Loading...
HomeMy WebLinkAboutDecision - 6 WOODBERRY LANE 4/23/1990 MUM fflfl TOWN OF NORTH ANllOVEIt Dt;i{tl {_ L 'iG MASSACHUSETTS TO`^'tlt,l_E'iY� o� NOR 1„ 9 25 appeal shall be filed Any apP within (20) days after the date of filing of this Notice In the Office of the Town NOTICE OF DECISION Clerk. Date ,April ,23: 1990 Date of llearingApr�X. X9,,1990, , , Petition Of . . . Patricia Rennicke. • . . ' � , . • . , , . . . . . . . . • . . • . . . . . . , • , , , ' . . . . . . . . 6 Premises affected , . . . . . . . . . Lane . . . . . . , . .. , • . Referring to the above petition for a special permit from the recluiremerlts of the North Andover Zcninq• BXlaws •Section ,4;135. .. Watershed•District • • • „ • , . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . so as to permit ,the•construction of, an.addition to an existing,structure within 69 feet of a wetland area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above elate, the Planning Board voted CONDITIONALLY to 4-WM i . . . . . . . . .the . .SPECIAL PERMIT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . based upon the following conditions cc: Director of Public Works Board of Public Works Signed Highway Surveyor Building Inspector George Perna,. . r.:.Chairman . , . , . . . . . . . . . . . . . . . Board of Health Conservation Commission John .Simons:. Clerk. . . . . . . . . . . . . . . Assessors Police Chief Erich Nitzsche. , . . . . . , . Fire Chief Applicant Jack ,Graham Engineer File, Interested Parties OF NORiN 1 OFFICES OF: os: "' �° Town Of 120 Main Street North Andover BUILDING NORTH ANDOVER - Massachusetts 01845 CONSERVATION HEALTH c"usE`� DIVISION OF (508)68246483 PLANNING PLANNING & COMMUNITY DEVELOPMENT' KAREN H.P. NELSON, DIRECTOR April- 23 , 1990 Mr. Daniel Long Town Clerk Town Hall 120 Main Street North Andover Re : Special Permit Watershed District, Patricia Rennicke , 6 Woodberry Lane Dear Mr. Long : The North Andover Planning Board held a public hearing on April 5 , 1990, upon the application of Patricia Rennicke , 6 Woodberry Lane , North Andover, requesting approval of a Special Permit under Section 4 . 135 of the North Andover Zoning Bylaw. The hearing was duly advertised in the North Andover Citizen on March 22 and March 29 , 1990 and all parties of interest were properly notified . The following members were present: George Perna, Jr . , Chairman, John Simons, Clerk, Erich Ni.tzsche and John Draper . Jack Graham was absent. The applicant is seeking approval of a Special Permit to construct an addition to the existing structure within 69 feet of a wetland area. The premises affected is located on the North side of Woodberry Lane , known as 6 Ydoodber_ ry Lane , in a Residential-3 ( R--3 ) Zoning District and Lake Cochichewick Watershed Overlay District, containing 40, 602 sq. ft. with frontage of 150 . 6 feet . For the record John Simons did not. participate in the discussion for 6 Woodberry Lane as the applicants and the Simons are friends . John Draper read the legal notice to open the public hearing . Mr. Rennicke spoke to the Planning Board on the application before them. He stated that the Conservation will not monitor the proposed construction of an addition . Hay Bales will be placed at the site . The applicant stated that they gill be connecting to the sewer on Marbleridge Road. A motion was made by Erich Nitzsche to continue the public hearing to April 19 , 1990 and direct the Planner to draft conditions including 1 . ) abandon the septic system and connect with the sewer on Marbleridge Road; 2 . ) loam and see construction road ; 3 . ) Hay bales will be placed; 4 . ) only if a variance is granted from the Zoning Board of Appeals ; 5 . ) all debris will be taken care of around the site . The motion was seconded by John Draper and voted unanimously by those present, including John Simons . Page 2 : On April 19 , 1990 the Planning Board held a regular meeting in the Town Hall , Selectmen ' s Ifeeting Room. The following members were present: George Perna, Erich Nitzsche and John Simons . Jack Graham arrived at 9 : 00 p. m . John Simons read the notice of decision from the Zoning Board of Appeals. No variance was required . The addition will be less than 50% of the existing structure . Mr. Rennicke had questioned on Condition #3 and Condition #10 . Those conditions were clarified. Condition number 5 of Finding of Facts will be clarified by stating the reason for the Board approving this Special Permit being the applicants are connecting to a sewer . A motion was made by Erich Nitzsche that the Planning Board approve the Special Permit for construction in the Watershed Protection District under the Zoning Bylaw, Section 4 . 135 for Patricia Rennicke , 6 Woodberry Lane in accordance with the draft decision before the Board and amending Finding of Facts #5 to reinforce that the applicant is eliminating an on-site sanitary system and tying into the sewer system which is one of the reasons the Planning Board is approving this application, and within the same motion make a motion to close the public hearing . The motions were seconded by John Simons and voted unanimously by those present including the Chairman. Those conditions are attached . Sincerely , PLANNING BOARD George erna, Jr. , airah attachment CC : Director of Public Works Board of Public Works Highway Surveyor Assessors Building Inspector Conservation Commission Board of Health Police Chief Fire Chief Applicant Engineer File PATRICIA RENNICKE 6 WOODBURY LANE SPECIAL PERMIT FOR CONSTRUCTION WITHIN THE WATERSHED PROTECTION DISTRICT. ZONING BYLAW, SECTION 4.135 FINDINGS OF FACT: The Planning Board makes the following findings regarding this Special Permit as required by section 4 . 135 of the Zoning Bylaws: 1. . The proposed use and site design for this lot are appropriate, due to it' s location in Town. 2 . Adequate vehicular and pedestrian access into the surrounding site has been provided for. 3 . The applicant has met the requirements of the Town for a Special Permit as stated in Section 4 . 135 of the Zoning in g Bylaw. 4 . Adequate and appropriate facilities will be provided for the proper operation of the proposed use. 5. This application for construction or regrading within the Watershed Protection District, Section 4 . 135 of the North Andover Zoning Bylaw, was specifically granted for construction or regrading within 100 ' of a tributary to Lake Cochichewick. Specific reasons why the Planning Board believes that this application has met the requirements under section 4 . 135 include: a. The application is only for the construction of an addition to an existing home. It will not involve any additional bathrooms, showers or other related uses. b. The applicant will disengage an existing septic system on the lot and will tie into the town sewer system. The net effect of this conversion will be to reduce the potentially adverse impact on the water supply. C. The applicant has provided an adequate erosion control and construction activity plan that will minimize any potential impacts of the construction on the Town' s water supply. The Planning Board finds under Section 4 . 135 of the Zoning Bylaw that the proposed site plan generally complies with the Town Bylaw requirements but requires minor conditions in order to be completely in compliance with Town Bylaws. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions which shall be submitted to the Board prior to signing the documents to be filed with the North Essex Registry of Deeds. SPECIAL CONDITIONS: 1. This decision shall be filed with the North Essex Registry of Deeds. Included as part of this decision are the following plans: PLAN OF LAND IN NORTH ANDOVER, MA. OWNED BY PATRICIA Q. RENNICKE DATED: 3/1/90 PREPARED BY: SCOTT L. GILES R. L.S . NORTH ANDOVER, MASS. All plans shall be on 24" x 36" sheets 2 . All Planning Board Order of Conditions, issued herein, are to be placed upon the recorded Final Plans, ( Cover Sheet ) prior to endorsement and filing with the Registry of Deeds. 3 . A final set of plans shall be drawn with regard to the conditions contained herein. The Plans shall be submitted to and approved by the Planning Board prior to endorsement and filing with the North Essex Registry of Deeds. 4 . The Determination issued by the North Andover Conservation Commission, Dated 3/29/90, Shall be considered as part of this decision. 5. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 6. Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies. 7 . All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 8. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 9. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 10. Prior to the Building Permit being issued for the structure and again prior to occupancy of the structure, the applicant shall receive a written determination from the Conservation Administrator that all work being done under the jurisdiction of the Conservation Commission is being satisfactorily performed and maintained. 11. The provisions of this conditional approval shall apply to and be binding upon the applicant, it' s employees and all successors and assigns in interest or control. 12 . This Special Permit is granted with the understanding that the applicant is tying into the existing -sewer system and shall disengage the septic system found on site in accordance with the rules and regulations of the North Andover Board of Health. 13 . Prior to the issuance of a Building Permit the applicant shall establish proper hay bales and other sedimentation protection as required and approved by the North Andover Conservation Commission. 14 . Construction vehicles shall be limited to the proposed access road shown on the plan on file with the Planning Board. Building Materials shall only be stored as shown on the same plan. Prior to the applicant receiving a Certificate of occupancy all areas disturbed by construction activity shall be regraded, loamed and seeded. cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Assessors Conservation Commission Police Chief Fire Chief Applicant Engineer File