Loading...
HomeMy WebLinkAboutHIGHWAY SURVEYOR COMMENTS .4, OFFICE OF HIGHWAY SURVEYOR AMILM X TOWN OF NORTH ANDOVER, MASSACHUSETTS 01845 CHU vvv� WILLIAM A. CYR TELEPHONE 683-2234 HIGHWAY SURVEYOR April 20, 1973 William Chepulis, Chairman Planning Board 120 Main Street North Andover, Mass. Re: "Cedar Lane Subdivision" Dear Mr. Chepulis: I dontt see any visable problems on this plan other than the mistake on the shoulder measurements. I could find no problems on our on site inspect- ion tour. However, I feel that the width of this road should be changed to a width of 24 ft. instead of 22 ft. to allow room for the installation of berms on both sides of the road on all grades other than the turn around area. An alternate to this would be to install two more catch basins between Forest St. and the planned basins shown on the plan and hold the road width to 22 ft., because I feel that the distance between Forest St. and the proposed basins on the plan is too great and that we would have erosion problems in wet seasons. Very truly yours, William A. Cyr, Highway Surveyor WAC/mp OFFICE OF HIGHWAY SURVEYOR Pitt 7tv Ra k. A o TOWN OF NORTH ANDOVER, MASSACHUSETTS 01845 WILLIAM A. CYR TELEPHONE 683-2234 HIGHWAY SURVEYOR July, 7, 1975 Mr. William Chepulis, Chairman Planning Board 120 Main St. North Andover, Mass. Re: Cedar Lane Dear Bill: I have inspected all phases of construction of Cedar Lane and find it satisfactory in all respects outside of some minor grading and a small section of paving to be done where the drainage empties out at the headwall. Mr. Barbagallo has informed me that he will. take care of these items and I am sure he will. I have no objections to releasing the bond on this sub-division. I will attend -the meeting this evening to answer any further questions . Very truly yours, William A. Cyr Highway Survey-or NAC/mp lee C, c/ Y/;///-/ �axry d�**, ae ao �,„7�.yY �o� ar•,�'a OFFICE OF HIGHWAY SURVEYOR Hi APRIL71" : M h •a 18s5 °* TOWN OF NORTH ANDOVER, MASSACHUSETTS 01845 vw+' WILLIAM A. CYR TELEPHONE 683-2234 HIGHWAY SURVEYOR February 4, 1971 William A. Chepulis9 Chairman Manning board 120 Main Street North Andover, Mass. Be: "Cedar Lanell Dear Mr. Chepuliss At the request of Mr. Barbagal.lo, I am writing this letter to inform you that Subdivision "Cedar Dane" has been inspected by me and I find the drainage system pretty well established and the rough gravel has been placed leaving the finish grading and paving, to be completed. I feel that ample work has been accomplished to warrant the possibility of releasing the two lots that . he is requesting. I will attend the meeting Monday evening and will answer any questions that might arise. i I Very truly yours, William A. Cyr, Highway Surveyor i WACjmp