HomeMy WebLinkAbout2015-07-07 Planning Board Minutes PLANNING BOARD 4MV4 Town of North Andover d John Simons, Chairman David Kellogg Lynne Rudnicki �� Lora McSherry Peter Boynton Tuesday July 7,2015 @ 7 p.m.Town Hall, 120 Main Street,North Andover,MA 01845 1 Present: J. Simons,L.Rudnicki,L. McSherty,D.Kellogg,P. Boynton 2 Staff Present: K. Cheetham,B. Wolstromer 3 4 J. Simons,Chairman: The Planning Board meeting for Tuesday,July 7,2015 was called to order at 7 p.m. 5 6 LOT RELEASE 7 166,170 & 180 Salem Street(Map 37D Lot 21): Jack Cahill requested release of Lots 1 &3 to begin construction 8 of 2 new homes. The DPW has recommended a bond amount of$1K per lot. 9 K. Cheetham: The DPW has reviewed the site. There's an as-built plan for the property and a letter from the 10 engineer certifying the work. The DPW provided a bond estimate of$1K per lot.All the legal paperwork and the 11 deed restrictions have been recorded. The town will not have any responsibilities associated with this property, it 12 is a private way. 13 Jack Cahill (_79 Old Village Lane developer 166 Salem Street): I constructed the approved renovation at 166 14 Salem Street and established two buildable lots that were approved in 2008.The approved debris pile in question 15 remains under a tarp and is not fenced in. It is comprised of stones, sod and loam which are to be used for the 16 construction of retaining walls,etc. during the construction of the two new homes. It will be removed when the 17 first foundation goes in. 18 L.Rudnicki: Asked several questions about the property: such as tree removal,the development schedule,the 9 stone wall and any outstanding conditions in the Watershed Special Permit. _0 J. Cahill: 89 trees were planted on the three lots. The Watershed Special Permit was resolved with the initial 21 approval. We have not updated the development schedule for the new lots.The sidewalk fund has been addressed. 22 The sewer is stubbed to each of the lots.We submitted an as-built and letter from our engineer to certify the work 23 is completed. 24 L.Rudnicki: You will be required to submit a final as built when you finish the new lots.According to the 25 Decision,there are still a fair amount of items that need to be completed. The private driveways and the 26 stormwater have to be constructed,the final site cleanup, site restoration, site screening, street trees, lot and site 27 erosion control. 28 J. Simons: Addressed concerns of the status of the roadway and sewer and whether any future work will be 29 required in the right of way. Given the significance of the watershed and potential site disturbance and risk to the 30 town he felt$7,500 per lot was a fair amount. We will release the bond when the work is completed. 31 MOTION: L.Rudnicki made a motion to release lots 1 & 3 upon receipt of a$7,500 Performance guarantee per 32 lot and completion of the appropriate paperwork.D.Kellogg seconded the motion. The vote was 5-0,unanimous 33 in favor. 34 35 Regency Place 464 Appleton St (Map 65 Parcels 8 9 & 55): Applicant requests lot release to begin construction 36 of single family harries. 37 K. Cheetham: Regency Place is a subdivision located at 464 Appleton Street. The Decision is complete and a 38 basic plot plan is in your packets. The road is in and they want to release the lots and begin construction. The 39 utilities are set and the DPW has reviewed the site and they recommended a bond amount of$45,500. 40 Christiansen and Sergi has accepted that amount from DPW. 41 J. Simons: Typically,the developer doesn't establish the bond amount. It usually comes from the DPW based on a 42 detailed analysis and we receive more information than we have here. I am uncomfortable approving this without "3 detailed documentation. The bond amounts protect the town's interest. If we wait two weeks is that a problem? 1 There is nothing here that states the DPW approved this. 1 PLANNING BOARD Toivn of North Andover John Simons, Chairman David I(ellogg Lynne Rndnicka" ia Lora McSheriy Peter Boynton Tuesday July 7,2015 @ 7 p.m. Town Hall, 120 Main Street,North Andover,MA 01845 45 P. Christiansen: We were asked by DPW, Gene Willis,to provide an estimate for the work that is remaining. 46 P. Boynton: The email provided does not mention DPW. 47 K. Cheetham: The email provided was the one that had the numbers and details. 48 L. Rudnicki: We need to consider our funds for the as-builts and the stormwater for the homes. I'd be willing to 49 release three lots with the added contingency if the applicant agrees we can modify this per the DPW approval. 50 P. Christiansen: We originally had 6 lots, a modification occurred now there are a total of 8 lots. They have plans 51 and can submit building permits as soon as this is resolved.Losing two weeks is significant. Perhaps we add a 52 20%contingency for the release of the requested three lots. 53 J. Simons: Requested the Planner to speak with DPW to validate the amounts in order to render a decision 54 contingent to what was discussed. 55 MOTION: D.Kellogg motioned to authorize the Plainer to immediately release 3 lots with a bond arnount of no 56 higher than 20%more than the $45,500. Prior to that, a detailed DPW site work budget will be sent to the 57 Planning Board members stating the DPW established amount. The applicant agrees to allow the Planning Board 58 to adjust the amount of the Performance Bond. (If the DPW recommended bond amount is over 20% of the $45K 59 the applicant has to come back to the Planning Board.)L. McSheriy seconded the motion. The vote was 5-0, 60 unanimous in favor. 61 62 B.BOND &ESCROW RELEASE 63 110 Sutton Street(Map 17 Lot 9): Bob Carberry of Chippendale Dance Studio seeks release of bond funds 64 ($2,500)for completion of landscaping. Applicant seeks release of$2,500 bond. 65 K. Cheetham: Provided updated site photos and a project history of landscape plans. The original plan was 66 approved in March of 2013 and that plan changed during construction. The applicant placed gravel on the site. 67 The Board agreed on the gravel,yet required a landscaping plan. The applicant has installed trees and relocated 68 some landscaping per the request of the Board. 69 Board: The Board members expressed concern over the front portion of the site being used as a parking lot.At 70 one point there were photos of cars parked in this area. They felt that the landscape plan was not executed with 71 regard to specified planting locations. 72 Bob Carberry(Applicant):The previous Town Planner approved the gravel and landscape plan. We planted(3) 73 azaleas, (6) arborvitaes;you asked for(3) 7 ft.trees,we planted(3) 14 ft.trees, spaced further apart because 74 they're wider trees. We spaced the river birches so they could grow and fill in. The crushed stone is there for 75 drainage purposes. Foundation plantings would not be a good idea in that location. Snow shoveled off the roof 76 ends up there. Perhaps we restrict parking to the area of concern and it solves the issue. 77 L. Rudnicki: Held up a color sketch that the applicant had originally proposed, showing a lawn with plantings. We 78 approved the building partly because of the landscaping plan.The building has a flat panel and the windows aren't 79 New England style windows. The trees should be in the middle of the area to block parking access; instead they 80 were placed on the street. It doesn't break up the fagade. We felt the same about the arborvitaes.The simple 81 solution is to leave the trees and introduce raised mulch mounds with plantings to block parking permanently. 82 J. Simons: We're not going to release the bond and we recommend you execute the approved landscape plan with 83 raised mulch mounds. 84 85 [Continued] 1018 Osgood Street(Map 35 Lot 19): Cafua Realty Trust LX, LLC requests bond release for project 86 completion ($10,000) and release of Escrow($1,900)JFJ Holdings,LLC. 87 K. Cheetham: The applicant is not requesting the release at this time. 88 2 PLANNING BOARD Town of North Andover • John Sim David Kellogg ons, Chairman a �,,. Lynne Rnrinieki " Lora McSherry Peter Boynton Tuesday July 7,2015 @ 7 p.m.Town Hall, 120 Main Street,North Andover,MA 01845 89 640/660 Great Pond Road (Map 63 Lot 11)_Rolling Ridge facility at United Methodist Church,release of Escrow 90 balance of($1,608.50) 91 K. Cheetham: This was a WSP permit for a driveway at the smaller parsonage on the property(#640)from 92 2007/2008. I have inspected and photographed the site. I have a letter from the Director of Community 93 Development,Building inspector and an engineer proving the work is substantially complete, 94 MOTION: D.Kellogg made a motion to release the escrow balance($1,608.50)for 640/660 Great Pond Road. L. 95 McSherry seconded the motion. The vote was 5-0 unanimous in favor. 96 97 PUBLIC HEARINGS 98 LContinuedl 242 Dale Street: Julie Nigro &Rob Barter(Map 64 Lot 30): Request for Watershed Special Permit to 99 construct an above ground pool, deck,patio and fencing&removal of four trees. 100 K. Cheetham: This project received a NO:[from the Conservation Commission and the project will not impact 1.01 endangered species habitat. The peer engineer had minimal comments. You may want to review the retaining wall 102 per the engineering comments. A draft Decision for the WSP is in the meeting packets. I'm seeking guidance on 103 the Special Conditions you would like to include. Draft Decision was reviewed and amended by the Board. 104 J. Simons recommended the escrow balance be rolled into the $1K required bond amount. 105 MOTION: D.Kellogg made a motion to close the public hearing. L. McSherry seconded the motion.The vote 106 was 5-0,unanimous in favor. 7 MOTION: D. Kellogg made a motion to approve the Watershed Special Permit for 242 Dale Street, as amended .,8 and subject to all the Planning Board members receiving an amended copy for review. L.Rudnicki seconded the 109 motion. The vote was 5-0,unanimous in favor. 110 111 [Continued] 1600 Osgood Street: OSGOD Permit for Solar Project(Map 34 Lot 17): Applicant request for time 112 extension 113 MOTION: D.Kellogg made a motion to approve the request for continuance with an extension to August 19, 114 2015. L.McSherry seconded the motion. The vote was 5-0,unanimous in favor. 115 116 D. GENERAL DISCUSSION: 117 4 High Street: West Mills(Map 54 Lot 1): Applicant seeks review of scope and timing for demolition of 118 Building#37. 119 David Steinbergh presented an overview of the modifications to 4 High St.-West Mill 120 The developer explained that due to structural reviews,the existing culvert area between the two mills that 121 travels underneath the proposed parking lot cannot support heavy trucks, cars, etc. They are proposing a 122 re-orientation of the parking lot, landscaping and drainage. An open deck will be designed to float over 123 this area in the center of the parking lot. The vehicle approach and circulation patterns to the center lot 124 will change slightly. 125 In addition,the original permit featured the reuse of one portion of Building#37. The applicant now 126 wishes to demolish Building#37 entirely(80K sq.ft.).After demolition,the area will be grassed until a 127 feasible redevelopment plan emerges. The building was not structurally sound and is not historically 128 significant to the site. The schedule for demolition is late August and through the fall.The parking lot and 129 landscaping will be phased in. All would be in place when the ground freezes mid-December. The 130 developer is working with National Grid to identify where power is located on site. The applicant will file "I with Planning and Conservation on July 8, 2015. Town Planner confirmed that the bonds need to be in 2 place for the demolition projects. This is to be considered a modification to the Site Plan approval. 3 PLANNING BOARD Town of North Andover John Siinons, Chairman „ David lfellogg Lynne Rudnicki ��� Lorry McSherry Peter Boynton Tuesday July 7,2015 @ 7 p.m.Town Hall, 120 Main Street,North Andover,MA 01845 133 • Planning Board Membership & Signature Page for Registr: Planning Board would like to wait on the 134 authorization to allow the new Town Plainer the ability to sign documents requiring recording at the 135 Registry of Deeds. J. Enright will maintain signing capability. Water Quality Research: Planner reviewed 136 the water treatment plan on the website and noted annual water quality reports are there. P. Boynton 137 would like a presentation reviewing long term trending of the pretreated lake water quality as it relates to 138 watershed protection. Town Planner to schedule this presentation with DPW for a fixture meeting. 139 o Watershed: The Board agreed to carry the watershed notification/education piece(mailer)that was started 140 by the previous Town Planner on each upcoming agenda until that effort is completed. 141 • Working Group: Planner initiated a Trails Meeting with the working group at the DPW 142 7/8/2015 and will update the Board on any Trails developments. Dropbox: Planner asked whether the 143 Board would be willing to utilize this system as a way of organizing meeting documents. The Board 144 requested all Decisions be in the packet folders when bond releases are requested. 145 146 MINUTES APPROVAL 147 The Board noted amendments&clarifications to minutes specifically lines 12,37, 97, 182 & 185. 148 MOTION: P. Boynton made a motion to approve the minutes for Tuesday June 16,2015, as amended. L. 149 Rudnicki seconded the motion. The vote was 5-0 unanimous in favor. 150 151 ADJOURNMENT 152 MOTION: P.Boynton made a motion to adjourn the meeting,motion seconded by L.Rudnicki.The vote was 153 5-0,unanimous in favor. Meeting adjourned @ 9:00 p.m. 154 155 MEETING MATERIALS: 156 Administrative: July 7,2015 Agenda; DRAFT June 16, 2015 Meeting Minutes; Staff Memo; 157 110 Sutton Street: 110 Sutton St.Revised Landscape Plan, 131203 Meeting Minutes,Aerial View,Arborvitae,As 158 built&landscape plan,Azalea,Birch 1,Birch 2,D.Mund notes re PB meeting,Image of landscaping,June 15 159 Image 2, June 15 Image, June Mtg Min 2014, Staff Thoughts, Street View 1, Street View 2; 170 & 180 Salem 160 Street: Aerial View,DPW Estimate,Interim As Built Plan 7-22-2013,RE Barad Estimate for 170& 180 Salem 161 Street; 242 Dale Street: 242 Dale base map,242 Dale St. WSP Decision Draft,Aerial View 242 Dale,J5 162 Response,LE Comments, SITE DEV.PLAN 6.9.15; Regency Place: 2 of 7 Regency Place_Lot Plan 1, 150106 163 Decision Modification DRAFT 2,Bond Estimate, Monitoring Report 6-24-15; West Mill: Notice of Decision- 164 Attachment A,West Mill- 141222-West Mill-Revised Drawings; [Additional Hard Copy Materials Supplied from 165 Planner Files Meeting]: 660 Great Pond Road: 660 As-Built, 660 Minor Modification Letter from Planner 166 6/27/2008,Watershed Decision 9/19/2007; 166 Salem Street: 166 Salem Street WSP Decision 4/16/2009. i 4