Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit # 6/9/2015 (3)
BUILDINGtyORTH PERMIT OF�tL�o Z ye y`, ,..•,, V6 O TOWN OF NORTH ANDOVER ® , - Z. APPLICATION FOR PLAN EXAMINATION Permit No#: Date Received °RArE D•�`4a`.(5 Date Issued: r ,/ x gcHusE IMPORTANT:Applicant must complete all items on this page / Ell, � / r r 1l TRI ./ r / ...... 0 TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial VAlteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg X Others: ❑ Demolition ❑ Other E614 C444 a ham. r ,q,,Se tic/r/❑1Nell /r� , � � ,� r,„ rr ,, r ,,, � , /r ��r/��,,,r,/„ ,, �r, ,, r;>,r�r,r, ,,, ,�r / r / „ � ❑ Flood lalnr ❑rWet/ ,,, ,;; ��(,,� , ,/ / ❑ Wate , r, ✓r,,,,. „i ,�.. i/1,,, �.L//r,,.r,���rr!/i/,%r/�//,/,��f/////!�,//�ii��/�/���/f����,rl�/il/��9%�/s: i DESCRIPTION OF WORK TO BE PERFORMED: lylauaes 4XIL i Identification- Please Type or Print Clearly OWNER: Name: r vk M aC I Qe Phone: q Address: ryeir 10 MY /// I//r/i�j//i/ii/r/// /r/%//i /r /f / / /r /ir ,% ,,, ri r/ �/ ...i //• // /� r //.%r/Oil/ j/ r, ,./(i�r///�.oc,,/i /,,,/r.. �/ /. / 1, ,/ / ,,,/. / / /i /%/,, ,r r, ,,. .fir r. „//O //,/ /„ ", ///✓// ,, ,,... r / / r / / / r r .,,rrr r / / r/✓ /r... /, / ., /,/ r.... (/,/ /i rr �, // /i,,.11 / /. // /, r. r. /,..../r /,✓/..r /ir // / ,rr, / r r,,, ,..,,, r ,.,,. it ,, ,,,,. r,/,r�i, ./, /i,/ // ,� ,(,,,.,: /,,/.. / . .� ri /� /� o. ✓ ¢���/ /r / ////r„.. if/r r / r ,>' c!,, , r ,� X191 ,, �: / / r / /,,.r, ✓a///, // ,., / //, l ,��%//�, r , /, r r�// rr/ rii,< ,� ��1 G�� � ,/// � // � /// // 1 ,✓ /r rrr , / / ,r r ARCHITECT/ENGINEER tewtI Phone: 60 Address: L,a O eg . No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST B QED ON$125.00 PER S.F. l Total Project Cost: $ FEE: $ II Check No.: Receipt NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent/O-W �M Signature of contractor V40RTH m'sdover Town of 0 , 0 No. C% T `h ver, Mass, coc 14 ATE BOARD OF HEALTH Food/Kitchen PERMIT T LU Septic System BUILDING INSPECTOR THIS CERTIFIES .......... .......................... has permission to erect .......................... buildings o n ........ ........................ Foundation r Rough to be occupied as .... ..................... .......... ... ....... Chimney 6 rm o I r0i i�' provided that the person accepting this permit shall in every respect conf rm o the term f the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough Service Final BUILDING INSPECTOR GAS INSPECTOR Qccy2an cv Penn it Rea,uired to 0ccMpjvB�ufl1dd�hn a Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. Trident Building, LLC 111Trident 155 N BROADWAY PO BOX 68 SALEM,NEW HAMPSHIRE 03079 A Project Management Company Telephone(603)898.6110 Facsimile(603)890.1070 May 19, 2415 Mr. Anthony DeCarlo Siena Construction 25 Birch Street Cambridge, MA 42138 Re: Merrimack College, North Andover, MA iTech Renovation Project Letter of intentlLimited Notice-to-Proceed Agreement Construction Management Services Dear Anthony: This attached Letter of Intent/Limited Notice to Proceed, once fully executed, shall serve as the Owner's initial agreement and confirmation of the direction that Siena Construction Corporation is authorized to proceed with Construction Management services on this Project based on the terms and conditions contained therein. If the attached meets with your understanding of this Letter of Intent/Limited Notice-to-Proceed agreement, please print & sign 3 copies where indicated and return all three (3) originals to this office for countersignature by the College. We will there forward and request that the Owner execute and return one (1) original to you for your files. Sincerely, Trident Building, LLC Project Advantage Group Agent for the Owner Gino J. Baroni, SMCE, M.I.T. Owner and Managing Principal Enclosures: LOI/LNTP Agreement May 19,2015 Page 1 of 8 Letter of Intent/Limited Notice-to-Proceed Agreement-- Construction Management Services, iTECH Renovation Project Property: Campus of Merrimack College Andover/North Andover, MA 01810 Project: Renovations to the existing Engineering shop area, Mendel Hall Owner: Merrimack College 315 Turnpike Street North Andover, MA 01845 Owner's Project Manager: Trident Project Advantage Group 155 N Broadway, 2nd Floor Salem, New Hampshire 03079 Architect of Record: DSK Architects & Planners 30 Monument- Square Concord, MA 01742 Construction Manager: Siena Construction Corporation 25 Birch Street Cambridge, MA 02138 Primary Contacts: Owner: Mr. Jeff Doggett, Chief Operating Officer or in his absence, Mr. Felipe Schwarz, Assistant Vice President, External Affairs Owner's Project Manager: Mr. Gino J. Baroni or in his absence, Mr. Marc Lehoullier Construction Manager: Anthony DiCarlo, Sr. Project Manager Siena Construction Corporation. 0 2014 Trident Building,LLC Salem,New Hampshire—All Rights Reserved macintosh hd:users:seliwarzf downloads:siennn-owner-em loi-lntp itech reno-5-19-15 mjl(nim edits 5-18-15).doc May 19,2015 Page 2 of 8 Architect of Record: Michelle Ouellette, Project Manager DSK Architects & Planners Intent: It is the intent of the Owner & Construction Manager above to enter into a Construction Management Contract in an amount to be agreed upon. The overall construction budget is approximately JZ§ The negotiated amount shall be Cost plus a fee of 2.5% with a Guaranteed Maximum Price, delivered in an open book manner. An Initial Guaranteed Maximum Price ("IGMP") has been delivered to the Owner in the amount of $831,188.00 based upon Schematic Design documents by DSK Architects, dated 4/29/2015, and RFS MEP Schematic Narrative dated April 24, 2015. The Final , Guaranteed Maximum Price ("FGIVIP") shall be delivered to the Owner upon completion (on or about June 1, 2015) of Construction Documents. All savings, if any shall revert to the Owner. A CM contingency shall be maintained by the Construction Manager in an amount not to exceed 5% of the Cost of the "Work within the Guaranteed Maximum Price. The CM Fee for this work shall not exceed 2.5% of the Cost of the Work. The contract, shall be based upon a modified AIA A107, v. 2004. The language of the contract may be modified by the Owner and is subject to agreement between the parties. Owner's counsel is currently preparing the contract form. Until such time as the agreed upon Contract is executed by both parties, this Agreement shall include, by reference, those Terms and Conditions of the A107. It is the Intent of the Parties to expeditiously execute a Construction Management Contract within thirty (30) days of this Letter of Intent and Limited Notice to Proceed Agreement, subject to proper due diligence by the Parties, and agreement on a Guaranteed Maximum Price. Scope of Services: The Construction Manager shall provide Construction Management services (the "Services") as detailed in Exhibit A (Construction Manager's proposal, dated May (D 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19,2015 Page 3 of 8 6, 2015 REV #2, attached herewith and made a part hereof. In the event of any conflict between the provisions of the Exhibit A and the Terms and Conditions herein or other Exhibits attached hereto, the provisions of the A107 Agreement's Terms & Conditions and/or other Exhibits shall control. _[Continued on Next Page] 0 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19,2015 Page 4 of 8 Terms and Conditions Form Of Compensation -- Cost plus a Fee: Services are to be provided on a Cost plus a fee of 2.5% of the Cost of the Work basis. The total amount of compensation due to the Construction Manager in consideration of the full performance of Services by the Construction Manager is the amount(s) set forth set forth above, released by each fully executed Individual Work Package Authorization(s), until the final Agreement is fully executed. The Owner shall pay the Construction Manager as Services are performed by the Construction Manager based upon the portion of Services properly completed, delivered, and accepted by the Owner. Retainer: None Design Services Reimbursable Expenses: None Billing Terms & Schedule: All billing by the Construction Manager shall be in a form acceptable to the Owner. No more than one billing shall be made in any calendar month and in accordance with the billing schedule established by the Owner. Each billing shall set forth all items for which the Construction Manager is to be paid and include all detail and back-up as requested by the Owner substantiating the Construction Manager's billing. Payment shall be due within thirty (30) days after the Owner receives a proper monthly bill. Other than for the actual non-payment of any amounts properly due and owing, in no event shall the Owner be liable for interest, penalties, expenses or attorneys fees. All billing shall be sent to the Owner at the address stated in this Agreement to the attention of Mr. Jeff Doggett, Chief Operating Officer, with a simultaneous copy emailed to Mr. Marc Lehoullier, Sr. Project Manager at Trident Building, LLC, Marc.Lehoullier@Tridentgrp.com. Q 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19, 2015 Page 5 of 8 Budget& Schedule Understanding: Owner and Construction Manager herein acknowledge and agree to work diligently toward meeting the Owner's budget and schedule requirements for the Project. Insurance-- Minimum Limits: General Liability: $ 2,000,000. Professional Liability: $ N/A Worker's Compensation and Employee Liability: $ (As required by law) Excess Umbrella $4,000,000. The Construction Manager agrees that Merrimack College will be named as an additional insured and a certificate holder of said policies. Authorization To Proceed: The Construction Manager will commence and/or continue to proceed to provide Services in a continuous manner and may be authorized to proceed on additional work pursuant to execution by the Owner and the Construction Manager of Individual Work Package Authorization(s). Work Product: When the Construction Manager has been paid for the Services and/or work product performed by it hereunder, all reports, drawings, and other material either furnished or required to be provided under this Agreement to the Owner shall become the Owner's property and may be used by the Owner thereafter in such manner and for such purposes as the Owner may deem advisable for the intent of this project, without further employment of or additional compensation to the Construction Manager. Other than in the normal course of business requirements with its Construction Managers to perform its Services on the Project, the Construction Manager shall not release or disclose to any third party any reports, drawings, or other materials produced for the Owner on this Project without obtaining the Owner's prior written consent. Limited Liability: ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19, 2015 Page 6 of 8 No General or Limited Partner, Member, Manager, stockholder, officer, director, joint venture, beneficiary, trustee, employee, or other principals, agents, contractors or representatives (whether disclosed or undisclosed) of the Owner, Architect or the Owner's Project Manager shall be personally liable to the Construction Manager hereunder, for the Owner's payment obligations or otherwise. The Construction Manager hereby agrees to look solely to the assets of the Owner for the satisfaction of any liability of the Owner hereunder. Indemnification by Construction Manager: To the maximum extent permitted by law, the Construction Manager agrees to defend, pay, indemnify and save harmless the Owner, Architect and the Owner's Project Manager, their trustees, employees, or other principals, agents, Construction Managers or representatives (whether disclosed or undisclosed) from all suits, actions, claims, demands, damages or losses, expenses andior costs of every kind and description on this Project to which the Owner or the Owner's project Manager may be subjected or put by reason of injury (including death) to persons or property resulting from, in connection with, or growing out of any act or commission or omission of the Construction Manager, its agents, servants, employees, visitors, guests or any person or corporation dealing with the Construction Manager. No Relationship: The Construction Manager acknowledges and agrees that the Architect and Owner's Project Manager are not a party to this Agreement and there exists no relationship, contractual or otherwise, between the Construction Manager, Architect or the Owner's Project Manager. Construction Manager Representations: The Construction Manager represents and warrants to the Owner that it is experienced and able to perform the Scope defined hereunder and future work contemplated in this Agreement and that it has the financial and bonding (if required) capacity and commitment to perform the Scope of Work, subject to proper reimbursement from the Owner. 02015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19,2015 Page 7 of 8 Termination: If the Owner terminates the Construction Manager for any reason, including but not limited to the failure to execute the final Owner-Construction Manager agreement or to meet the Owner's budget and schedule requirements for the Project, under this Agreement, the Owner shall pay to the Construction Manager a sum equal to (i) all proper Cost if the Work expenses incurred to the effective date of termination, plus (ii) all proper costs to the effective date of termination of Services performed as directed under Individual Work Package Authorization(s). Publicity and Releases: The Construction Manager shall not use or release any information about this Project without first providing a written draft of any such materials for the Owner's review and then receipt of written approval to so release. Such approval shall be at the sole discretion of the Owner. Final Agreement: It is specifically understood that the Owner and Construction Manager agree to work diligently, reasonably and in a timely manner to prepare and execute the final Owner-Construction Management Agreement for the proposed Project. It is the Intent of the Parties to expeditiously execute said Owner modified Al 07 Construction Management Contract within 30 days of this Letter of Intent and Limited Notice to Proceed, subject to proper due diligence by the Parties. Jurisdiction: This Agreement shall be governed by the laws of the Commonwealth of Massachusetts. Waiver: The partial or complete invalidity of any one or more provisions of this Agreement shall not affect the validity or continuing and effect of any other provision. 02015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved May 19, 2015 Page 8 of 8 AGREED AND ACCEPTED: OWNER: CONSTRUCTION MANAGER: Merrimack College Siena Construction Corporation By: By: � - George Poulos Printed Printed Title: SV P Title: Controller Hereunto Duly Authorized Hereunto Duly Authorized Date: s��z /t,S Date: 05/22/2015 ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved INDIVIDUAL WORK PACKAGE AUTHORIZATION Number One (1) Pursuant to the terms and conditions of the Letter of Intent Agreement dated May 15, 2015, the Owner hereby directs the Construction Manager to perform the following work package for the Project. 1) See Exhibit A, Siena Construction Corporation Conceptual Estimate for Merrimack College- Engineering Shop Renovation Project (4 pages), dated 5-6-15 REV#2 . 2) The Owner hereby releases the following Services: • General Conditions: $40,000 • Project Requirements $20,000 • Demolition: $19,600 • Concrete $30,000 • Miscellaneous Carpentry $5,000 • Finish Carpentry $65,000 • Doors & Hardware $43,716 • Drywall $30,000 • Specialties $15,000 • Fire Protection $ 10,000 • Mechanical $80,000 • Electrical $60,000 Subtotal: $418,316 Fee @ 2.5% $ 10,458 Total Authorization: $428,774 0 2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved (Page 1 of 2) INDIVIDUAL WORK PACKAGE AUTHORIZATION Number One (1) The budget value of this Individual Work Package No.1 is stated to be Four Hundred Twenty Eight and Seven Hundred Seventy Four ($428,774) Dollars Acknowledged and Agreed Acknowledged and Agreed OWNER: CONSTRUCTION MANAGER: Merrimack College Siena Construction Corporation. By: r% By: Vy"-Q George Poulos Printed Printed Title: Titles: Control ler_ Hereunto Duly Authorized Hereunto Duly Authorized Date: �12� 1 Date: 05/22/2015 (Page 2 of 2) ©2015 Trident Building,LLC Salem,New Hampshire—All Rights Reserved Initial Construction Control Document z I W To be submitted with the building permit application by a d Registered Design Professional �Q for work per the 8°i edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: iTEC Workshop Date: 5/29/15 Property Address: Mendel Building, 315 Turnpike Street, North Andover, MA 01845 Project: Check(x) one o►•both as applicable: New construction X Existing Consh•uctior► Project description: Design of architectural interior renovation I Thomas D.Kearns MA Registration Number: 6938 Expiration date: 8/31/15 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': X Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my laiowledge, information,and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter i 7,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing fli this docttmetit relieves the contractor of its responsibility regarding the provisions of 700 CMR 101/ When required by the building official, l shall submit field/progress reports (see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. EDA Enter in the space to the right a"wet"or electronic sigrrawre and seal: p ga c� 938 u� BOSTON MASS y Phone number: 978-371-7500 Email: tkearns@dskap.com 4tH OF Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate Nvith an•x' project design plans,computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version 06112013 Initial Construction Control Document M v To be submitted with the building permit application by a o Registered Design Professional for work per the 8`►' edition of the a Massachusetts State Building Code, 780 CMR, Section 107 Project Title: iTEC Workshop Date: 5/29/15 Property Address: Mendel Building, 315 Turnpike Street, Nortli Andover, MA 01845 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Engineering modifications to existing building systems for architectural renovations. I, Bruce J. Shuinway,P.E., MA Registration Number; 38620 Expiration date: 06/30/16 , ani a registered design professional, and I have prepared or directly supervised the preparation of all design m plans, computations andspecifications coticerningl: Architectural Structural X Mechanical Fire Protection Electrical Other: for the above named project and that to the best of niy knowledge, information,and belief such plans, computations and specifications sleet the applicable provisions of the Massachusetts State Building Code;(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or niy designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirenie►its of the construction documents. 2. Perforin tile duties fol•registered desigii professiotlais in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed iii a manner consistent with the approved construction documents and this code. Nothittig III this docunieiit relieves the coiltractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent coillnlents, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Docunle►rt'. Etiter in the space to the right a"wet" or -�P�,rtH OF MA&,T. electronic signature and seal; B E J. tiG � a C) E ICAL rj N .3 0 Phone number: 603-524-4647 Email: bshuniway@rfsengineering.com o� . F - G181 FFS�INAA Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an `x' project design plans,computations and specifications that you prepared or directly supervised.If other'is chosen, provide a description. Version 06 11 2013 Initial Construction Control Document = To be submitted with the building permit application by a J Registered Design Professional ~< for work per the 8"' edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: ITEC Workshop Date: 5/29/15 Property Address: Mendel Building, 315 Turnpike Street,North Andover, MA 01845 Project: Check(x) one or both as applicable: New construction X Existing Construction Project description: Engineering modifications to existing building systems for architectural renovations. I, Bruce J. Shu►nway,P.E., MA Registration Number: 38620 Expiration date: 06/30/16 , and a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerningi: Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project and that to the best of my knowledge, information,and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the ditties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this docuiiient relieves the eot:tractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet" or �P�'iN OF M4 electronic signature and seal: H WAY il". M c AL N .38620 Phone number: 603-524-4647 Email: bshumway@rfsengineering.com A FGISIEP�� stoNa-EN Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans,computations and specifications that you prepared or directly supervised. If`other' is chosen, provide a description. Version 06 11 2013 Initial Construction Control Document v To be submitted with the building permit application by a d Registered Design Professional �< for work per the 8t1i edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: iTEC Workshop Date: 5/29/15 Property Address: Mendel Building, 315 Turnpike Street, North Andover, MA 01845 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Engineering modifications to existing building systems for architectural renovations. I, Bruce J. Shumway,P.E., MA Registration Number: 38620 Expiration date: 06/30/16, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerningt: Architectural Structural Mechanical Fire Protection Electrical X Other: Plumbing for the above named project and that to the best of my knowledge, information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by tile contractor in accordance with the requirements of the construction documents. 2. Perforin the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet" or N OF Mgssyc electronic signature and seal: SHU ECF Nl '^,L k:. No 0620 Phone number: 603-524-4647 Email: bsliumway@rfsengineering.com C, SStONAL FN Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an `x' project design plans,computations and specifications that you prepared or directly supervised. if`other' is chosen, provide a description. Version 06 1 1 2013 Initial Construction Control Document H To be submitted with the building permit application by a d Registered Design Professional for work per the 8t1i edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: iTEC Workshop Date: 5/29/15 Property Address: Mendel Building, 315 Turnpike Street, Nortli Andover, MA 01845 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Engineering modifications to existing building systems for architectural renovations, I, Bruce J. SI►umway,P.E., MA Registration Number: 38620 Expiration date: 06/30/16 , am a registered design professional, and I liaw prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical X Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)sliall perform the necessary professional services and be present on the construction n site oa regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance witli the requirements of the construction documents. 2. Perfortii the duties for registered design professionals iii 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction docuinents and this code. Nothing in this docutnent relieves the coa.tractor of its respcnsibility regarding the provisiot:s of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I sliall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a"wet"or �P�(H OF AMMASS�cti electronic signature and seal G� uw v EC AL No 8620 Phone number: 603-524-4647 Email bshumway cr rfsengineering,com A�oISTEP����a`�``�` FSstONAL Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans,computations and specifications that you prepared or directly supervised. If`other'is chosen, provide a description. Version 06 1 1 2013 Merrimack College—iTEC Workshop Page 1 of 7 MERRIMACK COLLEGE—I'TEC WORKSHOP 315 TURNPIKE ROAD NORM ANDOVER MA DESIGN INFORMATION& NARRATIVE REPORT(780 CMR CHAPTER 9) a) Description of Project: This project consists of modifying an existing fire protection, fire detection, and fire alarm notification system for the renovation of the proposed ITEC Workshop in Mendel Hall. The building is provided with an automatic sprinkler system. Flow control valve stations are located at each floor level in the egress stairwells. The system is provided with an existing fire department connection. The fire protective signaling system is a fully-addressable type system. This includes manual fire alarm boxes located within five (5) feet troiil the entrance to each exit and horn/strobe alarm notification appliances (A/V). All A/V units have been located to comply with applicable sections of the Massachusetts State Building Code (780 CMR) Chapter 9, NFPA 72 and the 521 CMR Architectural Access Board requirements. All visual devices will have candela rating sized in accordance with NFPA 72, Chapter 18. b) Codes& Standards Used; 527 CMR- Board of Fire Prevention Regulations �P��H OF Mg SSgc 780 CMR Massachusetts State Building Code, 8th Edition r;N 521 CMR- Architectural Access Board N .3 t CMR 12.00 -Massachusetts Electrical Code (MEC) �FFSSIONA���� NFPA and Other Codes: NFPA 13 Installation of Sprinkler Systems (2013 Edition) NFPA 72 Fire Alarm Systems (2010 Edition) NFPA 101 Life Safety Code(2009 Edition) c) Design Criteria& Systems Features: The area of renovation will be provided with an automatic sprinkler system. The office areas are designed as Light Hazard. Labs, storage rooms, mechanical rooms and electrical rooms are designed as Ordinary Hazard Group I. The existing Main Fire Alarm Control Panel, (FACP) is a Simplex 4100U is located in the main entrance lobby. New initiating and notification devices will be added in the ITEC laboratory space and connected to the existing fire alarm system. System programming will be completed to incorporate the new devices. J.1Afaslerl7815.0011Reporlsl7815.2015-OG-01 FP-F/I Nm•rative.doc Meri-irnack College—iTEC Workshop Page 2 of 7 d) Sequence of Operation: Fire Protection System: When a fire occurs, the heat will build up at the ceiling. When the temperature reaches a certain level, determined by the type of sprinkler head, the fusible element will melt or the glass bulb will break. This will cause the release of water through that head to wet the fire area. When the water flow starts, the flow will move the sprinkler zone paddle switch and the building alarm check paddle switch creating both a sprinkler zone flow alarm and a building flow alarm both of which will be received by the fire alarm control panel for the building. Activation of any manual fire alarm box (pull station) or any heat detector will immediately and simultaneously activate designated horn strobes, release electro- mechanically-held smoke doors, and transmit an alarm message to the city masterbox and central monitoring station. Activation of a fire protection flow switch shall immediately and simultaneously activate designated horn strobes, release electro-mechanicaily-held smoke doors, and transmit an alarm message to the city masterbox and central monitoring station: Activation of a single smoke detector shall immediately and simultaneously activate designated horns and strobes, release electro-mechanically-held smoke doors, and transmit an alarm message to the city masterbox and central monitoring station. All supervisory signals shall annunciate at the FACP, remote annunciators and send a signal to the central monitoring station. All alarm conditions will be indicated at the annunciator in the FACP and remote annunciators. All alarms, pre-alarms, trouble conditions and other changes of state shall be saved in the computer-based memory file within the fire alarm panel. The panel's liquid crystal display (LCD) shall indicate the most recent change of state and shall indicate the status or the history of the panel and peripheral devices. The "alarm" and "supervisory" resets of the fire alarm system shall be accomplished manually at the panel. All "trouble" conditions shall deactivate at the panel when the trouble condition clears. Generally speaking, "dirty detector," "detector head missing", and "low battery" conditions would not be expected to clear on their own. The transponder shall transmit the following signals/messages to the central monitoring station: 1) Fire Alarm 2) Fire Trouble 3) Supervisory Trouble e) Testing Criteria: 1) Professional in Charge for Setting Up and Coordinating All Testing: Construction Manager Fire Protection Contractor J:1,I,fasler17815.0011Repor1s17815.2015-06-01 FP-FAA'arralive.doc Merrimack College—iTEC Workshop Page 3 of 7 Electrical Contractor Mechanical Contractor BAS Contractor 2) Verification: Method of verification and confirmation by professional in charge, that all fire protection systems, equipment and devices have been individually tested and tested as an entire system when specific systems are integrated to form a building life safety system. Engineers of Record, Building Official, Fire Department, Owner, and Contractors will witness tests. Installing Contractor to prepare test report. Tests will be submitted as required in Contract Documents. All features, devices, components, and modes of operation shall be 100% tested for acceptance in accordance with the relevant codes and NFPA-72. 3) Coordination of Testing: Construction Manager in charge will schedule test dates by mail. Contractor to include equipment for testing. 4) Testing Criteria: Fire Protection: (a) Sprinkler Testing: When the sprinkler system and fire alarm systems are complete, the following tests .nest be complete: (1) The sprinkler system will have two hundred (200) pounds of pressure pumped into it to prove there are no leaks or defects in the sprinkler pipe or its fittings. This pressure must remain in the system for two (2) hours. (2) Every control valve will be closed (or opened if normally closed) to activate the silent alarm on the fire alarm panel. This will indicate a valve is closed and the sprinkler system has lost its water supply. (3) At each flow switch a flow test line will be opened to allow a sufficient amount of water to flow through the new flow switches. The flow of water will move the internal paddle activating the flow switch. The activation of this flow switch will send a signal to the fire alarm system that the system has water flow. (4) The tests listed above must be completed by the Fire Protection Contractor and witnessed by a representative of the Owner. Before the tests are done the fire department will be called and notified so they may view the tests. (5) All fire protection systems shall be tested in accordance with the applicable provisions of 780 CMR and NFPA Standards and the North Andover Fire Department. J.I,tlaster17815.00111Zeports17815.2015-06-01 FP-FA Marrative.doc Merrimack College—iTEC Workshop Page 4 of 7 (6) Obtain, in writing, approval of tests by authorities having jurisdiction over installation and submit to Owner before final acceptance of work. (7) No part of system shall be concealed or closed in (this includes backfilling and application of insulation) Until such portions have been tested and approved. (8) Notify Architect and various departments and bureaus forty-eight (48) hours in advance of time that tests are to be made, (9) Operating test of sufficient duration shall be made for equipment, fixtures, and accessories to Owner's satisfaction. (b) Fire Alarm System Testing: (1) Test initiating devices to assure zone, device address, nomenclature, and ability for the device through its programming to indicate an alarm condition at the fire. alarm control panel and cause the devices to sound and/or strobe. The fire alarm system shall be fully tested in accordance with NFPA 72, Chapter 7 Standards. Each and every new device shall be tested including 10% of existing initiating devices. A copy of the final test report shall be submitted indicating proper functioning of the system and conformance to the specifications. The test shall be performed by Factory-Trained qualified Technicians. Each and every device shall be tested and stand-alone operation of remote panels shall be verified. Manufacturer shall guarantee all system equipment for a period of one (1) year from the date of final acceptance of the system. The Contractor shall guarantee all raceways and wiring to be free from inherent mechanical or electrical defects for one (1) year from the date of final acceptance of tl.e system. Additionally, each Contractor shall include, as part of their base bid, the cost of a one-year test and inspection contract. This contract shall provide for quarterly tests according to UL, NFPA and Local requirements. Upon its expiration, the contract shall be renewable by the Building Owner. (2) Contractor to include equipment for testing. (3) Test smoke detectors with canned smoke or magnet to activate an alarm condition (verify with North Andover Fire Department). (4) Test heat detectors with test magnet or hot air (verify with North Andover Fire Department). (5) Test manual pull stations by pulling the handle on the device to activate an alarin. (6) Test flow switches on all zones and the main with Sprinkler Contractor and time with digital stopwatch. J:1,ifcrsierr17315.0011Reporls17815.2015-06-01 FP-Ful A'arralire.doc Merrimack College—iTEC Workshop Page 5 of 7 (7) Test tamper switches at each zone on main riser and both sides of backflow preventer. Verify a supervisory signal is sent to the fire alarm control panel when in the off-normal state. (8) Perform integrity testing on the SLC loop by creating a ground fault at a detector and initiating the nearest device in the loop and assure a trouble condition is sent to the fire alarm control panel. (9) Open SLC loop at a device by removing the negative wire from the device and initiate nearest device and assure the loop functions properly in an open wire scenario and ensure the fire alarm control panel registers a trouble condition. (10) Test horn strobe units by opening and ground faulting the circuit to verify a trouble signal is sent to the fire alarm control panel. (11) Remove random horn strobes and ensure the functionality of the remaining devices. (12) Remove DC power by unplugging batteries and ensure that a trouble signal is transmitted. (13) Remove AC power and initiate multiple alarms to ensure the system operates properly on battery backup. (14) Verify the alarm is received at the North Andover Fire Department and central station. 5) Eau ipment and Tools: (a) Identification of equipment and procedures to be used to verify system performance: Manufacturer's instructions Specifier's special instructions Narrative Report, sequence of operation section Smoke machines Smoke candles Sound meters Fire hoses, nozzles Flow measuring devices Gauges Voltage meters Magnets Communication radios Fire department equipment Special tools Notification announcements If a system or a portion of a system fails to operate, notify the Contractor and Engineer of Record. Review and remedial actions will be J:Iil,fasier17315.0011Reporls17815.2015-06-01 FP-FSI Narralive.doc Merrimack College—iTEC Workshop Page 6 of 7 recommended. The Contractor will implement the required corrective work, 6) Approval Requirements: (a) Method of approval required from code official that system satisfies all operational code compliance requirements -written. 100%testing is required. (b) Documentation is to be submitted to code officials at completion verifying that systems are in compliance with all laws, regulations and standards and pre-approved narrative reports, (1) Testing Report. (2) Construction observation reports and affidavits. (3) Guarantees from the Contractor. (4) Record Drawings. (5) Operating and Maintenance (O&M) Data containing: • Description of each system with description of each major component of the system. • Complete set of page-size equipment Shop Drawings including any control drawings. • A lubrication schedule of all specified equipment. • Spare parts list, • Equipment identification list with serial number. • Page-size valve tag schedule and flow diagrams. • A copy of the pertinent NFPA standards(as applicable to design), • Names, addresses, and phone numbers for all suppherS Service personnel for all equipment. • Copies of all product equipment and system guarantees from manufacturers, including signed written guarantee of systems from this Subcontractor. • Copy of all pertinent NFPA system maintenance manuals. • A schedule of intervals for system maintenance. • A schedule of intervals for system testing. (6) Documentation as required by 780 CMR, Section 901.5. (7) Prior to testing, certification from the registered professional engineer responsible for the design stating that the fire protection systems have been installed in accordance with the approved fire protection construction documents and that he or she has reviewed the shop drawings for conformance and has identified deviations, if any, from the approved shop drawings. (8) Witness by the Fire Department and Building Department Official for satisfactory functional test of all fire protection systems. Testing shall be conducted for 780 CMR and NFPA Standards. (9) Confirmation by the building owner that they have received the as- built drawings from the installing Contractor, and the registered Professional Engineer has certified their reasonable accuracy. J.I,blaster17815.0011Reporis17815.2015-06-01 (P-PA Narrative.doc Merrimack College—iTEC Workshop Page 7 of 7 (10) Material, test, performance, and completion certificates by the installing Contractor. (11) Documentation to be submitted to code officials listing names, addresses, and telephone numbers of personnel for emergency notification. (12) Fire alar►n riser diagram. (13) Fire alar►n battery calculations. (14) Fire alarm notification circuit voltage drop calculations. (15) All construction work shall be performed in a safe workmanlike manner. Proper construction safeguards shall be implemented in strict conformance with 780 CMR Chapter 33, Safeguards During Construction and NFPA 241, Construction, Alteration and Demolition Operations. J:hllasrer17815.0011Repo,•rs17815.2015-OG-01 FP-EllNarrcnnve.doc Department of IndustrialAccidents Office of Investigations - 1 Congress Street, Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Siena Construction Corporation Address: 26 Birch Street City/State/Zip: Cambridge, MA 02138 Phone#:617-547-4546 Are you an employer? Check the appropriate box: Type of project(required): i.1� I am a employer with 30 4. ❑ I am a general contractor and I b. ❑New construction employees (full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. M Remodeling ship and have no employees These sub-contractors have g. ❑Demolition workingfor me in an capacity. employees and have workers' Y p tY• 9. ❑Building addition [No workers' comp. insurance comp. insurance.t required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself [No workers' comp. right of exemption per MGL 12.❑Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.[:]Other comp. insurance required.] *Any applicant that checks box#I must also fill out the section.below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Selective insurance Company of Southeast Policy#or Self-ins. Lic. M WC9008328 Expiration Date:01/01/2016 Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a Bni of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Signature: Date: 01/05/2015 Phone#: 6175474546 Official use only. Do not write in this area,to he completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector d.Other Contact Person: Phone#: 0 L12/30/]2014 MIDDIYYYY) �' CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 1XIM"P" Ted Matthews The Driscoll Agency, Inc. PHONE -66 Fac o: 1- 93 Longwater Circle MAIL y P.O. Box 9124 AnDREss: d dr' c c .co Norwell MA 02061 INSURERS AFFORDING COVERAGE NAIC# INSURER A-Selective Insurance Ca of Southeast 39926 INSURED 17558 INSURER a: Siena Construction Corporation INSURER C: 25 Birch Street INSURER 0: Cambridge MA 02139-4514 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER:259111424 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE POLICY EFF POLICY EXP LIMITS LTR N9 WVD POLICY NUMBER M IDD MIDD A GENERAL LIABILITY 2139638 /1/2015 /1/2016 EACH OCCURRENCE $1,000,000 X DAMAGE TO RENTED COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence) $100,000 CLAIMS-MADE D OCCUR MED EXP(Any oneperson) $10,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $3,000,000 GE N'L AGGREGATE LIMIT APPLIES PER; PRODUCTS-COMP/OP AGG $3,000,000 POLICYFX PRO- LOC $ JECTA AUTOMOBILE LIABILITY A9099881 1/112015 /1/2016SINGLE LIMIT EaaociED $1,000,000 ANYAUTOI I BODILY INJURY(Per Penson) $ ALL OWNED SCHEDULED"UTOS AUTOS Ii BODILY INJURY(Per accident) .$ X . X HIRED AUTOS X NON-OWNED PROPERN DAMAGE $ AUTOS Per aocident a w A X UMBRELLA LIAB X OCCUR S2139638 1/1/2015 /1/2016 EACH OCCURRENCE $5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED X RETENTION None $ A WORKERS COMPENSATION C9008328 1/1/2015 !112016 X WC TORYLIMIT ER AND EMPLOYERS'LIABILITY Y/N ANFICERIMEMBEREXCLNERIE ECUTIVE� NIA E.L.EACH ACCIDENT $1,000,000 (Mandatory in NH) E.L,DISEASE-EA EMPLOYEE $1,000,000 If yes,,describe under DERIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 A Leased/Rented 2139638 1/1/2015 /112016 Per Single Unit $100000 Equipment Aggregate $100000 DESCRIPTION OF OPERATIONS I LOCATIONS i VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If more space Is required) CERTIFICATE HOLDER CANCELLATION Siena Construction Corporation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 25 Birch Street ACCORDANCE WITH THE POLICY PROVISIONS. Cambridge, MA 02138 AUTHORIZED REPRESENTATIVE //l ©1988.2090 ACORD CORPORATION. All rights reservec ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD l Massachusetts -Department of Public Safety \ f Board of Building Regulations and Standards Construction supervisor License: CS-083597 ANTHONY S DICAI" 43 FAIItFAX ST Somerville NIA0144 ✓.�..M �.6[ " '�' Expiration Commissioner 0111212016 Unrestricted-Buildings of any use group which contain less than 35,000 cubic feet(991m)of enclosed space. Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. For DPS Licensing information visit: www.Mass.Gov/DPS