HomeMy WebLinkAboutBuilding Permit # 9/23/2015 01 OORTH
BUILDING PERMIT
TOWN OF NORTH ANDOVER 0
APPLICATION FOR PLAN EXAMINATION
Permit No#: Date Received Arso
Date Issued: [PORTANT: Applicant must complete all items on this page
LOCATION J
Print
PROPERTY OWNER -5'T�ei��- S14,3o Za
Print 100 Year Structure yes
MAP PARCEL: ZONING DISTRICT: Historic District yes
Machine Shop Village yes ®r,
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
YNew Building [] QRe family
Li Addition Zfwo or more family 0 Industrial
0 Alteration No. of units: 11 Commercial
11 Repair, replacement [I Assessory Bldg 11 Others:
11 Demolition D Other
� ,, / e�/� / , ��, � ,,��/ iii
,,,,,�ll, ,wa4er/se�,er/��ri f/��/�„�f il��/,i�f����,�f%///;/�,l/D///////,
DESCRIPTION OF WORK TO BE PERFORMED:
I Ve a
Identific
Location 2 ��7
OWNER: Narne
-
No. Date
Address:
Contractor Name: TOWN OF NORTH ANDOVER
Email:
Address: 7 6 az,/o- 'All
Certificate of Occupancy $
Supervisor's Construction Licel i Building/Frame Permit Fee $
I
Home Improvement License:— Foundation Permit Fee
Other Permit Fee $
ARCHITECT/ENGINEER—C. TOTAL
Address/6,0
Check# A'ow
FEE SCHEDULE.BULDING PERMIT$ 0
Total Project Cost: $ I Bultding Inspector
Check No.:
NOTE: Persons contracting t1i unreg2riste ed c tractors do not have access to the
8kn
t%®RT#1
0%, w. , n o f
uuvull
®
0 0 ✓/
Af
ro LAKE h y ♦ er, ss, (/-J • 7
COC NIC M@WICK ��'
ATED
S U
OF—"IMr ' Rm T �T U BOARD OF HEALTH
Food/Kitchen
Septic System
�'d�v Ji,�iep��t7e �(� /1 BUILDING INSPECTOR
THIS CERTIFIES THAT ................................................................................... ... .........................I.........
' Foundation
has permission to erect g & ¢ '�er
.......................... buildings ......�'.....�.......��:.... .�c.i�.... ...�..........
Rough
s .
to be occupied as ...............��e(e")...g.Ai.iii, �........... �. :. .,[� .................................... Chimney
provided that the person accepting this permit shall in e�6ery respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT E IRE IN 6 MONTHS ELECTRICAL INSPECTOR
LESS CONSTRUCTION STARTS Rough
Service
................. ..:3 " :ra................................
Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy By Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approvedthe Building Inspector. Burner
Street No.
Smoke Det.
1ZREScheck Software N
Compliance Certificate
Project
Energy Code: 2012 IECC
Location: North Andover, Massachusetts
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,632 ft2
Glazing Area 10%
Climate Zone: g
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
Lot 3 Mathew's Way
North Andover,MA
Compliance: 5.1%Better Than Code Maximum UA: 217 Your UA: 206
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
rn e l o e k3semblies
r
Ceiling 1: Flat Ceiling or Scissor Truss 816 49.0 0.0 0.026 21
Wall 1:Wood Frame, 16" o.c. 1,856 21.0 0.0 0.057 92
Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 142 0.300 43
Door 1: Solid 60 0.190 11
Door 2: Glass 40 0.300 12
Floor 1:All-Wood joist/Truss:Over Unconditioned Space 816 30.0 0.0 0.033 27
Compliance Statement, The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to me E°tha�012 IECC requirements in
REScheck Version 4.6.1 and to comply with the mandatory requirements H d in the REScheck In ection Checklist.
c �cc
Name-Title SigtYature Date '
Project Title: Report date: 09/09/15
Data filename: C:\Users\Martha\Desktop\2011\Smolak- Lot 3 - Mathew's Way.rck Page 1 of 8