HomeMy WebLinkAboutMiscellaneous - 1679 OSGOOD STREET 9/21/2015 (3) I
i
Grant, Michele
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Tuesday, September 15, 2015 10:59 AM
To: Grant, Michele; Blackburn, Lisa
Cc: Isaac Rowe; Pam Lally; 'Dan Ottenheimer'
Subject: 1679 Osgood St
Attachments: 1679 Osgood St. - Final inspection form.doc; 1679 Osgood Street - emails from Vladimir
Nemchenok 9-14-15.pdf, 1679 Osgood Street - info from Vladimir Nemchenok
9-14-15.pdf,Additional final inspection notes 9-9-15 and 9-11-15.PDF
Michele,
Please find attached the final inspection report, additional inspection notes and information and emails from the
designer for the above referenced property.
Please let me know if you have any questions.
Thanks,
Isaac M. Rowe, R.S.
Project Manager
MITI River Consulting
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.804
Fax: 978-282-1318
irowe@miliriverconsulting.com
www.millriverconsultinccom
I
t
1
r
r
J C, 6" SLE
Exss'i, B
E�„asr. � $pae►�. ( � ��c�
Dvsu_ #1079
*BM.7f 64.9
CLEANOUT h, INSPECTION
of °
PRE EX131 ttiS ERI
a SORTS ti
LEACH F
W/60 INS
CHAMBEF
2000 GAL_
SEPTIC TANK #1
D—BOX
-H
OD
cn BUFF E
(ROUTE 12
m�
l
i
"I HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL;
EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS-BUILT SUBSTANTIALLY
AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK
OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET,"
APPROVED DESIGNS PLANS.
VIA ud kut.fC4&- O 9//040 1
SIGNATURE OF DESIGNER 'D&E
SUMMARY OF INVERTS
SEWER 0 FDTN. PRE-EXIST.
SEPTIC TANK #1 IN 51.28
SEPTIC TANK #1 OUT 50.95'
SEPTIC TANK #2 IN 56.39 Rj
SEPTIC TANK #2 OUT 55,97 ;
DIST. BOX IN 49.41
r4 DIST. BOX OUT 49.23 " `p
o INV. IN CHAMBER 49.17 `
INV. IN CHAMBER 49.17 ♦
INV. IN CHAMBER 49.18 fi'
o INV. IN CHAMBER 49.19 il , 1m'
INV. IN CHAMBER 49.20yf
BOTT. CHAMBER 48.90
A
0
0
c�
BUILDING TIES NOTE: THIS PLAN & CERTIFICATION IS NOT
BLDG. CORNER A B C D A WARRANTY OF THE SUBSURFACE DISPOSAL
SEPTIC TANK 1 30.8 45.5 - - SYSTEM. IT IS A RECORD OF THE LOCATION
m SEPTIC TANK #2 - - 67.0 83.0 AND ELEVATION OF THE EXISTING SYSTEM
DIST. BOX 54.2 57.8 - - COMPONENTS.
w
i
{ I
7f
Usi V,
i
C I. -ST)
�I
C/,ZO) T 5530 . z
I. L7 1. z15-
i
i
lam / 1. 9""
OJ- 1.0o r
m [m
f f�"
1� ) 166 ( (L:: 6p) r (5 49,19,
A-L 1070 41.6 CS O,w2)-
P-,5 lo7o (vm� 4-fi9
i
le 70 C '.19 (-S Z).
7 C"
�
77-5
L/ &
66 4.1
El A4 '7&3 &C�+4
S,4 O-z-
i
12 "
65 7
L...,
jok 17 co
O 142) 514 f ' .
L .°7
i 1i ''
*L Ai
i
i
Ile _0 t
VOW r
1
. ,rid
�/ [ ./ yr"
be
N
i
-� v A?
f .
d7
, =! Z7
d /
v1 L=
i
Isaac Rowe
Fromm: Vladimir Nemchenok ^vnemchenok@»z-Ucoet>
Sent Monday, September 14. 2OI5l:lIPM
To: irowe8ymiUriveuonsu|tingzom
Cc: migmnt@townofno�ondmecmm;wrdufresne@comcast.net
Subject: I679 Osgood Street
Isaac,
Our initial as-built survey identified negative slope, no slope, and adequate slope for the 5 distribution lines leaving the i
�
distribution box and going to the infiltrator leach field.At that tirne we indicated to the owner and contractor that the
�
distribution box should be raised to provide positive slope for all distribution lines to assure equal distribution to the soil
i
absorption system.We visited the site a 2 nd time and found the distribution box to be raised and the 5 distribution lines
to have adequate s|ope Thedesi�np\andoesnutneceeoh�specifvadopefo/eachpipeasoenhpipo |sdUfereniin
| ' '
'
length and must meet the same invert elevation.The design INTENT istomeet the specified bottom of field elevation
' whichhas been done.
'
In response to your last e-mail,we visited the site again and confirmed that each of the 5 distribution lines has positive
slope from the distribution box to the infiltrator leach field as indicated on the as-built plan. Ve did not find any lines to
' be flat as you suggest.
i
Additionally,we entered the basement of the main dwelling and measured the approximate height of the existing sewer
pipe to the best of our ability given the existing conditions and found it to be at elevation 56.8.The invert-in elevation of
the septic tank is approximately 51.3.The length of pipe is approx. 32 feet.As Such, the slope of the sewer is approx. |
|
17%,far in excess of the minimum required slope and consistent with the intent of the approved plans. i
We hope this additional information is adequate and provides You all the necessary details to a resolution of this matter. �
Thanks,
Vladimir (
| V06m/rL Nemchenok, F.E.
Project Ifn(,Jineer
�
! SEA-COAST CONSULTING, LLC`
"The Pet"o|e�umPro6es5/mna|s^
i Engmeers. Contractor-5. 5uppher5
� fforEomronmenta\ ¢ Petro|eumProJuct5.
4 Court 5treet. 5u/te |U/
|
Taunton. MA. 02780
�
Tel.: 600.94G. 1 575
� Fax: 800.94C. 1575
Cell: 857,2252608 �
�
\ amaJ: �
| �
` Th15 email an(J any attachmCnts cmntain private and cmo6dent/a| nmt�na| for the sue use of the mtended
recipient. Any review, oopyn.� nrJ/stnhuhon of th`�3email (or any attachments thereto) by others /* stnct|y
proh/b.teci. |f you are not the intended recipient, p|oa5n n0t1fythe sender immediately and permanently delete
the or/0ma| and anycmp/e5 nfth/s email h
and any theretu
! .
z
Isaac Rowe
From: Vladimir Nemchenok <vnernchenok@scc-11c.net>
Sent: Monday, September 14, 2015 5:28 PM
To: 'Isaac Rowe'
Subject: RE: 1679 Osgood Street
Isaac,
Thank you for your note. t can confirm that all NEW building sewers
Comply with Title 5 and the intent of the plans.
'rhe middle dwelling has a short portion of pre-existing buildirig sewer beneath a deck
which cannot be verified, however it was not replaced, and therefore it is riot the subject for
an Upgrade re(JUirernent,
Thank You
L. Ne�rnchen(*,
C ,H 815"'1 5
41r'JJ any At,,")chrnerlts cc nta n h�)nv,4te, m,,�Lcrl-d for [)5(� o§ tht" wtelf(JeJ
dtxrr°r"e C:. OHIPT5 15 t 1,1
Any cor,��ywej or cJ thit, 0� err y I ,6,Cy
l6 rcA, tht, wte"In:fie'd r�(-Altythc
tht c,rncynr l and arly of ..my AAa(J,mne--,,nt,,,
From: Isaac Rowe [Mailt AroweL) ip
0
Sent: Monday, September 14, 2015 2:00 PM
To:vn hen lic.riet
LeLnd.--a�-Dsc�
Cc: m gLa �o Itin com>
............
Isaac Rowe<iro
Subject: RE: 1679 Osgood Street
Vladimir,
Thank you for the response and re-inspecting the site as needed,
Can you confirm if the slope of the building sewer lines for the (2) 1 bedroom dwellings to septic tank#2 meet the
minirnUrn slope requirernents of Title 5 regulations and the apliroved design, plarr?
Thanks,
Isaac M. Rowe, R.S.
Project Mooager
Mill Mver tbnsuiting
6 Sargent Street
Gloucester, MA 01930-2719
1
1
Blackburn, Lisa
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Wednesday, September 09, 2015 2:43 PM
To: vnemchenok @yahoo.com; merreng @aol.com; Blackburn, Lisa; Grant, Michele; Dan
Ottenheimer;IMR
Subject: 1679 Osgood St
Vladimir,
We conducted our final inspection today and a couple of items need to be addressed:
1.The d-box outlet elevation and leach field inlet elevation are the same.The minimum slope as depicted on your
design plan was not met.
2.The installer indicated the Merrimack Engineering representative on site for the as-built inspection did not obtain the
elevations of the building sewer lines between the (2) one bedroom dwellings.The elevations between all cleanouts
need to be obtained in order to confirm the minimum slope of 0.01 is met.
Please let us know how you will address these items. Feel free to call me with any questions 978.836.6412.
Thanks,
Isaac
i �
i
Grant, Michele
From: Grant, Michele
Sent: Monday, September 14, 2015 12:46 PM
To: 'Chad Lawlor'; 'Vladimir Nemchenok'
Cc: 'MERRENG @aol.com'; 'Isaac Rowe;wrdufresne @comcast.net; Blackburn, Lisa
Subject: FW: 1679 Osgood St.
Good Afternoon Chad,
You have indicated that you will assume all responsibility for the final grading between the two (1) bedroom dwellings
only. This acceptance of responsibility will be sufficient.
However, there are a few outstanding items that need to be addressed prior to this office signing and issuing the
Certificate of Compliance.They are as follows:
1. Final grading for the main house has not been completed.The distribution box and pipes are still exposed.
2. After two inspections(9/9/15 and 9/11/15) by our consultant from Mill River Consulting (MRC),the slope of the pipes
from the distribution box outlet to the leach field inlet essentially have no slope (slopes vary from 0.000 to 0.002) and
are different from what was specified on the approved design plan. Furthermore, the elevations on the as-built plan do
not match the elevations obtained from our consultant from MRC.
3. A statement indicating if the designer,Vladimir Nemchenok, has examined the building sewer pipes to ensure they
meet the minimum specifications required per Title 5 regulations and the approved design plan.
The designer,Vladimir Nemchenok,will need provide a statement in writing to let the Town of North Andover know the
current conditions of the septic system piping and components are acceptable to him.
As of 12:30 today, we have not been able to reach the engineer for the property. If you are successful in reaching the
designer please have him contact this office or Isaac Rowe from MRC directly(978.836.6412)so Mr. Giard can finish
backfilling, and we can expedite the certificate of Compliance.
Many Thanks,
Michele E.Grant
Public Health Agent
Town of North Andover
1600 Osgood St i Suite 2035
North Andover,MA 01845
Phone 978.688.9540
Fax 978.688.8476
Email mgrant@townofnorthandover-.com
Web www.TownofNorthAndover.com
1
i
i
Grant, Michele J
From: Chad Lawlor <crlawlorl @hotmail.com>
Sent: Monday, September 14, 2015 9:59 AM
To: Grant, Michele
Subject: Back yard final grade
Hi Michelle,
At the property of 1679 Osgood Street the back yard between the second and third buildings has not been
final graded but I am quite capable of grading and seeding the property in the near future as we discussed per
our phone call. If you need anything else please feel free to contact me at 978-265-4752.Thank You.
Sincerely,
Chad R. Lawlor
1
1
Grant, Michele
I
From: Vladimir Nemchenok <vnemchenok @yahoo.com>
Sent: Friday, September 11, 2015 5:56 PM
To: wrdufresne @comcast.net; Grant, Michele
Subject: Fwd: 1679 Osgood St `
i
i
Sent from my iPhone
Begin forwarded message:
From: "Isaac Rowe" <irowe a,millriverconsulting.conn>
Date: September 11, 2015 at 3:08:17 PM EDT
To: <vnemchenok( wahoo.com>, <merren0&,aol.eom>
Cc: "'Grant, Michele"' <MGrant ci townofnorthandover.com>, "Isaac Rowe"
<irowe&i illriverconsultin-.coin>, "'Dan Ottenheimer"' <dano(i 7) illyiverconsulting corn>
Subject: RE: 1679 Osgood St
Vladimir,
At the request of the your client, Chad Lawlor, I stopped by the site today to re-inspect the distribution
box. Unfortunately the licensed installer has made no progress towards rectifying the questions which
were raised at the previous inspection and noted in our email to you of September 9, 2015. There
continues to be essentially no slope between the distribution box outlet and the leach field invert
elevations(slopes vary from 0.000 to 0.002).
As indicated in our previous communication:
1. What has been constructed is different from what you had specified on your design plan. Please
let the Town of North Andover know, in writing, If the current condition of the piping is
acceptable to you or not
2. Please let the Town of North Andover know if you examined all the building sewer pipes and
determined if they meet the minimum specifications required per regulation and your design
plan
Our understanding is the transaction of this property is dependent on resolving these issues and the
general finalization of the construction of the septic system. Please note the Town of North Andover is
working expeditiously to deal with the matters under its purview,even making visits to the site to see if
progress has been made, but cannot advance this further without your involvement in these two
matters. We await your assistance in resolving these matters.
If I can be of any assistance please feel to call me 978.836.6412.
Thanks,
Isaac M. Rowe, R.S.
Project Manager
Milt River Consulting
1
i
Grant, Michele
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Wednesday, September 09, 2015 2:43 PM
To: vnemchenok @yahoo.com; merreng @aol.com; Blackburn, Lisa; Grant, Michele; Dan
Ottenheimer;IMR
Subject: 1679 Osgood St
Vladimir,
We conducted our final inspection today and a couple of items need to be addressed:
1.The d-box outlet elevation and leach field inlet elevation are the same.The minimum slope as depicted on your
design plan was not met.
2.The installer indicated the Merrimack Engineering representative on site for the as-built inspection did not obtain the
elevations of the building sewer lines between the (2) one bedroom dwellings.The elevations between all cleanouts
need to be obtained in order to confirm the minimum slope of 0.01 is met.
Please let us know how you will address these items. Feel free to call me with any questions 978.836.6412.
Thanks,
Isaac
i
Grant, Michele
Prom: Grant, Michele
Sent Wednesday, August 262015 3:43PK4
To: 'Isaac Rovve'; 'Dan Ottenheime/
Cc: Blackburn, Lisa
Subject: lb/9 Osgood sL
Attachments: 20150826I509.pdf
Hi,
FYI ] called Dan Giard today. He's the installer at1679 Osgood st, I've been there o total of4 times. I've done 3tank
inspections. On all occasions Mr.Giard arrives after the fact.Today the second tank was being set.There were many
problems that Giard's worker and Shea Concete were facing.There are 3 sets of wires over the area.The worker was on
the house trying to pull the wires away etc etc. | called Mr. Giund and politely reminded him of the Installer's Obligation.
(Please see the attached)Also the other day when I was there they had already laid some of the pipes from the top
house down tu the first tank. The pipes were bedded on dirt. I spoke to Mr. Giard about bedding them properly.
As you know I will be here late tomorrow night for the meeting. I will be off Friday and Monday. | onnin hopes they will
call for a Bottom nf the Bed by tomorrow night. | also told 8ateson (217 Gray street)that |would bearound.
Thx
Michele E. Grant |
Public Health Agent �
Town of North Andover
1600 Osgood St | Suite l035
North Andover, MA 01845 |
|
Phone 978.688.9540
Fax 978.688.8476
Email mgrant2townofnorthandover.com Web
-----Original Message-----
From: j
Sent: Wednesday,August 2G, 2U1G3:09PM
To: Grant, Michele
Subject: Message from "ComDev-Hea|ih'Ricoh"
This E-mail was sent from "ComDev-Heo|th-Ricnh" (AfidoMPC30O2).
Scan Date: 08.2G.201615:O9:25 ('O4U0)
Queries to: noreply@townofnorthandover,com
Blackburn, Lisa
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Tuesday, August 04, 2015 4:43 PM
To: Blackburn, Lisa; 'Pam Lally'
Cc: Grant, Michele;Isaac Rowe 1
Subject: RE: 1679 Osgood St.
Attachments: 1679 Osgood St -Approval letter 8-5-15.doc
Lisa/Michele,
I completed the review of the revised plan. Attached is the approval letter for the above referenced property.
I added condition#3 because the designer did not clearly answer item#8 but this information may not exactly be known
at this time.
I do not entirely agree with the designer's answer for item#12 but he has gone on record to indicate the reasoning for
modifying the elevation of the test pits and groudwater. There is no way to determine this without the survey data but
either way the system will be well above the seasonal groundwater table. I just wanted this to be noted in our records.
Please let me know if you have any questions.
Thanks,
Isaac M. Rowe, R.S.
Project Manager
Mill River Consulting
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.804
Fax: 978-282-1318
irower. millriverconsulting.com
www.millrivercopsulting.com
From: Blackburn, Lisa [mailto:LBlackburn townofnorthandover.com]
Sent: Monday, July 27, 2015 1:07 PM
To: Dan Ottenheimer; Isaac Rowe; Pam Lally
Cc: Grant, Michele
Subject: 1679 Osgood St.
Good Afternoon,
I'm mailing out revised septic; plans for 1679 Osgood St,
Lisa Blackburn
Health Department
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover, MA 01845
1
i
Grant, Michele
From: Grant, Michele
Sent: Wednesday,July 22, 2015 12:38 PM
To: 'vnemchenok @yahoo.com'; 'MERRENG @aol.com'
Cc: 'Isaac Rowe'; Blackburn, Lisa; 'wrdufresne @comcast.net'
Subject: FW: 526 Winter Street/1679 Osgood
Good Morning Vladimir,
526 Winter Street
Please see the message below.
When doing the As-Built; please include the location of the of the insulation along the pipe.
Also,
1679 Osgood Street
A walk through of 1679 Osgood Street was done by town offices,yesterday,July 21, 2015. Based on the walk through, a
total of Seven Bedrooms were found.The plan is designed for Eight Bedrooms. Please design accordingly on the re-
design.
Sincerely,
Michele E. Grant
Public Health Agent
Town of North Andover
1600 Osgood St I Suite 2035
North Andover,MA 01845
Phone 978.688.9540
Fax 978.688.8476
Email mgrant c!townofnor-thandover,com
Web www.TownofNorthAndover.com
•
From: wrdufresne@comcast.net [mailto:wrdufresne@comcast.net]
Sent: Tuesday, July 21, 2015 11:29 AM
To: Blackburn, Lisa
1
1
Blackburn, Lisa
From: Isaac Rowe <irowe @millriverconsulting.com>
Sent: Thursday, July 09, 2015 11:37 AM
To: Blackburn, Lisa; Grant, Michele
Cc: Pam Lally,Isaac Rowe; 'Dan Ottenheimer'
Subject: 1679 Osgood St
Attachments: Assessors property card.pdf, Soil test app Con Com comments.pdf; 1679 Osgood Street
- Disapproval Letter 7-9-1S.doc
Lisa/Michele,
Attached is the disapproval letter for the initial plan review for the above referenced property.Also attached are the
Assessor's property card and Con Cam comments on the soil application. A few comments in particular to review
Comment#1 is in red because we should discuss how we want to present this comment. Basically the Assessor's
information has the house as a (2) bedroom but the design plan shows a total of(8) bedrooms. Is there an old design
plan on file indicating the number of bedrooms the current system is designed for? I believe it would be prudent for the
Health Dept or MRC to conduct a walk through each dwelling unit because this is not a typical residential design. Let me
know what you think.
Comment#4-a wetland buffer zone is shown but not wetland flags.See Heidi's comments about the soil testing.This is
seems to reinforce the need to show the location of wetland flags.
Comment#12- 1 believe the proposed leach field is approximately 1'too low based on existing grades and the ESHWT.
Thanks,
Isaac M. Rowe, R.S.
Project Manager
WI River Consultlng
6 Sargent Street
Gloucester, MA 01930-2719
Phone:978-282-0014 ext.804
Fax: 978-282-1318
irowe(a)millriverconsultina.com
www.millriverconsulting.com
i
Grant, Michele
From: Gaffney, Heidi
Sent: Tuesday,June 23, 2015 11:24 AM
To: 'wrdufresne @comcast.net'
%
Cc: Grant, Michele; Blackburn, Lisa; Hughes, Jennifer
Subject: 1679 Osgood St
Attachments: 201506231122.pdf
Bill, attached is a scan of the buffer zone that extends onto the property of 1679 Osgood (from the delineation done for
1600),the driveway for 1679 is highlighted, can you just use this to add the BZ to the plan?
Heidi Gaffney
Conservation Field Inspector
Town of North Andover
1600 Osgood Street, Suite 2035
North Andover, MA 01845
Phone 978-688-9530
Fax 978-688-9542
Email hgaffney@townofnorthandover.com Web www.TownofNorthAndover.com
1
i
i
l
1
` \1
,
s ` '
„ r '
, r
i
® � f
- �G3)
_
Blackburn, Lisa
From: Pam Lally <p|a|k/VgmiUriverconsu|bngznm>
Sent: Thursday, May 14, 2OlSl0:03AM
To: Blackburn, Lisa; 'Dan Ottenheime/'; 'Isaac Rowe'
Cc: Grant Michele
Subject: RE: I679 Osgood St.
Hi Lisa,
We've set up this soil testing with Bill Dufresne for Wednesday, 5/27 at 9am.
Pam
-----Original Message-----
From: Blackburn, Lisa l
Sent:Tuesday, May 1Z, 2O154:32PK4
To: Dan Ottpnheimer; Isaac Rowe; Pam Lally
Cc Grant, Michele
Subject: 1679 Osgood St. �
/
Good Afternoon,
\
Soil testing for 1679 Osgood St.
-----Original Message----- |
From: ]
Sent:Tuesday, May 1Z, 2O154:44PM
To: Blackburn, Lisa
Subject: Message from "ComDev-Hea|th'Ricoh" �
This E-mail was sent from "CumDev'Heakh'Ricoh" /AOcioK4PC3U0J\.
Scan Date: 05.12.201516:44:15 ('O40O)
Queries to:
All email messages and attached content sent from and tothis email account are public records unless qualified asan
exemption under the Massachusetts Public Records Law.
Visit us online at
Social Networks
bwitter.com/north andnver
|