HomeMy WebLinkAboutApplication - 205 DALE STREET 7/5/2005 RECEIVED
E
WATERSHED SPECIAL PERMIT APPLICATION
205 DALE STREET
NORTH ANDOVER, MA 01845
PREPARED FOR
JAMES AND SANDRA TIMMONS
NORTH ANDOVER,MA 01845
JULY 5,2005
PREPARED BY:
NEW ENGLAND ENGINEERING
60 BEECHWOOD DRIVE
NORTH ANDOVER, MA 01845
G
BENJAMIN C.
o OSGOOD,JR. '
CIVIL "' 3
NO.45989
FOIST
�a�
Town of North Andover Planning Board
Application for Watershed Special Permit
Please type or print clearly.
1. Petitioner: :5 AMU 5 >, 5 yq'e7 9 R 14 'f"1 M M D ^f$
Petitioner's Address: 205 .DA iS flraO !! do 2711 AN
Telephone number: q7B - 6 SS - 716
2. Owners of the Land: JrAM65 > ,SA4ND R,4 'Tt Miv10NS
Address:_ ZC.S D#41�p, N�12-rk AAJ D D✓e/1.
Number of years of ownership: 3 O-F•
3. Year lot was created: 6 q 73
4. Is the lot currently on septic or sewer? 5�'�71 C
If on sewer,please provide date the sewer connection was completed:
5. Description of Proposed Project: r+PP v-0 o J 0-r- «f2.R G-E
-P X,S-1—( r 5 i AV C 7'j12
6. Description of Premises: r X1.577,,U Cr q(g_ 760"? S
L4-/ I-J-)-t .SlN&LL% 1-,I Mle.y r->c-JEC LJAJ G
7. Address of Property Being Affected R O S D A 1.E .s rt-A e
Zoning District: -
Assessors-. Map: 878 Lot# 61 if
Registry of Deeds: Book#: 1133 Page#: /(6 S
8. Existing Lot:
Lot Area(Sq.Ft) qn, 7(n BuildinglIelght :2.5 4
Street Frontage: 75' Side Setbacks: So' 115
Front Setback: Rear Setback: /-JO
Floor Area Ratio: Lot Coverage:
9. Proposed Lot(if applicable):
Lot Area(Sq.Ft) Ql,,76 A Building Height ,
Street Frontage: 7-6- Side Setbacks: S/ ' YS
Front Setback: 3 q0" Rear Setback: IYo
Floor Area Ratio: Lot Coverage:
10. Required Lot(as required by Zoning Bylaw):
Lot Area(Sq.Ft) 87, 1 R O Building Height 3J
Street Frontage: 17"5 Side Setbacks: 3C,
'
Front Setback: 30, Rear Setback: 3c�
Floor Area Ratio: 0114 Lot Coverage: Iyl Kl
it. Existing Building(if applicable):
Ground Floor(Sq.Ft.) 1(y 8 U #of Floors: 2
Total Sq.Ft. 2.5 '1 Height:
Use: Re'+o C^'t1� t7"�j CVL%fj r Type of Construction �—j I✓lLA/%&F-
12. Proposed Building:
Ground Floor(Sq.Ft.) 31 2 O #of Floors: z
Total Sq.Ft. Height: z2 l
use: Type of Construction ,v o.c-s> i=aA-i
13. Has there been a previous application for a Special Permit from the Planning Board on these
premises? /iO If so,when and for what type of construction?
14. Section of Zoning BvIaw that i Special Permit Is Being
Requested 13 G C.t...l.,) I/ ;, >. S _ &1./516 G
15. Petitioner and Landowner signature(s):
Every application for a Special Permit shall be made on this form which is the official form of the
Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the
responsibility of the petitioner to furnish all supporting documentation with this application.
The dated copy of this application received by the Town Clerk or Planning Office does not
absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses
for filing and legal notification. Failure to comply with application requirements,as cited herein
and in the Planning Board Rules and Regulations may result in a dismissal by the Planning B oard
of this application as incomplete.
Petitioner's Signature:
Print or type name here: t.ti C Qsy d,,Q i 45K--i
Owner's Signature:_ ��� 4:::Z,7
Print or type name here: OT
16. Please list title of plans and documents you will be attaching to this application.
WATERSHED SPECIAL PERMIT APPLICATION
249 MARBLERIDGE ROAD
NORTH ANDOVER, MA 01845
INTRODUCTION
This application is being submitted to allow the construction of a garage addition to the
existing home in the watershed protection district. The site is currently one single family
lot with 75 feet of frontage and 90,762 square feet of area and is improved with a single
family home and appurtenances. The lot as it exists today is fully landscaped with a
mowed lawn which is used as yard and a horse coral.
The enclosed plans propose the construction of a garage addition to the existing dwelling.
The new garage is proposed as being constructed within the non discharge buffer zone
associated with the wetlands at the rear of the property as allowed by the bylaw. The
structure on Lot 2 however is located within the non discharge buffer zone of a wetland
located on the opposite side of Marbleridge Road. This wetland does not receive flow
from the site or from Marbleridge Road and a variance is to be sought from the Board of
Appeals.
SPECIFIC SPECIAL PERMIT REQUESTS
4.136(3)(c)(ii)(1)Changes in Topography or Grade
Grading for the homes and the infiltrator areas will occur in the Non-Disturbance Buffer
Zone.
4.136(3)(c)(ii)(2)Vegetation removal or cutting
Grading for the addition and construction of the addition will cause the removal of
existing lawn areas.No tree would be cut in association with the construction.
4.136(3)(C)(ii)(5) Increases in surface water discharge
In conjunction with the construction of the garage there is an increase of impervious area
resulting in a potential increase in storm water runoff.To offset the increase the existing
structure and the proposed garage will have the roof runoff directed in to gutters and in to
an infiltrator system which will infiltrate the increased flow in to the ground. The result
of this infiltration is to reduce the flow from the site due to the fact that all of the water
from the proposed roof will be infiltrated in to the ground.
4.136(3)(c)(iii)(3) Expansion of an existing structure in the Non-Discharge buffer zone
Construction of the garage addition attached to the existing house. A variance will be
sought to allow the expansion of the home by more than 25%within the Non-Discharge
Buffer Zone .
STATEMENT OF WATER QUALITY IMPACT
CONSTRUCTION OF A GARAGE ADDITION
205 DALE STREET,NORTH ANDOVER, MA
Potential degradation of water quality associated with residential development can be
most closely associated with the following:
• Ground water contamination from on site subsurface sewage disposal systems.
• Construction activity resulting in erosion of soil into adjacent wetlands.
• Increases in storm water volume runoff from impervious surfaces.
• Chemical loading as a result of fertilizer and pesticide application.
None of the above activities at the above referenced location will adversely impact the
water quality in the adjacent wetlands and downstream waters, i.e. Lake Cochichewick
due to the following:
• The site is currently serviced by a septic system which will be replaced by a
municipal sewer.
• Erosion control consisting of double staked haybales backed by siltation fence
will be installed between the project site and the downstream wetland areas to
prevent siltation during construction.
• Increases in storm water volume will be absorbed by infiltration of roof water
runoff in to the ground.
• Use of organic and low nitrogen fertilizers and curtailing the use of pesticides will
reduce the potential chemical loading in to adjacent wetlands.
o Maintaining a 25' buffer zone area will promote on site treatment of runoff water.
Application of the above measures will result in no increase in concentrations of nitrogen,
phosphorous and other dissolved inorganic chemicals. The quality of surface and ground
water adjacent to Lake Cochichewick will not be adversely impacted by the proposed
construction at 205 Dale Street,North Andover.
Benj Jr.,P.E.
BENJAMI C. (P
05000D,JR,
CIVIL
N0. 9I
G
s /Ott