Loading...
HomeMy WebLinkAboutMiscellaneous - 1679 OSGOOD STREET 9/21/2015 (3) I i Grant, Michele From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Tuesday, September 15, 2015 10:59 AM To: Grant, Michele; Blackburn, Lisa Cc: Isaac Rowe; Pam Lally; 'Dan Ottenheimer' Subject: 1679 Osgood St Attachments: 1679 Osgood St. - Final inspection form.doc; 1679 Osgood Street - emails from Vladimir Nemchenok 9-14-15.pdf, 1679 Osgood Street - info from Vladimir Nemchenok 9-14-15.pdf,Additional final inspection notes 9-9-15 and 9-11-15.PDF Michele, Please find attached the final inspection report, additional inspection notes and information and emails from the designer for the above referenced property. Please let me know if you have any questions. Thanks, Isaac M. Rowe, R.S. Project Manager MITI River Consulting 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.804 Fax: 978-282-1318 irowe@miliriverconsulting.com www.millriverconsultinccom I t 1 r r J C, 6" SLE Exss'i, B E�„asr. � $pae►�. ( � ��c� Dvsu_ #1079 *BM.7f 64.9 CLEANOUT h, INSPECTION of ° PRE EX131 ttiS ERI a SORTS ti LEACH F W/60 INS CHAMBEF 2000 GAL_ SEPTIC TANK #1 D—BOX -H OD cn BUFF E (ROUTE 12 m� l i "I HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL; EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS-BUILT SUBSTANTIALLY AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET," APPROVED DESIGNS PLANS. VIA ud kut.fC4&- O 9//040 1 SIGNATURE OF DESIGNER 'D&E SUMMARY OF INVERTS SEWER 0 FDTN. PRE-EXIST. SEPTIC TANK #1 IN 51.28 SEPTIC TANK #1 OUT 50.95' SEPTIC TANK #2 IN 56.39 Rj SEPTIC TANK #2 OUT 55,97 ; DIST. BOX IN 49.41 r4 DIST. BOX OUT 49.23 " `p o INV. IN CHAMBER 49.17 ` INV. IN CHAMBER 49.17 ♦ INV. IN CHAMBER 49.18 fi' o INV. IN CHAMBER 49.19 il , 1m' INV. IN CHAMBER 49.20yf BOTT. CHAMBER 48.90 A 0 0 c� BUILDING TIES NOTE: THIS PLAN & CERTIFICATION IS NOT BLDG. CORNER A B C D A WARRANTY OF THE SUBSURFACE DISPOSAL SEPTIC TANK 1 30.8 45.5 - - SYSTEM. IT IS A RECORD OF THE LOCATION m SEPTIC TANK #2 - - 67.0 83.0 AND ELEVATION OF THE EXISTING SYSTEM DIST. BOX 54.2 57.8 - - COMPONENTS. w i { I 7f Usi V, i C I. -ST) �I C/,ZO) T 5530 . z I. L7 1. z15- i i lam / 1. 9"" OJ- 1.0o r m [m f f�" 1� ) 166 ( (L:: 6p) r (5 49,19, A-L 1070 41.6 CS O,w2)- P-,5 lo7o (vm� 4-fi9 i le 70 C '.19 (-S Z). 7 C" � 77-5 L/ & 66 4.1 El A4 '7&3 &C�+4 S,4 O-z- i 12 " 65 7 L..., jok 17 co O 142) 514 f ' . L .°7 i 1i '' *L Ai i i Ile _0 t VOW r 1 . ,rid �/ [ ./ yr" be N i -� v A? f . d7 , =! Z7 d / v1 L= i Isaac Rowe Fromm: Vladimir Nemchenok ^vnemchenok@»z-Ucoet> Sent Monday, September 14. 2OI5l:lIPM To: irowe8ymiUriveuonsu|tingzom Cc: migmnt@townofno�ondmecmm;wrdufresne@comcast.net Subject: I679 Osgood Street Isaac, Our initial as-built survey identified negative slope, no slope, and adequate slope for the 5 distribution lines leaving the i � distribution box and going to the infiltrator leach field.At that tirne we indicated to the owner and contractor that the � distribution box should be raised to provide positive slope for all distribution lines to assure equal distribution to the soil i absorption system.We visited the site a 2 nd time and found the distribution box to be raised and the 5 distribution lines to have adequate s|ope Thedesi�np\andoesnutneceeoh�specifvadopefo/eachpipeasoenhpipo |sdUfereniin | ' ' ' length and must meet the same invert elevation.The design INTENT istomeet the specified bottom of field elevation ' whichhas been done. ' In response to your last e-mail,we visited the site again and confirmed that each of the 5 distribution lines has positive slope from the distribution box to the infiltrator leach field as indicated on the as-built plan. Ve did not find any lines to ' be flat as you suggest. i Additionally,we entered the basement of the main dwelling and measured the approximate height of the existing sewer pipe to the best of our ability given the existing conditions and found it to be at elevation 56.8.The invert-in elevation of the septic tank is approximately 51.3.The length of pipe is approx. 32 feet.As Such, the slope of the sewer is approx. | | 17%,far in excess of the minimum required slope and consistent with the intent of the approved plans. i We hope this additional information is adequate and provides You all the necessary details to a resolution of this matter. � Thanks, Vladimir ( | V06m/rL Nemchenok, F.E. Project Ifn(,Jineer � ! SEA-COAST CONSULTING, LLC` "The Pet"o|e�umPro6es5/mna|s^ i Engmeers. Contractor-5. 5uppher5 � fforEomronmenta\ ¢ Petro|eumProJuct5. 4 Court 5treet. 5u/te |U/ | Taunton. MA. 02780 � Tel.: 600.94G. 1 575 � Fax: 800.94C. 1575 Cell: 857,2252608 � � \ amaJ: � | � ` Th15 email an(J any attachmCnts cmntain private and cmo6dent/a| nmt�na| for the sue use of the mtended recipient. Any review, oopyn.� nrJ/stnhuhon of th`�3email (or any attachments thereto) by others /* stnct|y proh/b.teci. |f you are not the intended recipient, p|oa5n n0t1fythe sender immediately and permanently delete the or/0ma| and anycmp/e5 nfth/s email h and any theretu ! . z Isaac Rowe From: Vladimir Nemchenok <vnernchenok@scc-11c.net> Sent: Monday, September 14, 2015 5:28 PM To: 'Isaac Rowe' Subject: RE: 1679 Osgood Street Isaac, Thank you for your note. t can confirm that all NEW building sewers Comply with Title 5 and the intent of the plans. 'rhe middle dwelling has a short portion of pre-existing buildirig sewer beneath a deck which cannot be verified, however it was not replaced, and therefore it is riot the subject for an Upgrade re(JUirernent, Thank You L. Ne�rnchen(*, C ,H 815"'1 5 41r'JJ any At,,")chrnerlts cc nta n h�)nv,4te, m,,�Lcrl-d for [)5(� o§ tht" wtelf(JeJ dtxrr°r"e C:. OHIPT5 15 t 1,1 Any cor,��ywej or cJ thit, 0� err y I ,6,Cy l6 rcA, tht, wte"In:fie'd r�(-Altythc tht c,rncynr l and arly of ..my AAa(J,mne--,,nt,,, From: Isaac Rowe [Mailt AroweL) ip 0 Sent: Monday, September 14, 2015 2:00 PM To:vn hen lic.riet LeLnd.--a�-Dsc� Cc: m gLa �o Itin com> ............ Isaac Rowe<iro Subject: RE: 1679 Osgood Street Vladimir, Thank you for the response and re-inspecting the site as needed, Can you confirm if the slope of the building sewer lines for the (2) 1 bedroom dwellings to septic tank#2 meet the minirnUrn slope requirernents of Title 5 regulations and the apliroved design, plarr? Thanks, Isaac M. Rowe, R.S. Project Mooager Mill Mver tbnsuiting 6 Sargent Street Gloucester, MA 01930-2719 1 1 Blackburn, Lisa From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Wednesday, September 09, 2015 2:43 PM To: vnemchenok @yahoo.com; merreng @aol.com; Blackburn, Lisa; Grant, Michele; Dan Ottenheimer;IMR Subject: 1679 Osgood St Vladimir, We conducted our final inspection today and a couple of items need to be addressed: 1.The d-box outlet elevation and leach field inlet elevation are the same.The minimum slope as depicted on your design plan was not met. 2.The installer indicated the Merrimack Engineering representative on site for the as-built inspection did not obtain the elevations of the building sewer lines between the (2) one bedroom dwellings.The elevations between all cleanouts need to be obtained in order to confirm the minimum slope of 0.01 is met. Please let us know how you will address these items. Feel free to call me with any questions 978.836.6412. Thanks, Isaac i � i Grant, Michele From: Grant, Michele Sent: Monday, September 14, 2015 12:46 PM To: 'Chad Lawlor'; 'Vladimir Nemchenok' Cc: 'MERRENG @aol.com'; 'Isaac Rowe;wrdufresne @comcast.net; Blackburn, Lisa Subject: FW: 1679 Osgood St. Good Afternoon Chad, You have indicated that you will assume all responsibility for the final grading between the two (1) bedroom dwellings only. This acceptance of responsibility will be sufficient. However, there are a few outstanding items that need to be addressed prior to this office signing and issuing the Certificate of Compliance.They are as follows: 1. Final grading for the main house has not been completed.The distribution box and pipes are still exposed. 2. After two inspections(9/9/15 and 9/11/15) by our consultant from Mill River Consulting (MRC),the slope of the pipes from the distribution box outlet to the leach field inlet essentially have no slope (slopes vary from 0.000 to 0.002) and are different from what was specified on the approved design plan. Furthermore, the elevations on the as-built plan do not match the elevations obtained from our consultant from MRC. 3. A statement indicating if the designer,Vladimir Nemchenok, has examined the building sewer pipes to ensure they meet the minimum specifications required per Title 5 regulations and the approved design plan. The designer,Vladimir Nemchenok,will need provide a statement in writing to let the Town of North Andover know the current conditions of the septic system piping and components are acceptable to him. As of 12:30 today, we have not been able to reach the engineer for the property. If you are successful in reaching the designer please have him contact this office or Isaac Rowe from MRC directly(978.836.6412)so Mr. Giard can finish backfilling, and we can expedite the certificate of Compliance. Many Thanks, Michele E.Grant Public Health Agent Town of North Andover 1600 Osgood St i Suite 2035 North Andover,MA 01845 Phone 978.688.9540 Fax 978.688.8476 Email mgrant@townofnorthandover-.com Web www.TownofNorthAndover.com 1 i i Grant, Michele J From: Chad Lawlor <crlawlorl @hotmail.com> Sent: Monday, September 14, 2015 9:59 AM To: Grant, Michele Subject: Back yard final grade Hi Michelle, At the property of 1679 Osgood Street the back yard between the second and third buildings has not been final graded but I am quite capable of grading and seeding the property in the near future as we discussed per our phone call. If you need anything else please feel free to contact me at 978-265-4752.Thank You. Sincerely, Chad R. Lawlor 1 1 Grant, Michele I From: Vladimir Nemchenok <vnemchenok @yahoo.com> Sent: Friday, September 11, 2015 5:56 PM To: wrdufresne @comcast.net; Grant, Michele Subject: Fwd: 1679 Osgood St ` i i Sent from my iPhone Begin forwarded message: From: "Isaac Rowe" <irowe a,millriverconsulting.conn> Date: September 11, 2015 at 3:08:17 PM EDT To: <vnemchenok( wahoo.com>, <merren0&,aol.eom> Cc: "'Grant, Michele"' <MGrant ci townofnorthandover.com>, "Isaac Rowe" <irowe&i illriverconsultin-.coin>, "'Dan Ottenheimer"' <dano(i 7) illyiverconsulting corn> Subject: RE: 1679 Osgood St Vladimir, At the request of the your client, Chad Lawlor, I stopped by the site today to re-inspect the distribution box. Unfortunately the licensed installer has made no progress towards rectifying the questions which were raised at the previous inspection and noted in our email to you of September 9, 2015. There continues to be essentially no slope between the distribution box outlet and the leach field invert elevations(slopes vary from 0.000 to 0.002). As indicated in our previous communication: 1. What has been constructed is different from what you had specified on your design plan. Please let the Town of North Andover know, in writing, If the current condition of the piping is acceptable to you or not 2. Please let the Town of North Andover know if you examined all the building sewer pipes and determined if they meet the minimum specifications required per regulation and your design plan Our understanding is the transaction of this property is dependent on resolving these issues and the general finalization of the construction of the septic system. Please note the Town of North Andover is working expeditiously to deal with the matters under its purview,even making visits to the site to see if progress has been made, but cannot advance this further without your involvement in these two matters. We await your assistance in resolving these matters. If I can be of any assistance please feel to call me 978.836.6412. Thanks, Isaac M. Rowe, R.S. Project Manager Milt River Consulting 1 i Grant, Michele From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Wednesday, September 09, 2015 2:43 PM To: vnemchenok @yahoo.com; merreng @aol.com; Blackburn, Lisa; Grant, Michele; Dan Ottenheimer;IMR Subject: 1679 Osgood St Vladimir, We conducted our final inspection today and a couple of items need to be addressed: 1.The d-box outlet elevation and leach field inlet elevation are the same.The minimum slope as depicted on your design plan was not met. 2.The installer indicated the Merrimack Engineering representative on site for the as-built inspection did not obtain the elevations of the building sewer lines between the (2) one bedroom dwellings.The elevations between all cleanouts need to be obtained in order to confirm the minimum slope of 0.01 is met. Please let us know how you will address these items. Feel free to call me with any questions 978.836.6412. Thanks, Isaac i Grant, Michele Prom: Grant, Michele Sent Wednesday, August 262015 3:43PK4 To: 'Isaac Rovve'; 'Dan Ottenheime/ Cc: Blackburn, Lisa Subject: lb/9 Osgood sL Attachments: 20150826I509.pdf Hi, FYI ] called Dan Giard today. He's the installer at1679 Osgood st, I've been there o total of4 times. I've done 3tank inspections. On all occasions Mr.Giard arrives after the fact.Today the second tank was being set.There were many problems that Giard's worker and Shea Concete were facing.There are 3 sets of wires over the area.The worker was on the house trying to pull the wires away etc etc. | called Mr. Giund and politely reminded him of the Installer's Obligation. (Please see the attached)Also the other day when I was there they had already laid some of the pipes from the top house down tu the first tank. The pipes were bedded on dirt. I spoke to Mr. Giard about bedding them properly. As you know I will be here late tomorrow night for the meeting. I will be off Friday and Monday. | onnin hopes they will call for a Bottom nf the Bed by tomorrow night. | also told 8ateson (217 Gray street)that |would bearound. Thx Michele E. Grant | Public Health Agent � Town of North Andover 1600 Osgood St | Suite l035 North Andover, MA 01845 | | Phone 978.688.9540 Fax 978.688.8476 Email mgrant2townofnorthandover.com Web -----Original Message----- From: j Sent: Wednesday,August 2G, 2U1G3:09PM To: Grant, Michele Subject: Message from "ComDev-Hea|ih'Ricoh" This E-mail was sent from "ComDev-Heo|th-Ricnh" (AfidoMPC30O2). Scan Date: 08.2G.201615:O9:25 ('O4U0) Queries to: noreply@townofnorthandover,com Blackburn, Lisa From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Tuesday, August 04, 2015 4:43 PM To: Blackburn, Lisa; 'Pam Lally' Cc: Grant, Michele;Isaac Rowe 1 Subject: RE: 1679 Osgood St. Attachments: 1679 Osgood St -Approval letter 8-5-15.doc Lisa/Michele, I completed the review of the revised plan. Attached is the approval letter for the above referenced property. I added condition#3 because the designer did not clearly answer item#8 but this information may not exactly be known at this time. I do not entirely agree with the designer's answer for item#12 but he has gone on record to indicate the reasoning for modifying the elevation of the test pits and groudwater. There is no way to determine this without the survey data but either way the system will be well above the seasonal groundwater table. I just wanted this to be noted in our records. Please let me know if you have any questions. Thanks, Isaac M. Rowe, R.S. Project Manager Mill River Consulting 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.804 Fax: 978-282-1318 irower. millriverconsulting.com www.millrivercopsulting.com From: Blackburn, Lisa [mailto:LBlackburn townofnorthandover.com] Sent: Monday, July 27, 2015 1:07 PM To: Dan Ottenheimer; Isaac Rowe; Pam Lally Cc: Grant, Michele Subject: 1679 Osgood St. Good Afternoon, I'm mailing out revised septic; plans for 1679 Osgood St, Lisa Blackburn Health Department Town of North Andover 1600 Osgood Street,Suite 2035 North Andover, MA 01845 1 i Grant, Michele From: Grant, Michele Sent: Wednesday,July 22, 2015 12:38 PM To: 'vnemchenok @yahoo.com'; 'MERRENG @aol.com' Cc: 'Isaac Rowe'; Blackburn, Lisa; 'wrdufresne @comcast.net' Subject: FW: 526 Winter Street/1679 Osgood Good Morning Vladimir, 526 Winter Street Please see the message below. When doing the As-Built; please include the location of the of the insulation along the pipe. Also, 1679 Osgood Street A walk through of 1679 Osgood Street was done by town offices,yesterday,July 21, 2015. Based on the walk through, a total of Seven Bedrooms were found.The plan is designed for Eight Bedrooms. Please design accordingly on the re- design. Sincerely, Michele E. Grant Public Health Agent Town of North Andover 1600 Osgood St I Suite 2035 North Andover,MA 01845 Phone 978.688.9540 Fax 978.688.8476 Email mgrant c!townofnor-thandover,com Web www.TownofNorthAndover.com • From: wrdufresne@comcast.net [mailto:wrdufresne@comcast.net] Sent: Tuesday, July 21, 2015 11:29 AM To: Blackburn, Lisa 1 1 Blackburn, Lisa From: Isaac Rowe <irowe @millriverconsulting.com> Sent: Thursday, July 09, 2015 11:37 AM To: Blackburn, Lisa; Grant, Michele Cc: Pam Lally,Isaac Rowe; 'Dan Ottenheimer' Subject: 1679 Osgood St Attachments: Assessors property card.pdf, Soil test app Con Com comments.pdf; 1679 Osgood Street - Disapproval Letter 7-9-1S.doc Lisa/Michele, Attached is the disapproval letter for the initial plan review for the above referenced property.Also attached are the Assessor's property card and Con Cam comments on the soil application. A few comments in particular to review Comment#1 is in red because we should discuss how we want to present this comment. Basically the Assessor's information has the house as a (2) bedroom but the design plan shows a total of(8) bedrooms. Is there an old design plan on file indicating the number of bedrooms the current system is designed for? I believe it would be prudent for the Health Dept or MRC to conduct a walk through each dwelling unit because this is not a typical residential design. Let me know what you think. Comment#4-a wetland buffer zone is shown but not wetland flags.See Heidi's comments about the soil testing.This is seems to reinforce the need to show the location of wetland flags. Comment#12- 1 believe the proposed leach field is approximately 1'too low based on existing grades and the ESHWT. Thanks, Isaac M. Rowe, R.S. Project Manager WI River Consultlng 6 Sargent Street Gloucester, MA 01930-2719 Phone:978-282-0014 ext.804 Fax: 978-282-1318 irowe(a)millriverconsultina.com www.millriverconsulting.com i Grant, Michele From: Gaffney, Heidi Sent: Tuesday,June 23, 2015 11:24 AM To: 'wrdufresne @comcast.net' % Cc: Grant, Michele; Blackburn, Lisa; Hughes, Jennifer Subject: 1679 Osgood St Attachments: 201506231122.pdf Bill, attached is a scan of the buffer zone that extends onto the property of 1679 Osgood (from the delineation done for 1600),the driveway for 1679 is highlighted, can you just use this to add the BZ to the plan? Heidi Gaffney Conservation Field Inspector Town of North Andover 1600 Osgood Street, Suite 2035 North Andover, MA 01845 Phone 978-688-9530 Fax 978-688-9542 Email hgaffney@townofnorthandover.com Web www.TownofNorthAndover.com 1 i i l 1 ` \1 , s ` ' „ r ' , r i ® � f - �G3) _ Blackburn, Lisa From: Pam Lally <p|a|k/VgmiUriverconsu|bngznm> Sent: Thursday, May 14, 2OlSl0:03AM To: Blackburn, Lisa; 'Dan Ottenheime/'; 'Isaac Rowe' Cc: Grant Michele Subject: RE: I679 Osgood St. Hi Lisa, We've set up this soil testing with Bill Dufresne for Wednesday, 5/27 at 9am. Pam -----Original Message----- From: Blackburn, Lisa l Sent:Tuesday, May 1Z, 2O154:32PK4 To: Dan Ottpnheimer; Isaac Rowe; Pam Lally Cc Grant, Michele Subject: 1679 Osgood St. � / Good Afternoon, \ Soil testing for 1679 Osgood St. -----Original Message----- | From: ] Sent:Tuesday, May 1Z, 2O154:44PM To: Blackburn, Lisa Subject: Message from "ComDev-Hea|th'Ricoh" � This E-mail was sent from "CumDev'Heakh'Ricoh" /AOcioK4PC3U0J\. Scan Date: 05.12.201516:44:15 ('O40O) Queries to: All email messages and attached content sent from and tothis email account are public records unless qualified asan exemption under the Massachusetts Public Records Law. Visit us online at Social Networks bwitter.com/north andnver |