Loading...
HomeMy WebLinkAboutConsultant Review - 476 GREAT POND ROAD 7/18/1995 H 2 i L G F l,,l RRCHTTEC TEL : 1-802-767-3159 Jul 18 , 95 13 : 32 t%lo . 001 P .02 MEMO TO: - GAYLE AND ED NIEBURGER FROM: Robson Bilgen Architects, PC Paul R. Bilgen, Alt's DATE: July 18, 1995 Site Drainage at the New House and vicinity I. The site dMinago strategy for the next phase of work at the "Cottage" was done in association with H.W. Moore Associates of Boston, Mass utio are our Civil Engineering Consultants, Please refer to attached sketch. 2. The central drainage concerns are based on the following design decisions for the now and existing structures, a) The now house will be attached to the existing barn structure, at the site of the existing 2 2' x 2 2" horse barn. W The existing horse barn will be moved approximately 50 feet to the south and ro-:oriented to a now turn-around circle which will terminate the driveway. It will then be to-habilitated in keeping with its architectural character. Future use will be as a playhouse with some garden tool storage. 3.) The proposed turn-around will be paved 60 feet In diameter with an unpaved circle of plant material in the center which will contain a catch basin with a field InletZrating, This catch basin will pick up runnoff water from the viqP��y df ..........turnaround,,_" new house and roof water Kidbiin and 4) The elevation of the turn-around will be raised apprwdmatalv 12" abovo g. This will be done with cut material f r o,m ffe­b a-HIF—a at Iffii n,�0_Wsi,t-10 the horse barn. 5.) The south side of the driveway Will be raded from the new horse barn location to a point appro)dmately 80 feet east of the Cottage. This work will include m. drainage swafe_app_r`o_ mEft6W deep which will direct runnoff to a second ........... bottorn of the swale, just to the east of the now turn around. oes will od be remov ed eI d I in I tI h e I pro,cess. One is cur rently- a I d1 1 ly I damaged. I W ...'. " I Another interceptor swifa I s p r o po sed directly south of the relocated ­1 ho,r se This will pick up the sidohill drainage from the south and direct it to the West; around the now houseand then north to day W. on the north lave between 7.) Finally, atjpA i� catch basin will be converted ._o a manhole and its rim _�to . __.......... ..8....... . ..__........................... raised to the new turnaround circle elevation. The existIng " drain line w run f6'ffi, Ahird-h4w catch ba8in on th-9, north side of the turn around., betwen barn and wdsting garage. Catch basin number three will also take up water from a new trench drain in front of the existing garage. 8.) Please note that in addition to the surface drainage control techniques described above,, full foundation waterproofing and footing drains will also be employed on the house, barn and relocated horsebarn, END