HomeMy WebLinkAboutCorrespondence - 880 GREAT POND ROAD 12/13/2007 andover
consultants Methuen, East River Place
inc. Methuen, Massachusetts 01844
Tel. (978) 687-3828
Fax(978) 686-5100
Richard A. Nardella, Chairman
North Andover Planning Board
Town Offices
120 Main Street D
.#
North Andover, MA 01845
�y
ti
"'VER i
FLANNINU f)E 'ARTIAENT
December 13, 2007
r
RE: Watershed Special Permit Application–880 Great Pond Road
Dear Mr.Nardella,
Enclosed is an application for a Special Permit for the project at the address listed above.
The lot on which the project is proposed abuts Lake Cochichewick and is within the
Watershed Protection District. The project involves razing an existing single-family
dwelling and replacin ' with a new single-family dwelling. During a public hearing on
August 14, 2007 the ted a sitmensiaaaaa;the
Watershed Protection Districts Non-Disturbane Buffer2one-ofIhe.Zoning Bylaw
Section 4,paragraphs 4.136.3.c.ii.3 for relief from the setback requirement and from
4.136.3.c.ii 7-,for relieffrom-thv.-requirement that an.add tion or°expansion be.less.-than-
Aft—pe ce tgros floor,area.,Please:_see-.theattnched Notice-ofDecision.
The new dwelling has been located in the most feasible location. The proposed structure
will be more than 50 feet from the nearest Bordering Vegetated Wetland.Appurtenant
site grading has been minimized and no work is proposed within the 25-foot No-
Disturbance Zone. The existing public water and sewer services will be utilized to the
extent possible to further minimize disturbance to the site.
Measures have been taken to ensure that there will not be any degradation to the quantity
or quality of the groundwater. The elevation of the basement floor has been kept as high
as possible to help preserve the quality and natural flow of groundwater. Also,run-off
from the roof will be directed to an infiltration trench to recharge the groundwater and the
driveway will be constructed of individual pavers, instead of an impervious paved
surface,to allow infiltration. The existing vegetated buffer at the site will remain largely
the same as it exists now and the grounds surrounding the new structure will be mowed
or otherwise maintained grass and landscaping for the foreseeable future.
Civil Engineers • Land Surveyors • Land Planners
7cdo ov er
nsultants
inc.
The proposed structure will be located in the area of the existing dwelling and, given the
zoning and wetland setbacks, has been situated in the only practical location. The entire
lot is located within the Non-Discharge and Non-Disturbance Zones and there isn't a
more reasonable location for the proposed dwelling.The structure is proposed in a
location that allows the existing waterway at the site to continue to flow unaltered to the
Lake and preserves the quality of the surrounding wetlands.
A siltfence and haybale barrier is proposed at all down gradient locations. Construction
activities at the site are not expected to create elevated concentrations of nitrogen or other
potential chemical pollutants. When construction of the proposed dwelling has been
completed and the site has been stabilized it is expected that the site will have the same,if
not better, effect on the surrounding environment
Please do not hesitate to contact us with any questions or comments. Thank you.
Sincerely,
OVER CONSULTANTS,INC.
Patrick . Bower
Project Engineer.