Loading...
HomeMy WebLinkAboutConsultant Review - 673 GREAT POND ROAD 9/28/2000 CIVIL ENGINEERS ® SURVEYORS 28 September 2000 Mr. Tim McIntosh , P.E. VHB, INC. 101 Walnut Street Watertown, MA 02471 RE: VHB No. 06716.23 673 Great Pond Road North Andover, MA Dear Mr. McIntosh: Per our telephone conversation on Wednesday, September 27, 2000, this correspondence addresses your seven (7) comments regarding the above referenced site, as follows: 1. Enclosed is a copy of the deed siting the prior owner's deed, dated January 25, 1994, prodating October 24, 1994. 2. We agree. 3. Erosion control measures are shown on the enclosed revised plan. 4. Engineer's stamp is on plan. 5. Enclosed find copies of the assessor's and flood plain maps, showing the subject premises being 900 feet and 800 feet, respectively. Also, the lake elevation is at elevation 116+ feet, and the subject addition is at elevation 175+ feet, which is 59+ feet above the lake. 6. All zones are now shown on the plan. 7. Per subsection 4g, a roof drain is designed to recharge the 300 square feet roof surface runoff into a leaching pit, as recommended by DEP Storm Water Management 'Progra,m. Hopefully, all comments have been addressed to your satisfaction. Thank you for expeditious telephone response and direction. Very truly yours, Robert MGill. , R.L.S. O RMG/j �nc./cc: Heidi Griffin, No. Andover Planning Department RobERT M .Cill & ASSOCiATES l 418 bRIdGE STREET • [OWER, MA 01850 TEIEPhONE: 978.452-6510 • FACSWIE: 978970.2078 TOWN OF NORTH ANDOVER PLANNING BOARD REVIEW OF SPECIAL PERMIT APPLICATION FOR CONFORMANCE WITH THE TOWN OF NORTH ANDOVER ZONING BYLAW&STANDARD ENGINEERING PRACTICE Location: 673 GREAT POND ROAD VHB No.: 06716.23 Owner: ICB Realty Trust Applicant: Robert&Glorianne Farnham Applicant's Engineer: Robert M. Gill,P.E.,R.L.S. Plan Date: 08-14-00 Review Date: 09-20-00 The Applicant submitted a site plan,special permit application and cover letter to VHB for review.The special permit submission was reviewed for conformance to the appropriate sections of the 1972 Town of North Andover Zoning Bylaw reprinted in 1998 and standard engineering practice. The following comments note non-conformance with specific sections and questions/comments on the proposed design. VHB offers the following comments: Section 4.136 Watershed Protection District 1. VHB assumes that this lot was created before October 24, 1994 and therefore the criteria in Table 2 of subsection 21 will apply. The Applicant's engineer should confirm when the lot was created. 2. Based on Table 2,the proposed addition falls within the Non-Discharge Buffer Zone. 3. Subsection 3.b.iv.requires that construction within the Non-Discharge Buffer Zone comply with best management practices for erosion,siltation and stormwater control in order to preserve the ground water and the lake. No best management measures are apparent on the plan. VHB recommends that erosion control measures like hay bales and silt fences be provided on the site plan. 4. The site plan was not stamped with a registered professional engineering stamp. The Applicant's engineer should stamp the plan. 5. Subsection 4.c.ii.1.requires that the annual high water mark of Lake Cochichewick be shown on the plans if the proposed activity is within 400 feet of the annual high water mark. It appears that the proposed addition is within 400 feet of Lake Cochichewick. The Applicant's engineer should either show the annual high water mark on the plan or confirm that the proposed activity is not within 400 feet of the annual high water mark. 6. Subsections 4.c.ii.3.,4.and 5.require that the Conservation Zone,Non-Disturbance Zone and Non- Discharge Zone be shown on the plan. VHB recommends that the Applicant' engineer show these lines on the plan. 7. Subsection 4.g.requires that runoff from impervious surfaces,to the extent possible,be recharged on site. VHB recommends that runoff from the roof of the proposed addition be directed to an underground leaching pit or chamber so that the runoff can infiltrate to the ground water. 0 1 T:\06716\dots\reports\671623reviewl.doc It is recommended that the applicant provide WRITTEN RESPONSES,as appropriate,to the issues and comments contained herein. kbReviewed by: Date: Timothy B.McIntosh,P.E. Senior Project Engineer—Highway and Municipal Engineering 2 T.\06716\docs\reports\671623reviewl.doc Transportation Land Development Environmental Services ® eroalgenatoart tr9reolrateea!n energy Creating results for our clients and benefits for our communities August 29,2000 Van1 se-Hange22_Brustlin...Inc _ Ref: 06716.20 Ms.Heidi A.Griffin,Town Planner Community Development&Services Town of North Andover 27 Charles Street North Andover,MA 01845 Re: #673 Great PondRoad Special Permit Review North Andover,MA Dear Heidi, Vanasse Hangen Brustlin,Inc. (VHB)has received Mr.Robert Gill's revised special permit plan(dated 9-28-00)which responds to our Engineering Review for the above referenced project. It appears that all of VHB's comments have been adequately addressed and VHB's concerns in this matter have been satisfied. No further engineering review is required at this time. If you have any questions or concerns,please call me at your convenience. Very truly yours, VANASSE HANGEN BRUSTLIN,INC. Timothy B. clntosh,P.E. Senior Project Engineer—Highway&Municipal Engineering cc: Mr.Robert Gill,P.E. 101 Walnut Street Post Office Box 9151 Watertown, Massachusetts 02471-9151 T;\0671623\does\(etters\673GreatPond-approv-082900.doc 177 924.1770 o FAX 611 Z 924. email: info @vhb.com www.vhb.corn