HomeMy WebLinkAboutConsultant Review - 254 GREAT POND ROAD 11/22/2010 Eggleston Environmental
November 22, 2010
North Andover Planning Board
1600 Osgood Street
North Andover, MA 01 845
Attn: Judy Tymon, Town Planner
RE: Watershed Special Permit Review
254 Great Pond Road
Dear Ms. Tymon and Board Members:
Per your request, I have conducted an initial technical review of the November 3, 2010
Watershed Special Permit Application packet for the above-referenced project, prepared
by Christiansen & Sergi, Inc. on behalf of Nancy Leland. The proposed project includes
the construction of a new single family home within the Non-Discharge Zone of the
Watershed Protection District.
My comments on the application are outlined below:
1. As proposed, an existing tennis court that lies primarily within the Non-
Disturbance Zone will be removed, and replaced with lawn and garden areas. The
proposed house, driveway, and walkways will be constructed totally within the
Non-Discharge Zone and will, according to the calculations presented, result in a
net decrease in impervious area on the site. From the standpoint of recharge, this
should have a beneficial impact on Lake Cochichewick. From a water quality
standpoint however, the existing tennis court does not contribute any pollutants to
the watershed, while the fertilizers, pesticides and herbicides typically used in
landscaped lawn and garden areas are a potential source of nutrients and toxic
chemicals. To the maximum extent possible, the project should utilize naturalized
landscaping and drought-tolerant native species to minimize the need for
watering, fertilizer and chemical application. Consistent with the requirements of
the Watershed District, the use of any non-organic landscaping chemicals should
be prohibited. Any fertilizer used on the property should be slow-release nitrogen
and phosphate-free.
2. It is unclear whether the breezeway, two patios and uncovered walkways are
included in the impervious area calculations. It is also not clear whether both the
walkways and the patios will be constructed with the porous pavers shown in the
detail, as the drawing suggests they are made of different materials.
3. The report narrative indicates that the roof drainage fi•om the proposed house will
be infiltrated; however this is not shown on the plan. I note that a good deal of the
55 Old Coach Road Sudbury MA 01776 tel 508.259.1137 fax €366.820.7840
254 Great Pond Rd, Technical Review 2
November 22, 2010
roof area is surrounded by impervious or semi-pervious surfaces, thus drip
trenches are not feasible.
4. The report narrative also states that runoff from the asphalt driveway will be
treated and infiltrated on site; however there is nothing on the plan to show how
this will be accomplished. Based on the apparent suitability of the soils on the
site, consideration should be given to incorporating biofilter swales or rain
gardens within the landscaping to treat and infiltrate the pavement runoff, or
alternatively using porous asphalt for the driveway surface.
5. Construction sequencing should be addressed. Erosion control barriers should be
installed prior to any soil disturbance and inspected and maintained throughout
the construction phase of the project.
6. The proposed dewatering basin is in the area where the existing tennis court is to
be removed. Discharge from the basin should be to a stable, vegetated area.
7. The proposed soil stockpile should be covered or stabilized with temporary seed
and mulch.
I appreciate the opportunity to assist the North Andover Planning Board with the review
of this project, and hope that this information is suitable for your needs. Please feel free
to contact me if you or the applicants have any questions regarding the issues addressed
herein.
Sincerely,
EGGLEMN ENVIRONMENTAL
- Yfffjjj �
Lisa D. Eggleston, P.E.
CHRISTIANSEN & SERGI, INC
PROFESSIONAL ENGINEERS AND LAND SURVEYORS
160 SUMMER STREET,HAVE FULL, MA 01830
CS'li tel:978-373-0310 wwwcsi-engrcom fax 973-372-3'060
North Andover Planning Board
1600 Osgood Street
North Andover MA 01845
Re: Watershed Special Permit
254 Great Pond Road
Responses to letter of November 22,20 10 from Eggleston Environmental
Dear Board Members:
I have reviewed the comment letter form Eggleston Environmental concerning the above
referenced project and offer the following responses. The responses are provided in the
order in which they appear in the Eggleston Environmental review letter.
Response to Items:
1. The applicant agrees to the comments offered and will provide the appropriate
landscaping and fertilizers.
2. The house, garage, breezeway, and all walks and patios are included in the impervious
area calculations. The plans have been revised to eliminate porous pavement.
3. Infiltrators for roof runoff have been added to the plan
4. Driveway drainage will flow westerly through grass which will filter the water and
allow infiltration into the soil. The water will flow over a broad area and construction of a
swale would only concentrate the flow and reduce the effectiveness of the treatment.
5. Construction Sequence
• Install sedimentation control
• Provide driveway entrance
• Remove the tennis court
• Establish the dewatering area
• Strip loam
• Establish soil stockpile
• Excavate the foundation
• Backfill foundation
• Remove the dewatering area
• Build the house breezeway and garage
• Install roof infiltrators
• Install Patios
• Gravel and put binder on driveway
• Install trees and shrubs
CHRISTIANSEN & SERGI, INC
PROFESSIONAL ENGINEERS AND LAND SURVEYORS
160 SUMMER STREET, HAVERHiLL,MA 01830
cs�li tel:978-373-0310 mm.csi-engrxom Says 978-372-39610
• Loam and seed disturbed areas
• Place top course on drive
• Remove sedimentation control
6. The test pits dug on site show the soil under the tennis court is sand and suitable for
rapid infiltration. It is an excellent site for a dewatering pit. Additionally the area beyond
the tennis court is grass and water that escapes will flow over the grass.
7. The Stockpile will be covered if it remains longer than three months
The proposed project will result in a decrease in overland storm flow from the site.
Additionally infiltration of roof runoff will further lessen the runoff. Runoff from the
driveway will flow through a lawn at a low velocity and allow suspended solids to be
removed. The project as designed and improved by the Eggleston Environmental review
meets all criteria for designing in the Watershed Protection District.
Very truly yours
Philip G. Christiansen P.E.
Eggleston Erivironryien-tal
November 22, 2010
North Andover Planning Board
1600 Osgood Street
North Andover, MA 01845
Attn: Judy Tymon, Town Planner
RE: Watershed Special Permit Review
254 Great Pond Road
Dear Ms. Tymon and Board Members:
Per your request, I have conducted an initial technical review of the November 3, 2010
Watershed Special Permit Application packet for the above-referenced project, prepared
by Christiansen & Sergi, Inc. on behalf of Nancy Leland. The proposed project includes
the construction of a new single family home within the Non-Discharge Zone of the
Watershed Protection District.
My comments on the application are outlined below:
1. As proposed, an existing tennis court that lies primarily within the Non-
Disturbance Zone will be removed, and replaced with lawn and garden areas. The
proposed house, driveway, and walkways will be constructed totally within the
Non-Discharge Zone and will, according to the calculations presented, result in a
net decrease in impervious area on the site. From the standpoint of recharge, this
should have a beneficial impact on Lake Cochichewick. From a water quality
standpoint however, the existing tennis court does not contribute any pollutants to
the watershed, while the fertilizers, pesticides and herbicides typically used in
landscaped lawn and garden areas are a potential source of nutrients and toxic
chemicals. To the maximum extent possible, the project should utilize naturalized
landscaping and drought-tolerant native species to minimize the need for
watering, fertilizer and chemical application. Consistent with the requirements of
the Watershed District, the use of any non-organic landscaping chemicals should
be prohibited. Any fertilizer used on the property should be slow-release nitrogen
and phosphate-free.
2. It is unclear whether the breezeway, two patios and uncovered walkways are
included in the impervious area calculations. It is also not clear whether both the
walkways and the patios will be constructed with the porous pavers shown in the
detail, as the drawing suggests they are made of different materials.
3. The report narrative indicates that the roof drainage fi•om the proposed house will
be infiltrated; however this is not shown on the plan. I note that a good deal of the
55 Old Coach Road Sudbury MA 01776 tet 508.259.1137 fax 866.820.7840
254 Great Pond Rd, Technical RevieNv 2
November 22. 2010
roof area is surrounded by impervious or semi-pervious surfaces, thus drip
trenches are not feasible.
4. The report narrative also states that runoff from the asphalt driveway will be
treated and infiltrated on site; however there is nothing on the plan to show how
this will be accomplished. Based on the apparent suitability of the soils on the
site, consideration should be given to incorporating biofilter swales or rain
gardens within the landscaping to treat and infiltrate the pavement runoff, or
alternatively using porous asphalt for the driveway surface.
5. Construction sequencing should be addressed. Erosion control barriers should be
installed prior to any soil disturbance and inspected and maintained throughout
the construction phase of the project.
6. The proposed dewatering basin is in the area where the existing tennis court is to
be removed. Discharge from the basin should be to a stable, vegetated area.
7. The proposed soil stockpile should be covered or stabilized with temporary seed
and mulch.
I appreciate the opportunity to assist the North Andover Planning Board with the review
of this project, and hope that this information is suitable for your needs. Please feel free
to contact me if you or the applicants have any questions regarding the issues addressed
herein.
Sincerely,
EGGLESTON ENVIRONMENTAL
�..
I�`J -
Lisa D. Eggleston, P.E.
June 14, 2013
North Andover Planning Board
120 Main Street
North Andover, MA 01845
Re: 254 Great Pond Road, Map 37A, Parcel 6-2, Watershed Special Permit
Dear Board Members,
Enclosed please find the engineer's certification and as-built plans for the above
referenced project. I would request that the performance bond in the amount of$4,000 be
released.
Respectfully submitted,
G��
Nancy Lela d
Applicant
CHRISTIANSEN & SERGI, INC
PROFESSIONAL ENGINEERS AND LAND SURVEYORS
160 SUMMER STREET,HAVERHILL, MA 01830
CS, tel:978-373-0310 www.csi-etigr.com fax 978--372-3960
June 11, 2013
North Andover Planning Board
120 Main Street
North Andover MA 01845
Re: 254 Great Pond Road, Map 37A Parcel 6-2, Watershed Special Permit
Dear Board Members:
I hereby certify that the construction for the above referenced project conforms to the
approved plans for the project and has been successfully completed.
V 01/1
"I"OF
O PHILIP G.
P istiansen CHRISTIANSEN cP
CIVIL
N0.28895 C/3
IST
ass/ANAL
INC
PROFESSIONAL ENGINEERS AND LAND SURVEYORS
160 SUMMER STREET, HAVERHILL,MA 01830
tel:978-373-0310 mm.csi-engr.com fax 978-372-3960
North Andover Planning Board
1600 Osgood Street
North Andover MA 01845
Re: Watershed Special Permit
254 Great Pond Road
Responses to letter of November 22,20 10 from Eggleston Environmental
Dear Board Members:
I have reviewed the comment letter form Eggleston Environmental concerning the above
referenced project and offer the following responses. The responses are provided in the
order in which they appear in the Eggleston Environmental review letter.
Response to Items:
1. The applicant agrees to the comments offered and will provide the appropriate
landscaping and fertilizers.
2. The house, garage, breezeway, and all walks and patios are included in the impervious
area calculations. The plans have been revised to eliminate porous pavement.
3. Infiltrators for roof runoff have been added to the plan
4. Driveway drainage will flow westerly through grass which will filter the water and
allow infiltration into the soil. The water will flow over a broad area and construction of a
swale would only concentrate the flow and reduce the effectiveness of the treatment.
5. Construction Sequence
• Install sedimentation control
• Provide driveway entrance
• Remove the tennis court
• Establish the dewatering area
• Strip loam
• Establish soil stockpile
• Excavate the foundation
• Backfill foundation
• Remove the dewatering area
• Build the house breezeway and garage
• Install roof infiltrators
• Install Patios
• Gravel and put binder on driveway
• Install trees and shrubs
A 0
m 1g.N-Ni 0-8
o.
o 2 0
A
0
0
m :R 4 x A A
0 1 -0
Ho
o Z
R IN m
�Z
0
Z
gym" g
c
o
om
O
z A m
I
M
A
z>
Z
O
m
----------
0 G
m
O Z r 4r \I \\ yPo \Ifo 8 „pv\ /'� i �\ 1\\ f\ '
7-
V
Ell
z
QIE
00 (500000:bOC63DU vv 1A _1111,11,11-', X
10,
t.UP #1 z.
z
............ ...........
10,10 S —W 1,
0
zg �=x 1 1
ch
T
-n 0
0
0 o oz.
6P g g oE 0 Z
0 0 o 6 z.
gm �8 z m
_n U)
m
10
0 >
m
0
Z
-n
CA)
m
z.
HE Ogg
, i NO
im I'm
H.4
W iiliiiiiliii
m j 0
3:_1
A
>
-4 zo 5-1�..g -HaR a
Z z. C) m 0 I
M11, j.W-1 -1H, 3—
viz M
Z <6 Z> a: C,) U)
m m
CZ) >Z
gg �m Q 6 ->I M U, -- 2 ;g
6.m ng. 0
0 z _u
0 T T z H.T.12H IP-fl
Bi—
M < Z m all! qffig.
. m Iffl-
0
>
0 Z zz .11
m<�;�
H1 I ;1",k" 1511,�W
z
f
0 _u
> m
all -p
19
Eggleston Environmental
November 22, 2010
North Andover Planning Board
1600 Osgood Street
North Andover, MA 01845
Attn: Judy Tymon, Town Planner
RE: Watershed Special Permit Review
254 Great Pond Road
Dear Ms. Tymon and Board Members:
Per your request, I have conducted an initial technical review of the November 3, 2010
Watershed Special Permit Application packet for the above-referenced project, prepared
by Christiansen & Sergi, Inc. on behalf of Nancy Leland. The proposed project includes
the construction of a new single family home within the Non-Discharge Zone of the
Watershed Protection District.
My comments on the application are outlined below:
1. As proposed, an existing tennis court that lies primarily within the Non-
Disturbance Zone will be removed, and replaced with lawn and garden areas. The
proposed house, driveway, and walkways will be constructed totally within the
Non-Discharge Zone and will, according to the calculations presented, result in a
net decrease in impervious area on the site. From the standpoint of recharge, this
should have a beneficial impact on Lake Cochichewick. From a water quality
standpoint however, the existing tennis court does not contribute any pollutants to
the watershed, while the fertilizers, pesticides and herbicides typically used in
landscaped lawn and garden areas are a potential source of nutrients and toxic
chemicals. To the maximum extent possible, the project should utilize naturalized
landscaping and drought-tolerant native species to minimize the need for
watering, fertilizer and chemical application. Consistent with the requirements of
the Watershed District, the use of any non-organic landscaping chemicals should
be prohibited. Any fertilizer used on the property should be slow-release nitrogen
and phosphate-free.
2. It is unclear whether the breezeway, two patios and uncovered walkways are
included in the impervious area calculations. It is also not clear whether both the
walkways and the patios will be constructed with the porous pavers shown in the
detail, as the drawing suggests they are made of different materials.
3. The report narrative indicates that the roof drainage from the proposed house will
be infiltrated; however this is not shown on the plan. I note that a good deal of the
55 Old Coach Road Sudbury MA 01776 tel 508.259.1137 fax 866.820.7840
254 Great Pond Rd, Technical Review 2
November 22, 2010
roof area is surrounded by impervious or semi-pervious surfaces, thus drip
trenches are not feasible.
4. The report narrative also states that runoff from the asphalt driveway will be
treated and infiltrated on site; however there is nothing on the plan to show how
this will be accomplished. Based on the apparent suitability of the soils on the
site, consideration should be given to incorporating biofilter swales or rain
gardens within the landscaping to treat and infiltrate the pavement runoff, or
alternatively using porous asphalt for the driveway surface.
5. Construction sequencing should be addressed. Erosion control barriers should be
installed prior to any soil disturbance and inspected and maintained throughout
the construction phase of the project.
6. The proposed dewatering basin is in the area where the existing tennis court is to
be removed. Discharge from the basin should be to a stable, vegetated area.
7. The proposed soil stockpile should be covered or stabilized with temporary seed
and mulch.
I appreciate the opportunity to assist the North Andover Planning Board with the review
of this project, and hope that this information is suitable for your needs. Please feel free
to contact me if you or the applicants have any questions regarding the issues addressed
herein.
Sincerely,
EGGLESTON ENVIRONMENTAL
tw___e-
L.v
{f= pj , fw4
Lisa D. Eggleston,P.E.
�
�
Enright,
From: Lois Christiansen iengcoon1
Sent: Monday, November 08, 2010 1:09 PM
To: Enright,
S RE: Revised Legal Notice attached �
Attachments: poge_1_revodf
|
Thanks for your efforts getting thisfixedthis morning, |
�
Attached io the revised page one wfthe watershed permit application form.
Loin �
�
/
From: Enright, ]ea
Sent November U8, 2O1O12:28RM
oo: 'Lom@oo|-engr.com'
Subject: Revised Legal Notice attached
Please review. Dn you agree with this language? Thank you
]e@D Enright
Town of North Andover
Planning Department
1GUO Osgood St.
Bldg. 2O, Suite 2-3G
North Andover, Ma 01845
978-688-9535 phone
978-688-9542 fax
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more
information please refer to:
Please consider the environment before printing this email.
�
�
|
�
�
1 �
�