Loading...
HomeMy WebLinkAboutCorrespondence - 880 GREAT POND ROAD 3/24/2008 andover 1 East River Place Consultants Methuen, Massachusetts 01844 Inc. Tel. (978) 687-3828 7 Fax(978) 686-5100 March 24, 2008 RECEIVED Richard A.Nardella, Chairman North Andover Planning Board APR 2®Qr� Town Offices NORTH ANDOVER 120 Main Street PLANNING DEPARTMENT North Andover,MA 01845 RE: 880 Great Pond Road—Special Permit Application Dear Mr. Chairman, The proposed project at 880 Great Pond Road offers significant improvements to the existing condition in regards to the quality of storm water runoff. Storm water drainage calculations show no significant change in the quantity of water directed toward Lake Cochichewick. Currently,the property is mowed grass and landscaping very near and in some places directly adjacent to existing wetlands. There are no methods of infiltrating roof runoff and there are no limitations on the type or quantity of fertilizers used on site. The proposed project,however, includes two infiltration trenches that will direct `clean' runoff from the roof into the groundwater and a pervious paver driveway that will provide additional infiltration benefits will replace the existing impervious,bituminous concrete driveway. Also, an aggressive enhanced planting schedule is proposed within the 25-foot no-disturbance zone and landscaping throughout the site will provide a superior level of treatment to storm water runoff. As part of the Landscape Plan, plantings have been chosen by the Landscape Architect to require minimal maintenance and to thrive without the need for commercial fertilizers or pesticides. A note on the proposed site plan prohibits the use of fertilizers during construction. Steven Eriksen of Norse Environmental Services,Inc., completed an analysis of the projected down-gradient concentrations of nitrogen,phosphorous and other relevant chemicals to be expected from redevelopment of the site. The investigation finds that there will be a slight reduction in the quantity of nitrogen and phosphorous export and that"redevelopment of the property will result in reduced nutrient export and a slight improvement in environmental benefits through infiltration and reduction in impervious surfaces". The report entitled, "Estimated Nutrient Loading Report 880 Great Pond Road North Andover, Ma."is attached. Civil Engineers • Land Surveyors . Land Planners andover //Tl consultants inc. Due to the improvements mentioned above and the findings of the report prepared by Mr. Eriksen,it is my opinion that there will be no significant degradation of the quality or quantity of water entering Lake Cochichewick as a result of the proposed project at 880 Great Pond Road. Please feel free to contact me at any time to discuss the project. Sincerely, ANDOVER CONSULTANTS,INC. �SN OF Mgssq\ WILLIAM S. g MacLEOD CIVIL y No. 31478 William S. MacLeod,P.E.,P.L.S. a A�°FF�FCIsTER����,�w� President s�ONAL ENG