HomeMy WebLinkAboutConsultant Review - 250 BRIDLE PATH 10/25/2005 TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF WATERSHED SPECIAL PERMIT FOR CONFORMANCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW Site Plan Title: Lot 20A Bridle Path VHB No.: 09280.10 Site Plan Location: Bridle Path Road,North Andover,MA Applicant: Hefco Realty Trust,P.O.Box 1701,Lowell,MA Applicant's Engineer: Christiansen&Sergi,160 Summer St,Haverhill,MA The plan was reviewed for conformance to the 1972 Town of North Andover Zoning Bylaw(last amended May 2004). The Applicant has submitted the following information for VHB's review: • Application for Watershed Special Permit, • Petition letter from Applicant, • Notice of Recision from the August 9,2005 hearing, ' • Order of Conditions issued by North Andover Conservation Commission, • Site Plan for Lot 20A Bridle Path(1 sheet)dated December 14,20M(revisions through 2/1/05). The following comments note non-conformance with specific sections of the Zoning Bylaw or questions/comments on the proposed design and VHB's recommendations/suggestions. Town of North Andover ZoWns Bylaw 1. (4.136.2) The plans show a 75'Conservation Zone line,however since the lot was created prior to October 24,1994,this zone does not apply. The Applicant should eliminate this line from the plans. 2. (4.136.3.c.ii.1) Change in grade is proposed and is allowed by special permit. (no action required) 3. (4.136.3.c.ii.2) Vegetation removal is proposed and is allowed by special permit. (no action required) 4. (4136.3.c.ii.3) A new permanent structure is proposed and is allowed by special permit if a variance has been granted by the Board.(variance has been granted)(no action required) 5. (4.136.3.c.ii.5) Surface and sub-surface discharge is proposed and is allowed by special permit. (no action required) 6. (4.136.3.c.iii.4,5) Condition#77 of the Order of Conditions issued by the North Andover Conservation Commission specifies the use of slow release low-nitrogen lawn care products and prohibits the use of pesticides and herbicides within 100'of the Bordering Vegetated Wetland. (no action required) 7. (4.136.4.g) The Applicant should provide calculations for groundwater recharge. VHB cannot review the sizing of the Cultee units. 1 \T:\0428010\do+x\memos\0928010-8rldlePafi.doe GeneraUDrainaze Comments 8. Condition#55 of the Order of Conditions specifies that there shall be no increase in post-development discharges from the storm drainage system. The Applicant should provide calculations to demonstrate that this condition has been met. It is recommended that the Applicant rovide WRITTEN RESPONSES to the issues and comments contained herein. Reviewed by: Date: �Q-M-0 S Daryl ant Civil Engineer—IE way and M 'cipal Checked by: Date: 10121,145 Timothy -McIntosh,P.E. Project Manager—Highway and Municipal 2 \T:\09280.10\doca\momoe\0928010 BddtePath.doc I, I PROFESSIONAL ENGINEERS AND LAND SURVEYORS 1.60 SUMMER STREET HAVERHILL., MASSACHUSETTS 01830-6318 (978) 373-0310 FAX: (978)372-3960 November 7, 2005 Mr. Lincoln Daley North Andover Town Planner 400 Osgood Street North Andover, MA 01845 Re: Watershed Special Permit Lot 20A Bridle Path Henry Kucharzyk i Dear Mr. Daley: i We have received a copy of the October 25, 2005 Engineering Review prepared by Vanasse Hangen Brustlin, Inc., and we have the following response. i 1. As per VHB's recommendation, we have removed the 75' Conservation Zone line j from the Site Plan. i 2. We have performed a Roof Runoff Infiltration Analysis to confirm that the proposed roof runoff infiltration areas are adequately sized to recharge all of the roof runoff for storms up to the 100-year event. A copy of the Analysis is attached. 3. Condition No. 55 in the Order of Conditions issued by the Conservation Commission states"There shall be no increase in the post development discharges from the storm drainage system or any other changes in post development conditions that alter the post development watershed boundaries as currently depicted in the Notice of Intent and approved by this Order of Conditions, unless specifically approved in writing by the Commission." Since the Site Plan approved by the Commission is the same plan that was submitted for the Watershed Special Permit, and no changes are proposed to the stormwater management system, site grading, or limit of work,this condition is met by the Site Plan currently before the Planning Board. The post development discharges from the stormwater system and the post development watershed boundary are identical to those approved by the Commission. Enclosed are five copies of the revised Site Plan, as well as one copy of the Site Plan reduced to 11"x 17". Please contact me if you have any questions regarding this matter. Very y s, 4r h' G.~Christiansen i C.C. Timothy McIntosh,VBB I, PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 SUMMER STREET HAVERHILL, MASSACHUSETTS 01830-6318 (978)373.0310 FAX: (978) 372-3960 Lot 20A Bridle Path, North Andover Roof Runoff Infiltration Analysis An analysis has been performed to determine whether the roof runoff drywells proposed for the house are adequately sized to handle the runoff from a 100-year storm. The "HydroCAD" Stormwater Modeling System has been used to calculate the runoff rate from the roof and to analyze the roof runoff infiltration facilities. The results of the analysis indicate that the proposed drywells will be adequate for the proposed 1600 square foot roof area, Figure 1: S.C.S. Soils Map shows the Soil Conservation Service soil types found in the area of the project site. The S.C.S. soil type found on the portion of the project site that is to be developed is: SuB Sutton very stony fine sandy loam, 3 to 8 percent slopes Hydrologic Soil Group B The exfiltration rate used in the calculations for the infiltration areas is 0.00 1417 feet per minute. This correlates to an infiltration rate of 1.02 inches per hour over the bottom area of the drywells. The Sutton soil is listed as having a USDA texture of sandy loam in the Soil Conservation Service's Soil Survey of Essex County. The recommended design infiltration rate for a sandy loam in a Hydrologic Soil Group B soil is 1.02 inches per hour(See Table 1). Also;no credit was taken in the calculations for the exfiltration that will occur through the sidewalls of the drywells. Table 1: Hydrologic Soil Properties Classified by Soil Texture Texture Hydrologic Design Infiltration Class Soil Group Rate (inches per hour) Sand A 8.27 Loamy Sand A 2.41 Sandy Loam B 1.02 Loam B 0.52 Silt Loam C 0.27 Sandy Clay Loam C 0.17 Clay Loam D 0.09 Silty Clay Loam D 0.06 Sandy Clay D 0.05 Silty Clay D 0.04 Clay D 1 0.02 Source: Rawls, Brakensiek, and Saxton, 1982 I The attached "HydroCAD" sheet includes the roof runoff calculations and the drywell exfiltration calculations. F� l r {'� �r„l'r rr��:?1.w f ✓ -:7 P f r/ri'ff f r r 4�^B ( rr^' rfr P rr IPA` r r r y � f r r ✓r Or z” '"�" j'r:rGsr ;-�lr r(r ,$t rr- '�r r ?r' r t r 1 ✓ °t�' �r�r''rt t, "" x r r'r=?-r ' �,.trjtfr r/ r rr / %- .?✓r 'r' r T r tc c UD of t f 1 i MV � r r; SUB StA uu GaD VY s f j r f � r r f L) SATE o R,10 1 � � r� r r f r � ,. rm FIGURE 1 : f S. C. S. SOILS MA P t `g� 400 0 400 800 fT Ca SCALE. 1" = 800' C `x SL PROFESSIONAL ENGINEERS CHRIS � y� LAND SURVEYORS " 160 SUMMER ST. HAVERHILL, MA 01830 TEL. 878-373-0310 @2005 BY CHRISTIANS£N & SEREI, INC. Lot 20A Bridle Path Roof Runoff Recharge Type 111 24-hr 100 Year Rainfall=6.40" Prepared by{enter your company name here} Page 1 HydroCAD®7.00 s/n 001057 ©1986-2003 Applied Microcomputer Systems 11/7/2005 Subcatchment R: Proposed Roof Runoff = 0.27 cfs @ 12.01 hrs, Volume= 0.019 af, Depth= 6.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type III 24-hr 100 Year Rainfall=6.40" Area (sf) CN Description 1,600 98 Roofs Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.0 Direct Entry, Pond Inf. Roof Runoff Infiltration Areas Inflow Area = 0.037 ac, Inflow Depth = 6.16" for 100 Year event Inflow = 0.27 cfs @ 12.01 hrs, Volume= 0.019 of Outflow = 0.01 cfs @ 11.34 hrs, Volume= 0.019 af, Atten= 96%, Lag= 0.0 min Discarded = 0.01 cfs @ 11.34 hrs, Volume= 0.019 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs/9 Peak Elev=2.08'@ 14.53 hrs Surf.Area= 320 sf Storage= 414 cf Plug-Flow detention time= 352.4 min calculated for 0.019 of(100% of inflow) Center-of-Mass det. time= 352.4 min ( 1,092.0- 739.6) # Invert Avail.Stora a Storage Description 1 0.00' 255 cf Custom Stage Data (Prismatic) Listed below 638 cf Overall x 40.0%Voids 2 0.50' 174 cf 33.6"W x 20.0"H x 6.331 Cultec R-180 x 8 429 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 0.00 290 0 0 2.20 290 638 638 _ # Routing Invert Outlet Devices 1 Discarded 0.00' 0.001417 fpm Exfiltration over entire Horizontal area Discarded OutFlow Max=0.01 cfs @ 11.34 hrs HW=0.50' (Free Discharge) L1=Exfiltration (Exfiltration Controls 0.01 cfs) 11/14/2005 06:32 9763723960 CHRISTIANSEN & SERGI PAGE 01/02 CHRISTIANSEN & SERGI, INC. pWMSSKML ENOINEERS AND LAND SURVEYORS 160 SUMMER S7REEr HAVERNRA,MAWC11UxM 01M6316 07g)373.0310 FAX:(9760 372.3960 FACSIMILE TRANSMITTAL SHEET PROM: TO: Lincoln Daley Dan O'Connell COMrAIM DATE: Nortb Andover'Tawn Planner 11/14/2(X)5 FAX NUMBER: 'rOTA7:NO.Op PAGES INCLUDING COVER: 978-188-9542 2 C.C.: RE: Watershed Special Permit Lot 20A Bridle Path Cl I7 w NT ❑FOR.RrvlEw ❑PLEASE COMMENT ❑PLEASE_REPLY ❑PER,YOUR REQUEST NOTES/COMMIENTS: Lincoln,attached is a request for a continuance for the above referenced project until the December 20,2005 Planning Board meeting. Please call me to confirm that this iS acceptable. Thank you, Dan 11/14/2005 08:32 9783723960 CHRISTIANSEN & SERGI PAGE 02/02 CHRISTIANSEN & SERGI, INC. PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 SUMMER STREET HAVERHILL,MASSACHUSETTS 01830-6318 (978)373.0310 FAX:(978)372.3960 November 7, 2005 Mr, Lincoln Daley North Andover Town Planner 400 Osgood Street North Andover, MA 01845 Re: Watershed Special Permit Lot 20A Bridle Path Henry Kucharzyk Dear Mr,Daley: On behalf of my client,Henry Kucharzyk, l hereby request a continuance of the Public Hearing on the above referenced matter from the currently scheduled November 15, 2005 meeting until the December 20, 2005 meeting. Very y hil' hristianserl 160 Sremmer Street Haverhill, AAA 01630 7 - Sergi 9 x-373 0310 FAX 978-372-3960 Fax SEP 28 zQOS NOR/h� NE�_"L) ' BANNING OVER TO: Lincoln Daley ifs Lois Christiansen nEPAP_ NT R Fr= 978-688.9542 Pegis~ 1 INC COVER Phom Itetw 9128/2005 Mft Reschedule PB hearing M. David Ialoge—978.685-7878 Letts 20A Bridle Path H.Speicher—617-305-3129 f Urgent D For Revlsw LI Please Comewnt ®Pion&Reft LI plow*ItoWele On behalf of my client,Henry Kucharxyk,HEFCO Realty Trust,t hereby request that the public hearing sctheduled October 4 r a Watershed Special Permit, far his property at Lot 20A Bridle per,be contirued unto -date. C c�7 - t Thank you for your attention to this matter. f =,x :ofrt Lois Christiansen t� c=> ".14 Town of North Andover 0 Office of the Planning Department Community Development and Services Division 400 Osgood Street North Andover,Massachusetts 01845 bn://www.townofnorthandover.com P (978)688-9535 F (978)688-9542 FAX TO: Philip Christiansen Dan O'Connell From: Lincoln Daley Fax: 978-372-3960 Pages: 3 Phone: 978-373-0310 Date: December 16, 2005 RE: Lot 20A Bridle Path Watershed Special Permit Philip/Dan: Attached please find the 2nd and FINAL review for the Lot 20A Bridle Path—Watershed Special Permit. If you have any questions, please do not hesitate to contact me. Have a great weekend. Best Regards, Lincoln Daley BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 TOWN OF NORTH ANDOVER PLANNING BOARD ENGINEERING REVIEW OF WATERSHED SPECIAL PERMIT FOR CONFORMANCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW Site Plan Title: Lot 20A Bridle Path VHB No.: 09280.10 Site Plan Location: Bridle Path Road,North Andover,MA Applicant: Hefco Realty Trust,P.O.Box 1701,Lowell,MA Applicant's Engineer: Christiansen&Sergi, 160 Summer St,Haverhill,MA Plan Date: December 14,2004(revisions through 2/1/05) Review Date: 10-25-05 PI Date:, December 14-,2004(revisions,through,41/7/05) 2nd Review,Date.., 12-I5­05 The Applicant has adequately addressed VHB's comments and no further engineering review is required at this time. Please refer to the final report below for additional detail. The plan was reviewed for conformance to the 1972 Town of North Andover Zoning Bylaw(last amended May 2004). The Applicant has submitted the following information for VHB's review: • Response to Comments letter dated November 7,2005, • Roof Infiltration Analysis dated November 7, 2005, • Site Plan for Lot 20A Bridle Path(I sheet)dated December 14,2004(revisions through nnI05). The following comments note non-conformance with specific sections of the Zoning Bylaw or questions/comments on the proposed design and VHB's recommendations/suggestions. VHB's original comments are shown in normal font,the second round of comments are shown in bold. Town of North Andover Zoning BLIaw 1. (4.136.2) The plans show a 75' Conservation Zone line,however since the lot was created prior to October 24, 1994,this zone does not apply. The Applicant should eliminate this line from the plans. Addressed. 2. (4.136.3.c.ii.1) Change in grade is proposed and is allowed by special permit. (no action required) No response required. 3. (4,136.3.c.ii.2) Vegetation removal is proposed and is allowed by special permit. (no action required) No response required. 4. (4.136.3.60) A new permanent structure is proposed and is allowed by special permit if a variance has been granted by the Board. (variance has been granted)(no action required) No response required. 5. (4.136.3.60) Surface and sub-surface discharge is proposed and is allowed by special permit. (no action required) 1 \Q\Docunents and Settings\1daley\My Docmnents\Reviews\2005\VHB Reviews 2005\09280I0-BridlePoth-2nd.doe No response required. 6. (4.136.3.c.iii.4, 5) Condition#77 of the Order of Conditions issued by the North Andover Conservation Commission specifies the use of slow release low-nitrogen lawn care products and prohibits the use of pesticides and herbicides within 100'of the Bordering Vegetated Wetland. (no action required) No response required. 7. (4.136.4.g) The Applicant should provide calculations for groundwater recharge. VHB cannot review the sizing of the Cultec units. Addressed. The Applicant's analysis shows that the infiltration system has the necessary volume to store the runoff for the 100-year storm event. General/Drainne Comments 8. Condition#55 of the Order of Conditions specifies that there shall be no increase in post-development discharges from the storm drainage system. The Applicant should provide calculations to demonstrate that this condition has been met. Addressed. 2 \C:\Documents and Settings\Ideley\My Documents\Reviews\2005\VHB Reviews 2005\0928010-BridlePath-2nd.doc f t VHB ®New Contract Date: October 14,2005 ❑Amendment No. Project No. 09280.10 Vanasse Hangen Brustlin,Inc. Post OBke Box 9151 Project Name: Engineering Review of Watershed Special Permit Watertown,HA 02471-9151 for Lot 20A Bridle Path—North Andover,MA (617)9244770 FAX(617)924-2286 Transportation To: Lincoln Daley Cast Estimate: Land Development Town Planner Environmental Services Town of North Andover Amendment Contract Total 400 Osgood Street North Andover,MA 01845 tabor $1,400 Expenses $ 100 As Requested By: Lincoln Daley ❑ Fixed Fee ® Time&Expenses ❑ Cost+Fixed Fee ❑ other Date: October 14,2005 Estimated Date of Completion: January 14,2006 This Client Authorization is part of the Agreement for Professional Services between Vanasse llongen Brustlin,Inc.and the Town of North Andover,dated August 31,1999, and shall conform to the Terms&Conditions and hourly labor rates of that Agreement. Scope of Services The scope of services consists of the engineering review of the Watershed Special Permit Application. VHB will review the Permit/Site Plan and drainage report for conformance to applicable North Andover bylaws. VHB will prepare one engineering review report and,if necessary,one follow-up letter that addresses the Applicant's responses to VHB's original report. VHB will plan,monitor,and coordinate the review effort. Project or public meeting attendance is not included. Compensation The estimated compensation for performing the Scope of Services is summarized as follows: DESCRIPTION LABOR FEE 1. Plan Review(6 Hrs x$70/Hr) $ 420 2. Drainage Review(10 Hrs x$80/Hr) $ 800 3. Project Management(2 Hrs x$90/Hr) $ 180 TOTAL ESTIMATED LABOR PEE $1,400 ESTIMATED DIRECT EXPENSES 100 TOTAL ESTIMATED COMPENSATION $1,500 Prepared By- Timothy B.McIntosh,P.E. Department A rov .Bechard,P.E. Please execute this Client Authorization for Vanasse Hangen Bmstlin,Inc.to pros a above scope of services at the stated estimated costs. No services will be provided until it is signed and returned to VHB. ❑ Subject to the attached terms&conditions. ® Subject to terms&conditions in our original agreement dated August 31,1999 Vanasse Hangen Brastlin,Inc.Authorization Client Authorization(Please sign original mid retarn) B By OFE T Title Date e+� f �� Date�r No originals of this Authorization need to be executed. One original needs to be forwarded to Accounting Contract Files. TA09Z80.MdocAcontracA09280-Cint AuthVO-CintAuth-BridlePath-WSP.doe i DAMS M L IDAc.OSTINE PC. ATTORNEYS AT LAW Howard P.Speicher C,Michael Malm William F,Griffin,Jr. January 12, 2006 John G.Serino Gary S.Matsko VIA FACSIMILE 978 688-9542 AND FIRST CLASS MAIL John T.Lynch, Lincoln Daley,Town Planner Carol R.Cohen North Andover Planning Department Howard P,Speicher 400 Osgood Street Paul L.Feldman. North Andover, MA 01845 Gary M.Feldman George A.Hewett Re: Lot 20A,Bridle Path Laurence M.Johnson Kenneth J.Mickiewicz Dear Lincoln; Thomas S.Fitzpatrick J,Gavin Cockfield Thank you for sending me a draft of the proposed decision for the special David Rapaport permit for Lot 20A Bridle Path. I asked our engineers,Phil Christiansen and Whitton E.Norris,III Dan O'Connell to review the decision, and they had the following minor Andrew D.Myers comments: Robert J.Galvin John D,Chambliss Special Condition l)C)should read, "That the outlet from the catch basin in Thomas'Frisardi ' Suisman Marjorie j the driveway be discharged into a water quality Swale to prevent untreated Samuel Marorie B.Moskowitz StormWater from directly entering wetland'areas" Charles H.DeBevoise Kenneth R,Appleby ! Special Condition 2)c) prohibits the use ofesticides, fertilizers, and Robert J.Diettrich chemicals for lawn maintenance. This appears to be overly restrictive, and is Amy L.Fracassini more restrictive tl, the limitations required by the Conservation Commission. Ann M,sobolewski The Order of Conditions issued byyte Conservation Commission allows slow Alice A,Kokodis release, low nitrogen(�5%),,ferFtilizers, except within 25 feet of wetland Kathryn C.Sodetberg areas, and prohibits( pesticide s,.-and herbicides within 100 feet of wetland Joshua S.Grossman areas Condition#77 .) e hope that this language, consistent with the Order Neal J.Bingham � of Conditions, will Ye,acceptable to the Board in lieu of a complete David M Cogliano prohibition. Seth A.Schwartz Lori.A,Jodoin In Special Condition 3)a) "storm water mitigation trenches" would more Sophie C.Mighazzo accurately be called"stormwater management structures". Harold R.Davis, of counsel Julian J.D'Agostine of Counsel direct 617-589,-�3r8�2G9�direct��ffaax 6�17y-33�0�5-3129 ONE BC�S�8 f CRc H1ACJ3fCJ1d"i MA` eft 617.367.2500 ., fax 617.523.621.5 wtit w . davismalin . com I f Lincoln Daley,Town Planner 1D1J>[ . January 12, 2006 IDAGOSTINE PC, Page 2 The dates listed for the record Site Plan referenced in Special Condition 9 should include the final 11/7/05 revision date. I hope these proposed changes are acceptable to you and the Board. Thank you for your courtesy in this matter. Very truly yours, Howard P. Xeher cc Henry Kucharzyk Philip Christiansen 393008v.]