, construction progress modeling, and presentation materials
requested by the Owner;
.8 Mancusi Builders, LLC's Consultant's, Subcontractor's, and Sub-subcontractor's expense of professional liability insurance
dedicated exclusively to this Project, or the expense of additional insurance coverage or limits if the Owner requests such
insurance in excess of that normally carried by Mancusi Builders, LLC's consultants, Subcontractors, and Sub-subcontractors;
Biu 'ai u�siPtrsi� construction I energy audits I consultation ) design
mancUSlbuilde:rs, 30 Holiday Lane, Hampstead, NH 1 603.329.8113
9 All taxes levied on professional services and on reimbursable expenses;
10 Site office expenses; and
.11 Other similar Project-related expenditures.
§ 6.2.2 For Reimbursable Expenses, the compensation shall be the expenses incurred by the Architect/Contractor and Mancusi Builders, 11C's
consultants, Subcontractors, and Sub-subcontractors plus an administrative fee of three percent 13%1 of the expenses incurred.
§ 6.3 PAYMENTS TO MANCUSI BUILDERS, LLC
§ 6.3.1 An initial payment of Twenty four thousand, six hundred forty six dollars and eighty, four cents ($24,646.84) shall be made upon
execution of this Agreement and is the minimum payment under this Agreement.
§ 6.3.2 Payments for services shall be made monthly in proportion to services performed. Payments are due and payable upon presentation of
Mancusi Builders, LLC's invoice. Amounts unpaid fifteen (15)days after the invoice date shall bear interest at twelve percent(12%) compounded
annually.
§ 6.3.3 The Owner shall not withhold amounts from Mancusi Builders, LLC's compensation to impose a penalty or liquidated damages on
Mancusi Builders, LLC.
§ 6.3.4 Payment shall not include requests for payment for portions of the Work for which Mancusi Builders, LLC does not intend to pay a
Subcontractor or material supplier, unless such Work has been performed by others whom Mancusi Builders, LLC intends to pay.
§ 6.3.5 Payment shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in
the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a
location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by Mancusi
Builders, LLC with procedures satisfactory to the Owner to establish the Owner's title to such materials and equipment or otherwise protect the
Owner's interest, and shall include the costs of applicable insurance, storage and transportation to the site for such materials and equipment
stored off the site.
§ 6.3.6 Records of Reimbursable Expenses for services and Work performed on the basis of hourly rates shall be available to the Owner at
mutually convenient times.
§ 6.3.7 When the above reasons for withholding payment are removed, payment will be made for amounts previously withheld.
§ 6.3.8 The final payment shall be presented upon when all Work complies with the requirements of the Contract.
§ 6.3.9 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from:
1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled;
.2 terms of special warranties required by the Contract.
§ 6.4 FAILURE OF PAYMENT
If the Owner does not issue a Payment, through no fault of Mancusi Builders, LLC, within fifteen (15) days after receipt of Mancusi Builders, LLC's
invoice, or awarded by binding dispute resolution, then Mancusi Builders, LLC may stop the Work until payment of the amount owing has been
received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of Mancusi Builders, LLC
reasonable costs of shutdown, delay and start-up, plus interest as provided for in Article 6 Section 3.2.
ARTICLE 7 MISCELLANEOUS PROVISIONS
§ 7.1 This Agreement shall be governed by the law of the place where the Project is located.
EM
���I°11�'illllllllllllllllpllllllllllllllllllllllll��I uryq l t����h��l�i�jii�i�i�iii ii�iiii�itli ilii i�i�iiiiii��ii�uiiitlljiii�id uu uu uuu a uuu uuuu u'u'Vu'u'u'ua'u'u'u'u'u'u'u'u'u'u'u'uu'u'uutltl a"u
qui construction ( energy audits I consultation I design
mancuSlbuilders, 30 Holiday Lane, Hampstead, NH 1 603.329.8113
§ 7.2 The Owner and Mancusi Builders, LLC, respectively, bind themselves, their agents, successors, assigns and legal representatives to this
Agreement. Neither the Owner nor Mancusi Builders, LLC shall assign this Agreement without the written consent of the other, except that the
Owner may assign this Agreement to a lender providing financing for the Project if the lender agrees to assume the Owner's rights and
obligations under this Agreement.
§ 7.3 Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against
either the Owner or Mancusi Builders, LLC.
§ 7.4 Mancusi Builders, LLC shall have responsibility for the discovery, presence, handling, removal or disposal of, or exposure of persons to,
hazardous materials or toxic substances in any form at the Project site.
§ 7.5 If Mancusi Builders, LLC or Owner receives information specifically designated by the other party as "confidential" or"business
proprietary," the receiving party shall keep such information strictly confidential and shall not disclose it to any other person except to(1) its
employees, (2) those who need to know the content of such information in order to perform services or Work solely and exclusively for the
Project, or 13) its consultants and subcontractors whose contracts include similar restrictions on the use of confidential information.
ARTICLE 8 SCOPE OF THE AGREEMENT
§ 8.1 This Agreement represents the entire and integrated agreement between the Owner and Mancusi Builders, LLC and supersedes all prior
negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both
Owner and Mancusi Builders, LLC.
§ 8.2 This Agreement is comprised of the following documents listed below:
.1 Contract agreement
.2 Work estimate
This Agreement entered into as of the day and year first written above.
OWNER MANCUSI BUILDERS, LLC
(Signature) Date (Sigfacture)
Duncan Kelly Norman Mancusi, Master CGP
0
(Sig ure) D e
Lynette Kelly
Mon construction I energy audits I consultation design
ma ncusi builders,, 30 Holiday Lane, Hampstead, NH 603.329.8113
5.29.2015
Sub Contractors
Shanley Plumbing & Heating
71 Pleasant St.
Danville, NH 03819
Has Employees
Policy # WC 288300576401
Sweet Electric LLC
76 Kingston Rd.
Danville, NH 03819
Has Employees
Policy # UB4B030256
Kelly water damage Revised 5.18.15 May 18, 2015
iuimiMlllin!w'Hml�lmmo nrm>�ruu6 '.
mancusibuilders
Kelly water damage Revised 5.18.15
Duke and Lynette Kelly
240 Dale St., N. Andover Ma.
United States
Submitted by:
Norman Mancusi
Mancusi Builders LLC.
30 Holiday Ln.
Hampstead, NH 03841
Office: 603-329-8113
Mobile: 603-235-7293
info@ mancusibuilders.com
www.mancusibuilders.com
License #: Ma. Contractors Lic# CS-034963
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 1
Kelly water damage Revised 5.18.15 May 18, 2015
Norman Mancusi
Mancusi Builders LLC.
30 Holiday Ln.
Hampstead, NH 03841
United States
Office 603-329-8113 P.
mgr
Mobile 603-235-7293 mancusibuilders,
info mancusibuilders.com
www.mancusibuilders.com
License#: Ma. Contractors Lic# CS-034963
Project:20150331 Customer
Kelly water damage Revised 5.18.15 Duke and Lynette Kelly Home 978-683-3622
Duke and Lynette Kelly 240 Dale St. I.kelly1974@yahoo.com
240 Dale St., N.Andover Ma. N. Andover, Ma.
United States United States
This estimate is to make necessary repairs to areas of the home that were subject to water infiltration due to ice dams. This does
not include any work that would be required to prevent future ice damming. Each of the areas are listed below with a description
of the scope of work including materials and labor. Each of these areas will be address separately with the understanding that
additional work may be required due to unforeseen circumstances that were not visible during our evaluation.
Notes:
1. This is an estimate only, not a contract. Once the Estimate has been accepted,the Contract Agreement will be drawn up
stating the terms and conditions for the project.
2. Homes that were built prior to 1978 fall under the EPA's RRP Lead Renovator Laws.Any home that will be brought under
construction,that was built prior to 1978, must conform to the standards set forth by the EPA regarding Lead safety practices.
The home owner must be made aware of the EPA Lead Safety law, by a Certified Lead Renovator Contractor and that the areas
that will be affected by construction must be tested prior to beginning any work. If any of the areas test positive for lead paint,the
home owner must be notified of such, along with an additional cost for special procedures, and additional labor to perform the
work.
Description Quantity Hours Material Labor other Subcontract Cost
Kitchen $4,494.45
Appliances $707.40
Appliances, remove for work,then
reinstall 1 Ea 4 $288.20 $419.20 $0.00 $0.00 $707.40
Remove and reset all appliances,
Includes Range top,vent system,
Dishwasher,Garbage desposal,wall
oven,and refidgerator.All installs to
meet current code standards.
Cabinetry $396.14
Cabinets,Plastic laminate countertop
removal. 54 SF 3.78 $0.00 $396.14 $0.00 $0.00 $396.14
Remove existing built in place counter $7.34/SF $734/SF
top.
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 2
Kelly water damage Revised 5.15.15 May 18, 2015
Description Quantity Hours Material Labor Other Subcontract Cost
Kitchen
Demolition $1,896.88
Cabinets,Lower kitchen cabinet,
remove for work,then reinstall 29 LF 8.7 $0.00 $911.76 $0.00 $0.00 $911.76
Remove lower cabinets in order to make $31.44/LF $31.44/LF
necessary repairs
Cabinets,Upper kitchen cabinet,
remove for work,then reinstall 12 LF 2.4 $0.00 $251.52 $0.00 $0.00 $251.52
Includes prefabricated,prefinished upper $20.96/LF $20,96/LF
cabinets assembled in shop or on site.
Includes shims,screws,backing,
attachment hardware,and installation
labor.Installation includes cutting the
cabinet to fit site conditions.This price is
an overall allowance when replacing all
or most cabinets in a kitchen and is
based on a typical mixture of door units,
corner units,and over refrigerator units.
Drywall Demolition 175 SF 7 $0.00 $733.60 $0.00 $0.00 $733.60
Remove all wall coverings,drywall,trim, $4.19/SF $4.19/SF
insulation.Includes prep and cleanup.
Tile&Glass $1,494.03
Tile stripping 198 SF 9.9 $456.51 $1,037.52 $0.00 $0.00 $1,494.03
Strip tile and substrate from floor area. $2.31/SF $5.24/SF $7.55/SF
Include machine rental,and cleanup.
Family Room $888.70
Demolition $888.70
Drywall Demolition for wall areas. 150 SF 4.5 $0.00 $471.60 $0.00 $0.00 $471.60
Remove all wall coverings,drywall,trim, $3.14/SF $3.14/SF
insulation down to bare studs.Includes
areas behind TV and family room
stairwell area.
Remove insulation from walls and
ceilings. 199 SF 3.98 $0.00 $417.10 $0.00 $0.00 $417.10
Remove insulation from affected wall and $2.10/SF $2.10/SF
ceilings.Bag up depri and place in trash
container.
Dining room $368.90
Demolition $368.90
Drywall Demolition 88 SF 3.52 $0.00 $368.90 $0.00 $0.00 $368.90
Remove all wall coverings,drywall,trim, $4.19/SF $4.19/SF
insulation.Only Stud walls remain. .
Back bedroom $498.03
Demolition $498.03
Drywall Demolition per square foot,
typical room 132 SF 9.77 $0.00 $498.03 $0.00 $0.00 $498.03
Remove all wall/ceiling coverings, $3.77/SF $3.77/SF
drywall,trim,insulation.Stud wallsffoist
remain.
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 3
Kelly grater damage Revised 5.18.15 May 18, 2015
Description Quantity Hours Material Labar Other Subcontract Cosh
Demolition
Finish basement area $452.75
Demolition $452.75
Drywall Demolition per square foot,
typical room 120 SF 8.88 $0.00 $452.75 $0.00 $0.00 $452.75
Remove all wall coverings,drywall,trim, $3.77/SF $3.77/SF
insulation.Stud walls and remain. For
rooms with contents add 4%.
Main Stairwell $234.75
Demolition $234.75
Drywall,Remove ceiling,drywall and
prep for new installation. 56 SF 2.24 $0.00 $234.75 $0.00 $0.00 $234.75
Tear-out and debris removal to a truck or $4.19/SF $4.19/SF
dumpster on site.Install scafoiding,debri
protection and cleanup.
Den area $285.06
Walls&Ceilings $285.06
Drywall Demolition,back wall of
closet. 68 SF 2.72 $0.00 $285.06 $0.00 $0.00 $285.06
Remove all wall coverings,drywall,trim, $4.19/SF $4.19/SF
insulation.Only Stud walls remain. .
Kitchen $14,898.99
Cabinetry $3,768.16
Cabinets,Lower kitchen cabinet with
full heights reinstall. 29 LF 10.44 $0.00 $1,094.11 $0.00 $0.00 $1,094.11
Reinsali lower cabinets and full heights. $37.73/LF $37.73/LF
Includes shims,backing,screws,
attachment hardware,and installation
labor.
Cabinets,Plastic laminate countertop
installed 54 SF 8.1 $1,322.13 $848.88 $0.00 $0.00 $2,171.01
Install new plastic laminate counter top. $24.48/SF $15.72/SF $40.20/SF
Top must be replaced due to removal
constraints with current built in place
installation.
Cabinets,Upper kitchen cabinet
reinstall. 12 LF 4.8 $0.00 $503.04 $0.00 $0.00 $503.04
Reinstall upper cabinets,Includes shims, $41.92/LF $41.92/LF
screws,backing,attachment hardware,
and installation.
Electrical $169.78
Electrical,Light fixture allowance,
remove light fixture for work,then
1 Ea 1.02 $0.00 $71.53 $98.25 $0.00 $169.78
reinstall
Contractor's allowance per light fixture in
complete home.
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 4
Kelly water damage Revised 5.1 8.15 May 18, 2015
Description Quantity Hours Material Labor Other Subcontract Cost
Kitchen
Insulation $1,112.33
Insulation,Ceiling,Fiberglass Craft
108 SF 1.94 $322.57 $203.73 $0.00 $0.00 $526.30
face,batt
Install insulation in kitchen ceiling area. $2.99/SF $1.89/SF $4.87/SF
Area measures 9x12(108 sf).
Insulation,R38(12"deep).Includes air
sealing.
Insulation,Walls,Fiberglass batt
insulation. 64 SF 5.18 $42.75 $543.28 $0.00 $0.00 $586.03
Installed in wall.Fiberglass craft face, $0.67/SF $8.49/SF $9.16/SF
batt insulation,R11(3-1/2"deep).
Includes air sealing.
Interior Trim $609.42
Finish Carpentry,1/4"finish veneer
plywood,Replace,red oak 32 LF 2.5 $151.75 $185.68 $0.00 $0.00 $337.43
Install new toekick board,Includes finish $4.74/LF $5.80/LF $10.54/LF
nails and installation.
Finish Carpentry,Exterior window
surround,Replace exterior window
1 Ea 1.83 $135.98 $136.01 $0.00 $0.00 $271.99
surround,standard grade
Includes manufactured window surround
to match window size,fasteners,and
installation labor.Although window
surrounds can be built on site from
standard moldings,all labor
productivities are based on installation of
manufactured units.Material prices are
based on classical window surrounds
inspired by Greek and Roman designs.
Painting $3,150.45
Painting,Drywall,and trim. 600 SF 7.8 $259.38 $817.44 $0.00 $0.00 $1,076.82
Paint,or stain and varish 3-coats to $0.43/SF $1.36/SF $1.79/SF
drywall and trimwork.
Refinish cabinets,Strip paint or
varnish from cabinets,complex
60 LF 15.2 $480.25 $1,593.38 $0.00 $0.00 $2,073.63
design,3 coats
Cost to strip paint that does not contain $8.00/LF $26.56/LF $34.56/LF
lead.
Plumbing $378.33
Plumbing,Kitchen sink,Remove and
1 Ea 1.11 $131.00 $116.33 $131.00 $0.00 $378.33
reinstall.
Remove and reinstall kitchen sink.
Site Preparation $452.57
Masking&Moving 1 Ea 3 $138.17 $314.40 $0.00 $0.00 $452.57
Install debri protection on floors,walls,
and openings.Includes moving contents
from construction area.
Tile&Glass $4,253.83
Tile installation. 198 SF 15.84 $2,593.80 $1,660.03 $0.00 $0.00 $4,253.83
Install new ceramic/porceline tile over $13.10/SF $8.38/SF $21.48/SF
new underlayment,substrate,Includes
all setting materials and grout.
Mancusi Builders LLC., License#:Ma.Contractors LiC# CS-034963 5
Kelly water damage Revised 5.15.15 May 18, 2015
Description Quantity Hours Material Labor other Subcontract Cost
Kitchen
Walls&Ceilings $1,004.12
Drywall,1/2"drywall installed,taped
and coated to a smooth finish 175 SF 7.18 $183.40 $751.94 $68.78 $0.00 $1,004.12
Includes drywall board,drywall mud, $1.05/SF $4.30/SF $0.39/SF $5.74/SF
drywall nails and/or screws,drywall tape,
and corner bead.Also includes,
Scaffolding setup,debri containment and
cleanup.
Family Room $3,975.17
Insulation $273.13
Insulation,Fiberglass batt insulation, 150 SF 1.65 $100.21 $172.92 $0.00 $0.00 $273.13
installed fiberglass insulation R11(3-112" $0.67/SF $1.15/SF $1.82/SF
deep),into exposed walls.
Interior Trim $135.82
Finish Carpentry,Base shoe,Replace
3/4"base shoe,finger-joint pine 24 LF 0.91 $40.24 $95.58 $0.00 $0.00 $135.82
Includes 3/4"base shoe,finish nails,and $1.68/LF $3.98/LF $5.66/LF
installation labor.Outside joints are
mitered;inside joints are coped.Includes
7%waste.
Painting $2,573.89
Painting,Drywall,Paint ceiling 442 SF 5.75 $191.08 $602.18 $0.00 $0.00 $793.26
1 coat primer 2 coats finish $0.43/SF $1.36/SF $1.79/SF
Painting,Drywall,Paint walls and new
trim 700 SF 9.1 $302.61 $953.68 $0.00 $0.00 $1,256.29
1 coat of primer and 2 coats of finish $0.43/SF $1.36/SF $1.79/SF
paint.
Painting,stain and Varnish existing
1 LF 0 $0.34 $0.00 $0.00 $524.00 $524.34
trim and railings
Apply,stain with 2 coats of varnish over
existing trim and railings at main and
lower level area.
Site Preparation $324.23
Masking&Moving, 1 Ea 2.92 $18.21 $306.02 $0.00 $0.00 $324.23
Install debris protection,Move and cover
room contents.
Walls&Ceilings $668.10
Drywall,1/2"drywall installed on 150 SF 4.5 $196.50 $471.60 $0.00 $0.00 $668.10
rricludes drywall board,drywall mud, $1.31/SF $3.14/SF $4.45/SF
drywall nails and/or screws,drywall tape,
and corner bead.Also includes
scaffolding,debris protection and
cleanup.
Dining room $7,992.74
Flooring $4,380.64
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 6
Kelly water damage Revised 5.18.15 May 18, 2015
Description Quantity Hours" Material Labor Other Subcontract Cost
u
Dining room
Flooring
Flooring,Prefinished red oak strip
flooring,replace,standard&better
304 SF 0 $0.00 $0.00 $0.00 $4,380.64 $4,380.64
grade
Includes pre-finished red oak strip $14.41/SF $14.41/SF
flooring boards,nails,and installation.
Strip flooring is up to 3/4"thick and up to
3-1/4"wide.Grading information based
on rules established by the National Oak
Flooring Manufacturers Association
(NOFMA).All wood is kiln-dried,tongue-
and-groove,end-matched and hollow or
scratch backed.Does not include vapor
barrier or sleepers.
Insulation $396.46
Insulation,Fiberglass batt insulation, 104 SF 3.12 $69.48 $326.98 $0.00 $0.00 $396.46
Install R11(3-1/2"deep)fiberglass $0.67/SF $3.14/SF $3.81/SF
insulation.
Interior Trim $739.99
Finish Carpentry,Baseboard,finger-
Joint pine 16 LF 1.6 $14.25 $167.68 $0.00 $0.00 $181.93
Install 3-1/2"colonial baseboard, $0.89/LF $10.48/LF $11.37/LF
includes glue,fasteners,shims.All
outside corners will be miter cut at 45%,
all inside corners will be coped.
Finish Carpentry,Exterior window
surround,Replace exterior window
1 LF 3 $243.66 $314.40 $0.00 $0.00 $558.06
surround.
Includes casing,stool cap,and
fasteners,and labor.
Painting $1,066.92
Painting,Drywall and trim. 324 SF 4.21 $140.06 $441.42 $0.00 $0.00 $581.48
Apply 1 coat primer 2 coats finish to $0.43/SF $1.36/SF $1.79/SF
walls and trimwork.
Painting,Drywall ceiling. 192 SF 3.84 $83.01 $402.43 $0.00 $0.00 $485.44
Paint complete ceiling with 2 coats of $0.43/SF $2.10/SF $2.53/SF
paint.includes match in sand texture on
repaired surfaces.
Plumbing $334.05
Baseboard heat 1 Ea 3 $19.65 $314.40 $0.00 $0.00 $334.05
Remove and reinstall baseboard heat.
Site Preparation $320.12
Masking&Moving 1 Ea 3 $5.72 $314.40 $0.00 $0.00 $320.12
Remove contents from within room,
install debri and dust control.
Walls&Ceilings $754.56
Drywall,1/2"drywall installed, with
smooth-wall finish 180 SF 5.4 $188.64 $565.92 $0.00 $0.00 $754.56
Includes drywall board,drywall mud, $1.05/SF $3.14/SF $4.19/SF
drywall nails and/or screws,drywall tape,
and corner bead.
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 7
Kelly wafer damage Revised 5.18.15 May 18, 2015
Description Quantity Hours Material Labor Other Subcontract Cost
Walls&Ceilings
Back bedroom $2,211.35
Electrical $169.78
Electrical,Light fixture allowance,
remove light fixture for work,then
reinstall 1 Ea 1.02 $0.00 $71.53 $98.25 $0.00 $169.78
Contractor's allowance per light fixture in
complete home.
Painting $1,060.90
Painting,Drywall ceiling. 120 SF 3.6 $51.88 $377.28 $0.00 $0.00 $429.16
Apply 1 coat primer and 2 coats finish $0.43/SF $3.14/SF $3.58/SF
paint to ceiling area.
Painting,walls and trim. 352 SF 4.58 $152.17 $479.57 $0.00 $0.00 $631.74
Apply 1 coat primer 2 coats finish to $0.43/SF $1.36/SF $1.79/SF
walls and Irimwork.
Site Preparation $307.85
Masking&Moving,Move and cover
room contents, 1 Ea 2.5 $45.85 $262.00 $0.00 $0.00 $307.85
Remove items from construction area
and apply debris and dust protection.
Walls&Ceilings $672.82
Drywall,1/2"drywall installed, with
smooth-wall finish 120 SF 4.92 $157.20 $515.62 $0.00 $0.00 $672.82
Includes drywall board,drywall mud, $1.31/SF $4.30/SF $5.61/SF
drywall nails and/or screws,drywall tape,
and corner bead.
Finish basement area $2,277.23
HVAC $226.63
Ductwork 1 Ea 2 $17.03 $209.60 $0.00 $0.00 $226.63
Remove and reinstall duct work.
Interior Trim $671.82
Finish Carpentry,Base base shoe,
finger-joint pine 13 LF 1.3 $11.58 $136.24 $0.00 $0.00 $147.82
Install 3-1/2"colonial baseboard, $0.89/LF $10.48/LF $11.37/LF
includes glue,fasteners,shims.All
outside corners will be miter cut at 45%,
all inside corners will be coped.
Shelving 1 Ea 5 $0.00 $524.00 $0.00 $0.00 $524.00
Remove and replace shelving.Includes
necessary fasteners.
I
Painting $215.37
Painting,Drywall,Paint plaster or
drywall,3 coats 120 SF 1.56 $51.88 $163.49 $0.00 $0.00 $215.37
1 coat primer 2 coats finish $0.43/SF $1.36/SF $1.79/SF
Site Preparation $304.05
Masking&Moving,Move and cover
room contents,Install debris and dust
control. 1 Ea 2.7 $21.09 $282.96 $0.00 $0.00 $304.05
Mancusi Builders LLC., License#: Ma.Contractors Lic# CS-034963 8
Kelly water damage Revised 5.18.15 May 18, 2015
Description Quantity Hours Material Labor Other Subcontract Cost
Finish basement area
Walls&Ceilings $859.36
Drywall,1/2"drywall installed, with
smooth-wall finish 120 SF 3.6 $125.76 $377.28 $0.00 $0.00 $503.04
Includes drywall board,drywall mud, $1.05/SF $3.14/SF $4.19/SF
drywall nails and/or screws,drywall tape,
and corner bead.
Drywall,Drywall patch,drywall patch
(match existing texture or finish) 16 SF 3.2 $20.96 $335.36 $0.00 $0.00 $356.32
Patch drywall walls in stairwell area. $1.31/SF $20.96/SF $22.27/SF
Main Stairwell $3,789.35
Interior Trim $1,267.03
Finish Carpentry,2-1/2"Colonial
casing,stain-grade pine 40 LF 1.64 $78.08 $171.87 $0.00 $0.00 $249.95
Includes Colonial casing,finish nails,and $1.95/LF $4.30/LF $6.25/LF
installation labor.Outside corners are 45-
degree miler joints.Casing to be for
interior window trim,cased openings and
doors.
Painting,stain and Varnish existing
trim and railings 24 LF 9.6 $11.00 $1,006.08 $0.00 $0.00 $1,017.08
Apply,stain with 2 coats of varnish over $0.46/LF $41.92/LF $42.38/LF
existing trim and railings.
Painting $1,363.97
Painting,walls,ceiling and trim. 760 SF 9.88 $328.55 $1,035.42 $0.00 $0.00 $1,363.97
Apply 1 coat primer 2 coats finish to $0.43/SF $1.36/SF $1.79/SF
walls and trimwork.
Site Preparation $307.85
Masking&Moving,Move and cover
room contents, 1 Ea 2.5 $45.85 $262.00 $0.00 $0.00 $307.85
Remove items from construction area
and apply debris and dust protection.
Walls&Ceilings $850.50
Drywall,1/2"drywall installed on
ceilings 56 SF 2.3 $73.36 $142.31 $366.80 $0.00 $582.47
Includes drywall board,drywall mud, $1.31/SF $2.54/SF $6.55/SF $10.40/SF
drywall nails and/or screws,drywall tape,
and corner bead.Also includes
scaffolding,debris protection and
cleanup.
Drywall,Drywall patch,drywall patch
(match existing texture or finish) 1 Ea 2 $58.43 $209.60 $0.00 $0.00 $268.03
Patch drywall walls in stairwell area.
Olen area $4,434.92
Flooring $565.92
Flooring,Carpet,remove for work,
then re-lay 180 SF 5.4 $0.00 $565.92 $0.00 $0.00 $565.92
Includes carpet,feckless strips,seaming $3.14/SF $3.14/SF
tape,and installation. Includes
replaceing 20 sq.ft of carpet pad.
Mancusi Builders LLC., License#: Ma.Contractors Lic# CS-034963 9
Kelly water damage Revised 5.1 8.15 May 18, 2015
Description Quantity Hours Material Labor Other Subcontract Cost
o v ,
Den area
Interior Trim $845.59
Finish Carpentry,Base base shoe,
finger-joint pine 21 LF 3.57 $18.71 $374.14 $0.00 $0.00 $392.85
Install 3-1/2"colonial baseboard, $0.89/LF $17.82/LF $18.71/LF
includes glue,fasteners,shims.All
outside corners will be miter cut at 45%,
all inside corners will be coped.Include
remove and replace sliding closet doors.
Finish Carpentry,Closet shelf
brackets,shelving and rod.Remove
and install. 48 LF 4.32 $0.00 $452.74 $0.00 $0.00 $452.74
Includes shelf brackets,wood closet rod $9.43/LF $9.431LF
cut to length or metal telescoping closet
rod,and bullnose shelf up to 16"wide,
screws,and installation labor.
Painting $1,298.20
Painting,walls,ceiling and trim. 363 SF 10.89 $156.93 $1,141.27 $0.00 $0.00 $1,298.20
Apply 1 coat primer 2 coats finish to $0.43/SF $3.14/SF $3.58/SF
walls,ceiling and trimwork.
Site Preparation $307.85
Masking&Moving,Move and cover
room contents, 1 Ea 2.5 $45.85 $262.00 $0.00 $0.00 $307.85
Remove items from construction area
and apply debris and dust protection.
Walls&Ceilings $1,417.36
Drywall,1/2"drywall installed,replace,
all coats,no texture 140 SF 3.92 $183.40 $410.82 $0.00 $0.00 $594.22
Includes drywall board,drywall mud, $1.31/SF $2.93/SF $4.24/SF
drywall nails and/or screws,drywall tape,
and corner bead.
Painting,stain and Varnish existing
trim and railings 177 SF 7.08 $81.16 $741.98 $0.00 $0.00 $823.14
Apply,stain with 2 coats of varnish over $0.46/SF $4.19/SF $4.65/SF
existing trim and railings.
� t 1
Finish basement area $903.12
Cleanup $903.12
Cleaning, carpet 194 SF 5.82 $2.54 $480.33 $0.00 $0.00 $482.87
Clean carpet and deodorize. $0.01/SF $2.48/SF $2.49/SF
Cleaning, carpet 80 SF 4 $1.05 $419.20 $0.00 $0.00 $420.25
Clean and deodorize carpet in basement $0.01/SF $5.24/SF $5.25/SF
stair area.
General,construction` $2,716.94
Cleanup $2,061.94
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 10
Kelly water damage Revised 5.15.15 May 18,2015
Description Quantity Hours` Material labor - Other Subcontract Cost
General construction
Cleanup
Demolition&Hauling,Dump fee,
Charge per cubic yard 15 CY 0 $1,237.95 $0.00 $0.00 $0.00 $1,237.95
Typical metro area landfill fees. Will be $82.53/CY $82.53/CY
up to 60%higher in major metro areas
and 30%to 60%lower in rural areas.
Final clean-up 1 Ea 0 $0.00 $0.00 $0.00 $823.99 $823.99
Final clean-up of home,Includes
windows floors and walls.
Site Preparation $655.00
Lead Testing 1 Ea 0 $0.00 $0.00 $0.00 $655.00 $655.00
Conduct fluorescent scan of entire
construction area to test for Lead paint.
Main Stairwell $400.96
Cleanup $400.96
Cleaning, carpet 127 SF 3.81 $1.67 $399.29 $0.00 $0.00 $400.96
Clean carpet and deodorize. $0.01/SF $3.14/SF $3.16/SF
Project Total 324.53 $11,099.48 $32,577.22 $763.08 $6,383.63 $50,823.41
Tax $3,176.53
Total with Tax $53,999.94
We appreciate your business and look forward to working with you.
Approved By: Date: ° Date: 0/_' 1 911S_115
Contractor Customer _-
Mancusi Builders LLC., License#:Ma.Contractors Lic# CS-034963 11
The Commonwealth of Massachusetts
z Department of IndustrialAccidents
1 Congress Street, Suite 100
Boston,MA 02114-2017
�w www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers.
TO BE FILED WITH THE PERMITTING AUTHORITY.
Applicant Information Please Print Legibly
Name (Business/Organization/Individual):
Mancusi Builders LLC
Address: 30 Holiday Lane
City/State/Zip: Hampstead NH 03841 phone #: 603.329.8113
Are you an employer?Check the appropriate box: Type of project(required):
L❑I am a employer with employees(full and/or part-time).* 7. New construction
2.[:][am a sole proprietor or partnership and have no employees working for me in 8. Remodeling
any capacity.[No workers'comp.insurance required.]
9. El Demolition
3.®l am a homeowner doing all work myself.[No workers'comp.insurance required.]T
10®Building addition
4.®I am a homeowner and will be hiring contractors to conduct all work on my property. I will
ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions
proprietors with no employees. 12.®Plumbing repairs or additions
521 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑Roof repairs
These sub-contractors have employees and have workers'comp.insurance? Water Damage Repair
6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14. Other
152,§1(4),and we have no employees.[No workers'comp.insurance required.]
*Any applicant that checks box 41 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: _
Policy#or Self-ins.Lia#: Expiration Date:
Job Site Address: 240 Dale Street City/State/Zip: No Andover MA 01845
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00
and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a
day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coverage verification.
I do hereby certify,under the pains and penalties of perjury that the information provided above is true and correct.
Signature: Date:
Phone#: 603.329.81 13
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3. City/Town Cleric 4.Electrical Inspector 5.Plumbing Inspector
6. Other
Contact Person: Phone#:
Massachusetts -Department of Public Safety
Board of Building Regulations and Standards
Construction Supervisor
License: CS-034963
NORMAN E.MANN -- r
30 HOLIDAY LN
Hampstead NH 03841
Expiration
.72
Commissioner 01/31/2016
��e�a�uruarrcoe«lf�o/��crJ�ac rrc:le(/.1
Office of Consumer Affairs&Business Regulation
qfME IMPROVEMENT CONTRACTOR Type.
eqistration: 178539
piration: 4/30/2016 Individual
NORMAN E.MANCUSI
NORMAN MANCUSI
130 HOLIDAY ALNE
HAMPSTEAD,NH 03841 Undersecretary