Loading...
HomeMy WebLinkAboutConsultant Review - 1789 GREAT POND ROAD 5/25/1998 COLANTONIOZ ENGINGGAS AND 50ENTISTS May 25, 1998 Heidi Griffin Planning Board Town Hall Annex 27 Charles Street North Andover,NIA 01845 RE: Engineering Review Great Pond Road Lot `A' Special Permit for Watershed District Dear Ms. Griffin: In response to your request, Coler & Colantonio, Inc., has reviewed the requirements under the Zoning Bylaws relative to the Watershed District Special Permit for the above referenced project. The plan has been reviewed for conformance under these submittal requirements and standard engineering practice. The submittal package included the following information: Plan Entitled: ® "Plan of Land in North Andover, Mass" one sheet dated 5/5/99. Prepared by Atlantic Engineering. Received May 10, 1999_ Reports Entitled: e Letter of Submittal, Hydrology Report and Project Summary, Dated 5/5/99. Prepared by Atlantic Engineering. Received May 10, 1999. We offer the following comments: Zang law: 1. 4.136.)3.)b.)The proposed site runoff will discharge in the non-discharge buffer zone. 2. Section 4.136) 3.)c.)The proposed access drive,detention basin and utility connections are each located in the iron-disturbance buffer zone. 101 Accord Park Drive 781-982-5400 Norwell, MA 02061-1685 Fax: 781.982-5490 3. Section 8.3) 5.)e.)i.)The location map is not to scale, however the site can be located. 4. Section 8.3) 5.)e.)iv.)Utility easements, if any, should be indicated. 5. Section 8.3) 5.)e.)vi.)A zoning table,indicating compliance with the bylaw, should be provided. 6. Section 8.3) 5.)e.)vii.)Catch basins and manholes should provide a 4' sump. Test pits should be provided to indicate the depth high groundwater in vicinity of the proposed detention basin, CuItec recharger, house foundation and drywell. A detail should be provided for the proposed foundation drain and drywell. The location of the proposed Cultec Recharger should be indicated on the plan. The drainage calculations indicate a decrease of 0.12 acres in lot area under post construction conditions.The proposed 85' 10" PVC drain is indicated as discharging without treatment or erosion controls. It is unclear that runoff north of the proposed basin will be captured and channeled into the basin.The proposed basin discharge should be controlled and directed to the ultimate discharge point. Additional Comments: 7. A cross section detail should be provided of the proposed access drive. The proposed drive should be graded to facilitate runoff control. We appreciate the opportunity to assist the Planning Board on this project and hope that this information is sufficient for your needs. If you have any questions please do not hesitate to contact us. Very truly yours, COLER &COLANTONIO, INC. ohn Chessia,PE XC: Atlantic Engineering Jim Rand,DPW