HomeMy WebLinkAbout2015-08-27 Board of Health Agenda Packet i
North Andover Board of Health
Meeting Agenda
Thursday,August 27, 2015
7.00 p.m.
120 Main Street,2"d Floor Selectmen's Meeting Room
North Andover, MA 01845
L CALL TO ORDER
II. PLEDGE OF ALLEGIANCE
III. PUBLIC HEARINGS
IV. APPROVAL OF MINUTES
V. OLD BUSINESS
VI. NEW BUSINESS J
29 Granville Lane-Scott Cameron,representing the owners of 29 Granville Lane,requesting a LUA to
reduce the separation distance from the soil absorption system to the estimated seasonal high ground water
table from 5'to 4' (3 10 CMR 15.405(1)(h)(2).
VII. COMMUNICATIONS,ANNOUNCEMENTS,AND DISCUSSION
VIII. CORRESPONDENCE/NEWSLETTERS
IX. ADJOURNMENT
2015 North Andover Board of Health Meeting—Meeting Agenda Page 1 of 1
Note: The Board of Health reserves the right to take items out of order and to discuss and/or vote on items that are not listed on
the agenda.
Board of.Health Members: Thomas Trowbridge,DDS,MD,Chairman;Larry Fixler,Member/Clerk;Francis P.MacMillan,Jr.,
M.D.;Joseph McCarthy,Member; Edwin Pease,Member Health Department Staff:Susan Sawyer,Health Director; Debra
Rillahan,Public Health Nurse;Michele Grant,Public Health Inspector;Lisa Blackburn,Health Department Assistant
i
Morm.-Catneron.
I
August 6, 2015
� ,n,�r� ,I��
Ea aC7lC"
Ms. Michele Grant
Health Inspector
1600 Osgood Street, Suite 2035
North Andover, MA 01845
RE: Subsurface Sewage Disposal System Plan 29 Granville Lane (Map 1060, Lot 50)
Response to Comments
Dear Ms. Grant:
We are in receipt of your review letter dated July 27, 2015. Please find enclosed two (2) copies
of the design plan that have been revised to address your comments listed below.
The following numbered responses correlate with your numbered comments from your review
letter:
1. The names of direct abutters have been added to Sheet 1 of 2 on the design plan.
2. The percolation test log has been revised to depict the correct location in the Bw horizon
(at a depth of 35") on Sheet 1 of 2 of the design plan.
3. The design plan, calculations, soil absorption system and details (Sheet 1 and Sheet 2)
have been modified to correlate with a Class II soil long term acceptance rate (LTAR) of
0.60 gpd/sq.ft.. This change slightly increased the size of the soil absorption system,
caused some minor changes to grading, extended the retaining wall and shifted the
septic tank and distribution box northerly by approximately 2'. The details and system
profile have been updated to reflect these changes. Although there is only a total of 47"
in the C1 and C2 horizons, the test hole did not hit refusal (i.e. (edge). This can be seen
in the test hole notes provided by the Board of Health representative where 107+ is
noted in the Test Pit 15-1 notes. However, since the percolation test was conducted in
the Bw soil horizon, this soil horizon is eligible to count towards the 4' of pervious
material required. Therefore, Test Pit 15-1 has 6.1' of naturally occurring pervious
material and Test Pit 15-2 has 5.8' of naturally occurring pervious material, which are
both greater than the required 4'.
4. The bottom of the impervious barrier has been raised to an elevation of 97.2', creating a
separation of 1' between the bottom of the barrier and the estimated seasonal high
CIVIL ENGINEERS o LAND SURVEYORS e ENVIRONMENTAL CONSULTANTS a LAND USE PLANNERS
447 Boston Street(U.S. (route 1) Topsfield, MA 01983 978.887.8586 F-AX 978.887.3480
Providing Professional Services Since 1978
www.morincameron.com
|
Ms. Michele Grant August 6, 201 J
water table at the front of the 3VSt8nn and o 1.8' separation between the bottom of the
barrier and the estimated seasonal high wmtmrtabieattherearmfthosystenn.
5. The proposed loading for the septic tank has been labeled as "H-10" on the septic tank
. |
detail on Sheet 2 of 2 on the design plan. The materials to be used for the frames and �
covers have not been apecifkyd. This allows the installers to choose their preferred �
choice/material ofthe frames and covers to be used.
>
We trust that these responses satisfy your questions/concerns outlined in your review letter.
As you may recall, in our original application submitted to your office on ]uk/ IO, 2015, we
included Form 9A-App[icetioD for Local Upgrade Approval (a copy Of the application is
attached). We are requesting a one foot reduction in the setback from the bottom of the [each �
bed to the estimated seasonal high water table. Please schedule us to appear before the Board �
th
of Health at their next regularly scheduled meeting on Thursday, August 27 .
|f you should have any questions please do not hesitate ho contact me. {
�
Sincerely,
THE MON0N-CAMERON GROUP, INC.
Witt S[hkVta. E|T
Staff Engineer �
�
WAgkm0
Enclosures
|
cc: Mr. Robert Lanigan !
/
Mill River Consulting (via email)
|
R\KArHYm\Lanig^n]]70\8OH\NAoH Response Letter 8-6aldoo