HomeMy WebLinkAboutConsultant Review - 500 GREAT POND ROAD 8/4/2000 DEWSNwP ENGINEERING a17? 36SoS P. 01
surwyo�s' Dewsnap Engineering Associates
E11'Kineeis 178 Lincoln Avenue Saugus, MA 01906
EnvironmenralSpecialisrs Phone: (781)233-0595 Pax: (7$1)231-5521
Planners
August 4, 2000
Conservation Commission & Planning Board
Town of North Andover Town of North Andover
120 Main Street 120 Main Street
North Andover, MA 01846 North Andover, AAA 01645
RE: As-Built "Follow up"
DEP Fite No. 242-948
North Andover Country Club
500 Great Pond Road
Dear Conservation Commission and Planning Board members;
This letter is a follow up of a letter sent to you on December 16, 1999 regarding an Ala-Built for
work performed on the parking area adjacent to the platform tennis courts.
On July 31, 2000, Mr. Richard Hornidge, member of the North Andover Country Club.
contacted this office and indicated that the three (3)items noted within the December 16, 1909
letter has been completed_
This office visited the site on August 2, 2000 and found by visual inspection that the items
outlined within the December 16, 1999 letter have been performed. They are as follows:
1. The forebay/detention area has been seeded and ground cover has taken hold;
2_ The tee manifold within the catch basin has been fitted with a cap;
3. The smaller stones at the pipe outlet, forebay outlet and detention outlet has been
replaced with 4"stone.
Sincerely,
Duawsnap Engineering Associates
1 41 a -
aul A Dewsnap
Project Engineer
DEWSNAP ENGINEERING 6172SS0595 P® 62
Surveyors Dewsnap Engineering ss cia es
Engineers 178 Lincoln Avenue - Saugus, MA 01906
Environmental5pecialisis Phone: (781)233-0595 Fax: (781)231-5521
Planners
December 16, 1999
Conservation Commission & Planning Board
Town of North Andover Town of North Andover
120 Main Street 120 Main Street
North Andover, MA 01845 North Andover. MA 01845
Pe- "As-Bunt"
DEP File No. 242-946
North Andover Country Club
500 Great Pond Road
Dear Conservation Commission& Planning Board Members:
This office performed an"As-Bunt"survey on December 8. 1999 at the North Andover Country
Club property_ The "As-Bunt'depicts the newly paved area across the street from the
clubhouse next to the platform tennis courts.
The newly paved area and associated drainage system generally conforms with the approved
design plans for this project.
During the survey the following was noted:
I. The forebay/detention area was not seeded. Hay has been spread around the berm
of the forebay/detention area to stabilize it from the effects of erosion during the winter.
Mr. Richard Hornidge,of the North Andover Country Club, indicated that the forebay/
detention area will be seeded in the spring of 2040. Seeding will be done as indicated
on the proposed plan approved by the Conservation Commission and the Planning
Board. The hay bates&environmental fencing, already in place, shall be kept in good
working order until vegetation has been established.
2. The tee manifold within the catch basin has not been f+tted with a cap. Mr. Homidge
indicated that the cap was on order and it wit be installed as soon as R is received.
3. The stones at the pipe outlet,the forebay outlet, and detention area outlet are 2
inches in diameter. The proposed plan calls for inch minimum diameter stone. The
stones should be removed and replaced with 4 inch stone.
A representative of the North Andover Country Club will address the Conservation Commission
and Planning Eloard when the above items have been completed.
Attached with this letter is a blueprint of the 'As-Built" survey depicting the newly paved parking
I driveway area and the drainage system.
DEWSHAP ENGINEERING Po0-3
Re. "As®Rui(t" December 16, 1999
DEP File No. 242-948 Page 7,
North Andover Country Club
504 Great Bond Road
$Incerelyv,
Dawsnap Engineering Associates
6Q4 ,41
Paul A. De nap
Project Engineer
a�
-tederick®. Dewanap. P.E.
General Manager
Surveyors Dewsnap Engineering Associates
Engineers 178 Lincoln Avenue - Saugus, MA 01906
Environmental Specialises Phone: (781)233-0595 Fax: (781)231-5521
Planners
December 16, 1999
Conservation Commission & Planning Board
Town of North Andover Town of North Andover
120 Main Street 120 Main Street
North Andover, MA 01845 North Andover, MA 01845
Re: "As- Built"
DEP File No. 242-948
North Andover Country Club
500 Great Pond Road
Dear Conservation Commission & Planning Board Members:
This office performed an "As- Built" survey on December 8, 1999 at the North Andover Country
Club property. The "As- Built" depicts the newly paved area across the street from the
clubhouse next to the platform tennis courts.
The newly paved area and associated drainage system generally conforms with the approved
design plans for this project.
During the survey the following was noted:
1. The forebay/detention area was not seeded. Hay has been spread around the berm
of the forebay/detention area to stabilize it from the effects of erosion during the winter.
Mr. Richard Hornidge, of the North Andover Country Club, indicated that the forebay/
detention area will be seeded in the spring of 2000. Seeding will be done as indicated
on the proposed plan approved by the Conservation Commission and the Planning
Board. The hay bales& environmental fencing, already in place, shall be kept in good
working order until vegetation has been established.
2. The tee manifold within the catch basin has not been fitted with a cap. Mr. Hornidge
indicated that the cap was on order and it will be installed as soon as it is received.
3. The stones at the pipe outlet, the forebay outlet, and detention area outlet are 2
inches in diameter. The proposed plan calls for 4 inch minimum diameter stone. The
stones should be removed and replaced with 4 inch stone.
A representative of the North Andover Country Club will address the Conservation Commission
and Planning Board when the above items have been completed.
Attached with this letter is a blueprint of the "As- Built"survey depicting the newly paved parking
/driveway area and the drainage system.
Re: "As- Built" December 16, 1999
DEP File No. 242-948 Page 2
North Andover Country Club
500 Great Pond Road
Sincerely,
Dewsnap Engineering Associates
Paul A. Dewsnap
Project Engineer
Fr dericl D. Dewsnap, P.E.
General Manager