PLANNING September 2, 1998
Richard S. Rowen, Chairman
Kathleen Bradley Colwell, Town Planner
Planning Board
North Andover, MA 01845
RE„ Allen Trust - Robert A. Brawn Pre►perty - Map 62, Lot 23
Bradford Street
Dear Mr. Rowen,
The following addresses the siting of the house can the property
and the quality and quantity of water entering Lake Cochichewick.
First T will address the siting of the house on the lot. The lot
was created prior to October 24, 1994 and therefore is subject to a 100
font Non Disturbance Zone and a 325 foot Non-Discharge Zone. Although
the lot is 5.67 acres, the configuration of the wetlands in two fingers
create: a situation where there is no land, on the lot outside the Non--
Discharge Zone of 325 feet. We feel we have sited the house to present
the minimum impact on the lot and not force it right up to the existing
neighbors. The house is completely outside the 100 foot buffer zone
except for a portion of the roof runoff underground leaching facility
in the 100 font buffer zone.. The limit of work and maneuver area has
been established by locating the hay bale/silt fence 60 feet from the
BVW. In addition a past and rail fence will be installed on the house
side of this barrier prior to its removal. This fence will act as the
limit of mowing line.
Since the entire project is 'within the Non-Discharge Zone we have
proposed x. 1000 square foot leach bed for the roof drains and a total
of approximately 520 feet of 12"x121' (1560 sq. ft. ) leaching trench
along both sides of the driveway. The final grade of the paved driveway
will pitch slightly tca each side and will shed the surface runoff to
these trenches . The leaching bed provides a factor- of safety of 2 for
the 100 year storm and the leach trench provides a factor of safety of
3. The net result of these will be a reduction in the quantity of
runoff from the site since all roof and driveway runoff will :infiltrate
into the parent, soil and therefore also not change the quality of the
runoff . A covenant will be placed in the deed concerning the types of
fertilizers which can be used on the site.
Rowen , Pct 2 01
9/2/98
The hay bales and silt fence are shown on the plans. Because of
the shallowness of the groundwater (less than 3 feet) some fill will be
required over the root drain leach field. All disturbed area will be
loamed and seeded as soon as possible. Any soil requiring stockpiling
will be stockpiled to the south of the house and driveway.
Should you have any questions please call us.
Very truly yours; O'F
ME$ALFRED
O'DAY
ames A. O'Day P.f4 No 22733
10, a
�*ISTV-
JOB ✓ r4 1`U GI� J �/• �e•/ b U �/ L
JAMES A. O'DAY, P
SHEET NO. f OF
CALCULATED BY -� �' DATE-
CHECKED BY DATE
SCALE
, A!e C C
.
—�
:. . .. ..�.. . ,... . . .... . 12/ ARCL _.O ....
d.., o..............
��.,.. 9...f .
loo...../?.._.._ . _ 4 '-!�..r �.t. . /�-!.4...7`1 _� �.........
.......... .. ..C ../ �'...
�X..L� K .L /a r e . .L.S G N/}2 G Z ! N.,. ...�S.
co
....... ... _...., .. ... ..
^/.c ............ C G / /(� "/..... (..�_c. .`� /y/n/
/ ...... ...
z a wi/ .a l_ ._^ _s._r._T;� ?..._a.. " : ..
... ....
; . Tp : : , . . .. ...�./. .i,1 4 .c..-
..A.... _..o...
.7�.......
F. ../..s 4].7 ._..... o. ._. Z 3. S/' %
o. a.;.. P t- .. ............c . �....?
._...
^ 1/
.......... Q:r.3.�.(.Z....B N2 ...: ° o�Q /�� O. 4...:1 C ._. s'
........._.i.,. .. ',n/ 'Nrli�( E� tel� Teo : —o2Zao/= 2� i► LGCfGS—o1 SSuw =
!/i ?......... ry.........f l..t�.,.............r................�r..............?..................................... ......._.I.......,.........................,............. ..........1�......................,............0.....................s............................_.��..._.....................k...
D T'c�� lh = o•oo
s
.l
¢ X z ._ ...
7�.!�.<! .._'................ ....'............ s �?.. ..... a o
Q ..... ....o.........
.. .... ..... _
Q...r..4._�_-....... U_�.... .1...�.. s.... s / .... s ................. .........
......_. > o ¢ I e
.... ..... ... ....
... ........._...........:...... .•
ir1._ ...�' ._ . ...
r.z �...` L......_C ... ..
S
. . .....
�. 0"*.....2 A / /r A C L L .^/
/O 2 - zCG c� r p 2 ti 1A/.•r /��//
..... ..../. ._ . .._.. / .. . ._ _..._. l......__.. . c ,3 v...
2
1V
Cc{2 �cr
p/1 20 0 P... A a r A J iI r C �. ./ � f:-F:-
J013 3 rZ A�P 0 All o 0 c-- -?,-
JAMES A. O'DAY, r SHEET NO. OF T9
CALCULATED BY DATE—
CHECKED BY DATE
SCALE
.......... .........
............... ..............
.............
........................ .. ................
/) L 2
.......... io'r .......
6Z
............ ........... ....... ......................- ......................
t2 C':0
.................. ......... ...........
..........
rc
...........
..T.
s....._..9 e- '4/
... ...
.... ....
........... ......
.......... . ............
............. .
........... ........... ...................................... .............
2-Y,
..........
........... ........... ....... .............................. ..
... .............
.......... ......
e-
.121 To
....... ....... ..........4
................ ...................................
......................- ........ ............... .................. ........... ......................... ......................
.................... .......... .......................... ................
s
.......... ................................................................................................. ........... .......... .......... .............................................................................. .................
.............
.......... ..........................i..............................................................................................
.......... .......... .................... .............................. ............. ......................................................
............ ...........- ..............................
............ -4
. ... ..... ............ ................. ......................... .......... ...........-
...................... ......................................
............................................................... ......................
........................ ...... ........... ............ ................................................ ........................
........... ..................
.............. .......................... ............ ...................
.......... ... .......
........... ......................... ................................ ................................. ...................-........... .......... ......................................-
...................................... ........ i-......................? . . . ........
.................................. .............. ................. ........... .................... ..............
. ......... ............. ........... .......... ...... .............. ..........................
.......... ........... ........................ .......... ...... ............. ................................ ....................... .............: ........... .................. .............................
...................-
...... . .... d- :
..............
........... ...................... ......7:�K.F...I.........................
.............I...................................................
.......................... .................................................. ......... . . .
..............
............ .............. ................................................................
.......... ........... ....................
........................ ............. .......... .............. ...........................................
.............
............ ........ .............. ........... ........... .............. .......... ..........
.............. ..............
................. ..........
....................... ............. ........... ........... ...........
...................... ......... .......................................................................
.........................
........... ................
................. .............
..........
................. ............ ...... .
OF
.....................
... . ... ...... JAMES ALFRED
O'DAY
CML
NO.227 3
-I ST
.......... 61;AL......
...........-........... ....... ...................
............ ....................... ......
FORM 12 - PERCOLATION TEST
Location Address or Lot No. MAC Z �oT c 3
b
COMMONWEALTH OF MASSACHUSETTS
Massachusetts
Percolation Test*
Date: -Ju c cL, X99$ Time:, :,. / 3.52... ....,
Observation Hole #
Depth of Perc ,r
Start Pre-soak
End Pre-soak
Time at 12" _
Time at 9"
Time at 6"
/ 3 .�
Time (9"-6")
a
Rate Min./Inch
* Minimum of 1 percolation test must be performed in both the primary area AND
reserve area.
Site Passed ❑ Site Failed ❑
....................................................................................................................................._._......_........
'
Performed By: —J A � �� s' //j • 0 � � �
Witnessed By: u y o T o L o
Comments: ...._ ``�
DEP AXPROVED FORM•12/07/95
RAINFALL, INTENSITY - DURATION GRAPH
b-
NOTE -
i FREOUENCY ANALYSIS BY METHOD OF
EXTREMES VALUES. AFTER GUMBLE
150
To I
t —04 _�.l _ !
l
t 5 iC zo 40 to Z.
M NuTE.S
n l+ff.'.I
REFERENCES
1. TECHNICAL PAPER NO 40
U.S. DEPT OF COMMERCE
f WEATHER EUREAU
MAY 1951
•r
"n A A . TF(I)JI(`A1 f.eF►.nnl✓An1n11►A t+wc uvr, z c. �
'•�V< ��. �•;�L7"'ti:. t�;G?:.t'. .rt'•^-= '.:t :•:J )5 a. i , yJs�.y �,t::.•• �%• T .:r• v?�, r, i �.�;.,.r. •,,:
All. 0. 44
RAINFALL. INTENSITY - DURATION GRAPH
-j — NOTE —
FREQUENCY ANALYSIS BY METHOD OF
EXTREMES VALUES, 'AFTER uUMBLE "
n:
cc
uj
jxt I w.•. r.. t .,• •_ ._
!
5 10 ?.O 40 (o 3 a 5 5 0 IO 12 18 24
hiiNuTE.s HrIURS
^URATItsN
REFERENCES
1. 'r. TECHNICAL PAPER NO 40
J.S. DEPT OF COMMEFCE ;
~: WE'ATHER EUR8ALl :
r
+• t, Q ;�ECNI'CAL't`(v+a=Mor�ian!dUMrtws FlY0Ft0` F> r ;` �:c;� r :.tc
tlTQF, C0;1vMEFiCE �`� ` t �
r=A, IE�PguRAUP�ov�a�v
00
vm
CY
o_ x m
U4
-•o
JOCIIJ
-s
N
CY
I �T_
SM
p �1_3c i cd
LL
in Cd
LA-
TML -1}
' c
T
0—� m F, In 0
to n • n r1 O �
C) IN
_ S3HJN1 NI (0) 330Nn8 10381a -
FORM 11 - SOIL EVALUATOR FOKM
Page I or 3
No. Date:
Commonwealth of Massachusetts
Nol 'M- , Massachusetts
Soil Suitability Assessment for On-site Sewage Disposal
Performed By: ...... ................. Date: �X 411q,el .
......... .............................................
Witnessed By: -rj.........................................................................................................
L=t*-Addrus of
/Vo,�'ro )9-"oov,5ie Afteu, 411do
Tckphorx I
0
ew FConstructlon Repair ❑
Office Review
Published Soil Survey Available: No ❑ Yes
Year Published /7 t... Publication Scale Soil Map Unit
./............
Drainage Class M.WD.... Soil Limitations ..../1.11JA.........L5 cv ......................................................_.......
Surficial Geologic Report Available: No X Yes ❑
Year Published Publication Scale
GeologicMaterial (Map Unit) ............................................................................................................................................
Landform ..........................:....................
Flood Insurance Rate Map:
Above 500 year flood boundary No EJYes E-1
Within 500 year flood boundary No ID Yes ❑
Within 100 year flood boundary No 0 Yes ❑
Wetland Area: ffA?dt-g',^ " .
National Wetland Inventory Map (map unit) ......................................................I..................................................
Wetlands Conservancy Program Map (map unit) . ................................................ .......... ..............
Current Water Resource Conditions (USGS): Month
Range :Above Normal ❑Normal ❑Belc!v Normal ❑
Other References Reviewed:
DEP APPROVED FORM•12/07195
FORM 11 - SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot No. B CO s
lo . ) ✓.C,►^ A
On-site Review
Deep Hole Number7—T9 1 Date:. 2�� ¢�9S° Time: Weather
Location (identify on site plan)
Land Use L�>gClfl 1`'.. Slope (%)3 -S'16 Surface Stones NU.
Vegetation ..J-9c-)C
Landform ���...�'
Position on landscape (sketch on the back)
Distances from:
Open Water Body --
r feet Drainage way feet
Possible Wet Area2/IF,A/UCH feet Property Line feet
Drinking Water Well `' feet Other ::...... :,.:...
DEEP OBSERVATION HOLE LOG*
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsell) Mottling (Structure,Stones, Boulders, Consistency, %
Gravel
0-7 ;l `¢� 5 ow, ao r�i�l f0/!i 3/3 /t/,O va/t y Pft'a b le --S�g vtt w lar
7-24- 13••L' F-me'
5"d-1 NU VP fy Frlail' g spa >7 U�o N
/,,a r4
/oY�s/>^s
6/3
Dr st f N c7"
MINIMUM OF 2 HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA
v:vi •
Parent Material (geologic) lm My g f u a/ / / 0 DepthtoBedrock: �PQ�i2V'�/7 u✓t 94-
Depth to Groundwater: Standing Water in the Hole: /a 0 -1— Weeping from Pit Face: 40
r/
Estimated Seasonal High Ground Water: 3
DEP APPROVED FORM- 12107/95
FORM 11 - SOIL LVALUATOR FOR-NI
Page 3 of 3
Location Address or Lot No. .81-ad f2Y,-4 5
-ft: Determination for Seasonal Hizh Water* Table
Method Used:
❑ Depth observed standing in observation hole ........ inches
❑ Depth weeping from side of observation hole .. inches
Depth to soil mottles 33` inches
❑ Ground water adjustment .................. feet
Index Well Number ................. Reading Date ... ._ . . Index well level ....
Adjustment factor .... ........ Adjusted ground water level ....
...... ......... .........
Depth of Naturallv Occurrina Pervious Material
Does at least four feet of naturally occurring pervious material exist in all areas
observed throughout the area proposed for the soil absorption system?--;�-w 5�
/-PSV s
If not, what is the depth of naturally occurring pervious material?
Certification
I certify that on , (date) I have passed the soil evaluator examination
approved by the Department of Environmental Protection and that the above analysis
was performed by me consistent with the required training, expertise and-experience
described in 310 CMR 15.017.
Signature Date 7 2- z
DEP APPROVED FOR.*f• 12/07/95
FORM 11 - SOIL EVALUATOR FORM
Page i or 3
No. Date:
Commonwealth of Massachusetts
IWR " Massachusetts
Soil Suitability Assessment for On-site Sewa e Disposal
Performed By: ...... ..................... Date: 7A.471
WitnessedBy: .... d..........................................................................................................................
lau
Addrwj or BRPE>FI)I�D
Lot I Addrcu,LM
Tckph=I t, 110,19
Lew.construction ,Repair ❑
Office Review
Published Soil Survey Available: No F-1 Yes
Year Published 61 .... Publication Scale ltl� Soil Map Unit
Drainage Class /O.-W ... Soil Limitations 1113..h
Surficial Geologic Report Available: No � Yes ❑
Year Published Publication Scale
GeologicMaterial (Map Unit) ....................................................................................................................................
Landform
Flood Insurance Rate Map:
Above 500 year flood boundary No ❑Yes ❑
Within 500 year flood boundary No ❑Yes ❑
Within 100 year flood boundary No 0 Yes El
Wetland Area: 6 )00 / . .
National Wetland Inventory Map (map unit) .................I.............................................................................
Wetlands Conservancy Program Map (map unit) . .................................................................................................
Current Water Resource Conditions (USGS): Month
Range :Above Normal E]Normal . ❑Belcw Normal ❑
Other References Reviewed:
DEP APPROVED FORM-12/07/95
FOF_N1 11 - SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot No.
On-site Review
Deep Hole Number / I 1��'—L Date: �l��� Time: Weather
Location (identify on site plan)
Land Use Slope (%) 3 —8 o Surface Stones /1/0
Vegetation /50, v//
O� �,� /
Landform . �Y .r✓1Gt�/. .,_.: _ ..
4).
Position on landscape (sketch on the back)
Distances from:
Open Water Body feet Drainage way feet
Possible Wet Area zl. coo/ct?_tfeet Property Line . feet
Drinking Water Well feet Other
DEEP OBSERVATION HOLE LOG'
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsell) Mottling (Structure,Stones, Boulders, Consistency, %
Gravel)
O-7 rr Se td�� /OAR 3/3 NG Ve-/'y' j LOC) aN
S am d y 3/� A'10 V,e cy F✓`/off le 'u'g'rao v la)/I
/oalv)
2 f
C6-M Pa C7- �
1 1►� �`sl� yes �' r f� cc ea p lia
Z,0 '/°10
/v o Y4
MINIMUM UF 2 HuLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA
Parent Material (geologic) )110 to 4 f0<( 0 f 1 DepthtoBedrock: &O-2;c'i" Aet44-
DePth to Groundwater: Standing Water in the Hole: -1) 41 Weeping from Pit Face: •/9C,V7
Estimated Seasonal High Ground Water: 3?.'r
DEP APPROVED FORM. 12/07195
FORM 11 - SOIL L• VALUATOR FOR-NI
Page 3 of 3
Location Address or Lot No. L/��
Determination for Seasonal High Water- Table
Method Used:
❑ Depth observed standing in observation hole ........ inches
❑ Depth weeping from side of observation hole inches
Depth to soil mottles 3z.. inches
Ground water adjustment ................... feet
Index Well Number .. ............ Reading Date ... ... ... Index well level ....
Adjustment factor ...
Adjusted ground water level .._. .......
Depth of Naturally Occurring Pervious Material
Does at least four feet of naturally occurring pervious material exist in all areas
observed throughout the area proposed for the soil absorption system? Q C. s7-
If not, what is the depth of naturally g occurrin �'PSc�I
pervious material.
Certification
I certify that on� � (date) I have passed the soil evaluator examination
approved by the Department of Environmental Protection and that the above analysis
was performed by me consistent with the required training, expertise and-experience
described in 310 CMR 15.017.
Signature (, Date 7 Eby
DEP APPRO%FD FORM• 1:!07!95
Town of North Andover NORTH
��tTEO bgti
� Office of the Punning Department
OL
Community Development and Services Division
27 Charles Street
North Andover,Massachusetts 01845 �gss,CH •ti�c5
gc►+us
Telephone (978)688-9535
Fax(978)688-9542
April 25, 2002
Bill Barrett
1049 Turnpike Street
North Andover MA 01845
Re: 705 Bradford Street
Modifications to Stormwater Management System
Dear Mr. Barrett,
I am in receipt of your letter dated April 16, 2002. In this letter and the attached plans
you have indicated a new layout of in-ground infiltration locations. Incorporated within
the original Decision of Approval is contained a clause indicating that modifications to
the Special Permit may be reviewed by the Planner. If the Planner finds modifications to
be substantial, the applicant must return to the Planning Board.
Based upon the discussion at the original hearing, the letter and plan that you have
provided and my discussions with representatives of the Conservation Commission, I find
that no substantial change is presented. I make this'finding in accordance with the
following:
• The existing Permit layout is not possible due to the final pitch of the site—water
cannot flow uphill to the single leach bed area without some form of pump, which
will only increase the risk of failure.
• The Applicant proposes three distinct locations to accommodate different portions
of the runoff thus minimizing the impact of any failure.
• Changing from one large area to three areas reduces the point impact of any
runoff thus in essence increasing the natural functionality of the site and
minimizing chance of system failure from an intense localized use presented by
the original single leach area.
• One of the proposed locations lies outside of the buffer thus reducing the actual
impact to the buffer area and the protected resource.
• The two remaining systems, although in the buffer, represent a substantial
decrease in actual impact to the protected buffer.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANWNG 688-9535
705 Bradford Street
Page 2 of 2
April 25, 2002
• Although not directly related to the provisions of the permit — the driveway
surface area has also been reduced, therefore reducing the overall impervious
surface found on the site.
As a result of the above, I find that not only are the proposed changes not substantial, but
that they in fact enhance the intent of the bylaw and the planning board's approval and
concerns related thereto.
If you have any questions regarding my determination, please feel free to contact me at
your convenience.
Very"truly yours,
.._... tchell
Inter un T o-Wn-Planner --
cc: Conservation Commission
Special Permit File
attch
�m RECEIVED
William
BARRETT
7 2002
<`P�mm!elalf 0/' April 16, 2002
FINE, "HOMES
Clayton Mitchell
Planning Department Consultant
Town of North Andover
27 Charles Street
No. Andover, Ma. 01845
1049 Turnpike Street Dear Clayton,
North Andover, MA 01845 As was discussed with you in the office last week, I am
writing to detail for your records the changes we are
making to the storm water management system on 705
. . mar . . . . .. . . . Bradford Street.
The existing record plan has called for a single leach bed
Tel 978 682 2320 system at the Northwest corner of the house. Due to the
elevation of the system and grades at the south side of the
Fax 978 682 2397 property it is impossible to gravity the roof drains into the
system. Therefore we have redesigned the system into 3
separate systems. Each has been designed to accommodate
E-mail: the particular roof area of each system. We have also
wbmTett@�vbarretthomes.com changed from a leach bed system to one using chambers
similar to Abbott Village.
There are environmental benefits to these changes. As you
will see on the plan, some of the system is now located
New Homes outside the 100 foot buffer zone. Additionally,this type of
Additions & system is less likely to fail due to clogging and can be
cleaned if it does. The leach bed system, once failed, would
Remodeling have to be replaced and would require a filing to do so.
I hope you concur that this is a minor modification and can
be approved though your office. If you have questions or
need additional information, please don't hesitate to call.
A Division of
S* e
'y
Colonial Village
lBl arrett
Development
Corporation
. . . . . . . . . . .
William
: , . : E. u
0/ June 3,2002
FINE HOMES
Clayton Mitchell
Planning Department Consultant
Town of North Andover
27 Charles Street
m' No. Andover, Ma. 01845
1049 Turnpike Street Dear Clayton,
As was discussed with you last week, I am writing to detail
North Andover, MA 01845 for your records the changes we are making to the
installation of the fence on 705 Bradford Street.
. . . . . . . . . . . . The existing record plan has called for a split rail fence
incorporating the following text: "Protected Wetland
Tel 978 682 -2320 Resource Area"to be installed along the " 60'No-
Disturbance Zone ". The new fence is shown enclosing the
side and rear yards. ( see enclosed plans) . In addition we
Fax 978 682 m 2397 will install single posts every 50' with the Con. Com. Label
affixed to each post. This method has been approved by
E-mail: Con. Com in the past.
wbarrettC�vbai-i-etthomes.com
I hope you concur that this is a minor modification and can l
m w be approved though your office. If you have questions or
need additional information, please don't hesitate to call.
New Homes
Sincerel ,
Additions&
Remodeling a
I
I
A Division of
Colonial Village
Development
Corporation
fown of North Andover 1 ,,ORTH
OFFICE OF 3r° „`- "4"o
COMMUNI'T'Y DEVELOPMENT' SERVICES p
30 School Street �9 �
North Andover,Massachusetts 01845 2•9SSgcEHUSEt�y
WILLIAM J. SCOTT
Director
August 5, 1998
Mr. Robert A. Brown
Allen Trust
242 Andover Street
Andover, MA 01810
Re: Bradford Street—Watershed Special Permit
Dear Mr. Brown,
I have reviewed your application for a watershed special permit and find the following items
missing as required by Section 4.136 (4) of the Zoning Bylaw:
1) Special Permit Application: Application does not refer to the appropriate section of the
bylaw. You should be requesting a special permit under section 4.136 (3)(b) and(c) for
work within the non-disturbance zone related to the creation of a yard and drainage for the
construction of a single family home. The application should reference the fact that this lot
was created prior to October 24, 1994.
2) Plan:
a) A Registered Professional Engineer, not a Professional Land Surveyor, must prepare the
plan.
b) The Non-Disturbance and Non-Discharge Zones must be shown on the plan and labeled
as such. The current plan shows the 75' and 150' buffer zones which do not apply to this
lot and are therefore confusing. The plan must also show the proposed limit of vegetation
clearing (limit of work).
c) The plan must contain existing and proposed topography at 2' intervals. This is
necessary in order for the Board to determine the extent of the proposed disturbance and
to analyze the drainage patterns on the site.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
d) The plan must show proposed erosion control methods and locations.
e) Test pit locations must be shown on the plan. C CLn
f) The entire proposed sewer line must be shown on the plan. '
C 4kL�
3) Written Certification by a Registered Professional Engineer: The certification generally
includes a more detailed description of the methods proposed both during and after
construction to protect Lake Cochichewick.
4) Proof that no reasonable alternative location outside the buffer zones exists: The certification
by the Registered Professional Engineer also generally includes a brief discussion regarding
possible alternative locations for the house, yard, and drainage.
I recommend that you withdraw your current application and re-file when all of the required
information has been provided. I would be happy to meet with you to review the submittal
requirements.
If you have any questions please do not hesitate to contact me at 688-9535.
Very truly yours,
Kathleen Bradley Colwell
Town Planner
CC. R. Rowen, Chairman PB
M. Howard, Conservation Admin.
J. Hines, GrahamBoston Group
C
10/16/98
Bradford Street
Watershed Special Permit
Facts:
• Lot created prior to 1994 therefore lot subject to 100' non-disturbance and 325"non-
discharge zones
• Lot is adjacent to the Mazaurenko Farm Property
• Proposed single family dwelling within the non-discharge zone
• The site will be connected to Town sewer
• Wetland line confirmed by ConCom
Proposed Work in Non-Disturbance Zone (IQn.
• Lawn to within 60' of edge of wetland with a proposed wood rail fence
Board may want to suggest a lawn limit at 75'
• Roof Drain leaching area
• Grading associated with construction of home and driveway
Proposed Work in Non-Discharge Zone (325"
• The entire lot is located within this zone
For 10/20:
A revised plan was submitted on Wednesday and"fedexed"to John Chessia. Due to the lateness
of the submittal, John may or may not be able to review it. I have drafted a decision in
anticipation of review.
09/28/98
Bradford Street
Watershed Special Permit
Facts:
• Lot created prior to 1994 therefore lot subject to 100' non-disturbance and 325"non-
discharge zones
• Lot is adjacent to the Mazaurenko Farm Property
• Proposed single family dwelling within the non-discharge zone
• The site will be connected to Town sewer
• Wetland line confirmed by ConCom
Proposed Work in Non-Disturbance Zone (100'
• Lawn to within 60' of edge of wetland with a proposed wood rail fence
Board may want to suggest a lawn limit at 75'
• Roof Drain leaching area
• Grading associated with construction of home and driveway
Proposed Work in Non-Discharge Zone ,325"
• The entire lot is located within this zone
CI
u.
. � .
JAMES A. O'DAYRE. Office: (978)687-6350
599 Canal Street Res: (978) 687-1729
Lawrence,MA 01840-1233 -
July 29 , 1998
Town of North Andover
Planning Board
North Andover, MA 01845
RE: Map 62 , Lot 23 - Bradford Street
Dear -Planninq Board:
By the use of the underground leaching facility for the
roof runoff and the infiltration trench for the drivewav I
certify that there will not be any significant degradation of
the quality or quantity of - water entering Lake Cochichewick.
Sincerely' OF M4s�c
Ce. �. ��� DAMES ALFRED
O'DAY y cui
(JAMES A. O'DAY P .E NoC2 733
��
9CFC�T �
)-
ENGNEEM
FACSIMILE COVER SHEET
L
To: Kathleen Colwell
Company: North Andover Planning Board
Phone: 978-688-9535
Fax: 978-688-9542
From: John C. Chessia
Company: Cofer& Colantonio, Inc.
Phone: 781-982-5400
Fax: 781-982-5490
Date: October 20, 1998
Pages including this
cover page: l
Comments:
Attached is the documentation of a conversation between Coler&Colantonio and Mannie Rabbitt.
As related to comment#1 from Coler&Colantonio's latest review,dated October 20, 1998, for the
above mentioned project,it can be noted that the plan indicates the finished floor elevation as 172.5. It
could be assumed that this would indicate a cellar floor elevation of 164.5, 0.75 feet above the ground
water elevation(163.75 according to percolation tests submitted),However the detail sheet attached
indicates a finished floor elevation of 169.0 and cellar floor elevation of 161.5,2.25 feet below the
ground water elevation,In a phone conversation with Mannie Rabbitt on October 20, 1998 at
approximately 5:30PM, it was stated by Mr.Rabbitt that the detail sheet submitted was incorrect and the
revised copy will be presented at the Planning Board Meeting on October 20, 1998.'Phis detail has not
been presented to Coler&Colantonio.
The fore mentioned comment remains barring the presentation and confirmation of the revised detail
sheet which indicates the cellar floor elevation and the foundation drain elevation to be above the ground
water elevation of 163.75,namely 164.5.
cc: Jim Rand,DPW 978-688-9573
Mannie Rabbitt 978 535-3099
Coastal Survey 978 774-9737
COLANTONIOZ
U
ENGINEVRS ANO 5CIENT15TS ''..,.
September 24, 1998
Kathleen Colwell
Town Hall Anne
30 School Street
North Andover,MA 01845
Supplemental Engineering Review
Bradford Street
Special Permit for Watershed District
Dear Ms- Colwell:
In response to your request, Coler& Colantonio, Inc., has reviewed the requirements for
the Watershed )District Special Permit for the above referenced project. Plans have been
reviewed for conformance under these submittal requirements and standard engineering
practice. The submittal package included the following information:
Plan Entitled:
"Plan of Land in North Andover, Mass" one sheet dated July 27, 1995.
Prepared by Coastal Survey Wadsworth Village — Danvers Bldg. 130 Center
St.Danvers,MA Received September 11, 1998.
Application for Special Permit,Received September 11, 1998,
We offer the following comments:
Section 4136.)2.)ii.)The entire lot is located within the designated 325' non-discharge
zone. Drainage systems and discharge locations are not detailed on the plan.No invert
data has been provided.Some drainage system and invert data has been provided,
however details and inverts of the drainage system were unclear and incomplete.
Infiltration trench inverts, relative ground water table elevations and a correlation
between plans and test pit lags should be indicated on the plans. It is unclear that the
recommended two feet minimum separation between,groundwater and the base of the
infiltration system is provided. Percolation calculations for the drainage infiltration
trenches incorrectly assume a direct conversion between percolation rates and
permeability. This may be acceptable based on the factor of safety(2)provided. In
addition, the foundation as designed appears to be located in the groundwater table.
Typically, structures in this district are constructed above the
e g oundwater table to avoid
altercation of groundwater conditions.
101 Accord Park Drive 781-982-5400
Norwell, MA 02061-1695 Fax:781-962°5490
Section 4,136)3.)a.)i.)2.),A,sewer easement is not indicated on the plan. It is unclear that
the proposed connection is allowed. Comment remains.
Section 4.136)3.)a.)iv.) It is unclear how this proposed development would comply with
best management practices for erosion, siltation and storrnwater control, since there is
insufficient information on the plan. Silt fences and stockpiling locations were indicated
on the plan.
Section 4.136)3.)c)ii.)1.) Topography was not included on the proposed plan.
Existing and proposed topography was provided on the plan.
Section 4,136)3.)c)ii.)2.)Vegetation removal or cutting is not illustrated on the plan.
The limits of work were included, which indicate a minimum 60'non-disturbance
buffer zone. Note that the foundation drain is indicated extending beyond the limits
of the haybales/silt fence. This should be corrected.
6. Section4.136)4.)c.)ii.)4J5.)The non-disturbance and non-discharge zones are not
labeled on the Plan. The non-disturbance and non-discharge zones were indicated in
the letter of project narrative.
7. Section 4.136)4.)c.)iii.)There is no written certification provided by a Registered
Professional ,Engineer stating that there will be no significant degradation of the
quality or quantity of water in or entering Lake Coclzichewick provided.A letter
written by a certified professional engineer was provided.
8. Section 4.136)4.)g.)Test pits for the proposed roof leaching areas are not indicated on
the plans, Mails of the proposed drainage system are not included on the plan. Test
pits locations and logs were provided. In addition, details of the proposed drainage
system was provided.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this infornation is sufficient for your needs. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER &COI-ANTONIO, INC.
Jahn C. Chessia,P.E.
XC: Coastal Survey
Jim Rand, DPW
ENGINEERS AND SCIENTISTS
August 21, 1998
Kathleen Colwell
Town Ball Annex
30 School Street
North Andover,MA 01845
RE: Engineering Review
Bradford Street
Special Permit for Watershed District
Dear Ms. Colwell:
In response to your request, Coler & Colantonio, Inc., has reviewed the requirements for
the Watershed District Special Permit for the above referenced project. Plans have been
reviewed for conformance under these submittal requirements and standard engineering
practice. The submittal package included the following information:
Plan Entitled:
• "Plan of Land in North Andover, Mass" one sheet dated July 27, 1998.
Prepared by Coastal Survey Wadsworth Village — Danvers Bldg, 130 Center
St.Danvers,MA Received August 7, 1998.
• Application for Special Permit, Received August 7, 1998.
Note that the plan,does not indicate existing topography or proposed grading.
We offer the following comments:
1. Section 4136.)2.)ii.)The entire lot is located within the designated 325' non-discharge
zone. Drainage systems and discharge locations are not detailed on the plan.No invert
data has been provided.
2. Section 4.l36)3.)a.)i.)2.)A sewer easement is not indicated on the plan.It is unclear
that the proposed connection is allowed.
3, Section 4.136)3.)a.)iv.)It is unclear how this proposed development would comply
with best management practices for erosion, siltation and stormwater control, since there
is insufficient information on the plan.
4. Section 4.136)3.)c)ii.)1.)Topography was not included on the proposed plan.
101 ,accord Park Drive 781 982-5400
Norwell, MA 02061-1685 Fax: 781-962-5490
5. Section 4.136)3.)c)ii.)2.)Vegetation removal or cutting is not illustrated on the plan.
6. Section4.136)4.)c.)ii.)4./5.)The non-disturbance and non-discharge zones are not
labeled on the plan.
7. Section 4.136)4.)c.)iii.)There is no written certification provided by a Registered
Professional Engineer stating that there will be no significant degradation of the
quality or quantity of water in or entering Lake Cochichewick provided.
S. Section 4.136)4.)g.)Pest pits for the proposed roof leaching areas are not indicated on
the plans. Details of the proposed drainage system are not included on the plan.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your needs. if you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER&COLANTONXO, INC.
tom•
John C. Chessia,P.E.
XC: Coastal Survey
Jinn Rand,DPW
ENGINEERS ANp 9SIENYV�TS
October 20, 1998
Kathleen Colwell
Town 1-tall Annex
30 School Street
North Andover,lM 01845
U. Supplemental Engineering Review
Bradford Street
Special Permit for Watershed District
Dear leis. Colwell:
In response to your request, Coler& Colantonio, Inc., has reviewed the requirements for
the Watershed District Special Permit for the above referenced project. Flans have been
reviewed for conformance under these submittal requirements and standard engineering
practice. The submittal package included the following information:
Plan Entitled:
e "Plan of Land in North Andover, Mass" one sheet dated July 27, 1998.
Revised October 13, 1998. Received October 14, 1998. Prepared by Coastal
Survey Wadsworth Village — Danvers Bldg. 130 Center St. Danvers, MA
Received September 11, 1998.
® Letter of response dated October,9, 1998, Received October 14, 1998.
We offer the following comments:
1. Section 4136.)2.)ii.)The entixe lot is located within the designated 325'non®discharge
zone.Drainage systems and discharge locations are not detailed on the plan.No invert
data has been provided. Some drainage system and invert data has been provided,
however details and inverts of the drainage system were unclear and incomplete.
Infiltration trench inverts,relative ground water table elevations and a correlation
between plants and test pit logs should be indicated on the plans. It is unclear that the
recommended two feet minimum separation between groundwater and the base of the
infiltration system is provided. Percolation calculations for the drainage infiltration
trenches incorrectly assume a direct conversion between percolation rates and
permeability. This may be acceptable based on the factor of safety(2)provided. In
addition,the foundation as designed appears to be located in the groundwater table.
Typically,structures M- this district are constructed above the groundwater table to avoid
alteration of groundwater conditions. The cellar floor and foundation drain elevations
were raised, but are still proposed within the water table.
101 Accord Park drive 781 982-5400
Norwell, MA 02061-1585 Fax: 781-982-5480
3,)a)&)2)A sewer easement is not indicated on the plan.It is unclear
4.136}
2- Section
that the proposed connection Is allowed. Comment Tema
4.1.36)3.)a.)iv.)It is unclear how this proposed d a er eont od puce there
3. Section
with best management practices for erosion, siltation an s
is
with best genirnatiom on the plan.Silt fences and stockpiling locations were
indicated on the plan.
ography was not included on the proposed plain. Existing 4. Section 4.136)3.)c)i1.)l.)Top
and proposed topography was provided on the plan.
5. Section 4.136)3.)c)ii.)2.)Vegetation removal or cutting is not illustrated on the plan.
The limits of work were included,which indicate a minimum 60' non-disturbance buffer
zone. Note that the foundation drain is indicated extending beyond the limits of the
haybales/silt fence. This should be corrected. The limit of the silt fence and haybales was
extended to include the foundation drain.
6. Scction4.136)4.)c_)ii.)4./5.)The non-disturbance and non-discharge zones are not
labeled on the plan. The non-disturbance and non-discharge zones were indicated in
the letter of project narrative.
7. Section 4.136)4.)c.)iii.) There is no written certification provided by a Registered
Professional Engineer stating that there will be no significant degradation of the
quality or quantity ofwater in or entering Lake Cochichewick provided. A letter
written by a certified professional engineer was provided.
8. Section 4.136)4.)g.)Test pits for the proposed roof leaching areas are not indicated on
the plans.Details of the proposed drainage system are not included on the plan. Test
pits locations and logs were provided. In addition,details of the proposed drainage
system was provided.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient for your weeds. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER.& COLANTONIO, INC.
ohn C.Chassis,l'.E_
XC: Coastal Survey
Jim Rand,DPW
FORM 11 SOIL EVALUATOR FORNM
Page I of 3
No. Date:
Commonwealth of Massachusetts
)Ilol�H- Massachusetts
Soil Suitability Assessment, for On-site Sewage Moos&
Performed By: 1:5......C�?
................... Date:
WitnessedBy: ................................................................................................................... ..... .....................................
Lontm Addmis or Oww'sNum,
Addreu.&M z 4-
/0 Tckphonc I
ew Construction Repair ❑
Office Review
Published Soil Survey Available: No ❑ Yes 12�
Year Published ... Publication Scale
40 Soil Map Unit ...............
Drainage Class Soil Limitations ....MJ11......... ......................................................................
Surficial Geologic Report Available: No ja Yes ❑
Year Published Publication Scale
GeologicMaterial (Map Unit) ....................................................................................................I....................................
Landform ........................I.....................................................................................................................................................................
Flood insurance Rate Map:
Above 500 year flood boundary No E]Yes ❑
Within 500 year flood boundary No ❑Yes ❑
Within 100 year flood boundary No ❑Yes ❑
Wetland Area: lev " .
National Wetland Inventory Map (map unit) ...............................................................................................—........
Wetlands Conservancy Program Map (map unit) . .......................... ............................................ ..............
Current Water Resource Conditions (USGS): Month
Range :Above Normal ❑Normal ElBelcwNormal ❑
Other References Reviewed:
DEP APPROVED F014.12/07/95
FORUM 11 - SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot fro. ;B d S t-
On-site Review
Deep Hole Number 9 Date:. �Z `���� Time: Weather
Location (identify on site plan)
Land Use LL--Cv J.5.. Slope m 3'�� Surface Stones N .
Vegetation J�✓C. � / oY):.-'z v";
Landform ��� ..D h v vo [l})
Position on landscape (sketch on the back)
Distances from:
Open Water Body ��r feet Drainage way feet
Possible Wet Area,,T-AcA1c)0 feet Property Line feet
Drinking Water Well -J feet Other _:...:.:.:
DEEP OBSERVATION HOLE LOG
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsell) Mottling (Structure, Stones, Boulders, Consistency, %
Gravel)
0-7 ✓��! e Vv-1(y P-,Ta b/g S�g vtt j v tar
:50, -1
loo rv1
A
7-2 4-' S"d
lea to
�It Y-r C,� �Co z�sY,s7/6 �,es �j �j
T"/V1,0.S"df n »�f O� Lv�k P 1Q �
/o'Y�s;'�
Comm A..
Drs f0Zl-
,M-r�r,;t/1
MINIMUM OF 2 HOLES REQUIRED TT EVERY PROPOSED ulot'UbAL AREA
Parent Material (geologic) �DA y bQ/QC/a / / /, I/ DepthtoBedrock: ��212�V'��lf✓t Q.'¢
Depth to Groundwater: Standing Water in the Hole:_ f�l Weeping from Pit Face:
Estimated Seasonal High Ground Water: 3
DEP APPROVED FO%%f-12/07/95
FORM 11 - SOIL L• `'ALUATOR FOR-NI
Page 3 of 3
Location Address or Lot No. .8 I'GI�{Z>,r'J� SS
J-Pc'g—1 Determination for Seasonal High Water, Table
Method Used:
❑ Depth observed standing in observation hole ... .... inches
❑ Depth weeping from side of observation hole . inches
25 Depth to soil mottles -3-5— inches
❑ Ground water adjustment .................. feet
Index Well Number .. ............ Reading Date ... .. . .. Index well level -,
Adjustment factor .... ......... Adjusted.ground water level ....
Depth of Naturally Occurring Pervious Material
Does at least four feet of naturally occurring pervious material exist in all areas
observed throughout the area proposed for the soil absorption system?
If not, what is the depth of naturally occurring pervious material?
Certification
I certify that on/U'--) , `— (date) I have passed the soil evaluator examination
approved by the Department of Environmental Protection and that the above analysis
was performed by me consistent with the required training, expertise and-experience
described in 310 CMR 15.017.
Signature Date ;
DEP APPROVED FORM• 12/07/95
FORM 11 - SOIL EVALUATOR FORN,I
Page I or 3
No. Date:
Commonwealth of Massachusetts
IW AND00:�A,' , Massachusetts
Soil Suitability Assessment for On-site Sewage Disposal
Performed B ......6..... .....................y:
WitnessedBy: .... ..................................................................................
.............................................
.................
L=lm A&mss or »0 Lot I Addieu,ard tqyk40Le-,-1, 5�%-,("t
Tckphom I l7dOl.LP(, "44,19
ew Construction Jam,Repair ❑
Office Review
Published Soil Survey Available: No ❑ Yes
Year Published 61 .... Publication Scale /11/ Soil Map Unit
Drainage Class M.P... Soil Limitations 111J..h.......;I?��6W:T....... ........ ...
... .. ........................ .................
Surficial Geologic Report Available: No �. Yes F-1
Year Published Publication Scale
GeologicMaterial (Map Unit) ....................................................................................................................................
Landform. ..........................
Flood Insurance Rate Map:
Above 500 year flood boundary No ❑Yes ❑
Within 500 year flood boundary No ❑Yes ❑
Within 100 year flood boundary No ❑Yes El
Wetland Area: 6 rleo'be-(`Z�lAeLYL )00
National Wetland Inventory Map (map unit) ...............................................................................................
Wetlands Conservancy Program Map (map unit) . .................................................. ...................................
Current Water Resource Conditions (USGS): Month
Range :Above Normal E]Normal . ❑Belcw Normal ❑
Other References Reviewed:
DEP APPROVED FORM-12/07/95
FOR.,'11 11 - SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot i4o.
/loo��� ✓a d.�t./�-yam �y)
On-site Review
Deep Hole Number / / ��—L Date: 71Z419V�' Time: Weather
Location (identify on,site plan)
Land Use %L/oo d y Slope (%) 3 —8 o Surface Stones
Vegetation ..�.C.�c, hU�.�/ //Sw,�t, vyJ .IV-?R�/. .:_.:
Landform �. O ��"!J✓Vl
Position on landscape (sketch on the back)
Distances from:
Open Water Body feet Drainage way .. .. feet
Possible Wet Area?haA1cV2feet Property Line . feet
Drinking Water Well feet Other _:....:.
DEEP OBSERVATION HOLE LOG
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsell) Mottling (Structure, Stones, Boulders, Consistency, %
Gravel)
D,-7 rr V'-Y,y �f n /11�R 3/3 JvG �/�-�/'� �/'(46�� �9 nwv d N
5'a�'l 11 ocH4 `
PO
le,akt-)
Po C
r ryl uJ-eci fc p la�iz5
'Sill C
V"A
//` / r • s
MINIMUM OF 2 HOLES REQUIRED T I EVERY PROPOSED DISPOSAL AREA
Parent Material (geologic) Da poo l Q / e-( 0 / l l DepthtoBedrock:
Depth to Groundwater: Standing Water in the Hole: 77 0 Weeping from Pit Face: 'nl
Estimated Seasonal High Ground Water: 3 ?.'
DEP APPROVED FORM•12107!95
FORM 11 - SOIL LVALUATOR 1'OkNl
Page 3 of 3
Location Address or Lot No.
Determination for Seasonal High Water' Table
Method Used:
❑ Depth observed standing in observation hole ........ inches
❑ Depth weeping from side of observation hole inches
Depth to soil mottles 3a-. inches
Ground water adjustment .................. feet
Index Well Number .. ..._....... Reading ate ... ..
9 Index well level ....
Adjustment factor ... Adjusted ground water level ....
Depth of Naturally Occurring Pervious Material
Does at least four feet of naturally occurring pervious material exist in all areas
observed throughout the area proposed for the soil absorption system? - e �te-s7-
If not, what is the depth of naturally occurring pervious material? f'Psc�J
Certification
I certify that on,, 1V' (date) I have passed the soil evaluator examination
approved by the Department of Environmental Protection and that the above analysis
was performed by me consistent with the required training, expertise and-experience
described in 310 CMR 15.017.
Signature k-U Date 7 k-
DEP APPROVED FOR.%f• 1:/07/95
Joe _517?,4 r al?l, J7 0
JAMES A. O'DAY, P.E SHEET NO. I OF
CALCULATED BY DATE
CHECKED BY DATE
SCALE
............ ................... ................................ ............ ...........................- ...... .........
-7 t Ls
........... ............... .......... ...........- ...................... ............ ...........-
;2 6
.......... ...................... .......... P-17
... .........: -
.......... ...........
—/Z,4 ...........
........
............ ...... ..........
.....................
...........- ..........
............. P-67............
...... ....
Y P*-97li 1-0 v
. .......................................
............. ....................
........... .............
...............................
..........
.......... ... ....
................. ............-........................-
.................. ....... ....... .......... ........... ........................ ................................
...................................... .. ........
. .............. ...... ..... ............
?� ............
...... ........ .... ......
.............. ........................ ........... ......
7-6 �IZ A; lz,9
..............:.- .............-
............ ............ ... .. ..............
. ....... ... 0-
17 .5-.
..............
..........
*/
............................. .............. ............. ...........................................
............. ...........
................ .............I �Z 4 ..c
............ ............ ........... ..................... ..........
-1 ............ lz�b 0;;= ),e 4
Lf
.............-............
................... .. ........... .I.............
......................... ......................
D. I'rc................................ ......................
............. ........ ... ................ ................. ............................
................ ....................
........ ..... ..............
....................... ...................................................
.............. ...........................
.......................-
............................
.............. .............. ........... ............. ................... ...................... ............... ....................... .........- i........... ..........................................-.............
�JL ..............................................................................
......... ................ . ........
.......... ........................
............ ............... ........................ .............. ......... .............
............t .......... ...................... .....................................
6 L (- -' :
... . ...................
1 4:2 'i 47
........... ........
.............. ..........
................................
....................... ........... ..........
Lj-Al' S I
7-1.;--
Ive
12 12
AlJ—o 4 e-) ;7- �.-2- eF A I.Itq 12 tF C. Al e A1,37 S
..7
...............
joe R A, 0 �Y• �r/� o ` L f2
JAMES A. O'DAY, P.h. SHEET NO. / G OF— y I
CALCULATED BY v' DATE L Z T
CHECKED BY DATE
SCALE
(/ 1 /
.........L.._./o/ I-....a. ( �.3..�/�` . 71Z._S.~/. _ .Z ..7. 'U. . .�...� 1 . � '
... / .
S t/h�G Z� M/N Grp .. NCM �c'2c"t, z o / ,qT� S �cs i2
.....f G...j T S ...�..^�._.. � ..Z 4_ 1�O° "T /� �'�_ /.....
.2..6. f'......._. ..4 SS .p G v cJ s
20 M' �../ .:. . . ./_N�/-f'� D Z /-r/
C_F1C N 6Z 3 /d <r Q�c f rl..�T ...... ...... �.�... /d._ J Z.
`•
... ..................... .........._....................................,. ..........
....'............. o 0 0...S / p_f'............ c r ... L ...S. 2 T
........ ....
e-A.. ........ ...:.. ...•
o .? 2-�-
...........<..... ................._..........,.............:. ......;.............._........ ........... ....... ... ... .. .... .. _ .._. .._....... ... ... ..
...... .._...
��JAM AL RED c�
ES
. . _.._
O'DAY
.......... .. . _ .... _ _..:_ _ cm..
No.22733
9_
A9 rGfSTF" o.
_. ....._
........_... ............... ..... ..... .. ... : . ....:.__........ ..: .
.........:...... _.._ __... ...
FORM 12 - PERCOLATION TEST
Location Address or Lot No. MAT b z 2. 3
COMMONWEALTH OF MASSACHUSETTS
Massachusetts
Percolation Test*
Date: ._- z a, /99S Time:, .,: /G?3..�?....,....:.
Observation Hole #!
Depth of Perc .r
Start Pre-soak
• /o ; 3g
End Pre-soak
/v : 5" 3
Time at 12" _
Time at 9"
Time at 6"
Time (9"-6") /
Rate Min./Inch
* Minimum of 1 percolation test must be performed in both the primary area AND
reserve area.
Site Passed ❑ Site Failed ❑
.....................................................................................................................................—._......_........
Performed By: -J A s
Witnessed By: L o
Comments:
� S �.`.:..._,....._..:.......:...:......,.,:.,.�....,.._,...:.....:. . w....::......,:..............._.....-:_.
DEP APPROVED FORM-12/07/4S
RAINFALL INTENSITY - DURATION GRAPH
NOTE -
FREOUENCY ANALYSIS BY METHOD OF -
EXTREMES VALUES. AFTER GUMBLE
150
6.Q
4.0 t�` -
1 0
cr 20 -
I
F
04
LL
OB
5 Ic 2.0 40 Co + r. 0 10 12 iii ?4
• �:l�Ft:i I::F1
REFERENCES
I. TECHNICAL PAPER NO 40
U.S. DEPT OF COMMERCE
i WEATHER EUREAU
ti MAY 1961
Y m n A A . *rormii`hI rs run r,A'mrnit►e n uwc uvr,a.-,- -4c-
.•/.�... �♦• .'� ���,a .'...�}' �.il'.vt - 1• - dr%S,i' ..tia..,:..a-t[•'f.v , '` .. '.
2 y �n�..•,th�'SrF •'ti. �t� .�-� '•:it..�J.. Y�^`�. ik.�S` ��n
.—JY?^���`.'li•`�+`se�p... ? .'•3��1`; :� .F � n t•rf. � �1'�"' :•i •�:•e^ ?�;:-.� �j 1`r'. `y��;..
:� .. ?� ..... _... -. ....F:h 1J1C:..�._ .. .a.'_n c v•A .-. . ':9 _t_.. .. ..a ?��+jk �C.`:-. _t..'
RAINFALL INTENSITY — DURATION GRAPH
- i — NOTE
FREQUENCY ANALYSIS BY METHOD OF
EXTREMES VALUES; 'AFTER GUMBLE
10 if)
Cc
`a � 1, --1-{-'--��^••�,T._.... Vii•�.._-_: ._. ....•_:Y.._..,_w_A......;......•
i 5 5 8 10 12 18 24
MiNuTES HnuRS
^URA71c:N
REFERENCES
1. '�, TECHNICAL PAPER NO 40
1J•S: DEPT OF COMMERCE
A WE•QT.NER EURLAU
� ♦ F �sN 4' 19. 14•t,f M1
,�• ICAL't'fv+EMORA1hDl3M,} NwS 41 O.Ft04�' rx
r •. - :i;air ic'�1�
'T 0 GO(v, MEFiCE ;�.: S M
;m, `FarER euFi EAU
. f, `PftOViDI
y co
0
•• i
W
u.-,
co
OD
0
I'C�\j
s
Z
.tom-Al C .. N�• � ..�
N
vi
LL
LL
p _ a a >: - ��� •ter, -may �— �._ fn n
cc
/ � - o :t' u.1 c �-~ ---$-- -1-6'7• - �- _ - � c -- v
o - ___ `i _j _ c w
i5 x
u• r'1 •N - o
cr: co
) Y
_- S3 HON 1 Ni (0) 3.JONn8 103810