HomeMy WebLinkAboutInspection - 40 NORTH CROSS ROAD 10/27/2015 i Sri �i,• IIJf❑❑❑ i l North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 40 North Cross Rd. MAP: 038.0 LOT: 0183 INSTALLER: Todd Bateson DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS E Outlet T and D-Box: DATE OF BED BOTTOM INS ECTION: �` ❑) � DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon tank has been installed H-10 loading ❑ Monolithic tank construction ❑ Water tightness of tank has been achieved by visual testing ❑ Inlet tee installed, centered under access port ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port F-1 Hydraulic cement around inlet & outlet Comments: PUMP CHAMBER ❑ Bottom of tank hole has 6" stone base ❑ Weep hole plugged ❑ 1500 gallon Pump Chamber installed ❑ H-10 loading ❑ Monolithic tank construction ❑ Inlet tee installed, centered under access port ❑ Pump(s) installed on stable base ❑ Alarm float working ❑ Pump On/Off floats working ❑ Separate on/off floats F-1 Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Water tightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits F-1 Alarm sounds when float is tripped ❑ Location of control panel: basement F-1 Alarm signal located inside: basement Comments: DISTRIBUTION-BOX ❑ Installed on stable stone base F-1 H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ❑ Hydraulic cement around inlet & outlets ❑ Observed even distribution ❑ Speed levelers provided (not required) F-1 Schedule 40 PVC Pipe Comments: 1 �' 9�n'� rt� " � 9 � ra � � f � �»➢ I VVy l/G3 G /y 9. fF �14 i e (I V. �I n ' it � r Ud r P." v 1 r r 'ff� / F. � F 1 �r 'y"kir r