HomeMy WebLinkAboutCertificate of Compliance - 759 DALE STREET 10/29/2015 PUBLIC HEALTH DEPARTMENT
Town of North Andover
Coimnunity Development Division
CERTIFICATE OF
COMPLIANCE
As o£ 10/29/15
This is to certify that the individual subsurface disposal system received a
SATISFACTORY INSPECTION of the:
Repair of D-Box
By: John DiVincenzo
759 Dale Street
Map 104.0 Lot 0162
r hndover,MA 01845
The I ance of this certific e- not be conshved as a guarantee that the system will function satisfacto ily.
< r C
Michete Grant
Public Health Agent
I
1600 Osgood Street,North Andover,Massachusetts 81845
Phone 978.688.9540 Fax 978.688.8476 Web www.lownofnofthandover.coni
North Andover Health Department
Community Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS.!- �- 4)u )r�.�✓'l MAP: LOT:
INSTALLER: I-Ar\
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN: hh
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer '......
❑ Topography not appreciably altered '...
Comments: '..
SEPTIC TANK
❑ Building sewer in continuous grade,on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6"stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
❑ Inlet tee installed,centered under access port
❑ Outlet tee installed,centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6"of finish grade
installed over one access port
❑ Hydraulic cement around inlet&outlet
Comments:
PUMP CHAMBER
❑ Bottom of tank hole has 6"stone base
❑ Weep hole plugged
❑ 1500 gallon Pump Chamber installed
❑ H-10 loading
❑ Monolithic tank construction
❑ Inlet tee installed,centered under access port
❑ Pump(s)installed on stable base
❑ Alarm float working
❑ Pump On/Off floats working
❑ Separate on/off floats
❑ Drain hole in pressure line
❑ cover at final grade installed over pump
access port
❑ Water tightness of tank has been achieved by
testing
❑ Hydraulic cement around inlet&outlet
Comments:
CONTROL PANEL
❑ Alarm&Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel:basement
❑ Alarm signal located inside:basement
Comments:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
❑ Inlet tee(if pumped or>0.08'/foot)
Hydraulic cement around inlet&outlets
❑% Observed even distribution
Speed levelers provided(not required)
Comments: