Loading...
HomeMy WebLinkAboutWaiver - 500 GREAT POND ROAD 2/8/2002 North Andover Country Club 500 Great Pond road North Andover, Ma. Planning Board of North Andover; The North Andover Country Club is planning a renovation of the existing pool facility on our property. Plans have been submitted to the Conservation Commission for their review. We would like to request a waiver of the watershed protection district special permit. This project is dealing with an existing structure; it will not expand the footprint of the facility; it will not disturb the existing topography; and it results in an upgrade of the drainage system which ties into the existing town sewer. Proper erosion control is shown on the enclosed plans. Thank you for your consideration. CL Of , 2� •��11 ',,. Thomas O. Childs on behalf of North Andover Country Club Feb. 8,2002 L ��� STEVEN J. 'IJ S Registered .Professional ,unitarian New Hampshire Designer Certified Soil Scientist Site Plans Wetland Scientist Soil Tests Wetland Delineations Soil Surveys Wetland Replication Plans Septic System Designs -1 o, n o North Andover Town Hall No . Andover , MA 8 Feb 02 Dear Sir , The proposed renovations at the North Andover Country Club entails resurfacing the existing pool apron as well as updating the mechanical functions of the pool . Since there will be no increase in the apron size nor increase in impery ious area , there will be no increase in run-off from the proposed construction . isra t3F Lyr°t FEB 1 '1 2002 NORT!_, PLANNING k:r r i MENT Sincerely , Steven J . D ' Urso 22 Lilly Pond Road STEVEN J. D'URS® Boxford, MA 01921 Environmental Designs (978) 352-9872 Mar 26 02 02: 41p rab 9786638288 p, 2 Custom Quality Pools, Inc 1.6 Wyman Road Billerica,MA 01821 (978)663-8290 Fax: (978)663-8288 3/5/02 North Andover Planning Board North Andover Country Club North Andover,Ma. 500 Great Pond Rd. No. Andover,Ma. To Whom It May Concern: Here is the tentative construction schedule for swimming pool restoration April 1 to 6. Remove and dispose of existing pool deck and prep pool for new plumbing. April; 8 to 12 Install new plumbing and run new undergound utilities. April 15 to 19 Install new offset stairway and start hydroblasting pool surface. Ari122 to 26.Complete hydroblasting and start final deck prep. April 29 to May 3 Set up new pool deck May 6 to May 10. Pour new concrete apron. May 13 to 17 Install new pool tile and install new filtration system. May 20 to 24 Clean,prep and piaster pool and truck fill with water. This schedule is weather dependent, bad weather will effect this timetable. If you have any questions or I can provide any additional information please Give me a call. Thank yo _ Robert A. Bent Pres. 03/08/02 FRI 11:46 FAX 978 688 9573 NORTH ANDOVER DPW Q001 TOWN OF NORTH ANDOVER DI`1ISI®N OF PUBLIC WORKS 384 OSGOOD STREET NORTH ANDOVER,MASSACFIU•SETTS 01 845-2909 J.WILLIAM HMURCL K,DIRECTOR,P.E. TilnothyJ. Willett F tow*„q Telephone(978) 685-0950 Staff.Engineer � `" "Og Fax(978)688-9573 Z # s March 8,2002 'SSackusES Ms. Jackie Byerly Interim Assistant Town Planner 27 Charles Street North Andover,MA 01845 RE:Proposed Sewer Line 500 Great Pond Road Dear Ms.Byerly: The Division of Public Works has reviewed and approved the plan of proposed sewer line for the swimming pool at the North Andover Country Club,dated January 29,2001 by Frank Giles. We have granted a sewer connection permit, dated March 8,2002, for this work. Our permit contains rules and regulations for the type, size,and slope of the pipe to be used,methods of construction,and other details. If you have questions,please contact this office. Very truly yours, Timothy J. i ett Staff Engineer CC:Bill Hmurciak Bob Beshara Julie Parrino Tom Childs 03/12/02 TUE 16:58 FAX 978 688 9573 NORTH ANDOVER DPW 16001 TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OSGOOD STREET NORTH ANDOVER,MASSACHUSETTS 01845-2909 1.WILLIAM HMURCIAK,DIRECTOR,P.E. Timothy J Willett Rrry Telephone(978) 655-0950 StgffEngineer 3� P`_•® �',•�"oL Fax(978) 688-9573 a m w March 12,2002 Ms.Jackie Byerly Interim Assistant Town Plarmer 27 Charles Street North A.udover,MA.01845 RE:North Andover Country Club Swimming Pool Sewer Connection Dear Ms.Byerly: The Division of Public Works supports the proposed sewer connection for the swimming pool to the town's sewer system for water quality reasons. Preventing water that has a high concentration of chlorine and other chemicals from entering Lake Cochichewick is a vital part of Water Source Protection, and certainly makes good environmental sense. The American Water Works Association(AW WA)actually has regulations in place for the de- chlorinization of highly chlorinated water before it can be discharged into the environment. There are many recorded cases of excessive chlorine killing fish and other wildlife species in streams and p9nds. Very truly yours, f Timoth J. Willett Staff Engineer Town of North Andover f ,,ORTH q 3 :•6 - a 4o office of the Planning Department - Community Development and Services Division 27 Charles Street * • �'�� North Andover,Massachusetts 01845 "SSACHUS���� Telephone(978)688-9535 Fax(978)688-9542 Memorandum To: Michael McGuire,Building Inspector From: Jacki Byerley,Interim Assistant Town Plannel Date: 4/1/02 t� Re: North Andover Country Club At the Planning Board meeting of March 26,2002,the Planning Board voted to a watershed special permit waiver for North Andover Country Club. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PL NT ING 688-9535