HomeMy WebLinkAboutPlans - 1275 TURNPIKE STREET 7/30/2015 Q
c
SENIOR LIVING BRIGHTVIEW NORTH ANDOVER, MA o
PROPOSED CORRIDOR MODIFICATION
ISSUED FOR PERMIT: June 03,2015
W
O w
® p
z0
Q z
2 � �
16 LU
a' zU)
OWlw
z w
co o
W Y
a-
z
I—
_ D
O �
r
m
INDEX OF DRAWINGS a
SHEET NO. SHEET DESCRIPTION z
AO COVER SHEET O c0i a
Al GENERALNOTES
a
A2 SECOND FLOOR LIFE SAFETY&KEY PLAN O
A3 FOURTH FLOOR LIFE SAFETY&KEY PLAN
A4 SMOKE DOOR PLANS&SECTION z
-l�–rS
r
MEP NOTES DEMOLITION NOTES GENERAL NOTES
1. ADD SMOKE AND FIRE DAMPER AT 1. ALL DEMOLITION TO BE DONE PER 1. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS.PROMPLY NOTIFY
EGRESS DOOR ASSEMBLY. OSHA REQUIREMENTS AND THE ARCHITECT OF ANY ERRORS,OMISSIONS,INCONSISTENCIES
SMOKE AND FIRE DAMPER SHALL GUIDELINES AND SHALL COMPLY OR OTHER PROBLEMS IMMEDIATELY UPON DISCOVERY,AND
BE INSTALLED WITHIN 18"OF NEW WITH APPLICABLE SECTIONS OF BEFORE PROCEEDING WITH THE WORK.
WALL.INTERLOCK POWER-OPEN NFPA. 2. ALL INDICATIONS AND NOTATIONS ON THE DRAWINGS APPLYING TO
DAMPER WITH AREA SMOKE 2. PATCH AND REPAIR ALL WALLS, ONE AREA,COMPONENT OR CONDITION,SHALL APPLY TO ALL
DETECTORS TO CLOSE UPON FLOORING AND CEILING MATERIALS OTHER SIMILAR AREAS,COMPONENTS AND CONDITIONS,UNLESS
DETECTION. DAMAGED OR EXPOSED BY CLEARLY INDICATED OTHERWISE.
2. ALL ELECTRICAL CABLING AND DEMOLITION WORK AND NEW 3, DIMENSIONS ARE TAKEN FROM COLUMN AND PARTITION
CONDUIT INSTALLED THROUGH CONSTRUCTION. CENTERLINE.CLEAR DIMENSIONS ARE TO THE FINISHED FACE OF
THE WALL OF THIS EGRESS DOOR 3. ALL EXISTING WALL,FLOOR AND NEW CONSTRUCTION AND SHALL TAKE PRECEDENCE OVER ANY
ASSEMBLY SHALL BE ENCLOSED CEILING PENETRATIONS TO BE OTHER DIMENSION.
IN(1)HOUR RATED SEALED AS REQUIRED TO 4. PROVIDE NEW SPRINKLERS IN ALL REMODELED AREAS AS
CONSTRUCTION. PRESERVE SOUND BARRIERS AND REQUIRED BY CODE AND NEW PARTITION/DOOR LOCATIONS.
3. FIRE PROTECTION SPRINKLERS FIRE RATING, 5. ADD EXIT SIGNS ON BOTH SIDES OF NEW WALLAS REQUIRED TO
SHALL NOT BE INSTALLED CLOSER 4. PROVIDE DUST AND NOISE MEET CODE.
THAN 6"OR FURTHER THAN T6" PROTECTION FOR ADJACENT 6. PROTECT EXISTING FIXTURES TO REMAIN DURING CONSTRUCTION.
FROM THE WALL OF THE EGRESS SPACES DURING DEMOLITION. 7. EXISTING GWB CEILINGS TO BE REPAIRED AND/OR REPLACED AS W Q
DOORASSEMBLY.INSTALL 5. MAINTAIN TWO MEANS OF EGRESS REQUIRED FOR A"LIKE NEW"FINISH. \ `<
ADDITIONAL SPRINKLER HEAD(S) AROUND WORK AT ALL TIMES,FOR 8. SUB-CONTRACTOR SHALL VERIFY COMPLIANCE WITH LOCAL CODES / K
OR RELOCATE EXISTING BUILDING OCCUPANTS. AND REQUIREMENTS OF LOCAL AUTHORITIES HAVING JURISDICTION ® W
SPRINKLER HEAD(S)AS 6. ALL EXISTING FIRE-PROOFING TO FOR MINIMUM CODE DESIGN CRITERIA. Q
REQUIRED. REMAIN.WHERE EXISTING FIRE- 9. PATCH AND REPAIR ALL WALLS,FLOORING AND/OR CEILINGS
PROOFING IS DISTURBED,REPLACE MATERIALS DAMAGED OR EXPOSED BY DEMOLITION WORK AND NEW Z Z
WITH NEW TO PRESERVE EXISTING CONSTRUCTION.PATCH AND REPAIR EXISTING FINISHES TO MATCH Q Q c
FIRE RATINGS. NEW FINISHES AS REQUIRED. = F W
H p 0
Z Z
JQ
2 6'-0"V.I.F. 2" 2" OLu
7'-0"V.I.F. 2" i
GWB RECESS TO RECEIVE Z
MAG.HOLD-OPEN SO DOOR W
3'-0" 3'-0" 3 6 3 6 W W
CAN BE HELD OPEN Y C'1
_ — PARALLEL TO WALL > z
- 1 HR RATED H.M. - = f
DOORS TO MATCH NEW RATED PARTITION = F
s" s" BUILDING STANDARD
6 9
_ FIRE RATED CLEAR
_ SAFETY GLASS MAGNETIC HOLD-OPEN m
i v.LF.
BUILDING STANDARD -y _ _ 0
o0
a
PANIC BAR ON PUSH - 7E
SIDE OF EACH DOORiEy-__-==7] o w Y
LEAF
_ z HOLLOW METAL
v EXISTING WALL
¢ FRAME - i °o O z
U p
OU
DOOR TYPE @ 4TH FLOOR2 DOOR TYPE 2ND FLOOR TYP. DOOR SECTION
J
SCALE: 3/8"=1'-0" SCALE: 3/8"=1'-0" SCALE: 3/8"=1'-0" �� e
MINIMIZE A-B _ _ —
000
3
A4 REMOVE EXISTING DOUBLE
DOOR&FRAME AS
—EXISTING CORRIDOR REQUIRED BY NEW WORK
PARTITIONS AND
DOORS TO REMAIN
AC
- NOTE:
EGRESS TO FIRE STAIRS MUST BE —
PROVIDE NEW EXIT SIGN TO ^�' a MAINTAINED DURING DEMOLITION ————————
MATCH BUILDING STANDARD, CLOSET AND CONSTRUCTION.COORDINATE CLOSET PATCH&REPAIR EXISTING
ON BOTH SIDES OF NEW THIS WORK WITH NORTH ANDOVER FINISHES TO MATCH EXISTING
DOORS.ALIGN EXIT SIGNS BUILDING AND FIRE DEPARTMENTS. ADJACENT FINISHES
WITH CENTER OF CORRIDOR. -
A-7
Z W < '-
2
Q
A-7
2 ENLARGED SMOKE DOOR PLAN 2ND FLOOR DEMOLITION PLAN p W
1/4.,_1,_p„ 1
1/4"-1'-0" 0 o Y
zzon
Q a >
2 w
HLL
z "
O I— w
AREA OF I o z LD LL
WORK eREPSTAIC
F
DO of
LASTTING2NR a - W Y O
a v C7
N O
I W
c/)
IoCITEDS =
b
000
THE CEILING F Dl NEDS ARE TQ HEW
BUILDING STANDARDS.
O�
TRUE PROJECT U
NORTH NORTH 0
U
-r— 3 —Li — u
Z y A4
A4 —EXISTING CORRIDOR
SIM 2 PARTITIONS AND
A4 DOORS TO REMAIN
moz rl NOTE-
B-G _ EGRESS TO FIRE STAIRS MUST BE
_ MAINTAINED DURING DEMOLITION
�' 1, ` AND CONSTRUCTION.COORDINATE
THIS WORK WITH NORTH ANDOVER
z BUILDING AND FIRE DEPARTMENTS.
PROVIDE NEW EXIT SIGN TO—
MATCH BUILDING STANDARD,
ON BOTH SIDES OF NEW W J
DOORS.ALIGN EXIT SIGNS
WITH CENTER OF CORRIDOR. B-5 O W }
ENLARGED SMOKE DOOR @ PLAN 4TH FLOOR ® 'o Y
zz 00,5
}
= F H
LL
0,z
o1-
zW _�
w
` K J
Eo AREA OF TAIR 5 On
Lr
PRoaos �DcanDN OF
000as WORK rESI-G.z HE
FIRE—I w w Y 0
> O_ O
FFE si - -
LL
I I
m O
USiAW
1
LL
U /
RE STAIR
PANELS IN THE QQQ 1
U
v TEoa
PANELS All O
IF
EUfLFG1 STANDAaos. 08
o�
U
TRUE PRO ECT
NORTH NORTH Q
DOOR SCHEDULE
DOOR DOOR FRAME
ROOM NAME NO. WIDTH HEIGHT THICKNESS TYPE MATERIAL FINISH TYPE MATERIAL RATING
COMMENTS
SECOND FLOOR
CORRIDOR 1000 (2)3'-6" T-0" 13/4" 1 HOLLOW METAL PAINTED A
CLOSET 1001 T-0" 6'-8" 1 3/4" HOLLOW METAL 45 MIN. FIRE-RATED DOORS;VERIFY WIDTH INFIELD
1 HOLLOW METAL PAINTED A HOLLOW METAL 20 MIN.
FOURTH FLOOR
CORRIDOR 1002 (2)3'-0" 7'-0" 13/4" 1 HOLLOW METAL PAINTED A
NOTES: 1. NEW DOORS&FRAMES TO MATCH BUILDING HOLLOW METAL
45 MIN. FIRE-RATED DOORS;VERIFY WIDTH INFIELD
STANDARDS I
2.USE LOW-PROFILE DOOR FRAMES
-STEEL COLUMN,WHERE OCCURS
CREATE RECESS FOR Q
MAG.HOLD-OPEN VARIES of <
_ >
TYPE"X"GYP WALLBOARD TO RUN UP TO — ® LU z
PROVIDE FIRE-STOPPING AS - _ EXISTING METAL DECK BETWEEN ® 0 O
REQUIRED FOR FIRE RATING - STRUCTURAL FRAMING MEMBERS,BOTH - z
- SIDES.CAULK JOINT W APPROVED FIRE- -- - Z U
D —
RATED SEALANT Q
Ui
... -.. - `: -. -..... ND BATT INSULATION IN R' .
REMOVE
a A
p o SHADED AREA. o co
o Z Z
4a -EXISTING 1-HOUR UL RATED WALL ASSEMBLY O H, J
—1/2"TYPE"X" c7 a a
GWB 12"WIDE. N J p
CORRIDOR DEMOLITION PLAN z LU o
w �1" p
LU
_ GWB CEILING,PATCH AS REQUIRED —STEEL COLUMN,WHERE OCCURS Y Y
UL CLASSIFIED SOUND ATTENUATION �-5/8"TYPE"X"GWB F'- Z O
FIBERGLASS BATT INSULATION, / -HOLLOW METAL FRAME BOX-OUT TO RECEIVE
FRICTION-FIT. - FIRE-STOP AROUND ALL PENETRATIONS A� MAG.HOLD-OPEN U1
w/UL APPROVED SYSTEM SMOKE DOOR PARALLEL F...
6"OOR/EI 16"o/c MAX FASTENED ON TO WALL
FLOOR/CEILING RUNNERS w/112"LONG /
"TYPE S-12"STEEL SCREWS BOTH SIDES --5/8"TYPE"X"GWB,APPLIED
(MIN 20 GA.) PER UL ASSEMBLY#U-465
` CONTINUOUS DOOR -
- SOUND SEAL
WOOD BLOCKING
SMOKE DOOR
MAGNETIC HOLD-OPEN— G
-
SCHEDULED H.M.DOOR FRAME, BATT INSULATION O o d
FILL w/FIBERGLASS INSULATION PROVIDE BLOCKING AS REQUIRED
�l EXISTING FINISH FLOOR TO REMAIN. / ` a
\ PATCH AND REPAIR EXISTING FINISHES -EXISTING 1-HOUR UL RATED WALL ASSEMBLY v
AS REQUIRED BY THE NEW WORK. O
SECTION AT SMOKE DOOR
3 CORRIDOR DOOR POCKET �.
� e
1 =I -�jl -All work to be cornplotely sealed off,
Challway
ork will A B _ with semi finished materials to not
paremain to one ide ont e z a expose occupants to the rough (Vme as to A4 � stages of work to be completed.Aa All work to be broom and vacuLi ri
® cleaned at all times and prior to the
completion of the days work.
EXISTING CORRIDOR
z PARTITIONS AND Fire department will be notified for
Aa DOORS TO REMAIN any fire alarm tie ins and sprinkler
A-C sIM modifications prior to starting work
by superintendent/sub contractor.
001 -superintendent to ensure that
-- — NOTE nearby detectors are free from dust
– –
EGRESS TO FIRE STAIRS MUST BE
PROVIDE NEW EXIT SIGN TO z I I �� MAINTAINED DURING DEMOLITION exposure by using bagged sanders.
MATCH BUILDING STANDARD - I ELEC CLOSET - AND CONSTRUCTION.COORDINATE
ON BOTH SIDES NEW - -_ _ — THIS WORK WITH NORTH ANDOVER
DOORS.ALIGN EXIT SIGNS BUILDING AND FIRE DEPARTMENTS,
WITH CENTER OF CORRIDOR. �I r
A-7 w <
ENLARGED SMOKE DOOR PLAN O w
LAreark to 1/4.. 1�_0' — — — ® on at all Q ¢ Q noY disruptresidentin the o p z
n ., OW
LL
Allk�WORK I W
WORK
LLl W U
_I
01
LLJ
zzz
rill rr� c i"� ' m
l N
I=11__i
l _. 17 I W
g
" 4Q' T
e
y a3 •� I e t I
l
nni tury AR a raft �0
n v
0 3i a w. w ,�.. x. '. �•.
s
Q R
N
TRUE PROJECT Z
NORTH NORTH p 3
C 166 pie Area 9��gistocs�En