March 1, 1985
Paul Hedstrom, Chairman
Planning Board
120 Main St.
North Andover, Ma. 01845
Re: Meadow View Crossing
Dear Paul:
I have reviewed the plan and I am also very familiar with
the site and I wish to make the following recommendations:
First of all Road A should be connected to Woodbury Lane.
A road extension easement was left there for that purpose.
Road C and B should be connected and Road C should run through
to Salem St.
The drainage associated with this subdivision will be a
problem, as proposed. There is not enough wet lands to absorb
the drainage from the discharge point on Road B. Drainage
on Roads C and D is not adequate and again cannot be dumped
as shown on plan. Drainage from Station 6+50 to the existing
culdesac at Woodbury Lane, should run continuous. An additional
set of catch basins would be required at approx. Station 17+00.
Drainage from the discharge point 6+50 should be piped 150 ft.
into lot #36 to the headwall.
All culverts and drainage courses that cross Abbott St.
and are in the drainage pattern, of this development, will have
to be upgraded. We are already subjected to flooding in
these areas.
This subdivision, in my opinion, is designed strictly for
maximum density of lots and for the convenience of the purchasers
of then Blots, to live on a dead end street.
When are we going to require that the future developments
of our Town be done for the best interest of the Town and the
departments that have to protect and service them?
Meadow View Crossing P.2
Every plan is coming through with a mishmash of dead
ended streets and cookie sheet type lot layout. No emphasis
is being placed on either open space or recreational areas.
I would recommend that this proposal be denied for the
reasons mentioned, and a resubmittal be required.
",, ,Very truly yours,
as
William A. Cyr
Highway Surveyor
WAC/m
- NOFITH
Oil �aof�'T�m�
1- °78 i���� �������(� TEL L. X83-5381
;8� CSCCC� STREET
SUPERINTENDENT OF
INSECT PEST CONTROL & � �y3 NOR'TH ANDOVER, MASS.
TREE WARDEN ARDEN �n �� 01845
pp ^� ouruc e a¢:4c w i
f�W 7e `paF',pf� ��p�Vag✓ "b
7 "':�0""9���M'"a 4..m WW,
INSECT PEST CONTROL AN .I."REE° I. E AR P'WII:r1` "r
February 19, 1985
I'lanni.ng Board
`:T'own. Office Building
North Andover, Hn.
Gentlemen: Tie: i"eadowview Crossing Subdivision
All requi rc. rents of the subdivision control laws pertaining
to "Street Trees" shall be enforced by this department.
I would therefore recommend that bond money in the amount
of 822,000 be retained for this purpose.
Very truly yours,
l�c�o I.,<�af`c, ari, :C'r(.�e Wa.'cden
wuwwuvr „;
NORTI-1 ANDOVER FIRE DEPARTMENT
CEN'rRAL FIRE HEADQUARTERS
'924 Main Street
0 North Andover,ver, Mass. 8`1848
aLUA V. DOL.AIN Tel. 1 686-3812
Chief of Department
6�
Date : January 29, 1985 JPN 2 9
To: North Andover Planning Board
From: Fire Chief Dolan
I have the following comments regarding NN"ING
subdivision:
1 . The nam Meadowv�e
i w Crossin should not be used
since the town alr ew Condominiums,
Meadowview Road and Meadow Lane all in different areas of
the town.
2 . Under the Subdivision and Control Regulations-
Preliminary Plan section III 2 (7) Street names for pro-
posed streets should be submitted with the preliminary
plan. Although this may seem minor to the developer, the
occurrence of each subdivision being constructed using
roads "A" "B" ""C" can cause confusion in an emergency and
once occupancy of a residence is taken, it becomes partic-
ularly important.
3 . Hydrants are not presently located at a suitable
location for fire protection as required in Section VF
Water Facilities . I recommend that the developer meet
with Mr . Borgesi and myself to adjust the location.
4 . The water main on Abbot Street must be connected
and fire hydrants added on Abbot Street prior to this
development proceeding.
5 . Lot numbers shall be posted during construction.
6 . House numbers shall be posted prior to occupancy.
"SMO 'E ETECTO S SAVE LIVES"
wu
R IIW II ANDOVER FIRE DEPARTMENT
i � ww�����w w� ������w w „,w„„„ ,wm���www�w,�w�a w�o�www�ww��www�.,wwwww��w:wwwww�w wwwwwww w��w.w�w.w�ww��w��ww�ww�w�wsw�Wwwiw�w�wwwwnw�www,
CENTRAL, FIRE HEADQUARTERS
�<;<,W„ M '124 Maa n Street
d rE
,SAC,- North s rWover, Mass, 01845
W�L.UAM V. DOLAN Tel. (617) 686-3812
Chief of Depaitr ent
7 . No opening burning is allowed except as permitted
by the North Andover Fire Department.
8 . Prior to taking occupancy, the subdivision streets
shall provide adequate access to each residence by the Fire
Department .
William V. Dolan, Chief
i
i
"SMOKE DETECTORS SAVE U 'ES"
"ORTH
+pA-
®� 44ED Ig"l
120 MAIN STREET
T10 NORTH ANDOVER, MASS. 01845 TEL. 682-6400
CHUS
Feb.15 1985
Planning Board,
Re: Meadowview Crossing
Abbott Street
Since this proposed subdivision uses town
sewage, no soil tests were performed, and this office
has no data on it.
Sincerely
Mike Graf
Chief Health Inspector
mg/gc
TOWN OF NORTH ANDOVER, MASSACHUSETTS
OFMCE OF
CONSERVATION COMMISSION
00R>1
0 rELEPHONE 683-7105
QW.Ml-
March 26, 1985
Mr. Michael Roberts
ChatriflcVfl, 1,11-anxting, Board
North Andoverp 'MA 01845 rMAR 2 6 19
,1 7�� , 85
, 89
Re : Meadowview Grossing
Dear Mr. Roberts : LANNI G BOARD
This letter is in response to a request from Mr. Thomas
Neve that the Conservation. Commission explain its positiol.-I
relative to the above referenced project directly to the
Planning Board. As we understand it from Mr . Neve, the
relevant issue is the possibility of connecting two cul-
de-sans by filling some wetland areas .
We feel we cannot approve such a plan because it does
not meet the performance standards set up wader the new
D.E.Q.E. regulations for administration of the 9etlands
Protection Act. Specifically these new regulations pro-
hibit alterations of more than 5000 square feet of border-
ing vegetated wetlands , and require replacement of any
alteration between 500 and 5000 square feet. The only
possible exception t.ca this requirement is when "crossing''
of a wetland is re ,uired to reach "dry land" on the other
side and there are no other reasonable alternative means
of access to the) dry land. ce gesteof he cul-de-sac in this projet does not fit this exception
and therefore cannot be approved by us .
Although we alt tem:pt to be reasonable and flexible in
reviewing proposed projects and alternativesp it is only
through strict adherence to the performance standards in
the regulations that we have any hope of avoiding further
drainage and water quality problems in our Town. It is
for this reason that we did not approve the Ingalls Crossing
III and Cobble Lane projects , or some of the common drive-
ways in the Equestrian Estates project.
March 26, 1985
Page Two
We hope this letter clarifies our position on this
issue and invite you to any of our meetings to discuss
Ois or any other common problems .
Yours truly
Guillermo Vicen
Vice Chairman, NACC
Gv:miufl
cc : "f"hoci:tas Neve & Assoc.
B. Cyr, Highway Surveyor
I
THOMAS
_. j ..fie
February 25, 1985
Planning Board
Town Hall
North Andover, MA 01845
RE: Meadowview Crossing Subdivision
Dear Board Members:
On behalf of John Tuttle, we hereby grant an extension to the Meadowview
Crossing decision until March 19th, 1985. We are looking forward to
presenting the preliminary subdivision plan on March 4, 1985.
Very truly yours,
THOMAS E. NEVE ASSOCIATES, INC.
�"0. ��
Thomas E. Neve, P.E. , R.L.S.
President
Ki BOARD
ENGINEERS 447 OLD BCC'rC. N ROAD
E_.AND SURVEYORS FOPSFIELD, MA 0198
1-AND USE P1....ANNERS (617) 887...8586
1
eo-d cu.-A) Q I
FORM L °
REFERRAL FORM
Preliminary Definitive Plans
North Andover , Mass .
® 19
HIGHWAY SURVEYOR
SUPERINTENDENT OF PUBLIC WORKS
CONSERVATION COMMISSION
BUILDING INSPECTOR —
FIRE CHIEF
POLICF CHIEF
TREE WARDEN
BOARD OF HEALTH
SUBDIVISION CONTROL COMMITTEE
The attached r /definitive plans were submitted to the
Planning Board on
® asp
A
' has been scheduled for ( • ; . m . on p�
to discuss these plans .
May we have your comments and recommendations c, ncerning this subdi -
vision by no later than 1 ' & _ Please return this
form and the plan with your comments and recommendations .
Thank you , ,
er anning oar
I
FORM L
REFERRAL FORM
Preliminary Definitive Plans
Jarth Andover , Mass .
19
HIGHWAY SURVEYOR
SUPERINTENDENT OF PUBLIC 'WORKS +
CONSERVATION COMMISSION
BUILDING INSPECTOR
FIRE CHIEF
POLICF CHIEF
TREE WAPDEN
BOARD eF HFALTH
SUBDIVISION CONTROL COMMITTEE
The attached reliminar /definitive plans wr e 'ubmitted to the
Pl anni nq Board on
A p e--a •-' m1 has been scheduled for p . m. on
to discuss these plans .
May we have your comments and recommendations concerning this subdi -
vision by no 1-ater than Please return this
form and the plan with your comments and recommendations .
, - Thank you , l
a
� I �..... �....
7 r anning Boara
m �
i
�7
� i
s
G �
44?��1 � at Let,
'Ac
A
FORM, L ,
REFERRAL FORM d
Preliminary Definitive Plans
lort�h Andover , Mass .
HIGHWAY SURVEYOR
SUPERINTENDENT OF PUBLIC WORKS
CONSERVATION COMMISSION
BUILDING INSPECTOR
FIRE CHIEF
POLICF CHIEF
TREE WARDEN
BOARD OF HEALTH
SUBDIVISION CONTROL COMMITTEE
The attached reliminar /definitive plans were submitted to the
Planning Board on 'C — g 4c
C� ;'S Z'LL 3 S
A , has been scheduled for . m . on
to discuss these plans .
May we have your comments and recommendations concerning this subdi
vision by no later than (21) Please return this
form and the plan with your comments and recommendations .
Thank you , ,
Clerk , Plan ing Board
M