Loading...
HomeMy WebLinkAboutApproved Septic Plan - 29 GRANVILLE LANE 8/28/2015 North Andover Health Department Community and Economic Development Division August 28, 2015 Robert Lanigan 29 Granville Lane North Andover, MA 01845 Re: Subsurface Sewage Disposal System Plan for 29 Granville Lane(Map 106C,Lot 50) Dear Ms. Lanigan: The proposed wastewater system design plan for the above site dated July 10, 2015 with a final revision date of August 6, 2015 and received on August 7, 2015 has been approved. The design plan has been approved for use in the construction of a new on-site septic system for a 4-bedroom (max 9-room)home utilizing a gravity leach field. This design plan approval is valid until August 28, 2017. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. In the event an imminent health problem, such as sewage backup into the dwelling is occurring, the North Andover Board of Health may reduce the time period for which this plan is valid. At a regularly scheduled meeting of the Board of Health,this plan received the following approvals by the members. Local Upgrade Approvals: To reduce the separation distance from the soil absorption system to the estimated seasonal high ground water table from 5' to 4' Page 1 of 2 North Andover Health Department, 1600 Osgood Street, Suite 2035, North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476 29 Granville Lane August 28, 2015 This approval is also subject to the following conditions: 1. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation,the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit(3 10 CMR 15.020(1)) 2. It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. m erely, � Michele Grant Health Inspector Encl. Installers list cc: John Morin, P.E. File Page 2 of 2 North Andover Health Department, 1600 Osgood Street, Suite 2035, North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688.8476