HomeMy WebLinkAboutBuilding Permit # 9/9/2016 (2) I
OORTH
BUILDING PERMIT 11go ;°6�0�
TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received
p � °7 �°pgrao n��" •.j°?
Date Issued:
_ I PORTANT: A2ficant n ust coin fete ail items on this .=fie _A �
LO ',ATi0N 615 Chestnut Street North Andover MA
PROPb RTP UNNER WATT
Print
MAP 1110. 107 PA Et.:,', 002 7t III � DISTRICT:/,, f�C���tcrir� District, � yep
M hihe`Shop W.laj o ,... ..._ .-... .
TYPE OF IMPROVEMENT - PROPOSED USE -
Residential Non- Residential �?
New Building One fam0y
Addition Two or more family Industrials
X Alteration No. of units: X Commercial
Repair, replacement Assessory Bldg Others:
Demolitions .., .... .mm _.._. ... .... .._ Other ..
' ter°/Suwr�r .,..if�6nin otl�°���d s Watershed DistrictSepti W0 I loo
.__.a.... t_....,.,_.,. .
Interior renovation and upgrades to existing egress stairs.
f�&cu�ri�c�ti�►re� �'"I�:aw�: °I'�la�emu•P�•i��t t:;ie�urir')
OWNER: Name; Jackie Comiskey Phone: 976-669-6067
Address:
O'N'Iµ C O° Nal°r e, Phone; 7' 1-721-1100
Eric Libb
Address:
,fast Street Winchester, MA 0,1590
° upervi qr's C nstruction License: Exp, Date',
C -09,7661 Q /tJ9/15 r
Pf
Home Iriqvemrrt ' Jr�6r�sw �Exp,
Vit ;, ., ,
ARCHITECT/ENGINEER The H.L. Turner Group Inc. phone: 603-226-1122
Address, 27 Locke Road Concord, NH 03301 Reg. No.
FEE SCHFQ _&BULDINO PERMIT. $12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125 00 PER S.F.
Total Project Cost: $ 275,710 FEE: $ 3,309
Check No.: Receipt No.: ,.
MOTE: Persons cont r acting ivit r unre t ed contractors do not have access to f1ikiiak en�VJW rl
Signature of Agent/ r -' rr nat�lre of c
«
ontracto
(hrr �iiq off`�� �'lr�� ,,, l!. /iO4/41/
%y r
7� ��/l� a ��ry/I //1j I r
�r��/i1;ii rr/�/r "% 4'111 ri,,,t/,
. . lfiJ,u„r��� i. �11///';,J., „ „//I✓�Y .' � �tl% /. ikNnili%<///i%i��Vi. 1 u� .. f/�(( /iiia i!✓% a r �/���
�r
oORT'H
e .. over
0-
0
No. saw
Z n h vera ass®
LAKF / /
C0C"1CNEW,[OC
X1,9 A°" AAo ►X�,�•(�
S U
BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
THIS CERTIFIES THAT ......... .........
_Sl V/� BUILDING INSPECTOR
... .............�,�........................... .,, ... .... ......................................
�� � orf
has permission to erect ...... ... ..... buildings FoundationRough
to be occupied as ........... `.Ila`�l. l :...`J. .1.: F.S...���. .k�. 5 .....::�.�..`.:r::6................. Chimney
provided that the person accepting this permit shall in every respect/conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT I E 16 MONTHS ELECTRICAL INSPECTOR
LESS C I S S Rough
Service
.--�
............................. . . .. .. ................................... Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit required t® ccupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
i
Enter construction cost for fee cal - North Andover Fee Calculation
Construction Cost
$ 275,71 0.00 m
$ - $ 3,308.52
Plumbing Fee $ 413.57
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 413.57
Total fees collected $ 4,235.65
815 Chestnut Street
311-20#6 on 9/9/2015
Renovations to stairs
Page 1 of 1
VA'Ase
CONSTRUCTION
Client: Watts Water Technologies, Inc.
Project: Code Compliance/Stair Improvement Project - F
Location: 815 Chestnut Street - North Andover, MA
Date of Estimate: 7-May-15; Rev 19-May-15; Rev 20-May-15; Rev 2'
Plan Date: 17-Apr-15
Estimate#: E15-082
Owner Contract
CSI # Trade Total
02100 Demolition $12,425
02500 Sitework $8,750
03300 Concrete $12,790
04500 Masonry $7,900
05500 Structural Steel/Misc. Metals $83,400
06000 Rough /Finish Carpentry $5,000
07000 Thermal and Moisture Protection $0
08100 Doors, Frames and Hardware $22,375
08800 Glass & Glazing $4,500
09250 Drywall $19,850
09500 Acoustical Ceilings $6,405
09650 Flooring $21,909
09900 Painting $4,465
10100 Specialties $0
11100 Equipment $0
12100 Furnishings $0
15300 Fire Protection $3,735
15400 Plumbing $18,770
15500 HVAC $17,086
16000 Electrical $26,350
Subtotal $275,710
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans X❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMENTS
CONSERVATION ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
HEALTH ❑ ❑
COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water & Sewer Connection/Signature& Date Driveway Permit
Located at 384 Osgood Street
FIRE DEPARTMENT ° °Tem` Drn ster on sl e; es
P,. ; p Y
Located at 241 Strait
F�rg Departrnen#s�gr�atu�-eldate
CO1V�NIENTS
COMMONWEALTH OF MASSACHUSETTS
STATE BUILDING CODE
780 CMR, 8TH; EDITION
CHAPTER 9
FIRE PROTECTION SYSTEMS
NARRATIVE REPORT
780 CMR—901.2.1
PROJECT NAME: Watts Water Technologies
Stair Upgrades
ADDRESS: 815 Chestnut Street
North Andover, MA
RDK PROJECT#: 20150245.00
DATE OF ISSUE: August 25, 2015
ENGINEERS
Andover Amherst Boston I Charlotte I Durham tvww. d,en n m
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name:Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
As required by 780 CMR §901.2.1, this narrative report is a written description of the proposed fire
protection system features to be installed as part of the Watts Water Technologies Stair Upgrades project
located at 815 Chestnut Street in North Andover, Massachusetts.
901.2.1 (1)(i) - BASIS (METHODOLOGY) OF DESIGN
Section 1 - Building Description
A. "Use" Group(s)within Scope of Renovation: "B" Business (office).
B. Location &Area of Renovation: Stairwells 1, 3 and 4 as shown on Architects drawings.
C. Existing Building Height&Area
1. Height: Two (2)] stories above grade; one (1) story below grade.
2. Area: —66,500 sgft total.
D. Type(s) of Construction:
1. Existing protected non-combustible.
E. Hazardous Material Usage and Storage: None in excess of exempt amounts within scope of
renovation.
F. High-pile Storage (over 12 ft.) of Commodities: None within scope of renovation.
G. Site Access Arrangement for Emergency Response Vehicles: Existing features to remain; not
affected by scope of renovation.
Section 2-Applicable Laws, Regulations & Standards
A. Massachusetts State General Laws (MGL), Chapter 148
1. MGL §148, sections as applicable.
B. 780 CMR—Massachusetts State Building Code, 81h Edition (amended IBC-2009)
1. Chapter 9 "Fire Protection Systems"
2. Chapter 34"Existing Structures"
C. Existing Building Code of Massachusetts (amended IEBC-2009)
1. Chapter 7"Alterations—Level 2"
527 CMR— Massachusetts State Fire Prevention Regulations
2. Chapter 10"Fire Prevention, General Provisions"
3. Chapter 12 "2014 Massachusetts Electrical Code Amendments"
D. 521 CMR—Massachusetts Architectural Access Board
Page 1 of 6
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name:Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
1. Section 40 "Visual Alarms"
E. National Fire Protection Association (NFPA) Standards:
1. NFPA 13 (2013) —"Installation of Sprinkler Systems"
2. NFPA 70 (2014) — "National Electric Code" as amended by 527 CMR Chapter 12
"Massachusetts State Electrical Code"
NFPA 72 (2010)—"National Fire Alarm Code"
F. Federal Regulations (significant requirements thereof to the extent applicable to RDK scope)
1. 28 CFR Part 36, ADA Standards for Accessible Design
2. 29 CFR Part 1910, Occupational Safety & Health Standards
G. Documented Local Ordinances (Voluntary Compliance)
1. local bylaws and ordinances
Section 3 - Design Responsibility for Fire Protection Systems
A. Engineer of Record: RDK Engineers (RDK) has engineered and specified the fire protection
systems to be installed. For each fire protection system designed by RDK, RDK shall review the
installing contractor's Tier II shop drawings for conformance to the approved construction
documents and be present at the site at intervals appropriate to become generally familiar with the
progress and quality of work and to determine if the work is being performed in manner consistent
with the construction documents and 780 CMR. RDK shall certify each fire protection system
installation to the extent required by 780 CMR§901.5.1(1).
B. Architect of Record: The H.L. Turner Group, Inc, has designed and specified the architectural
features to be constructed, including means of egress, fire resistance construction and interior
finish. The H.L. Turner Group, Inc., shall review the installing contractor's Tier II shop drawings for
conformance to the approved construction documents and be present at the site at intervals
appropriate to.become generally familiar with the progress and quality of work and to determine if
the work is being performed in manner consistent with the construction documents and 780 CMR.
Section 4 - Fire Protection Systems to be Installed
A. Fire Mains & Hydrants: Existing features to remain; not affected by scope of renovation.
B. Automatic Sprinkler System: Existing sprinkler system service equipment, pumps, zoning, mains,
alarm devices, etc. to remain and are not affected by the scope of renovation.
1. Existing wet-pipe fire sprinkler system to be modified to accommodate new partition
layout. Modifications shall predominantly include new return-bend piping to new
sprinklers and new branch piping from existing cross-mains.
C. Standpipe System: This building is not equipped with a standpipe system.
D. Fire Alarm System: Existing fire alarm system head-end, back-bone, sequence of operation, etc.
to remain and are not affected by the scope of renovation.
Page 2 of 6
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name: Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
1. Existing initiating circuits (SLC or IDC) within scope of renovated area to be modified to
accommodate new or relocated initiating devices. New circuits may be added as dictated
by the capacity of the existing circuits as determined by the installing contractor; the style
and class of new circuits shall match that of the existing system. The following types of
initiating devices shall be added:
a. Smoke detector; common area, electrical closet, etc.
b. Smoke detector; elevator lobby
C. Manual pull box
2. Existing notification appliance circuits (NAC) within scope of renovated area to be
modified to accommodate new partition layout. New circuits may be added as dictated by
the capacity of the existing circuits as determined by the installing contractor; the style
and class of new circuits shall match that of the existing system.
3. Audible notification appliances within scope of renovation shall be UL 464 horn type.
4. Visual notification appliances within scope of renovation shall be UL 1971 strobe type and
shall flash in a synchronized manner.
E. Emergency Power: Existing generation equipment, feeders, transfer switches, panel boards, etc
to remain and are not affected by the scope of renovation.
1. Where required, NAC remote power supplies added to support new circuits shall be
provided with standby batteries.
2. Means of egress lighting and exit signs within the scope of renovation shall be provided
with emergency power supplied from existing "base building" emergency circuits if
available or standby batteries local to the fixtures.
F. Smoke Control Systems: Existing features to remain; not affected by scope of renovation.
G. Commercial Cooking: Not applicable to the proposed renovation.
H. Hazardous Materials Monitoring: Not applicable to the proposed renovation.
Section 5 - Features Used in the Design Methodology
A. Occupant Notification Procedures: Existing occupant notification via the fire alarm system and
subsequent building management personnel procedures shall remain and are not affected by the
scope of renovation.
1. The existing fire alarm system treats the building as a single evacuation zone.
B. Emergency Response Features: Existing features to remain; not affected by scope of renovation.
C. Safeguards: Existing fire protection systems shall be maintained throughout the construction as
required by the Authority Having Jurisdiction (AHJ). Impairment to existing fire protection systems
shall be approved by the AHJ and Owner prior to commencing work. A fire watch shall be
provided during impairments to the fire suppression or fire alarm system in accordance with AHJ
requirements.
D. Future Testing & Maintenance: Modifications performed as part of the scope of renovation shall
be warranted by the installing contractors for a period of one year covering defects in materials
Page 3 of 6
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name: Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
and workmanship. NFPA required inspection, maintenance and testing activities associated with
the building fire protection system are the responsibility of the owner and are to be conducted
under existing and/or future maintenance contracts held by the Building Management Company.
Section 6 -Special Consideration and Description
A. Unless otherwise noted, the design of the fire protection systems does not utilize alternative
compliance design methods and is not intended to deviate from the prescriptive requirements of
780 CMR or other applicable codes and standards.
901.2.1 MOO - SEQUENCE OF OPERATION
A. The existing "base building" coordinated fire protection system basis of design and sequence of
operation shall remain unchanged and shall not be modified under the scope of renovation. The
general arrangement of the existing sequence of operation is described below and is subject to
confirmation by the installing contractor and fire alarm system control unit technical
representative.
B. Activation of an existing or new manual pull station, smoke detector, heat detector or sprinkler
system waterflow switch shall initiate the predefined fire alarm system "alarm condition" sequence:
1. Display alarm condition at fire alarm control unit and remote annunciator(s).
2. Energize audible (temporal-3 pattern) and visual (UL 1971 synchronized strobe) occupant
notification circuits within evacuation zone(s) as designated by pre-established control unit
sequence of operations.
3. Perform auxiliary fire safety functions as designated by pre-established control unit
sequence of operations such as elevator recall, damper activation, door closure, AHU
shutdown, pressurization systems, etc.
4. Transmit alarm condition to central / supervising station and/or local fire department via
municipal alarm system.
5. In addition, the operation of an existing in-duct smoke detector shall initiate the following:
a. Operation of an existing in-duct smoke detector provided at air handling
units (AHU's) shall shut-down the corresponding AHU.
b. Operation of an existing in-duct smoke detector provided for control of a
smoke damper shall close the corresponding damper.
C. The operation of an existing or new sprinkler tamper switch shall initiate the predefined fire alarm
system "supervisory"sequence:
1. Display supervisory condition at fire alarm control unit and remote annunciator(s).
2. Transmit supervisory condition to central/remote supervising station.
D. Normal power failure to fire alarm system remote power supplies, ground faults, short circuits and
open circuit conditions shall initiate the predefined fire alarm system "trouble" sequence.
1. Display supervisory condition at fire alarm control unit and remote annunciator(s).
2. Transmit trouble condition to central/supervising station.
Page 4 of 6
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name:Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
901.2.1 (1)(iii) - TESTING CRITERIA
Section 1 -Testing Criteria
A. Fire Protection System testing shall be scheduled, administered, conducted and overseen by the
general contractor, subcontractors and manufacturer's technical representatives.
B. The following fire sprinkler system inspections and testing shall be performed:
1. Visually inspect system installation for completeness, presence of defects or damage,
and confirm system is placed into"all normal" operational service.
2. Hydrostatically test system piping for a period of 2-hours. Piping shall be tested to normal
system operating pressure where new installed piping cannot be isolated from the existing
piping.
3. Functionally operate any new sprinkler waterflow or valve supervisory switches as part the
fire alarm testing.
C. The following fire alarm system inspections and testing shall be performed:
1. Confirm integrity of new or modified circuits (free of grounds, shorts, opens) prior to the
installation of devices, appliances or equipment.
2. Visually inspect system installation for completeness, presence of defects or damage,
and confirm system is placed into"all normal" operational service.
3. Confirm correct system supervision of wiring faults, missing devices and status of normal
and standby power supplies (for new equipment installed as part of the work).
4. Functionally operate new devices installed as part of the work and confirm correct
sequence of operation and address/zone identification at the fire alarm control unit.
5. Confirm audibility/intelligibility and visual synchronization of notification appliances.
6. Where fire alarm control unit software is updated as part of the work, functionally operate
10% of existing devices not affected by the work and confirm correct sequence of
operation and address/zone identification at the fire alarm control unit.
7. Confirm correct operation of circuits under fault conditions in accordance with installed
circuit style and class.
D. Documentation, to be submitted to the Engineer of Record and AHJ:
1. Sprinkler System: NFPA 13 "Contractor's Material and Test Certificate", accurately
completed and endorsed by installing contractor's signature.
2. Fire Alarm System: NFPA 72 "Fire Alarm System Record of Completion", accurately
completed and endorsed by installing contractor's signature.
E. Upon completion of the work, and receipt of the appropriate close-out documentation, the
Engineer of Record shall certify completion for each fire protection system to the extent required
by 780 CMR §901.5.1
F. The general contractor shall then schedule final acceptance demonstration testing with the AHJ in
order to obtain approval for a Certificate of Occupancy.
Page 5 of 6
780 CMR 901.2.1
Fire Protection Systems Narrative Report—August 25, 2015
Project Name:Watts Water Technologies Stair Upgrades
RDK Project Number: 20150245.00
Section 2 - Equipment and Tools
A. The contractor shall provide all required tools and equipment necessary to perform full functional
testing as outlined. As a minimum these items shall include:
1. NFPA Forms
2. Manufacturer's Instructions
3. Fire Protection Systems Narrative Report
4. UL smoke candles or aerosol spray
5. Sound meters
6. Voltage Meters
7. Gauges
8. Communication Radios
9. Printer or data transfer device for recording each FACP event
Section 3 -Approval Requirements
A. The contractor shall obtain written acceptance of the installed system from the AHJ prior to the
owner request for a Certificate of Occupancy.
B. The contractor shall replace and/or repair each system or component of a system that fails to
pass the Final Acceptance Test satisfactorily. Preliminary and Final Testing shall be rescheduled
and testing shall be conducted until compliance is fully demonstrated. The contractor shall be
liable for all additional charges as a result of retesting.
C. Final certification shall be provided from the contractors that the installation is in accordance with
the approved construction documents and applicable codes. The Engineer shall certify that the
installation complies with the approved construction documents per 780 CMR 901.5.1.
D. Operations Manuals and Record as-built drawings shall be submitted with any modifications as a
resultant of changes that were dictated from the Final Testing process.
E. The Owner shall provide an emergency contact list for use by the AHJ in the event of an
emergency at the protected property.
END OF NARRATIVE
Page 6 of 6
Initial Construction Control Document
W
To be submitted with the building permit application by a
Registered Design Professional
J` for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades ades Date:August 25,2015
Property Address: 815 Chestnut Street North Andover Massachusetts 01845
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safety.
I Harold Turner Jr.MA Registration Number:30941 Expiration date:6/30/16,am a registered design professional, and
that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
[] Entire Project [X]Architectural [X] Structural [ ]HVAC
[ ]Fire Suppression—NFPA 13 [ ]Electrical [ ]Fire Alarm-NFPA 72 [ ]Plumbing
for the above named project and that,to the best of my knowledge,information and belief,such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted
engineering practices for the proposed project.I understand and agree that I(or my designee)shall perform the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept,shop drawings,samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means,methods,sequences
and procedures,and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17.
When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a`Final Construction Control Document'.
m
Enter in the space to the right a"wet" r,f 4`�q
or electronic signature and seal: Yu R.
ST GT
,Q .30541 q y
NAL
Phone
Phone number: 603-228-1122 Email:
gblanchette@a,lilturner.com or
hturner@hlturner.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Initial Construction Control Document
U To be submitted with the building permit application by a
W
d Registered Design Professional
for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades Date:August 25, 2015
Property Address: 815 Chestnut Street North Andover Massachusetts 01845
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safety.
I,Jeffrey Faucon,MA Registration Number: 47208 -Expiration date: 6/30/16,am a registered design professional, and
that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] HVAC
[X] Fire Suppression—NFPA 13 [ ] Electrical [ ] Fire Alarm -NFPA 72 [ ]Plumbing
for the above named project and that,to the best of my knowledge, information and belief, such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted
engineering practices for the proposed project.I understand and agree that I (or my designee) shall perform the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means,methods, sequences
and procedures,and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17.
When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work,I shall submit to the buit4i official a `Final Construction Control Document'.
Enter in the space to the right a"wet" JEFFREY T.
or electronic signature and seal: LI ON
C) FIRE PROTECTION
No.4720£t
Phone number: 978-296-6375 4 P N Email:jfaucon(c�r�,rdkengineers.com
Build' g Official Use Only
Building Official Name: Permit No.: Date:
Initial Construction Control Document
u W To be submitted with the building permit application by a
d Registered Design Professional
for work per the 8th edition of the
gwd� Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades Date: August 25, 2015
Property Address: 815 Chestnut Street North Andover Massachusetts 01845
Project: Check (x)one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safety.
I, Scott Guertin,MA Registration Number:46837 -Expiration date: 6/30/16,am a registered design professional, and that
I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] HVAC
[ ] Fire Suppression—NFPA 13 [ ] Electrical [ ] Fire Alarm-NFPA 72 [X] Plumbing
for the above named project and that,to the best of my knowledge, information and belief, such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, (7 80 CMR),and accepted
engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17.
When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the t'1 ' official a`Final Construction Control Document'.
�r10F qss
9
Enter in the space to the right a"wet" SCOTT O. N
or electronic signature and seal: g rtaERTIN T4
MECHANICAL
Phone number: 978-296-6338urr!At_ _ Email: sgueitin@rdkeiigineers.com
et�tin@rdketigineers.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Initial Construction Control Document
u To be submitted with the building permit application by a
d Registered Design Professional
a
for work per the 81h edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades Date: August 25,2015
Property Address: 815 Chestnut Street North Andover Massachusetts 01845
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safety.
I, Scott Guertin,MA Registration Number: 46837 -Expiration date: 6/30/16, am a f°egistered design professional, and that
I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [X] HVAC
[ ] Fire Suppression—NFPA 13 [ ] Electrical [ ] Fire Alarm-NFPA 72 [ ] Plumbing
for the above named project and that,to the best of my knowledge, information and belief, such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted
engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means,methods, sequences
and procedures,and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17.
When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a `Final Construction Control Document'.
qS
Enter in the space to the right a"wet"
p• t::OT7 G. G
or electronic signature and seal: -ucRnN
MECHA
Cn
"o.4 7
W",
Phone number: 978-296-6338 Email: sguertin@rdkengineers.com..
AiddiVEOfficial Use Only
Building Official Name: Permit No.: Date:
Initial Construction Control Document
w To be submitted with the building permit application by a
Registered Design Professional
o" for work per the 8"' edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades Date: August 25, 2015
Property Address: 815 Chestnut Street North Andover Massachusetts 01845
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safety.
I, Keith E.Giguere, MA Registration Number: 49637 - Expiration date: 6/30/16, am a registerecl clesigir prrofessioncrl, and
that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] HVAC
[ ] Fire Suppression—NFPA 13 [X] Electrical [ ] Fire Alarm -NFPA 72 [ ] Plumbing
for the above named project and that,to the best of my knowledge, information and belief, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted
engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17.
When required by the building official, I shall submit field/progress reports (see item 3,)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'.
Enter in the space to the right a"wet" ,^ KEITH E,
or electronic signature and seal: o►ouERE -,
ELECTRICAL `�
No.49637
Phone number: 978-296-6357 5/pNA J< Email: kgiguere@rdkengineers.com
Building Official Ise Only
Building Official Name: Permit No.: Date:
Initial Construction. Control Document
W To be submitted with the building permit application by a
w
Registered Design Professional
a for work per the 8"' edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Watts Water Technologies Stair Upgrades Date: August 25,2015
Property Address: 815 Chestnut Street North Andover, Massachusetts 01845
Project: Check(x) one or both as applicable: New Construction X Existing Construction
Project description: Building renovation to improve egress and life safetx
I, Keith E. Giguere, MA Registration Number: 49637 - Expiration date: 6/30/16, am a registerecl design professiorrcrl, and
that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] HVAC
[ ] Fire Suppression—NFPA 13 [ ] Electrical [X] Fire Alarm -NFPA 72 [ ] Plumbing
for the above named project and that,to the best of my knowledge, information and belief, such plans, computations and
specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted
engineering practices for the proposed project. I understand and agree that I(or my designee) shall perforin the necessary
professional services in accordance with the Professional Standard of Care and be present on the construction site on a
periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable)
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to deteranine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety.
Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CNIR 17.
When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the '1 official a `Final Construction Control Document'.
i
Enter in the space to the right a "wet" '� KEITH E. Z�1
or electronic signature and seal: (aIGUERE 4
ELECTRICAL
No.49637
Phone number: 978-296-6357 71N,lIL"�%1 - Email: kgi tig Ierea,rdken tg•neers.com
Building Official se Only
Building Official Name: Permit No.: Date:
COMcheck Software r
Interior Lighting liance Certifi
Project Information
Energy Code: 2012 IECC
Project Title: Watts Water Technologies-Stairs/Egress
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
815 Chestnut Street Samang Phon
North Andover, MA RDK Engineers
200 Brickstone Square
Andover, MA
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-Common Space Types:Corridor/Transition 711 0.70 498
2-Common Space Types:Electrical/mechanical 91 1 .10 100
3-Common Space Types:Stairway 870 0.70 609
Total Allowed Watts= 1207
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/ Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Common Space Types:Corridor/Transition (711 sq ft.)
LED 1 copy 1:LT1/LT1E:2'X2'LED Troffer:Other: 1 11 34 374
Common Space Types:Electrical/mechani cal (91 sq.ft.)
Linear Fluorescent 1:FS1 E:4'Lensed LED strip:46"T5 28W: Electronic: 1 2 32 64
Common Space Types:Stairway(870 sq ft.)
LED 1 copy 2:LT1:2'X2'LED Troffer:Other: 1 7 34 238
LED 9 copy 1:WL:4'Lensed LED strip:Other: 1 4 19 75
Total Proposed Watts= 751
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.1 and to comply with the mandatory
requirements listed in the Inspection Checklist.
P - f_:--( - �--4 -
Name-Titl Signature Dat
Project Title: Watts Water Technologies-Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245 -WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 1 of 6
Lighting\20150245_Watts Stairwells_COMCheck.cck
COMcheck Software Version 4.0.1
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
2012 IECCI Flan Review Complies? Comments/Assumptions
C103.2 Plans, specifications, and/or ❑Compl—ie s
[PR4]1 calculations provide all information ❑Does Not
with which compliance can be ❑Not Observable
determined for the interior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact (Tier 3)
Project Title: Watts Water Technologies-Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245-WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 2 of 6
Lighting\20150245_Watts Stairwells—COMCheck.cck
Comments/Assumptions
2012 IECG Rough in Electrical Inspection Complies
C405.2.2. Automatic controls to shut off all ❑Complies
1 building lighting installed in all ❑Does Not
[EL22]2 buildings.
❑Not Observable'
❑Not Applicable
_...... _....._ ... . ...... . .....__ ._....._ -
C405.2.1. Independent lighting controls installed ❑Complies
1 per approved lighting plans and all ❑Does Not
[EL23]2 manual controls readily accessible and'
.,.;visible to occupants. '❑Not Observable'.
❑Not Applicable
_..... . ... ..... ._..... - - -._..... _... _._........ ... .......... _.... _._.
C405.2.1. Lighting controls installed to uniformly ❑Complies
2 reduce the lighting load by at least ❑Does Not
[EL15]1 50%.
❑Not Observable'..
❑Not Applicable
--- — --- -....__ ..... _...._... ......... --- _._. _.... ..... ---_- .......
C405.2.2. Daylight zones provided with ❑Complies
3 individual controls that control the ❑Does Not
[EL16]2 lights independent of general area ❑Not Observable'
lighting.
❑Not Applicable
__... __....._. -_. _._. .. . ...._.... _ _........_._ _ __._.._ ................ _._ ..................-......................_......_ ...._-
C405.2.3 Sleeping units have at least one ❑Complies
[EL17]3 master switch at the main entry door ❑Does Not
that controls wired luminaires and
switched receptacles. ❑Not Observable'.
❑Not Applicable
C405.2.2. Occupancy sensors installed in ❑Complies
2 required spaces. ❑Does Not
[EL18]1 -]Not Observable
❑Not Applicable
__.—...._...._...__....._.._.......--_..._.._..._.__...__._..__..._...._............_............._........._.._.._-_......._.._._._........._.___._..._—._._....... ...._....._......._........._;......_..—_.. ........._..._.............__....._._.__..._---...__......_....__._....._... .._.__._._._... .... ._..__.._..._._
C405.2.2 Primary sidelighted areas are ❑Complies
3 equipped with required lighting ❑Does Not
[EL20]1 controls.
❑Not Observable
❑Not Applicable
.......__.. - ..- .._.. . _..._—... .............. . ._ __..._. _.. — ---._.._... ....-- . ... ..__ ...__. .......
C405.2.2. Enclosed spaces with daylight area ❑Complies
3 under skylights and rooftop monitors ❑Does Not
[EL21]1 are equipped with required lighting
FI
Not Observable
controls.
❑Not Applicable
_..... .....__ _..._..__..—. -. _ __ _.__._._ __..__ ....._....... ........... .................
C405.2.3 Separate lighting control devices for ❑Complies
[EL4]1 specific uses installed per approved ❑Does Not
lighting plans.
❑Not Observable
❑Not Applicable
-
C405.3 Fluorescent luminaires with odd ❑Com lies
[EL19]3 numbered lamp configurations that ❑Does Not
are with 10 feet center to center(if
recess mounted) or are within 1 foot ❑Not Observable
edge to edge (if pendant or surface ❑Not Applicable
mounted) shall be tandem wired.
C405.4 Exit signs do not exceed 5 watts per ❑Complies I
[EL6]1 face. ❑Does Not
t ❑Not Observable
❑Not Applicable
C405.2.3 Additional interior lighting power ❑Complies
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ❑Not Observable
separated from general lighting. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact (Tier 3)
Project Title: Watts Water Technologies-Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245 -WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 3 of 6
Lighting\20150245_Watts Stairwells_COMCheck.cck
1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Title: Watts Water Technologies -Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245 -WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 4 of 6
Lighting\20150245 Watts Stairwells_COMCheck.cck
2072lECCi Final Inspection a
IComplies Comments/Assumptions
I
C408.2.5. Furnished as-built drawings for ❑Complies
1 electric power systems within 30 days ❑Does Not
[F116]3 of system acceptance. ❑Not Observable
❑Not Applicable
C303.3,C4Furnished O&M instructions for ❑Complies
08.2.5.2 systems and equipment to the ❑Does Not
[FI1713 building owner or designated
representative. ❑Not Observable'
❑Not Applicable
C405.5.2 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[F118)1 lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts ❑Not Observable
are less than or equal to allowed ❑Not Applicable
watts.
C408.3 Lighting systems have been tested to ❑Complies
[F13311 ensure proper calibration, adjustment, ❑Does Not
programming, and operation.
',❑Not Observable I
❑Not Applicable
C406 Efficient HVAC performance, efficient !❑Complies
[FI34)1 lighting system, or on-site supply of ❑Does Not
renewable energy consistent with
what is shown the approved plans. -]Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Watts Water Technologies - Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245 -WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 5 of 6
Lighting\20150245_Watts Stairwells_COMCheck.cck
Project Title: Watts Water Technologies- Stairs/Egress Report date: 08/27/15
Data filename: Q:\2015\20150245 -WWT Stair Code Compliance Upgrade\0600 Electrical Design\603 Page 6 of 6
Lighting\20150245 Watts Stairwells COMCheck.cck
DATE(MM/DD/YYYY)
CERTIFICATE LIABILITY INSURANCE 06124/15
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
CONTACT
PRODUCER
Phone:781-935-8480 NAME:
DeSanctis Insurance Agcy,Inc. PH
Fax:7899335645 ONE
- - F
100 Unicorn Park Drive aC No Exti: Arc No
Woburn,MA 01801 E-MAIL
ADDRESS:
PRODUCER
CUSTOMER ID#:WIS EC-1
INSURER(S)AFFORDING COVERAGE NAIC#
INSURED Wise Construction Corp INSURER A:Liberty Mutual Insurance Cos.
21 East Street INSURERB:Associated Employers
Winchester,MA 01890
INSURER c:Nautilus Insurance Company 17370
INSURER D:American Insurance Company
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
/NSR TYPE OF INSURANCE ADD B POLICY EFF POLICY EXP LIMITS
LTR POLICY NUMBER MM/DDIYYYY MMIDD/YYYY
GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00
DAMAGE TO R5NTEU__
A X COMMERCIAL GENERAL LIABILITY TB2Z11261323025 06/27/15 06/27/16 PREMISES Ea occurrence $ 300,00
CLAIMS-MADE 1XI OCCUR MED EXP(Any one person) $ 10,00
X Per Project Agg PERSONAL E ADV INJURY $ 1,000,00
GENERAL AGGREGATE $ 2,000,00
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ 2,000,00
POLICY X PRO LOC $
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 11000,00
A X ANY AUTO AS2Z11261323015 06/27/15 06/27/16 (Ea accident)
BODILY INJURY(Per person) $
ALL OWNED AUTOS
BODILY INJURY(Per accident) $
SCHEDULED AUTOS
PROPERTY DAMAGE $
X HIRED AUTOS (Per accident)
X NON-OWNED AUTOS $
X UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 10,000,00
EXCESS LIAR CLAIMS-MADE AGGREGATE $ 10,000,00
A TH7Z11261323035 06/27/15 06/27/16
DEDUCTIBLE $
X RETENTION $ 10,000 1 $
WORKERS COMPENSATION X WC STATU- OTH-
AND EMPLOYERS'LIABILITY T R IM
B ANY PROPRIETOR/PARTNERIEXECUTIVE Y/N WCC50050135352015A 06/27/15 06/27/16 E.L.EACH ACCIDENT $ 11000,00
OFFICER/MEMBER EXCLUDED? N N/A
(Mandatory In NH) MA E.L.DISEASE-EA EMPLOYEE $ 1,000,00
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,00
C Pollution LlabCPL201193411 06!27/15 06127/16 Aggloccur 3mill1mil
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If more space Is required)
"ADDITIONAL INSURED LIMITS ARE NO GREATER THAN THOSE REQUIRED BY WRITTEN
CONTRACT." Evidence of Coverage
CERTIFICATE HOLDER CANCELLATION
EVIDE-1
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
EVIDENCE OF INSURANCE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESEN NE
I 6�
190-2009 ACORD CO O N. All rights reserved.
ACORD 25(2009109) The ACORD name and logo are registered marks of ACORD
Massac;husetts - Department of Public Safety
Board of Building €egulations and Standards
Con.,strurtion Supen iwor
CS-097661
ERIC S LIBBY
200 JEWETT ST= �'
GEORGETOWN MA 0183 -
a—'
;t,tk ,irtc;..r 08/09/2015
i