HomeMy WebLinkAboutCorrespondence - 880 GREAT POND ROAD 4/7/2008 OPERATION AND MAINTENANCE PLAN #880 Great Pond Road RECEIVED North Andover,Mass. APR 7,'` 20081 NORTH ANOOVER Stormwater Management PLANNING()EPARTMENT 1. Inspection, maintenance and repair of the Stormwater Management System, including the pervious paver driveway, catch basin, roof drains, roof drain cleanouts/overflows, and infiltration trenches (if accessible) shall be the responsibility of the owner of the property(Owner). 2. During construction an Inspection and Maintenance Report form shall be completed daily by the Owner. The form shall be signed and filed on-site at a pre- designated location. 3. When construction is complete, Owner shall inspect the stormwater management system at least once every month, including visual inspection of the catch basin and roof drain cleanouts/overflows. The owner shall ensure that no portion of the stormwater management system is damaged,blocked or otherwise in a state that prevents its proper operation. 4. Owner shall ensure that silt and debris within the catch basin does not accumulate to a point at which the structure no longer functions as intended. Owner shall have the catch basin cleaned at least twice per year or when silt and debris accumulates to 1-foot within the sump. 5. Owner shall be responsible for regular maintenance of pervious paver driveway including removing any vegetation, silt or debris between individual pavers and otherwise ensuring that the infiltrating capabilities of the paver system are preserved. The Owner shall perform a visual inspection of the driveway once every month. Erosion and Sediment Control 1. During construction and until the entire site has been stabilized the Owner shall daily inspect the siltfence and haybale barrier for defect or excessive silt accumulation. An Inspection and Maintenance Report form shall be completed, signed and filed on-site at a pre-designated location. 2. Owner shall be responsible for immediately replacing any siltfence or haybale that is defective and removing any silt or debris that has accumulated. During Construction 1. During demolition of the existing dwelling,the existing driveway shall remain to provide a surface from which heavy equipment can work.Areas beyond the existing driveway that will be traveled over by heavy equipment shall be mulched. Upon completion of work,mulch shall be removed from the site. 2. All excavated materials shall be removed from the site at the time of excavation. No stockpiles of un-usable materials shall be permitted at the site. Loam stockpiles shall be surrounded at all down-gradient limits with a siltfence and haybale barrier. 3. All areas of disturbance shall be stabilized when work in the area is complete or will be delayed for more than two weeks. Areas shall be stabilized by seeding, mulching,planting or sodding. 4. All onsite vehicles shall be monitored for leaks and receive regular preventative maintenance to reduce the chance of leakage. Petroleum products shall not be stored on-site. Vehicles found to be leaking or defective shall be removed from the site immediately. 5. Materials and equipment necessary for spill cleanup shall be available on-site at all times. Any spills shall be cleaned immediately upon discovery and contaminated materials used during cleanup shall be disposed of off-site. Inspection and Maintenance Report 880 Great Pond Road Drainage Structure Condition Action Taken Driveway Catch basin Roof Drain Roof Drain Overflow East Roof Drain Overflow West Infiltration Trench East Infiltration Trench West Erosion/Sediment Location Condition Action Taken Control Device Siltfence Haybale Notes: Signed Date