Re: Watershed Special-Permit ,.
Lot 20A Bridle.Path
Henry Kucharzyk, owner
Dear Mr. Daley:
In accordance with Condition#3a of the Watershed Special Permit Approval issued by
the Planning Board, I hereby certify that the construction at the above referenced address
has been completed in substantial compliance with the plans approved by the Planning
Board, with the following exception:
1. The approved plan included a Cape Cod Berm at the end of the driveway that was
proposed to trap stormwater runoff and direct it into the catch basin. The Cape
Cod Berm was not installed. However,the driveway was graded such that the
catch basin lies within a depression. The rim elevation of the catch basin is
approximately three inches lower than the elevation of the pavement at the end of
the driveway. The grading of the driveway serves the same function that the Cape
Cod Berm would, i.e., it prevents runoff from bypassing the catch basin.
Very truly yours,